RU2687357C1 - Installation for snow thawing - Google Patents

Installation for snow thawing Download PDF

Info

Publication number
RU2687357C1
RU2687357C1 RU2018123031A RU2018123031A RU2687357C1 RU 2687357 C1 RU2687357 C1 RU 2687357C1 RU 2018123031 A RU2018123031 A RU 2018123031A RU 2018123031 A RU2018123031 A RU 2018123031A RU 2687357 C1 RU2687357 C1 RU 2687357C1
Authority
RU
Russia
Prior art keywords
chamber
melting
receiving
installation
screw
Prior art date
Application number
RU2018123031A
Other languages
Russian (ru)
Inventor
Александр Юрьевич Скрябин
Виктор Аджиевич Онкаев
Лев Николаевич Фесенко
Original Assignee
Общество с ограниченной ответственностью научно-производственное предприятие "ЭКОФЕС"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью научно-производственное предприятие "ЭКОФЕС" filed Critical Общество с ограниченной ответственностью научно-производственное предприятие "ЭКОФЕС"
Priority to RU2018123031A priority Critical patent/RU2687357C1/en
Application granted granted Critical
Publication of RU2687357C1 publication Critical patent/RU2687357C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice

Abstract

FIELD: municipal services.SUBSTANCE: invention relates to means of processing snow mass removed from urban territories by forced melting. Installation for snow thawing includes receiving, melting and vortex chambers. Receiving chamber is equipped with screw. Perforated screw shaft is made in the form of a flame tube. Perforated fire tube with grate with holes is rigidly fixed in melting chamber. On the outer side of the front wall of the receiving chamber there is a rotating screw. In the lower part of the front wall there is a gate. Shutter closes neck for removal of dirt and solid wastes. Rear part of the screw has a knife. Knife adjoins the grate with holes. Behind rear wall of melting chamber there is vortex chamber. Vortex chamber is equipped with an air blower, a tangential fuel feed branch pipe and an electric bladder. Under the receiving and melting chambers there is a pan for collecting melt water.EFFECT: higher efficiency coefficient of installation with simultaneous increase of its reliability.5 cl, 1 dwg

Description

Изобретение относится к средствам переработки убираемой с городских территорий снежной массы путем ее принудительного таяния.The invention relates to the processing of the snow mass removed from urban areas by its forced melting.

Известна установка для переработки снежно-ледяных образований, убираемых с дорожной поверхности, включающая камеру для приема снежно-ледяной массы и ее плавления. Внутри камеры располагается система перфорированных труб, расположенных в вертикальной и горизонтальной плоскости для подачи нагретой жидкости. Кроме того, имеется измельчитель снежной массы, в который эта масса попадает через горловину и далее в приемную камеру (см. патент RU №2290471 Е01Н 5/00, Е01Н 5/10).A device is known for processing snow-ice formations removed from the road surface, including a chamber for receiving snow-ice mass and its melting. Inside the chamber is a system of perforated pipes located in the vertical and horizontal plane for supplying the heated fluid. In addition, there is a grinder of snow mass, into which this mass enters through the neck and then into the receiving chamber (see RU Patent No. 2290471 Е01Н 5/00, Е01Н 5/10).

Недостатком данного устройства является низкий КПД обусловленный малыми размерами камеры с измельчителем и низкая надежность устройства обусловленная возможностью забивки грязесборника твердыми отходами и проблематичностью его очистки.The disadvantage of this device is the low efficiency due to the small size of the chamber with a grinder and the low reliability of the device due to the possibility of clogging the waste collector with solid waste and the difficulty of cleaning it.

Известна установка для таяния снега, содержащая камеру нагрева, горелку, источник топлива и воздуходувку, вихревую камеру и жаровую трубу (см. патент RU №2484199 Е01Н 5/10).Known installation for melting snow, containing a heating chamber, a burner, a fuel source and a blower, a vortex chamber and a fire tube (see patent RU No. 2484199 Е01Н 5/10).

Недостатком данной установки является низкий КПД, обусловленный плотной массой снега, сброшенного в камеру нагрева и требующий значительного расхода тепла для таяния снега, а также низкая надежность, обусловленная отсутствием грязесборника для удаления мусора.The disadvantage of this installation is low efficiency, due to the dense mass of snow thrown into the heating chamber and requiring significant heat consumption for melting snow, as well as low reliability, due to the absence of a dirt collector to remove debris.

Наиболее близким к предлагаемой установке для таяния снега является способ плавления снега (см. патент RU №2337207 Е01Н 5/10). Установка для осуществления способа содержит приемный бункер, устройство для измельчения снега, снегоплавильную камеру, набор шнеков установленных в снегоплавильной камере, поддон, устройство для сбора твердых отходов.The closest to the proposed installation for melting snow is a method of melting snow (see patent RU № 2337207 Е01Н 5/10). Installation for implementing the method includes a receiving hopper, a device for grinding snow, a snow melting chamber, a set of screws installed in a snow melting chamber, a pallet, a device for collecting solid waste.

Измельчение снега до указанных размеров (1-10 мм) требует определенных затрат времени, а само устройство для измельчения снега является помехой свободному проходу снежной массы в снегоплавильную камеру. Не исключена возможность забивки трубопровода твердыми отходами не прошедшими через щелевые отверстия. Кроме того, данное устройство имеет невысокий КПД, зависящий от количества расходуемой горячей воды и высокие потери тепла на излучение во внешнюю среду, а также низкую надежность, обусловленную возможностью забивки трубопровода, подающего твердые отходы в устройство для сбора отходов.Grinding snow to the specified size (1-10 mm) requires a certain amount of time, and the device for grinding snow is an obstacle to the free passage of snow mass into the snow melting chamber. The possibility of blocking the pipeline with solid waste that does not pass through the slot holes is not excluded. In addition, this device has a low efficiency, depending on the amount of consumed hot water and high heat loss due to radiation into the external environment, as well as low reliability due to the possibility of blocking the pipeline feeding solid waste to the waste collection device.

Технический результат, достигаемый предлагаемым изобретением, состоит в повышении коэффициента полезного действия установки при одновременном повышении ее надежности.The technical result achieved by the invention, is to increase the efficiency of the installation while increasing its reliability.

Указанный технический результат достигается тем, что установка для таяния снега содержит последовательно установленные приемную, плавильную и вихревую камеры, причем приемная камера снабжена шнеком, перфорированный вал которого выполнен в виде жаровой трубы. В плавильной камере жестко закреплена перфорированная жаровая труба с решеткой с отверстиями. С внешней стороны передней стенки приемной камеры расположен двигатель вращающий шнек, а в нижней части передней стенки расположена заслонка, закрывающая горловину для удаления грязи и твердых отходов. Задняя часть шнека имеет нож, примыкающий к решетке с отверстиями. За задней стенкой плавильной камеры расположена вихревая камера оснащенная воздуходувкой, тангенциальным патрубком подачи горючего, электрозапальником. Под приемной и плавильной камерами располагается поддон для сбора талой воды.This technical result is achieved by the fact that the installation for melting snow contains successively installed receiving, melting and vortex chambers, and the receiving chamber is equipped with a screw, the perforated shaft of which is made in the form of a flame tube. A perforated flame tube with a grid with holes is rigidly fixed in the melting chamber. On the outer side of the front wall of the receiving chamber there is an engine rotating auger, and in the lower part of the front wall there is a damper covering the neck to remove dirt and solid waste. The back of the auger has a knife adjacent to the grill with holes. Behind the rear wall of the melting chamber there is a vortex chamber equipped with a blower, a tangential fuel supply nozzle, and an electric igniter. Under the receiving and melting chambers there is a pan for collecting melt water.

Существо заявленного изобретения поясняется технологической схемой, изображенной на Фиг. 1The essence of the claimed invention is illustrated by the technological scheme shown in FIG. one

Установка для таяния снега, содержит последовательно установленные приемную 1, плавильную 2 и вихревую 3 камеры. Приемная камера 1 снабжена шнеком 4, перфорированный вал 5 которого выполнен в виде жаровой трубы. В плавильной камере 2 жестко закреплена перфорированная жаровая труба 6 с решеткой 7 с отверстиями. За передней стенкой 8 приемной камеры 1 расположен двигатель 9, вращающий шнек 4 с валом 5. В нижней части стенки 8 располагается заслонка 10, через которую производится удаление грязи, а задняя часть шнека 4 имеет нож 11 примыкающий к решетке 7. За задней стенкой 12 плавильной камеры 2 расположена вихревая 3 камера, оснащенная воздуходувкой 13,тангенциальным патрубком 14 подачи горючего, электрозапальником 15. В нижней части стенки 12 имеется патрубок 16 для слива талой воды, а под камерами 1 и 2 расположен поддон 17 для сбора талой воды.Installation for melting snow, contains sequentially installed receiving 1, melting 2 and vortex 3 chambers. The receiving chamber 1 is equipped with a screw 4, the perforated shaft 5 of which is made in the form of a flame tube. In the melting chamber 2, a perforated flame tube 6 with a grid 7 with holes is rigidly fixed. Behind the front wall 8 of the receiving chamber 1 is the engine 9, rotating the screw 4 with the shaft 5. In the lower part of the wall 8 is located a valve 10 through which dirt is removed, and the back of the screw 4 has a knife 11 adjacent to the grill 7. Behind the rear wall 12 the melting chamber 2 has a vortex chamber 3 equipped with a blower 13, a tangential fuel supply nozzle 14, an electric fuse 15. In the lower part of the wall 12 there is a nozzle 16 for draining the melt water, and under the chambers 1 and 2 there is a pallet 17 for collecting melt water.

Установка работает следующим образом. Снежную массу, убираемую с дорожной поверхности подают в приемную камеру 1. Открывают подачу воздуха через воздуходувку 13 и подачу топлива через тангенциальный патрубок 14. Воздух и топливо смешиваются в вихревой камере 3, образуя топливовоздушную смесь, которая закручивается и далее поступает в жаровую трубу 6 и перфорированный вал 5. Закрученную в вихревой камере 3 топливовоздушную смесь поджигают электрозапальником 15. При горении закрученной топливовоздушной смеси, в жаровой трубе 6 и в трубе вала 5 образуется протяженный пламенный жгут, под воздействием которого происходит равномерный нагрев этих труб. Жаровая труба 6 излучает тепло в плавильную камеру 2, а вал 5 - в приемную камеру 1, причем излучение тепла происходит как через поверхность труб, так и через их перфорацию.The installation works as follows. The snow mass removed from the road surface is fed into the receiving chamber 1. The air supply is opened through the blower 13 and the fuel supply through the tangential nozzle 14. Air and fuel are mixed in the vortex chamber 3, forming a fuel-air mixture, which twists and then enters the fire tube 6 and perforated shaft 5. The air-fuel mixture swirling in the vortex chamber 3 is ignited by an electric igniter 15. When burning the air-swirling air-fuel mixture, a flame flame is formed in the flame tube 6 and in the tube shaft 5, under the influence of which uniform heating of these pipes occurs. The flame tube 6 emits heat into the melting chamber 2, and the shaft 5 into the receiving chamber 1, and the radiation of heat occurs both through the surface of the tubes and through their perforation.

После включения двигателя 9 происходит вращение шнека 4 и продвижение снежной массы с последующим проталкиванием ее сквозь отверстия решетки 7 в плавильную камеру 2. В результате расслоения снежной массы, растапливание ее происходит гораздо быстрее. Талую воду через патрубок 16 сливают в поддон 17 который является отстойником-накопителем. Талая вода является очень мягкой водой, с минимальным содержанием солей жесткости и может быть направлена на электролиз с последующим получением гипохлорита натрия. (дезинфектанта)After turning on the engine 9, the screw 4 is rotated and the snow mass advances and then is pushed through the holes of the grid 7 into the melting chamber 2. As a result of the snow mass stratification, it melts much faster. The melt water through the pipe 16 is poured into the pan 17 which is a sump-drive. Melt water is very soft water, with a minimum content of hardness salts and can be sent for electrolysis with subsequent production of sodium hypochlorite. (disinfectant)

Чтобы в ходе переработки снежной массы содержащиеся в ней бытовые отходы, механические включения не забивали отверстия в решетке 7, на валу 5 шнека 4 предусмотрен нож 11 примыкающий к решетке 7 и в процессе вращения срезающий все механические включения, прилипшие к решетке. Для удаления отходов, скопившихся в приемной камере 1, открывают заслонку 10 в нижней части стенки 8, включают реверс двигателя 9 и шнек 4 вращаясь в обратную сторону выталкивает скопившиеся отходы из приемной камеры 1.So that during the processing of snow mass contained in its household waste, mechanical inclusions do not clog the holes in the grill 7, on the shaft 5 of the screw 4 there is a knife 11 adjoining the grill 7 and cutting off all the mechanical inclusions stuck to the grill during the rotation. To remove waste accumulated in the receiving chamber 1, open the valve 10 in the lower part of the wall 8, turn on the reverse of the engine 9 and the screw 4 rotating in the opposite direction pushes the accumulated waste from the receiving chamber 1.

Claims (5)

1. Установка для таяния снега, содержащая приемную, плавильную, вихревую камеры, жаровую трубу, источник топлива и воздуходувку, отличающаяся тем, что приемная камера снабжена шнеком, вал которого выполнен в виде перфорированной жаровой трубы с ножом, а в плавильной камере расположена жаровая труба и решетка с отверстиями.1. Installation for melting snow, containing the receiving, smelting, vortex chambers, flame tube, fuel source and blower, characterized in that the receiving chamber is equipped with a screw, the shaft of which is made in the form of a perforated flame tube with a knife, and in the melting chamber there is a flame tube and grill with holes. 2. Установка по п. 1, отличающаяся тем, что расположенные в плавильной камере решетка с отверстиями и жаровая труба закреплены жестко.2. Installation under item 1, characterized in that the grid with holes and the heat pipe are located in the melting chamber. 3. Установка по п. 1, отличающаяся тем, что с внешней стороны передней стенки приемной камеры расположен двигатель, вращающий шнек, а в нижней части передней стенки расположена заслонка, закрывающая горловину для удаления грязи и твердых отходов.3. Installation under item 1, characterized in that on the outer side of the front wall of the receiving chamber is the engine, rotating the auger, and in the lower part of the front wall is a valve that closes the neck to remove dirt and solid waste. 4. Установка по п. 1, отличающаяся тем, что нож шнека примыкает к решетке с отверстиями.4. Installation under item 1, characterized in that the auger knife adjacent to the grid with holes. 5. Установка по п. 1, отличающаяся тем, что под приемной и плавильной камерами располагается поддон для сбора талой воды.5. Installation under item 1, characterized in that under the receiving and smelting chambers is a pan for collecting melt water.
RU2018123031A 2018-06-25 2018-06-25 Installation for snow thawing RU2687357C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018123031A RU2687357C1 (en) 2018-06-25 2018-06-25 Installation for snow thawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018123031A RU2687357C1 (en) 2018-06-25 2018-06-25 Installation for snow thawing

Publications (1)

Publication Number Publication Date
RU2687357C1 true RU2687357C1 (en) 2019-05-13

Family

ID=66578724

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018123031A RU2687357C1 (en) 2018-06-25 2018-06-25 Installation for snow thawing

Country Status (1)

Country Link
RU (1) RU2687357C1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU577274A2 (en) * 1976-04-02 1977-10-25 Всесоюзный научно-исследовательский институт строительного и дорожного машиностроения Rotary snow-removing machine
RU2337207C1 (en) * 2007-04-04 2008-10-27 Открытое Акционерное Общество "Российские Железные Дороги" Method of snow melting
RU117457U1 (en) * 2011-04-15 2012-06-27 Государственное образовательное учреждение высшего профессионального образования "Тамбовский государственный технический университет" (ГОУ ВПО ТГТУ) SNOW MELTING INSTALLATION
RU2484199C2 (en) * 2011-05-26 2013-06-10 Коминтерн Александрович Щенников Snow melting unit
JP3197384U (en) * 2015-02-23 2015-05-14 義則 安達 Snow melting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU577274A2 (en) * 1976-04-02 1977-10-25 Всесоюзный научно-исследовательский институт строительного и дорожного машиностроения Rotary snow-removing machine
RU2337207C1 (en) * 2007-04-04 2008-10-27 Открытое Акционерное Общество "Российские Железные Дороги" Method of snow melting
RU117457U1 (en) * 2011-04-15 2012-06-27 Государственное образовательное учреждение высшего профессионального образования "Тамбовский государственный технический университет" (ГОУ ВПО ТГТУ) SNOW MELTING INSTALLATION
RU2484199C2 (en) * 2011-05-26 2013-06-10 Коминтерн Александрович Щенников Snow melting unit
JP3197384U (en) * 2015-02-23 2015-05-14 義則 安達 Snow melting system

Similar Documents

Publication Publication Date Title
CN104791767B (en) Biomass particle burner and use method thereof
CN109442387A (en) Biomass rotary fire grate combustor
KR101371235B1 (en) A pellet boiler with a brush cleaning grate and running method thereof
RU2687357C1 (en) Installation for snow thawing
RU122465U1 (en) AUTOMATED SOLID FUEL BOILER
JP2004293828A (en) Combustion device
JPH0252161B2 (en)
CN209371225U (en) Biomass rotary fire grate combustor
WO2006114654A2 (en) Method for the automatic combustion of solid granular fuels, particularly pellets, and burner for the boiler
KR101529432B1 (en) Pellet heater having pellet feeder device for backflow prevention of smoke
CN205480946U (en) Do not need biomass burning machine that blowing out can slag tap
CN206831474U (en) A kind of energy-conserving and environment-protective liquid ash melting type Coal burning boilers
CN202040972U (en) Hot-water boiler using biomass particle fuel
CN104748559A (en) Perlite preheating system
US2029725A (en) Method and apparatus for burning sewage sludge
KR101287818B1 (en) The pellet boiler
CN108895432A (en) Biomass granule fuel combustion system and biomass granule fuel commercial kitchen range
JP5802061B2 (en) Slag melting apparatus and fluidized bed gasification melting equipment provided with the same
CN101382341B (en) Full automatic heating stove burning stalks
CN106801873B (en) A kind of high efficiency domestic garbage disposer
KR20100132810A (en) A boiler using sawdust
KR20110043564A (en) Insulation vertical wood combustor and heat-exchanger
JP5322125B2 (en) Granular combustion equipment
TR202015485A2 (en) A REACTOR WITH THE FEATURE OF DRYING BY CARBONIZING AND BURNING VOCAL GASES AND TOXIC GASES TOGETHER
CN207019047U (en) The horizontal combustion chamber of anti-clogging