RU2667242C1 - Method of developing well oil reservoir with horizontal termination - Google Patents

Method of developing well oil reservoir with horizontal termination Download PDF

Info

Publication number
RU2667242C1
RU2667242C1 RU2017136227A RU2017136227A RU2667242C1 RU 2667242 C1 RU2667242 C1 RU 2667242C1 RU 2017136227 A RU2017136227 A RU 2017136227A RU 2017136227 A RU2017136227 A RU 2017136227A RU 2667242 C1 RU2667242 C1 RU 2667242C1
Authority
RU
Russia
Prior art keywords
well
horizontal
sections
packers
productive
Prior art date
Application number
RU2017136227A
Other languages
Russian (ru)
Inventor
Владимир Николаевич Петров
Владимир Борисович Оснос
Original Assignee
Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Публичное акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Публичное акционерное общество "Татнефть" имени В.Д. Шашина
Priority to RU2017136227A priority Critical patent/RU2667242C1/en
Application granted granted Critical
Publication of RU2667242C1 publication Critical patent/RU2667242C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Edible Oils And Fats (AREA)

Abstract

FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil industry and can find application in the development of heterogeneous terrigenous or carbonate productive formations with horizontal wells. By the method, the areas are identified as intervals of a productive formation with an inflow profile that differ in the specific oil rate by 20 % or more. Selected sections are separated by packers. Pump is descended into the well and well production is taken from each site with the maintenance of the same water cut in the sections. In this case, horizontal drill holes are drilled or horizontal wells are chosen so that their most productive areas in horizontal wells are located in sequence closer to the bottom. As the product is flooded, the most flooded and productive areas are successively cut off from the face by passing packers with adjustable valves and/or jets, allowing to maintain the same water cut of the product along the entire length of the horizontal completion of the well when extracted by one pump located above the proximal to the mouth of the installed packers. Due to the valves and/or jets of the packers, the selections of the highly productive sections are reduced and the water flooding front is leveled near the horizontal end of the well, which prolongs the operation of the well in a predetermined mode to ensure the selection of additional products.EFFECT: increased effectiveness of the method due to increasing its manufacturability and cheaper, providing the possibility of perform the descent, repair and maintenance of descended structural elements.1 cl, 1 dwg

Description

Изобретение относится к нефтедобывающей промышленности и может найти применение при разработке неоднородных терригенных или карбонатных продуктивных пластов скважинами с горизонтальным окончанием.The invention relates to the oil industry and may find application in the development of heterogeneous terrigenous or carbonate reservoirs with horizontal wells.

Известен способ разработки массивной залежи нефти (патент RU №2443854, МПК Е21В 43/20, Е21В 34/08, опубл. 27.02.2012 в бюл. №6), включающий исследование свойств пласта, бурение нагнетательных скважин и разветвленной добывающей скважины с горизонтальными участками, закачку вытесняющего агента в нагнетательные скважины и отбор продукции через добывающую скважину, при этом два горизонтальных участка добывающей скважины располагают друг над другом в пределах одного продуктивного пласта, проводят исследования горизонтальных участков на продуктивность каждого, после чего между горизонтальными участками устанавливают регулируемый от давления клапан со сменным жиклером в проходном канале, отбор из добывающей скважины осуществляют одним насосом, установленным выше клапана с производительностью больше продуктивности верхнего горизонтального участка, но меньше продуктивности двух участков, при этом клапан выполнен с возможностью разобщения горизонтальных участков при превышении уровнем жидкости в скважине выше максимально допустимого значения, сообщения снизу вверх горизонтальных участков при снижении уровня жидкости ниже минимально допустимого.A known method of developing a massive oil reservoir (patent RU No. 2443854, IPC ЕВВ 43/20, ЕВВ 34/08, published on 02/27/2012 in Bull. No. 6), including the study of reservoir properties, drilling of injection wells and branched production wells with horizontal sections , the injection of the displacing agent into the injection wells and the selection of products through the production well, while two horizontal sections of the producing well are located one above the other within the same reservoir, studies of horizontal sections on the productivity of each second, after which a pressure-controlled valve with a replaceable nozzle is installed in the passageway between the horizontal sections, the selection from the production well is carried out by one pump installed above the valve with a productivity higher than the productivity of the upper horizontal section, but less than the productivity of two sections, while the valve is made with the possibility uncoupling of horizontal sections when the liquid level in the well exceeds the maximum allowable value, messages from bottom to top of horizontal tkov when the liquid level below the minimum.

Недостатками данного способа являются:The disadvantages of this method are:

- узкая область применения из-за реализации без учета зональной неоднородности только в пластах массивного типа;- narrow scope due to implementation without taking into account zonal heterogeneity only in massive formations;

- высокая стоимость реализации из-за необходимости использования двух горизонтальных участков скважины.- high cost of sales due to the need to use two horizontal sections of the well.

Известен также способ разработки нефтяного пласта скважиной с горизонтальным окончанием (патент RU №2590918, МПК Е21В 43/16, Е21В 43/12, Е21В 43/25, опубл. 10.07.2016 в бюл. №19), включающий бурение или выбор уже пробуренной горизонтальной скважины, выделение по горизонтальному стволу интервалов продуктивного пласта, различающихся по свойствам, спуск в скважину колонны насосно-компрессорных труб с пакером, разделение интервалов продуктивного пласта пакером, спуск в скважину насоса, регулирующих устройств в виде электрических клапанов и манометров-термометров, подъем продукции на поверхность насосом по внутритрубному пространству, при этом предварительно между интервалами продуктивного пласта устанавливают оборудование локального крепления скважины, в скважину спускают компоновку, состоящую из пакера, колонны насосно-компрессорных труб, корпуса клапанного оборудования с расположенными в нем нижним электрическим клапаном для регулирования притока по колонне насосно-компрессорных труб, манометром-термометром для замера давления в колонне насосно-компрессорных труб перед корпусом, верхним электрическим клапаном для регулирования притока из затрубного пространства в полость корпуса, манометром-термометром для замера давления в затрубном пространстве и манометром-термометром для замера давления всасывания насоса, и колонны насосно-компрессорных труб до устья скважины, проводят освоение скважины в три этапа с отбором продукции по колонне насосно-компрессорных труб и затрубному пространству, только по колонне насосно-компрессорных труб и затем только по затрубному пространству, анализируют результаты замеров дебитов и обводненности продукции, эксплуатируют интервал скважины с меньшей обводненностью при остановке эксплуатации интервала с большей обводненностью при начальном повышенном дебите до снижения забойного давления и уровня жидкости ниже оптимального и при последующем рабочем дебите с поддержанием стабильным забойного давления, скважину эксплуатируют до превышения обводненности продукции из эксплуатируемого интервала обводненности продукции из второго интервала и затем эксплуатируют оба интервала одновременно, поддерживают обводненность обоих интервалов на одинаковом уровне.There is also a method of developing an oil reservoir with a horizontal completion well (patent RU No. 2590918, IPC ЕВВ 43/16, ЕВВ 43/12, Е21В 43/25, published on July 10, 2016 in Bull. No. 19), including drilling or selecting an already drilled horizontal well, allocation of horizontal intervals of the reservoir, differing in properties, descent of the tubing string with the packer into the well, separation of the intervals of the reservoir by the packer, descent of the pump into the well, control devices in the form of electric valves and manometers-thermometer s, raising the product to the surface by the pump along the in-pipe space, and then, between the intervals of the reservoir, the equipment for local fastening of the well is installed, the assembly consisting of a packer, tubing string, valve equipment body with a lower electric valve located in it is lowered into the well regulating the inflow along the tubing string, pressure gauge-thermometer for measuring pressure in the tubing string in front of the housing, ver with an electric valve for regulating the inflow from the annulus into the cavity of the body, a manometer-thermometer for measuring pressure in the annulus and a manometer-thermometer for measuring the suction pressure of the pump, and the string of tubing to the wellhead, the well is developed in three stages with selection products for the tubing string and annulus, only for the tubing string and then only for the annulus, analyze the flow rate measurements in and water cut, exploit the interval of the well with less water cut when stopping the operation of the interval with greater water cut at the initial increased flow rate until the bottomhole pressure drops and the fluid level is below the optimum and with the subsequent production flow rate while maintaining stable bottom hole pressure, the well is operated until the water cut from the production well is exceeded water cut interval from the second interval and then operate both intervals at the same time, support water cut nnosti both slots at the same level.

Недостатками данного способа являются:The disadvantages of this method are:

- сложность установки и ремонта из-за большого количества технически и технологически сложных взаимосвязанных конструктивных элементов, устанавливаемых в скважине, а при неисправности одного из элементов необходимо извлечение всей конструкции с остановкой добычи из скважины;- the complexity of installation and repair due to the large number of technically and technologically complex interconnected structural elements installed in the well, and if one of the elements fails, it is necessary to remove the entire structure with stopping production from the well;

- сложное управление из-за необходимости согласованного управления как насосом, так и клапанами;- complex control due to the need for coordinated control of both the pump and valves;

- большие временные и материальные затраты на изготовление, спуск и ремонт конструктивных элементов при реализации способа.- large time and material costs for the manufacture, descent and repair of structural elements during the implementation of the method.

Наиболее близким является способ разработки нефтяного пласта скважинами с горизонтальным окончанием (патент RU №2540720, МПК Е21В 43/16, опубл. 10.02.2015 в бюл. №4), включающий бурение или выбор уже пробуренных горизонтальных скважин, выделение участков в виде интервалов продуктивного пласта, спуск в скважину насоса, разделение участков пакерами и отбор продукции скважины из каждого участка, при этом при разработке терригенного или карбонатного пласта предварительно в горизонтальном стволе скважины определяют профиль притока, выявляют участки с профилем притока, отличающиеся друг от друга по удельному дебиту нефти на 20% и более, в местах изменения профиля притока устанавливают пакеры, в центр каждого участка спускают на колонне труб один насос при максимальном расстоянии между насосами в горизонтальном стволе не более 200 м, насосы размещают последовательно на одной колонне труб, каждый последующий насос от конца горизонтального ствола к его началу выбирают из условия обеспечения дебита жидкости не менее суммы дебитов жидкости предыдущих насосов.The closest is a method of developing an oil reservoir with horizontal completion wells (patent RU No. 2540720, IPC ЕВВ 43/16, published on 02/10/2015 in bull. No. 4), including drilling or selection of already drilled horizontal wells, allocation of sections in the form of productive intervals formation, descent into the well of the pump, separation of sections by packers and selection of well products from each section, while during the development of a terrigenous or carbonate formation, the inflow profile is determined previously in the horizontal wellbore, sections with Ofil inflows, differing in specific oil flow rate by 20% or more, packers are installed in places where inflow profile changes, one pump is lowered into the center of each section at a pipe string with a maximum distance between pumps in a horizontal well of not more than 200 m, pumps are placed sequentially on one pipe string, each subsequent pump from the end of the horizontal shaft to its beginning is selected from the condition that the fluid flow rate is not less than the sum of the fluid flow rates of the previous pumps.

Недостатками данного способа являются:The disadvantages of this method are:

- сложность установки и ремонта из-за большого количества насосов, устанавливаемых в скважине, а при неисправности одного из насосов необходимо извлечение всей конструкции с остановкой добычи из скважины;- the complexity of installation and repair due to the large number of pumps installed in the well, and if one of the pumps fails, it is necessary to remove the entire structure with stopping production from the well;

- сложное управление из-за необходимости согласованного управления насосами;- complex control due to the need for coordinated pump control;

- большие временные и материальные затраты на изготовление, спуск и ремонт насосов при реализации способа.- large time and material costs for the manufacture, launching and repair of pumps during the implementation of the method.

Технической задачей предполагаемого изобретения является создание дешевого и технологичного способа разработки нефтяного пласта скважиной с горизонтальным окончанием, позволяющего производить спуск, ремонт, обслуживание спущенных конструктивных элементов.The technical task of the alleged invention is the creation of a cheap and technologically advanced method of developing an oil reservoir with a horizontal end well, which allows lowering, repair, maintenance of deflated structural elements.

Техническая задача решается способом разработки нефтяного пласта скважиной с горизонтальным окончанием, включающим бурение или выбор уже пробуренных горизонтальных скважин, выделение участков в виде интервалов продуктивного пласта с профилем притока, отличающихся друг от друга по удельному дебиту нефти на 20% и более, разделение участков пакерами, спуск в скважину насоса и отбор продукции скважины из каждого участка с поддержанием одинаковой обводненности на участках, причем за счет клапанов и/или жиклеров пакеров уменьшают отборы высокопродуктивных участков и выравнивают фронт заводнения около горизонтального окончания скважины, чем удлиняют эксплуатацию скважины в заданном режиме для обеспечения отбора дополнительной продукции.The technical problem is solved by a method of developing an oil reservoir with a horizontal end well, including drilling or selecting already drilled horizontal wells, identifying sections in the form of intervals of the reservoir with an inflow profile that differ from each other in specific oil production by 20% or more, separating the sections with packers, the descent into the well of the pump and the selection of well production from each section while maintaining the same water cut in the sections, and due to valves and / or packer nozzles, the high near-productive sections and even out the waterflooding front near the horizontal end of the well, which lengthens well operation in a given mode to ensure the selection of additional products.

Новым является то, что бурят горизонтальные окончания скважин или выбирают горизонтальные скважины так, чтобы их наиболее продуктивные участки в горизонтальных скважинах располагались последовательно ближе к забою, по мере обводнения продукции наиболее обводненные и продуктивные участки последовательно от забоя отсекают проходными пакерами с регулируемыми клапанами и/или жиклерами, позволяющими поддерживать одинаковую обводненность продукции по всей длине горизонтального окончания скважины при добыче одним насосом, располагаемым над ближним к устью из установленных пакеров.What is new is that horizontal wells are drilled or horizontal wells are selected so that their most productive sections in horizontal wells are located sequentially closer to the bottom, as waterlogging products, the most flooded and productive sections are sequentially cut from the bottom by passage packers with adjustable valves and / or jets, allowing to maintain the same water cut of the product along the entire length of the horizontal end of the well during production by one pump, are located over near to the mouth of the installed packers.

На чертеже изображена схема реализации способа.The drawing shows a diagram of the implementation of the method.

Способ реализуется следующим образом.The method is implemented as follows.

Способ разработки нефтяного пласта 1 скважиной 2 с горизонтальным окончанием 3 включает бурение или выбор уже пробуренных горизонтальных скважин 2, выделение участков 4, 5 и 6 в виде интервалов продуктивного пласта 1 с профилем притока, отличающихся друг от друга по удельному дебиту нефти на 20% и более, разделение участков пакерами 7 и 8, спуск в скважину 2 насоса 9 и отбор продукции скважины 1 из каждого участка 4, 5 и 6 с поддержанием одинаковой обводненности на этих участках 4, 5 и 6. При этом бурят горизонтальные окончания 3 скважины 2 или выбирают горизонтальные скважины 2 так, чтобы их наиболее продуктивные участки 4 и 5 (продуктивность участка 4 выше участка 5, а участка 5 - участка 6) в горизонтальных окончаниях 3 скважин 2 располагались последовательно ближе к забою скважины 2. По мере обводнения продукции (более 90%) наиболее обводненные и продуктивные участки сначала 4, а потом и 5 последовательно от забоя отсекают проходными пакерами 7 и 8 соответственно с регулируемыми и съемными клапанами и/или жиклерами 10 и 11 (показаны условно), позволяющими поддерживать одинаковую обводненность продукции за счет регулируемого отбора по всей длине горизонтального окончания 3 скважины 2 при добыче одним насосом 9, располагаемым над ближним к устью из установленных пакеров - пакера 7 сначала, а потом пакера 8. Регулируемое уменьшение отбора благодаря клапанам и/или жиклерам 10 и 11 пакеров 7 и 8 из высокопродуктивных участков 4 или 4 и 5 приводит к выравниванию фронта заводнения около горизонтального окончания 3 скважины 2 и более длительной эксплуатации скважины 2 в рентабельном режиме, без отсечения участков 4 или 4 и 5 и без проведения в них водоизоляционных работ, что экономит материальные и временные затраты, а отбор продукции из горизонтального окончания 3 скважины 2 позволяет добыть дополнительные объемы продукции нефтяного пласта 1. Регулируемые клапаны и/или жиклеры 10 и 11 могут изготавливаться по любой из известных конструкций (см патенты RU №№2441141, 2443854 или т.п.). При выходе из строя или при необходимости регулировки клапанов и/или жиклеров 10 и 11 их извлекают известными труболовками (см. патенты RU №№45769, 43577, 40379 или т.п.) после извлечения насоса 9 и заменяют на клапаны и/или жиклеры 10 и 11 с требуемой пропускной способностью (определяется эмпирическим путем), с последующей установкой на место. Чаще всего выходят из строя насосы 9, но их извлечение, ремонт и замена происходят в штатном режиме, как и при эксплуатации скважин 2 без установленных пакеров 7 и 8.A method of developing an oil reservoir 1 by a well 2 with a horizontal end 3 includes drilling or selecting already drilled horizontal wells 2, identifying sections 4, 5 and 6 in the form of intervals of the reservoir 1 with an inflow profile that differ from each other in specific oil flow rate by 20% and more, the separation of sections by packers 7 and 8, the descent into the well 2 of pump 9 and the selection of production of well 1 from each section 4, 5 and 6, while maintaining the same water cut in these sections 4, 5 and 6. In this case, the horizontal ends of 3 wells 2 or choose th horizontal wells 2 so that their most productive sections 4 and 5 (productivity of section 4 are higher than section 5, and section 5 is higher than section 6) at the horizontal ends of 3 wells 2 are sequentially closer to the bottom of well 2. As the water cuts (more than 90%) ) the most watered and productive areas, first 4, and then 5 sequentially from the bottom, are cut off by passage packers 7 and 8, respectively, with adjustable and removable valves and / or jets 10 and 11 (shown conditionally), allowing to maintain the same water cut due to the controlled selection along the entire length of the horizontal end 3 of the well 2 during production by one pump 9, located above the closest to the mouth of the installed packers - packer 7 first, and then packer 8. Adjustable reduction in selection due to valves and / or nozzles 10 and 11 of packers 7 and 8 of the highly productive sections 4 or 4 and 5 leads to equalization of the waterflooding front near the horizontal end 3 of well 2 and longer operation of well 2 in a cost-effective manner, without cutting off sections 4 or 4 and 5 and without conducting water in them gold-plating operations, which saves material and time costs, and the selection of products from the horizontal end of 3 wells 2 allows you to get additional production volumes of oil reservoir 1. Adjustable valves and / or jets 10 and 11 can be manufactured according to any of the known designs (see patents RU No.№ 2441141, 2443854 or the like). In the event of a failure or, if necessary, adjustment of the valves and / or jets 10 and 11, they are removed by known tubes (see patents RU No. 45769, 43577, 40379 or the like) after removing the pump 9 and replaced by valves and / or jets 10 and 11 with the required throughput (determined empirically), with subsequent installation in place. Most often, pumps 9 fail, but their removal, repair and replacement occur in the normal mode, as well as when operating wells 2 without installed packers 7 and 8.

Предлагаемый способ разработки нефтяного пласта скважиной с горизонтальным окончанием наиболее экономически и технологически эффективен, при этом позволяет производить стандартный, технологически несложный процесс спуска, ремонт, обслуживание спущенных конструктивных элементов.The proposed method of developing an oil reservoir with a horizontal well is the most economically and technologically efficient, while it allows for the production of a standard, technologically uncomplicated descent process, repair, and maintenance of deflated structural elements.

Claims (1)

Способ разработки нефтяного пласта скважиной с горизонтальным окончанием, включающий бурение или выбор уже пробуренных горизонтальных скважин, выделение участков в виде интервалов продуктивного пласта с профилем притока, отличающимся друг от друга по удельному дебиту нефти на 20% и более, разделение участков пакерами, спуск в скважину насоса и отбор продукции скважины из каждого участка с поддержанием одинаковой обводненности на участках, отличающийся тем, что бурят горизонтальные окончания скважин или выбирают горизонтальные скважины так, чтобы их наиболее продуктивные участки в горизонтальных скважинах располагались последовательно ближе к забою, по мере обводнения продукции наиболее обводненные и продуктивные участки последовательно от забоя отсекают проходными пакерами с регулируемыми клапанами и/или жиклерами, позволяющими поддерживать одинаковую обводненность продукции по всей длине горизонтального окончания скважины при добыче одним насосом, располагаемым над ближним к устью из установленных пакеров, причем за счет клапанов и/или жиклеров пакеров уменьшают отборы высокопродуктивных участков и выравнивают фронт заводнения около горизонтального окончания скважины, чем удлиняют эксплуатацию скважины в заданном режиме для обеспечения отбора дополнительной продукции.A method of developing an oil reservoir with a horizontal completion well, including drilling or selecting already drilled horizontal wells, identifying sections in the form of intervals of the reservoir with an inflow profile that differs from each other in specific oil production by 20% or more, separating the sections with packers, and lowering into the well pump and selection of well products from each section, maintaining the same water cut in the sections, characterized in that horizontal wells are drilled or horizontal wells are selected so that their most productive sections in horizontal wells are located sequentially closer to the bottom, as the watering of the products, the most watered and productive sections are sequentially cut from the bottom by flow packers with adjustable valves and / or nozzles, allowing to maintain the same water cut over the entire length of the horizontal end wells during production with one pump located above the closest to the wellhead from installed packers, and due to valves and / or packer nozzles they reduce the selection of highly productive areas and even out the waterflood front near the horizontal end of the well, which lengthens the well’s operation in the specified mode to ensure the selection of additional products.
RU2017136227A 2017-10-12 2017-10-12 Method of developing well oil reservoir with horizontal termination RU2667242C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2017136227A RU2667242C1 (en) 2017-10-12 2017-10-12 Method of developing well oil reservoir with horizontal termination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2017136227A RU2667242C1 (en) 2017-10-12 2017-10-12 Method of developing well oil reservoir with horizontal termination

Publications (1)

Publication Number Publication Date
RU2667242C1 true RU2667242C1 (en) 2018-09-18

Family

ID=63580494

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2017136227A RU2667242C1 (en) 2017-10-12 2017-10-12 Method of developing well oil reservoir with horizontal termination

Country Status (1)

Country Link
RU (1) RU2667242C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2747200C1 (en) * 2020-07-28 2021-04-29 Общество с ограниченной ответственностью "Карбон-Ойл" Method of oil reservoir development

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5335732A (en) * 1992-12-29 1994-08-09 Mcintyre Jack W Oil recovery combined with injection of produced water
RU2539486C1 (en) * 2014-03-17 2015-01-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for oil development with horizontal wells
RU2540720C1 (en) * 2014-02-10 2015-02-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development of oil seam by horizontal well extensions
RU2544207C1 (en) * 2014-03-03 2015-03-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development of oil seam by horizontal multihole wells
RU2605860C1 (en) * 2015-10-29 2016-12-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of developing oil deposit by horizontal wells
RU2616052C1 (en) * 2016-05-05 2017-04-12 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method development of shaly carbonate oil pays

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5335732A (en) * 1992-12-29 1994-08-09 Mcintyre Jack W Oil recovery combined with injection of produced water
RU2540720C1 (en) * 2014-02-10 2015-02-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development of oil seam by horizontal well extensions
RU2544207C1 (en) * 2014-03-03 2015-03-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development of oil seam by horizontal multihole wells
RU2539486C1 (en) * 2014-03-17 2015-01-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for oil development with horizontal wells
RU2605860C1 (en) * 2015-10-29 2016-12-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of developing oil deposit by horizontal wells
RU2616052C1 (en) * 2016-05-05 2017-04-12 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method development of shaly carbonate oil pays

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2747200C1 (en) * 2020-07-28 2021-04-29 Общество с ограниченной ответственностью "Карбон-Ойл" Method of oil reservoir development

Similar Documents

Publication Publication Date Title
RU2328590C1 (en) Separate maintenance process for injection or production well and implementation variants
RU2015156402A (en) METHOD OF IMPROVED PRODUCTION OF HYDROCARBONS USING MULTIPLE ARTIFICIALLY EDUCATED CRACKS
RU2558058C1 (en) Interval hydraulic fracturing of carbonate formation in horizontal wellbore with bottom water
RU2363839C1 (en) Procedure for development of high viscous oil deposits
RU2483209C1 (en) Method of hydraulic fracturing of well formation
RU2334867C1 (en) Method of simultaneous-separate operation of several payout beds and installation of well for implementation of this method
RU2417306C1 (en) Procedure for development of oil deposit
US8668011B2 (en) Method of hydraulically fracturing a formation
RU2667242C1 (en) Method of developing well oil reservoir with horizontal termination
RU2506417C1 (en) Development method of high-viscosity oil deposit
RU2599156C1 (en) Method of interval treatment of bottom hole zone of horizontal well shaft
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
RU2339807C1 (en) Method of extraction of heavy and high viscous hydrocarbons from undeground deposits
CA2999197C (en) Method of well completion
RU2620099C1 (en) Method of increasing productivity of development wells and injection capacity of injection wells
RU2339808C1 (en) Method for extraction of heavy and high viscous hydrocarbons out of underground deposit
RU2680158C1 (en) Method of formation geomechanical impact
US20110203792A1 (en) System, method and assembly for wellbore maintenance operations
RU2505668C1 (en) Method of developing oil pool using horizontal multibranch wells
RU2425961C1 (en) Well operation method
RU2708747C1 (en) Method for multiple hydraulic fracturing of formation in horizontal borehole of well
RU2363838C1 (en) Procedure for development of bitumen deposits
RU2724715C1 (en) Operating method of water-flooded oil formation
RU2315166C1 (en) Well construction method
RU2584435C1 (en) Method of developing oil deposits