RU2655265C1 - Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime - Google Patents

Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime Download PDF

Info

Publication number
RU2655265C1
RU2655265C1 RU2017129542A RU2017129542A RU2655265C1 RU 2655265 C1 RU2655265 C1 RU 2655265C1 RU 2017129542 A RU2017129542 A RU 2017129542A RU 2017129542 A RU2017129542 A RU 2017129542A RU 2655265 C1 RU2655265 C1 RU 2655265C1
Authority
RU
Russia
Prior art keywords
electric heater
cable
paraffin
hydrate
phase
Prior art date
Application number
RU2017129542A
Other languages
Russian (ru)
Inventor
Василий Александрович Отрадных
Станислав Васильевич Отрадных
Евгений Петрович Солдатов
Original Assignee
Василий Александрович Отрадных
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Василий Александрович Отрадных filed Critical Василий Александрович Отрадных
Priority to RU2017129542A priority Critical patent/RU2655265C1/en
Application granted granted Critical
Publication of RU2655265C1 publication Critical patent/RU2655265C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/005Heater surrounding production tube
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells

Abstract

FIELD: mining.
SUBSTANCE: invention relates to major workover and production maintenance of development wells and can be used in wells development to maintain a thermal regime in them to prevent the formation and elimination of hydrate, hydrate-paraffin and ice plugs in them. Method includes launching into the well up to the upper boundary of the plug of a local electric heater on a wireline multicore cable, the metal shell of which is connected to the body of the electric heater. One of the cores of the cable is connected to the phase of a three-phase current source, and a metal covering is connected to its zero contact. Further, the electric heater is lowered until it reaches the plug, then it is turned on and the plug material is melted, while the lower part of its electrode contacts with a borehole electrically conductive fluid. After melting the plugs, a logging multicore cable is fixed, each of its wires is connected to the corresponding phase of a three-phase current source. It’s turned on, transferring the cable along its entire length into the mode of the heating device, and a full warm-up of the annular and tubular space of the well is performed.
EFFECT: expanding functional capabilities, it is possible to automatically control the temperature of the electric heater due to the use of current regulators and temperature sensors.
3 cl, 4 dwg

Description

Изобретение относится к области капитального и текущего ремонта нефтяных скважин и может быть использовано для поддержания теплового, рабочего режима в целях ликвидации и предупреждения образования гидратных и гидратопарафиновых и ледяных пробок.The invention relates to the field of overhaul and repair of oil wells and can be used to maintain a thermal operating mode in order to eliminate and prevent the formation of hydrated and hydrate-paraffin and ice plugs.

Из уровня техники известен способ разрушения парафиновых, гидратных и ледяных пробок в эксплуатационных скважинах, оборудованных штанговыми насосными установками [RU 2199650 С2, МПК Е21В 37/00, опубл. 27.02.2003], который включает в себя спуск на каротажном кабеле электрического локального нагревательного устройства в межтрубное пространство, создание канала в пробке, прокачивание через канал в пробке рабочего агента до полной ее ликвидации. При этом до ввода электрического нагревательного устройства в межтрубное пространство в ее планшайбе на устье скважины формируют сквозное наклонное отверстие, для соединения атмосферного пространства с межтрубным пространством.The prior art method for the destruction of paraffin, hydrate and ice plugs in production wells equipped with sucker rod units [RU 2199650 C2, IPC ЕВВ 37/00, publ. 02/27/2003], which includes the descent on the wireline cable of an electric local heating device into the annulus, the creation of a channel in the tube, pumping of the working agent through the channel in the tube until it is completely eliminated. In this case, before entering the electric heating device into the annular space in its faceplate at the wellhead, a through inclined hole is formed to connect the atmospheric space with the annular space.

Недостатком известного способа является его ограниченная возможность по разрушению отложений в эксплуатационных скважинах вследствие отсутствия в предложенном техническом решении технологических операций по автоматическому управлению режимами работы нагревательного устройства.The disadvantage of this method is its limited ability to destroy deposits in production wells due to the absence in the proposed technical solution of technological operations for the automatic control of the operating modes of the heating device.

Наиболее близким техническим решением к заявленному изобретению и выбранным в качестве прототипа признан способ ликвидации гидратных и парафиногидратных пробок в скважинах [RU 2204698 С2, МПК Е21В 37/00, Е21В 36/04, опубл. 20.05.2003], который включает в себя спуск в скважину до верхней границы пробки локального электронагревателя на подключенном к источнику тока многожильном кабеле, бронирующая металлическая оболочка которого соединена с корпусом электронагревателя, перевод материала пробки в расплавленное состояние включением электронагревателя и продвижение его по мере плавления материала пробки. При этом используют электронагреватель, нижний торец электрода которого контактирует со скважинной электропроводящей жидкостью, расположенной непосредственно над верхней частью пробки, которую используют в качестве электролита.The closest technical solution to the claimed invention and selected as a prototype is recognized as a method of eliminating hydrate and paraffin hydrate plugs in wells [RU 2204698 C2, IPC ЕВВ 37/00, Е21В 36/04, publ. 05/20/2003], which includes the descent into the borehole to the upper boundary of the local electric heater plug on a multicore cable connected to the current source, the armor metal sheath of which is connected to the electric heater body, converting the material of the plug into the molten state by turning on the electric heater and moving it as the material melts traffic jams. In this case, an electric heater is used, the lower end of the electrode of which is in contact with the borehole electrically conductive fluid located directly above the upper part of the plug, which is used as an electrolyte.

Недостатком известного способа является отсутствие функции измерения температуры отложений в зоне работы нагревательного устройства, что снижает качество процесса регулирования и, соответственно, технологичность способа.The disadvantage of this method is the lack of a function for measuring the temperature of deposits in the zone of operation of the heating device, which reduces the quality of the regulation process and, accordingly, the manufacturability of the method.

Технической задачей является расширение функциональных возможностей способа, за счет обеспечения режима автоматического регулирования процесса разрушения парафиновых, гидратных, гидратопарафиновых и ледяных отложений в эксплуатационных скважинах, а также осуществления технологического процесса очистки с требуемой периодичностью.The technical task is to expand the functionality of the method, by providing automatic control of the process of destruction of paraffin, hydrate, hydrate-paraffin and ice deposits in production wells, as well as the implementation of the cleaning process with the required frequency.

Указанная задача решена тем, что включает в себя спуск в скважину до верхней границы пробки электронагревателя на каротажном многожильном кабеле, бронирующая металлическая оболочка которого соединена с корпусом электронагревателя. В месте подключения электронагревателя к многожильному кабелю три жилы кабеля соединяют вместе по схеме «звезда». Одну из жил кабеля на поверхности соединяют с фазой трехфазного источника тока, а бронирующую металлическую оболочку соединяют с его нулевым контактом. Далее локальный электронагреватель опускают до момента, пока он не достигнет пробки, затем включают электронагреватель, выполняют плавление материала пробки, при этом нижний торец электронагревателя контактирует со скважинной электропроводящей жидкостью. После плавления пробки каротажный многожильный кабель опускают на максимальную длину кабеля, фиксируют, подключают каждую его жилу к соответствующей фазе трехфазного источника тока, включают его, переводя кабель по всей его длине в режим линейного нагревательного устройства, и выполняют полный прогрев затрубного и трубного пространства скважины.This problem is solved in that it includes a descent into the well to the upper boundary of the electric heater plug on a multicore logging cable, the armor metal shell of which is connected to the electric heater body. In the place where the electric heater is connected to the multicore cable, the three cores of the cable are connected together according to the "star" scheme. One of the cable cores on the surface is connected to the phase of a three-phase current source, and the armor metal sheath is connected to its zero contact. Next, the local electric heater is lowered until it reaches the plug, then the electric heater is turned on, the plug material is melted, and the lower end of the electric heater is in contact with the borehole electrically conductive fluid. After melting the plug, the multi-core wireline cable is lowered to the maximum cable length, fixed, each core of it is connected to the corresponding phase of the three-phase current source, it is turned on, the cable is transferred along its entire length to the linear heating device mode, and the annulus and tube space of the well are completely heated.

Для обеспечения автоматического регулирования температуры электронагревателя каждую фазу трехфазного источника тока снабжают регулятором тока, а в электронагреватель вводят первый термодатчик, расположенный внутри его корпуса, и второй термодатчик, закрепленный на его внешней поверхности. При этом входы упомянутых регуляторов подключают к силовым выходам блока управления, а первый и второй термодатчики подключают к его измерительным входам.To ensure automatic control of the temperature of the electric heater, each phase of the three-phase current source is equipped with a current regulator, and the first thermal sensor located inside its housing and the second thermal sensor mounted on its outer surface are introduced into the electric heater. In this case, the inputs of the mentioned regulators are connected to the power outputs of the control unit, and the first and second temperature sensors are connected to its measuring inputs.

После проведения работ каротажный кабель фиксируют на устье скважины, отсоединяют от физического и электрического контактов с барабаном лебедки и оставляют в подвешенном положении в скважине с возможностью периодического подключения к источнику трехфазного тока по мере необходимости.After the work, the wireline cable is fixed at the wellhead, disconnected from the physical and electrical contacts with the winch drum and left in a suspended position in the well with the possibility of periodically connecting to a three-phase current source as necessary.

Предпочтительно, чтобы трехфазный источник тока и блок управления были размещены на платформе наземного транспортного средства высокой проходимости, блок управления был выполнен на основе микропроцессорной системы, а в качестве термодатчиков были использованы терморезисторы.Preferably, the three-phase power source and the control unit were placed on the platform of a terrain vehicle with high cross-country ability, the control unit was based on a microprocessor system, and thermistors were used as temperature sensors.

Положительным техническим результатом, обеспечиваемым раскрытой выше совокупностью признаков способа, является значительное расширение его функциональных возможностей по разрушению отложений в эксплуатационных скважинах, за счет использования при прогреве скважины трехфазного источника тока, каждая фаза которого снабжена регулятором тока, и термодатчиков, обеспечивающих возможность автоматического регулирования температуры электронагревателя в зависимости от температуры скважинной жидкости; дополнительной функцией блока управления при этом может быть сбор статистической информации о градиенте температуры пластовой жидкости в затрубном пространстве во время очистки скважины. Кроме того, изобретение позволяет достичь дополнительного технического результата, состоящего в возможности проводить профилактическое обслуживание скважины с заданной периодичностью за счет размещения трехфазного источника тока и блока управления на платформе наземного транспортного средства.A positive technical result provided by the combination of the features of the method disclosed above is a significant expansion of its functionality for the destruction of deposits in production wells, due to the use of a three-phase current source, each phase of which is equipped with a current regulator, and temperature sensors, providing automatic temperature control of the heater depending on the temperature of the well fluid; An additional function of the control unit in this case may be the collection of statistical information on the temperature gradient of the formation fluid in the annulus during well cleaning. In addition, the invention allows to achieve an additional technical result, consisting in the ability to carry out preventive maintenance of the well at a predetermined frequency by placing a three-phase current source and a control unit on the platform of a ground vehicle.

Сущность изобретения поясняется чертежами, где на фиг. 1 представлена упрощенная схема подключения трехфазного источника тока к многожильному кабелю; на фиг. 2 - устройство электронагревателя, представляющего собой локальное нагревательное устройство открытого типа; на фиг. 3 - упрощенная структурная схема блока управления; на фиг. 4 - схема осуществления способа разрушения отложений.The invention is illustrated by drawings, where in FIG. 1 shows a simplified diagram of connecting a three-phase current source to a multicore cable; in FIG. 2 - device electric heater, which is a local heating device of the open type; in FIG. 3 is a simplified block diagram of a control unit; in FIG. 4 is a diagram of the implementation of the method of destruction of deposits.

Способ осуществляют с помощью устройства, включающего в себя трехфазный источник тока 1 (Фиг. 1), каждая фаза которого снабжена регулятором тока 2, 3 и 4, каждый из которых может быть выполнен на основе реостатов, IGBT-транзисторов или семисторов. К источнику тока подключен каротажный многожильный кабель 5 (Фиг. 2), защищенный металлической оболочкой 6, соединенный с электронагревателем 7, представляющим собой локальное нагревательное устройство открытого типа, внутри которого установлен электрод 8, подключенный к многожильному кабелю 5 и изолированный от корпуса электронагревателя 7 изолятором 9, в месте подключения 10 электрода электронагревателя 7 к многожильному кабелю 5, три жилы кабеля соединяют вместе по схеме «звезда». При работе нижний торец электрода 8 соприкасается с расплавленным материалом пробки. Электронагреватель 7 снабжен первым термодатчиком 11, расположенным внутри его корпуса, и вторым термодатчиком 12, закрепленным на его внешней поверхности. Входы регуляторов тока 2, 3 и 4 (Фиг. 1) подключены к силовым выходам 13, 14 и 15 блока управления 16, а термодатчики 11 и 12 подключены к его измерительным входам 17 и 18. Дополнительно к блоку управления 16 подключен блок индикации 19 и блок ввода данных 20.The method is carried out using a device including a three-phase current source 1 (Fig. 1), each phase of which is equipped with a current regulator 2, 3 and 4, each of which can be made on the basis of rheostats, IGBT transistors or heistors. A multicore logging cable 5 is connected to the current source (Fig. 2), protected by a metal sheath 6, connected to an electric heater 7, which is an open type local heating device, inside of which an electrode 8 is mounted, connected to a multicore cable 5 and insulated from the electric heater body 7 by an insulator 9, at the connection point 10 of the electrode of the electric heater 7 to the multicore cable 5, the three cores of the cable are connected together according to the "star" scheme. During operation, the lower end of the electrode 8 is in contact with the molten tube material. The electric heater 7 is equipped with a first temperature sensor 11 located inside its housing, and a second temperature sensor 12, mounted on its outer surface. The inputs of the current regulators 2, 3 and 4 (Fig. 1) are connected to the power outputs 13, 14 and 15 of the control unit 16, and the temperature sensors 11 and 12 are connected to its measuring inputs 17 and 18. In addition to the control unit 16, an indication unit 19 and data entry unit 20.

Предпочтительно, чтобы блок управления 16 был выполнен в виде микропроцессорной системы, включающей микроконтроллер 21 (Фиг. 3), например AVR ATMega128, содержащий RISC-микропроцессор 22 с регистрами общего назначения и встроенной памятью данных, подключенный к FLASH-памяти программ 23, соединенный общей шиной с пятью универсальными двунаправленными портами ввода-вывода 24, 25, 26, 27 и 28, двумя аналого-цифровыми преобразователями 29 и 30, блоком энергонезависимой электрически перепрограммируемой памяти 31 и универсальным синхронно-асинхронным приемопередатчиком 32. При этом измерительные входы 17 и 18 блока управления 16 подключены к аналого-цифровым преобразователям 29 и 30, порты ввода-вывода 24, 25 и 26 соединены с силовыми выходами 13, 14 и 15, подключенными к регуляторам тока, порт ввода-вывода 27 подключен к блоку индикации 19, а порт ввода-вывода 28 подключен к блоку ввода данных 20. Блок индикации целесообразно выполнить в виде TFT-дисплея, а блок ввода данных - в виде кнопочной клавиатуры, содержащей, по крайней мере, шестнадцать клавиш.Preferably, the control unit 16 was made in the form of a microprocessor system including a microcontroller 21 (Fig. 3), for example, an AVR ATMega128 containing a RISC microprocessor 22 with general purpose registers and an integrated data memory connected to the FLASH program memory 23 connected to a common a bus with five universal bi-directional I / O ports 24, 25, 26, 27 and 28, two analog-to-digital converters 29 and 30, a non-volatile electrically reprogrammable memory unit 31, and a universal synchronous-asynchronous transceiver ICOM 32. In this case, the measuring inputs 17 and 18 of the control unit 16 are connected to analog-to-digital converters 29 and 30, the input-output ports 24, 25 and 26 are connected to the power outputs 13, 14 and 15 connected to the current regulators, the input port is output 27 is connected to the display unit 19, and the input / output port 28 is connected to the data input unit 20. It is advisable to perform the display unit in the form of a TFT display, and the data input unit in the form of a keypad containing at least sixteen keys.

Способ с помощью описанного устройства осуществляют следующим образом.The method using the described device is as follows.

Первоначально каротажный кабель 5 с закороченными по схеме «звезда» жилами подключают к электронагревателю 7 (Фиг. 2), затем в планшайбе 33 (Фиг. 4), при необходимости, формируют наклонное отверстие, нарезают в отверстии резьбу для переводника сальникового устройства 34, устанавливают его вместе с многожильным кабелем 5 в переводнике и спускают сборку (кабель 5 с электронагревателем 7) в затрубное пространство скважины с помощью лебедки (не показано). При этом, на поверхности, одну из жил кабеля 5 соединяют с одной фазой трехфазного источника тока 1, а бронирующую металлическую оболочку соединяют с его нулевым контактом. Электронагреватель 7 опускают до момента, пока он не достигнет пробки, затем его включают, путем подачи напряжения одной фазы (220В), при этом нижний торец локального электронагревателя 7 контактирует со скважинной электропроводящей жидкостью, происходит расплавление пробки.Initially, the logging cable 5 with shorted cores according to the “star” pattern is connected to the electric heater 7 (Fig. 2), then in the faceplate 33 (Fig. 4), if necessary, an inclined hole is formed, a thread is cut in the hole for the stuffing box adapter 34, set it together with a multicore cable 5 in the sub and lower the assembly (cable 5 with electric heater 7) into the annulus of the well using a winch (not shown). At the same time, on the surface, one of the cores of cable 5 is connected to one phase of a three-phase current source 1, and the armor metal sheath is connected to its zero contact. The electric heater 7 is lowered until it reaches the plug, then it is turned on by applying a voltage of one phase (220V), while the lower end of the local heater 7 is in contact with the borehole electrically conductive fluid, the plug is melted.

После расплавления пробки гидратопарафиновых отложений и достижения каротажным кабелем 5 требуемой глубины каротажный кабель 5 фиксируют на устье скважины замком 35 (Фиг. 4). Кабель 5 через регуляторы тока 2, 3, 4 подключают к трехфазному источнику тока 1, в результате подается трехфазный ток на весь каротажный кабель 5, а поскольку кабель из-за своей длины (около 1400 метров) имеет достаточное сопротивление, позволяет использовать кабель с нагревом по всей его длине в качестве линейного нагревательного устройства с тепловой мощностью, составляющей около 100-110 кВт. Нагреваясь по всей длине, каротажный кабель 5 повышает температуру в затрубном и трубном пространстве до необходимой температуры, при которой твердые гидратопарафиновые отложения переходят в жидкое состояние и при воздействии вытесняющей жидкости выбрасываются на поверхность.After melting the plug of hydrate-paraffin deposits and reaching the required depth with the logging cable 5, the logging cable 5 is fixed at the wellhead with a lock 35 (Fig. 4). Cable 5 is connected through a current regulator 2, 3, 4 to a three-phase current source 1, as a result, a three-phase current is supplied to the entire logging cable 5, and since the cable has sufficient resistance due to its length (about 1400 meters), it allows you to use a cable with heating along its entire length as a linear heating device with a thermal power of about 100-110 kW. Heating along the entire length, the logging cable 5 raises the temperature in the annulus and tube space to the required temperature at which solid hydrate-paraffin deposits become liquid and are released to the surface when exposed to a displacing fluid.

После проведения работ кабель 5 отключают от трехфазного источника тока, дополнительно поджимают сальниковый узел и отсоединяют кабель 5 от барабана лебедки. Остаток кабеля 5, остающегося на поверхности, сворачивают и закрывают влагозащитным материалом, возле устья скважины на специально оборудованном месте.After work, cable 5 is disconnected from the three-phase current source, an additional stuffing box is tightened and cable 5 is disconnected from the winch drum. The remainder of the cable 5 remaining on the surface is folded and closed with a moisture-proof material, near the wellhead in a specially equipped place.

Для осуществления профилактического прогрева скважины на приустьевую площадку доставляют трехфазный источник тока 1, в качестве которого может применяться силовой повышающий трансформатор типа ТП-63, и блок управления 16, размещенные на платформе наземного транспортного средства высокой проходимости 36, например машины марки УАЗ. Затем каротажный многожильный кабель 5 по описанной схеме подключают к трехфазному источнику тока 1, который подключают к стандартному разъему (380 В) на кустовой подстанции 37. Далее подключают термодатчики 11 и 12 к измерительным входам 17 и 18 блока управления 16, а его силовые выходы 13, 14 и 15 подключают к регуляторам тока 2, 3 и 4, подключенным к соответствующим фазам источника трехфазного тока 1, нулевой провод при этом подключают к бронирующей металлической оболочке 6 многожильного кабеля 5. Затем с помощью блока ввода данных 20 корректируют параметры режимов регулирования источника трехфазного тока 1 и общим электромагнитным пускателем (не показан) подают напряжение 380 В.To carry out preventive heating of the well, a three-phase current source 1 is delivered to the wellhead site, as a TP-63 power step-up transformer, and a control unit 16 placed on the platform of a high-cross-country vehicle 36, for example, a UAZ vehicle, can be used. Then, a multi-core logging cable 5 is connected to a three-phase current source 1 according to the described scheme, which is connected to a standard connector (380 V) at the cluster substation 37. Next, the temperature sensors 11 and 12 are connected to the measurement inputs 17 and 18 of the control unit 16, and its power outputs 13 , 14 and 15 are connected to the current regulators 2, 3 and 4 connected to the corresponding phases of the three-phase current source 1, the neutral wire is connected to the armor metal sheath 6 of the multi-core cable 5. Then, using the data input unit 20, the pair is corrected Three modes of regulation of the source of three-phase current 1 and a common electromagnetic starter (not shown) supply a voltage of 380 V.

После начала профилактического прогрева затрубного пространства скважины микроконтроллер 21 блока управления 16 измеряет температуру электронагревателя и окружающей его пластовой жидкости с помощью термодатчиков 11 и 12. Одновременно с этим, в соответствии с управляющей программой, записанной во FLASH-памяти 23, микроконтроллер 21 осуществляет выдачу последовательности управляющих ШИМ-сигналов на порты ввода-вывода 24, 25 и 26, регулируя тем самым величину тока, подаваемого на кабель 5. После достижения кабелем 5 рабочей температуры, отложения переходят в пластическое состояние и, растворяясь в потоке подогретой поднимающейся в насосно-компрессорных трубах пластовой жидкости, выходят на поверхность. На этой стадии подземное насосное оборудование обслуживаемой скважины работает в режиме откачки пластовой жидкости и подъема ее на поверхность.After the preventive heating of the annular space of the well has begun, the microcontroller 21 of the control unit 16 measures the temperature of the electric heater and the surrounding formation fluid using temperature sensors 11 and 12. At the same time, in accordance with the control program recorded in the FLASH memory 23, the microcontroller 21 issues a sequence of control PWM signals to input-output ports 24, 25 and 26, thereby regulating the amount of current supplied to cable 5. After cable 5 reaches operating temperature, deposition of ehodyat the plastic state and being dissolved in heated stream rising in the tubing of reservoir fluid pipes come to the surface. At this stage, the underground pumping equipment of the serviced well operates in the mode of pumping formation fluid and lifting it to the surface.

В процессе работы устройства измерения температуры, выполненные микроконтроллером 21, сохраняются в его энергонезависимой памяти 31. В дальнейшем они могут быть переданы с помощью универсального синхронно-асинхронного приемопередатчика 32 на персональный компьютер для их дальнейшей обработки с целью установления рациональных временных интервалов проведения очистки скважины.During operation of the device, the temperature measurements made by the microcontroller 21 are stored in its non-volatile memory 31. In the future, they can be transferred using a universal synchronous-asynchronous transceiver 32 to a personal computer for further processing in order to establish rational time intervals for conducting well cleaning.

После завершения процесса разрушения вновь возникших отложений трехфазный источник тока 1 отключают от каротажного многожильного кабеля 5, а термодатчики 11 и 12 - от измерительных входов блока управления 17 и 18, затем кабель консервируют описанным выше способом до его следующего использования.After the destruction of the newly formed deposits is completed, the three-phase current source 1 is disconnected from the multi-core logging cable 5, and the temperature sensors 11 and 12 are disconnected from the measuring inputs of the control unit 17 and 18, then the cable is canned as described above until its next use.

Таким образом, описанный выше способ позволяет эффективно осуществлять процесс ликвидации гидратопарафиновых отложений на требуемой глубине (до 1400 м) и поддерживать оптимальный профилактический тепловой режим в скважине до ее планового ремонта без применения дополнительного сложного наземного оборудования на приустьевой площадке. При этом достаточным условием для осуществления способа является использование трехфазного источника тока и блока управления, а размещение их на мобильной платформе наземного транспортного средства позволяет осуществлять обслуживание несколько десятков скважин, что значительно удешевляет общую стоимость работ по их профилактике, а за счет создания необходимого фонда скважин, обладающих возможностью в любой момент времени быть включенными в профилактический режим, исключается дополнительные затраты на спуск кабеля на рабочую глубину, что увеличивает производительность и позволяет вести обслуживание в профилактическом режиме большее число скважин, чем это возможно при применении известных технологий.Thus, the method described above allows you to effectively carry out the process of eliminating hydrate-paraffin deposits at the required depth (up to 1400 m) and maintain optimal preventive thermal conditions in the well until its scheduled repair without the use of additional complex ground equipment at the mouth site. Moreover, a sufficient condition for the implementation of the method is the use of a three-phase current source and control unit, and placing them on a mobile platform of a land vehicle allows servicing several tens of wells, which significantly reduces the cost of the work to prevent them, and by creating the necessary fund of wells, having the ability at any time to be included in the preventive mode, eliminates the additional cost of lowering the cable to the working depth well, which increases productivity and allows maintenance to be carried out in a preventive mode for a larger number of wells than is possible with known technologies.

Claims (3)

1. Способ разрушения парафиновых, гидратных, гидратопарафиновых и ледяных отложений в эксплуатационных скважинах для поддержания их рабочего режима, включающий спуск в скважину до верхней границы пробки локального электронагревателя на каротажном многожильном кабеле, бронирующая металлическая оболочка которого соединена с металлическим корпусом электронагревателя, отличающийся тем, что в месте подключения электронагревателя к многожильному кабелю три жилы кабеля соединяют вместе по схеме «звезда», а одну из жил кабеля на поверхности соединяют с фазой трехфазного источника тока, а бронирующую металлическую оболочку соединяют с его нулевым контактом; электронагреватель опускают до момента, пока он не достигнет пробки, затем его включают и выполняют плавление материала пробки, при этом нижняя часть электрода электронагревателя открытого типа контактирует со скважинной электропроводящей жидкостью; после плавления пробки и спуска на максимальную глубину каротажного многожильного кабеля его фиксируют, подключают каждую его жилу к соответствующей фазе трехфазного источника тока, включают его, переводя кабель по всей его длине в режим нагревательного устройства, и выполняют полный прогрев затрубного и трубного пространства скважины; каждую фазу трехфазного источника тока снабжают регулятором тока, а в локальный электронагреватель вводят первый термодатчик, расположенный внутри его корпуса, и второй термодатчик, закрепленный на его внешней поверхности, при этом входы упомянутых регуляторов подключают к силовым выходам блока управления, а первый и второй термодатчики подключают к его измерительным входам, после чего каротажный кабель фиксируют на устье скважины, отсоединяют от физического и электрического контактов с барабаном лебедки и оставляют в подвешенном положении в скважине с возможностью периодического подключения к источнику трехфазного тока по мере необходимости.1. The method of destruction of paraffin, hydrate, hydrate-paraffin and ice deposits in production wells to maintain their operating mode, including the descent into the well to the upper boundary of the plug of the local electric heater on a multi-wire logging cable, the armor metal shell of which is connected to the metal body of the electric heater, characterized in that in the place of connecting the electric heater to the multicore cable, three cable conductors are connected together according to the “star” scheme, and one of the cable conductors on the surface and connected to the three-phase power source phase and the metal shell Book connected to its zero contact; the electric heater is lowered until it reaches the plug, then it is turned on and the plug material is melted, while the lower part of the open type electric heater electrode is in contact with the borehole electrically conductive fluid; after melting the plug and lowering to the maximum depth of the multicore logging cable, it is fixed, each core of it is connected to the corresponding phase of a three-phase current source, it is turned on, the cable is transferred along its entire length to the heating device mode, and the annulus and pipe space of the well are completely heated; each phase of the three-phase current source is equipped with a current regulator, and a first temperature sensor located inside its housing and a second temperature sensor mounted on its outer surface are introduced into the local electric heater, while the inputs of the mentioned regulators are connected to the power outputs of the control unit, and the first and second temperature sensors are connected to its measuring inputs, after which the wireline cable is fixed at the wellhead, disconnected from the physical and electrical contacts with the winch drum and left suspended dix downhole to periodically connect to a source of three-phase current as needed. 2. Способ разрушения парафиновых, гидратных, гидратопарафиновых и ледяных отложений в эксплуатационных скважинах для поддержания их рабочего режима по п. 1, отличающийся тем, что трехфазный источник тока и блок управления размещают на платформе наземного транспортного средства высокой проходимости.2. A method for destroying paraffin, hydrate, hydrate-paraffin and ice deposits in production wells to maintain their operating mode according to claim 1, characterized in that the three-phase current source and control unit are placed on a platform of a terrain vehicle with high cross-country ability. 3. Способ разрушения парафиновых, гидратных, гидратопарафиновых и ледяных отложений в эксплуатационных скважинах для поддержания их рабочего режима по п. 1, отличающийся тем, что блок управления выполняют на основе микропроцессорной системы.3. The method of destruction of paraffin, hydrate, hydrate-paraffin and ice deposits in production wells to maintain their operating mode according to claim 1, characterized in that the control unit is based on a microprocessor system.
RU2017129542A 2017-08-18 2017-08-18 Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime RU2655265C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2017129542A RU2655265C1 (en) 2017-08-18 2017-08-18 Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2017129542A RU2655265C1 (en) 2017-08-18 2017-08-18 Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime

Publications (1)

Publication Number Publication Date
RU2655265C1 true RU2655265C1 (en) 2018-05-24

Family

ID=62202670

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2017129542A RU2655265C1 (en) 2017-08-18 2017-08-18 Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime

Country Status (1)

Country Link
RU (1) RU2655265C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2728006C1 (en) * 2019-09-23 2020-07-28 Василий Александрович Отрадных Method of destruction of hydrate-paraffin and mechanical deposits

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2112134C1 (en) * 1995-09-13 1998-05-27 Товарищество с ограниченной ответственностью Научно-внедренческое предприятие "ТРИТОН-2" Gear breaking hydrate and paraffin plugs
RU2204698C1 (en) * 2001-11-19 2003-05-20 Багров Александр Иванович Method of elimination of hydrate and paraffin-hydrate plugs in wells and device for method embodiment
RU2398956C1 (en) * 2009-06-25 2010-09-10 Общество с ограниченной ответственностью "НТ" Procedure for removing paraffin-hydrate blocks in oil wells and facility for implementation of this procedure
CN204476361U (en) * 2015-03-25 2015-07-15 朱晓东 Paraffin removal from oil well viscosity-falling unit
RU2559975C1 (en) * 2014-06-02 2015-08-20 Владимир Александрович Кузнецов Heating method of well bottom hole area and device for its implementation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2112134C1 (en) * 1995-09-13 1998-05-27 Товарищество с ограниченной ответственностью Научно-внедренческое предприятие "ТРИТОН-2" Gear breaking hydrate and paraffin plugs
RU2204698C1 (en) * 2001-11-19 2003-05-20 Багров Александр Иванович Method of elimination of hydrate and paraffin-hydrate plugs in wells and device for method embodiment
RU2398956C1 (en) * 2009-06-25 2010-09-10 Общество с ограниченной ответственностью "НТ" Procedure for removing paraffin-hydrate blocks in oil wells and facility for implementation of this procedure
RU2559975C1 (en) * 2014-06-02 2015-08-20 Владимир Александрович Кузнецов Heating method of well bottom hole area and device for its implementation
CN204476361U (en) * 2015-03-25 2015-07-15 朱晓东 Paraffin removal from oil well viscosity-falling unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2728006C1 (en) * 2019-09-23 2020-07-28 Василий Александрович Отрадных Method of destruction of hydrate-paraffin and mechanical deposits

Similar Documents

Publication Publication Date Title
US7493962B2 (en) Control line telemetry
EP0940558B1 (en) Wellbore electrical heater
US6384389B1 (en) Eutectic metal sealing method and apparatus for oil and gas wells
EP2745365B1 (en) Integral splice for insulated conductors
CA2942717C (en) Insulated conductors formed using a final reduction step after heat treating
US10697249B2 (en) Method and assembly for downhole deployment of well equipment
RU2655265C1 (en) Method of destruction of paraffin, hydraulic, hydration-wax and ice deposits in development wells for support of their working regime
WO2010151176A2 (en) Method and device for eliminating paraffin deposits and hydrate plugs in oil and gas wells
RU2166615C1 (en) Process of dewaxing of oil and gas wells and plant for its realization
RU2204696C1 (en) Bottom-hole water heater for injection well
RU2455461C1 (en) Method of fluid flow heating in oil and gas well and installation for its implementation
RU2516303C2 (en) Device for thermal processing of hydrated gas accumulation
US2347589A (en) Liquid level indicating system for use in treating wells
RU2228431C2 (en) Device for prevention of forming and for elimination of asphalt-resin-paraffin sedimentations in well pipes
RU2449112C1 (en) Method of thermal rates regulating of oil wells and oil pipelines
RU101080U1 (en) OIL HEATING DEVICE
RU2563007C1 (en) Oil heating system
RU2007128329A (en) SELECTIVE ELECTROMAGNETIC DEVICE FOR MINING
RU220650U1 (en) WELL HEATING MODULE
RU2303127C2 (en) Device to eliminate hydrate and paraffin deposits in oil wells
US11293273B2 (en) Method and apparatus for downhole heating
RU2349744C2 (en) Method of well operation
RU2168002C1 (en) Method of eliminating paraffin-crystal hydrate plug in wells
SU1035200A1 (en) Deep-well electric heater
RU37765U1 (en) OIL WELL HEATER