RU2592623C2 - Space provision system using compression devices for reallocation of resources for development of new technology of existing and new deposits - Google Patents

Space provision system using compression devices for reallocation of resources for development of new technology of existing and new deposits Download PDF

Info

Publication number
RU2592623C2
RU2592623C2 RU2014103795/03A RU2014103795A RU2592623C2 RU 2592623 C2 RU2592623 C2 RU 2592623C2 RU 2014103795/03 A RU2014103795/03 A RU 2014103795/03A RU 2014103795 A RU2014103795 A RU 2014103795A RU 2592623 C2 RU2592623 C2 RU 2592623C2
Authority
RU
Russia
Prior art keywords
well
opening
drilling rig
depleted
geological
Prior art date
Application number
RU2014103795/03A
Other languages
Russian (ru)
Other versions
RU2014103795A (en
Inventor
Брюс Э. ТАНДЖЕТ
Original Assignee
Брюс Э. ТАНДЖЕТ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB1111482.4A external-priority patent/GB2484166B/en
Application filed by Брюс Э. ТАНДЖЕТ filed Critical Брюс Э. ТАНДЖЕТ
Publication of RU2014103795A publication Critical patent/RU2014103795A/en
Application granted granted Critical
Publication of RU2592623C2 publication Critical patent/RU2592623C2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Abstract

FIELD: geology.
SUBSTANCE: invention relates to means for producing geological space for tests in downhole conditions of new equipment for use in wells. Said system comprises at least one unproven downhole device comprising at least one drilling device with hydrodynamic bearing or downhole piston device. Said unproven downhole device includes an opening element for opening well without drilling unit configured to be actuated by at least by hydraulic means. Opening element for opening well without use of drilling unit is further configured for actuation by an explosion, a cable or a combination thereof, and configured for deployment through upper end of exhausted wells within one or more pipelines so that opening element opens inner opening in axial direction along and radially in wall. Debris, formed when opening inner opening, is placed and compressed in lower end of exhausted well for arrangement of hardening sealing material, hardening sealing material is placed in axial direction over debris and in wall at lower end of exhausted well for creation of similar geological structure over hardening sealing material, comparable with at least one part of geologic structure of well. Geological test space is configured for used for empirical measurement of operating parameters of at least one unproven downhole device. Proposed invention provides for cheaper methods for comparative analysis, development, testing and improvement of access to annular space and for selective placement of loaded pipelines and borehole barrier elements at necessary underground depths between annular space when accessing, maintaining and/or closing of parts of well to isolated parts by erosion and corrosion. This in turn prolongs service life of well until complete depletion of reservoir and also reduces risk associated with arrangement of borehole barrier elements and responsibility for environmental pollution from improperly liquidated well.
EFFECT: disclosed is a system for providing space for formation of geological test space for checking unproven devices with exhausted geological structure during closure of well.
32 cl, 30 dwg

Description

Данная заявка истребует приоритет на патентную заявку Великобритании GB1111482.4, озаглавленную "Cable Compatible Rig-Less Operable Annuli Engagement System For Using And Abandoning A Subterranean Well" (Кабелесовместимая и пригодная к работе без буровой установки система задействования затрубного пространства для использования и закрытия подземной скважины), поданную 5 июля 2011 года и на патентную заявку Великобритании GB1121742.9, озаглавленную "A Space Provision System Using Compression Devices For The Reallocation Of Resources To New Technology, Brownfield And Greenfield Developments" (Система обеспечения пространства с помощью устройств сжатия для перераспределения ресурсов на разработку новой технологии, существующих и новых месторождений), поданную 16 декабря 2011 года, каждая из которых включена сюда во всей полноте путем ссылки.This application claims priority for UK patent application GB1111482.4, entitled "Cable Compatible Rig-Less Operable Annuli Engagement System For Using And Abandoning A Subterranean Well" (CABLE) ), filed July 5, 2011 and UK patent application GB1121742.9, entitled "A Space Provision System Using Compression Devices For The Reallocation Of Resources To New Technology, Brownfield And Greenfield Developments" aspredeleniya resources for the development of new technologies, both existing and new fields), filed December 16, 2011, each of which is incorporated herein in its entirety by reference.

Область техникиTechnical field

Настоящее изобретение относится, в общем, к системам и способам, используемым для получения геологического испытательного пространства в скважинных условиях для проверки работы непроверенного скважинного устройства в старой геологической структуре и во время закрытия истощенной скважины без буровой установки, а также для перераспределения работы упомянутого скважинного устройства из непроверенного состояния в проверенное состояние, которая может произойти в среде с более низкими последовательностями отказов для, при использовании, предоставления новой технологии, которая зарекомендовала себя на практике во всех соответствующих геологических периодах и эпохах.The present invention relates, in General, to systems and methods used to obtain a geological test space in a borehole environment to verify the operation of an unverified downhole device in the old geological structure and during the closure of a depleted well without a drilling rig, as well as to redistribute the operation of the said downhole device from an unverified state to a verified state that can occur in an environment with lower failure sequences for, when used , Of a new technology that has proven itself in practice in all relevant geologic periods and eras.

Уровень техникиState of the art

Настоящее изобретение относится, в целом, к устройству и способам, применимым для закрытия скважин без буровых установок и формирования геологического испытательного пространства, применимого для перераспределения использования, например, буровых установок, на выполнение закрытий скважин и испытание или проверку новой технологии для других использований, включая использование проверенной технологии с упомянутыми буровыми установками для дальнейшей разработки существующих и новых подземных месторождений. Различные новые технологии, которые могут использоваться, испытываться и проверяться во время закрытия скважины без буровых установок, включают новые технологии, описанные в предыдущих заявках данного изобретателя, например: Патент Великобритании 2465478, озаглавленный "Apparatus And Methods For Operating A Plurality Of Wells Through A Single Bore" (Устройства и способы для эксплуатации нескольких скважин через один ствол); патентная заявка Великобритании GB1011290.2 и патентная заявка PCT GB2010/051108, обе озаглавлены "Apparatus And Methods For A Sealing Subterranean Borehole And Performing Other Cable Downhole Rotary Operations" (Устройства и способы для уплотнения подземной скважины и выполнения других кабельных скважинных вращательных операций) и обе поданы 5 июля 2010 года; патентная заявка Великобритании GB1021787.5, озаглавленная "Managed Pressure Conduit Assembly Systems And Methods For Using a Passageway Through Subterranean Strata" (Управляемые системы узлов напорных трубопроводов и способы использования каналов через подземный пласт), поданная 23 декабря 2010 года; патентная заявка Великобритании GB1015428.4, озаглавленная "Shock Absorbing Conduit Orientation Sensor Housing System" (Система размещения датчика ориентации ударопоглощающих трубопроводов), поданная 16 сентября 2010 года; заявка по договору о патентной кооперации (PCT) US2011/000377, озаглавленная "Manifold String For Selectively Controlling Flowing Fluid Streams of Varying Velocities In Wells From A Single Main Bore" (Манифольдная трубная колонна для избирательно управляемых потоков текучей среды с разными скоростями в скважинах из одного главного ствола), поданная 1 марта 2011 года, и патентная заявка Великобритании GB1104278.5 под тем же заглавием, поданная 15 марта 2011 года; Заявка PCT US2011/000372, озаглавленная "Строительство скважин с контролем давления, рабочие системы и способы, применимые для углеводородных операций, хранения и добычи растворением", поданная 1 марта 2011 года и патентная заявка Великобритании GB1104278.5 под тем же заглавием, поданная 15 марта 2011 года; патентная заявка Великобритании GB1116098.3, озаглавленная "Rig-less Abandonment Testing" (Испытание закрытия скважины без буровой установки), зарегистрированная 19 сентября 2011 года; патентная заявка Великобритании GB1121741.1, озаглавленная "Rotary Stick, Slip And Vibration Reduction Drilling Stabilizers With Hydrodynamic Fluid Bearings And Homogenizers" (Стабилизаторы бурения для уменьшения заклинивания, проскальзывания и вибрации с гидродинамическими подшипниками и гомогенизаторами), поданная 16 декабря 2011 года; и патентная заявка Великобритании GB1121743.7, озаглавленная "Cable Compatible Fluid Hydrodynamic And Homogenizing Bearing Rotary Steerable System For Drilling And Milling" (Кабелесовместимая система наклонного бурения и дробления с одновременным измерением их параметров и с гидродинамическими и гомогенизирующими подшипниками), поданная 16 декабря 2011 года, каждая из которых включена сюда во всей своей полноте путем ссылки.The present invention relates, in General, to a device and methods applicable for closing wells without drilling rigs and the formation of a geological test space, applicable to redistribute the use of, for example, drilling rigs, to perform well closures and test or test new technology for other uses, including the use of proven technology with the mentioned drilling rigs for the further development of existing and new underground deposits. Various new technologies that can be used, tested, and tested during well shut-ups without drilling rigs include new technologies described in previous applications of this inventor, for example: UK Patent 2465478, entitled "Apparatus And Methods For Operating A Plurality Of Wells Through A Single Bore "(Devices and methods for operating multiple wells through one trunk); UK Patent Application GB1011290.2 and PCT Patent Application GB2010 / 051108, both entitled "Apparatus And Methods For A Sealing Subterranean Borehole And Performing Other Cable Downhole Rotary Operations" and other cable downhole rotary operations) and both filed July 5, 2010; UK patent application GB1021787.5, entitled "Managed Pressure Conduit Assembly Systems And Methods For Using a Passageway Through Subterranean Strata", filed December 23, 2010; UK patent application GB1015428.4, entitled "Shock Absorbing Conduit Orientation Sensor Housing System", filed September 16, 2010; Patent Cooperation Treaty (PCT) Application US2011 / 000377 entitled "Manifold String For Selectively Controlling Flowing Fluid Streams of Varying Velocities In Wells From A Single Main Bore" one main trunk), filed March 1, 2011, and UK patent application GB1104278.5 under the same title, filed March 15, 2011; PCT Application US2011 / 000372, entitled “Well Control with Pressure Control, Operating Systems and Methods Applicable for Hydrocarbon Operations, Storage and Production by Dissolution”, filed March 1, 2011 and UK Patent Application GB1104278.5 with the same title, filed March 15 2011 year; UK patent application GB1116098.3, entitled "Rig-less Abandonment Testing", registered September 19, 2011; UK patent application GB1121741.1, entitled "Rotary Stick, Slip And Vibration Reduction Drilling Stabilizers With Hydrodynamic Fluid Bearings And Homogenizers", filed December 16, 2011; and UK patent application GB1121743.7 entitled "Cable Compatible Fluid Hydrodynamic And Homogenizing Bearing Rotary Steerable System For Drilling And Milling" filed on December 16, 2011 , each of which is incorporated herein in its entirety by reference.

Настоящее изобретение истребует приоритет, заявленный в предварительной заявке на патент GB1111482.4, который может быть использован, например, для обеспечения четырехмерного пространства путем включения дополнительного измерения геологического времени. До этого изобретения, относящегося к созданию и использованию четырехмерного пространства, в предыдущих заявках данного изобретателя речь шла о создании и использовании двумерных и трехмерных пространств, например, в патентной заявке GB1011290.2, где раскрываются способы и системы, используемые для обеспечения трехмерного применимого пространства внутри скважины, и в патентной заявке GB1116098.3, где раскрывается метод, применимый, например, для испытания герметизации трех- и/или четырехмерных пространств, которые герметизируются цементом или затвердевающим материалом.The present invention claims the priority claimed in provisional patent application GB1111482.4, which can be used, for example, to provide four-dimensional space by including an additional measurement of geological time. Prior to this invention related to the creation and use of four-dimensional space, previous applications of this inventor dealt with the creation and use of two-dimensional and three-dimensional spaces, for example, in patent application GB1011290.2, which discloses methods and systems used to provide three-dimensional applicable space inside wells, and in patent application GB1116098.3, which discloses a method applicable, for example, for testing the sealing of three- and / or four-dimensional spaces that are sealed with cement or hardening material.

Хотя различные аспекты этих предшествующих заявок, включая патентные заявки GB1011290.2 и GB1111482.4, касаются устройств и способов для гидравлически приводимых поршней, в настоящем изобретении рассматривается использование скважинного поршневого устройства, включающее открывающий элемент для открытия скважины без буровой установки, выполненный с возможностью приведения в действие гидравлически, взрывом, кабелем или их сочетаниями для образования геологического испытательного пространства. Кроме того, варианты воплощения настоящего изобретения включают устройства и способы использования геологического испытательного пространства для проверки одного или нескольких непроверенных скважинных устройств для работы в приблизительно сходной истощенной геологической структуры истощенной скважины, другой истощенной скважины (79), новой скважины (80) или группы скважин (79, 80), обычно называемых старыми месторождениями (79) и новыми месторождениями (80).Although various aspects of these previous applications, including patent applications GB1011290.2 and GB1111482.4, relate to devices and methods for hydraulically driven pistons, the present invention contemplates the use of a downhole piston device comprising an opening member for opening a well without a drilling rig configured to bring hydraulically, by explosion, by cable, or combinations thereof, to form a geological test space. In addition, embodiments of the present invention include devices and methods for using a geological test space to test one or more unverified borehole devices to operate in approximately the same depleted geological structure of a depleted well, another depleted well (79), a new well (80), or a group of wells ( 79, 80), commonly referred to as old deposits (79) and new deposits (80).

Кроме того, варианты воплощения настоящего изобретения, заявляющие приоритет на GB1121741.1, предоставляют устройство и способы получения двигателя с гидродинамическим подшипником, применимые, например, для привода дробящей поверхности на рычаге дробящего механизма или образуют часть, уменьшающую удары и вибрацию жидкости и/или электрических двигателей, которые могут быть применимы согласно данному изобретению при формировании подземного пространства.In addition, embodiments of the present invention, claiming priority on GB1121741.1, provide a device and methods for producing an engine with a hydrodynamic bearing, applicable, for example, to drive the crushing surface on the lever of the crushing mechanism or form a part that reduces shock and vibration of the liquid and / or electrical engines that may be applicable according to this invention in the formation of the underground space.

Несмотря на значительные положительные качества, различные новые технологии, описанные в предыдущих патентных заявках других изобретателей, может быть трудно применить из-за нежелания владельцев рисковать и олигополистических практик крупных поставщиков услуг, доминирующих в отрасли, которые, по понятным причинам, предпочитают использование технологии с самой высокой и быстрой нормой прибыли, таким образом затрудняя развитие новых технологий.Despite the significant positive qualities, various new technologies described in previous patent applications by other inventors can be difficult to apply due to the reluctance of owners to take risks and oligopolistic practices of large service providers dominating the industry, which, for obvious reasons, prefer to use the technology from the very high and fast profit margins, thus hampering the development of new technologies.

В конечном счете, прежде чем быть принятой, новая технология должна пройти испытание на месте и дальнейшую проработку с различными корректировками первоначального изобретения, что обеспечит надежное решение. Тем не менее несколько специалистов-практиков готовы рискнуть последствиями такого испытания новых технологий, в частности с учетом взрывного характера углеводородов и катастрофических событий в нефтегазовой отрасли в прошлые годы.Ultimately, before being adopted, the new technology must undergo a field test and further development with various adjustments to the original invention, which will provide a reliable solution. Nevertheless, several practitioners are ready to risk the consequences of such a test of new technologies, in particular, taking into account the explosive nature of hydrocarbons and the catastrophic events in the oil and gas industry in past years.

Операторы скважин сталкиваются с рядом проблем на каждом этапе жизненного цикла скважин, поскольку они стремятся сбалансировать необходимость максимально экономически выгодной добычи и снижение чистой приведенной стоимости ответственности за закрытие скважины для выполнения своих обязательств по безопасным и экологически чувствительным работам и закрытию объекта. Когда скважины теряют структурную целостность, которую можно определить как очевидная настоящая или возможная будущая потеря давления или способность гидродинамических подшипников и/или общая работоспособность, вся или часть скважины может быть закрыта на обслуживание или консервацию до окончательного закрытия или может потребовать немедленного закупоривания и закрытия, потенциально оставляя запасы в слоях, которые не могут оправдать затраты на вмешательства или на новую скважину.Well operators face a number of problems at each stage of the well life cycle, as they strive to balance the need for the most cost-effective production and the reduction in the net present value of the responsibility for shutting the well to fulfill their obligations for safe and environmentally sensitive work and shutting down the facility. When wells lose structural integrity, which can be defined as the apparent present or possible future loss of pressure or the ability of hydrodynamic bearings and / or overall performance, all or part of the well may be closed for maintenance or preservation until the final shutdown or may require immediate plugging and shutting, potentially leaving reserves in layers that cannot justify the costs of interventions or a new well.

Некоторые из наиболее часто описываемых проблем структурной целостности включают отсутствие централизации насосно-компрессорных труб, что ведет к эрозии системы трубопроводов из-за движения по тепловому циклу; коррозии в системе трубопроводов скважины; например, от биологических организмов или H2S, образующих утечки или разрушение трубопроводов или оборудования; и/или отказы клапанов, связанные с подземными предохранительными клапанами, газлифтными клапанами, клапанами кольцевого пространства и другим подобным оборудованием. Другие распространенные проблемы включают необъяснимое давление в кольцевом пространстве, отказы разъемов, отложения, износ обсадных труб от буровых работ, рост или усадку оголовка скважины и фонтанной арматуры устья или неисправности или утечки деревьев клапанов на поверхности или под водой. Такие вопросы включают области, где владельцы способны или выбрать испытание, и там имеются другие (такие как внутренние части кондуктора), которые они не могут или не испытывают, и которые могут представлять серьезную опасность для экономической жизнестойкости и окружающей среды. Проблемы внутри различных частей скважины, в частности, кольцевого пространства, не могут быть обычным способом доступны без значительного вмешательства или взлома также скважинных барьеров, например, с помощью буровой установки. Таким образом, эти значительные операции дорогостоящие и представляют значительный риск безопасности для владельцев, что неприемлемо для обычных подземных операций.Some of the most commonly described structural integrity problems include the lack of centralization of tubing, which leads to erosion of the piping system due to movement through the heat cycle; corrosion in the piping system of the well; for example, from biological organisms or H2S resulting in leaks or destruction of pipelines or equipment; and / or valve failures associated with underground safety valves, gas lift valves, annular space valves, and other similar equipment. Other common problems include unexplained annular pressure, connector failures, deposits, wear of casing from drilling, growth or shrinkage of the head of the well and fountain fittings, or malfunction or leakage of valve trees on the surface or under water. Such issues include areas where owners are capable of either choosing a test, and there are others (such as the interior of the conductor) that they cannot or do not experience, and which can pose a serious danger to economic viability and the environment. Problems within various parts of the well, in particular the annulus, cannot be accessed in the usual way without significant intervention or breaking into the well barriers, for example, using a drilling rig. Thus, these significant operations are expensive and pose a significant security risk to owners, which is unacceptable for ordinary underground operations.

Основным преимуществом использования буровых установок для доступа в скважину является удаление обсадных труб и доступ к кольцевому пространству во время доступа в скважину и закрытия, где возможность доступа и определения состояния кольцевой обсадной трубы и первичного цемента за промышленным трубопроводом или колонной обсадных труб могут быть использованы для принятия ключевых решений, касающихся будущей добычи и/или закрытия. Если же обсадные трубы скважины корродируют или теряют внешнее цементное кольцо, меры по исправлению положения, например расфрезеровывание обсадной колонны, может быть предпринято путем размещения буровой установки для обеспечения постоянного барьера. С другой стороны, проблема может усугубляться обычным закрытием скважины без буровых установок, когда слепые решения принимаются без доступа каротажа цемента к кольцевому пространству и попытки разместить цемент не получаются, в связи с чем размещение еще одного барьера над потенциально серьезной и ухудшающейся целостностью скважины приводит к тому, что может представлять значительную проблему в будущем, как технически, так и экономически, даже для буровой установки.The main advantage of using drilling rigs for access to the well is the removal of casing and access to the annular space during access to the well and closure, where the ability to access and determine the condition of the annular casing and primary cement behind an industrial pipeline or casing string can be used to make key decisions regarding future production and / or closure. If the well casing corrodes or loses the outer cement ring, corrective measures, such as milling the casing, can be taken by placing the rig to provide a permanent barrier. On the other hand, the problem can be aggravated by the usual closure of the well without drilling rigs, when blind decisions are made without cement logging access to the annular space and attempts to place cement fail, therefore placing another barrier over potentially serious and deteriorating well integrity leads to , which may be a significant problem in the future, both technically and economically, even for a drilling rig.

Воплощения по различным способам данного изобретения могут быть удобными для сравнительного анализа, разработки, испытания и совершенствования новой технологии, связанной с, например, сбором эмпирической информации, что при обычных операциях без буровой установки невозможно, путем предоставления доступа и/или места для обоих измерительных приборов и герметизирующих материалов. Как только такая информация собирается, еще другие варианты воплощения способа могут быть удобными для сравнительного анализа, разработки, испытания и совершенствования размещенных барьеров без буровых установок и расфрезеровывания или измельчения трубопроводов и/или подверженных обсадных труб для перекрытия через прочный непроницаемый слой или формации из покрывающих пород с целью размещения постоянных барьеров без втапливания оборудования в цемент для обеспечения структурной целостности.Implementations of the various methods of the present invention may be convenient for comparative analysis, development, testing and improvement of a new technology related, for example, to the collection of empirical information, which during normal operations without a drilling rig is impossible, by providing access and / or space for both measuring instruments and sealing materials. As soon as such information is collected, still other variants of the method embodiment may be convenient for comparative analysis, development, testing and improvement of placed barriers without drilling rigs and milling or grinding pipelines and / or susceptible casing pipes for overlapping through a strong impermeable layer or formations from covering rocks in order to place permanent barriers without flooding equipment into cement to ensure structural integrity.

В общем, возраст, как полагают, является основной причиной структурных проблем целостности скважины. Сочетание эрозии, коррозии и обычных усталостных трещин, связанное с длительной эксплуатацией месторождения, в частности в скважинах, превышающих свой расчетный срок службы, вместе с плохим расчетом, стандартами обеспечения монтажа и целостности, связанными с износом фонда скважин, как правило, приводят со временем к увеличенной частоте проблем. Эти проблемы могут быть еще более усугублены, например повышением уровней обводненности, интенсификации добычи и газлифта позже во время срока эксплуатации месторождения.In general, age is believed to be the main cause of structural integrity problems for the well. The combination of erosion, corrosion and conventional fatigue cracks associated with long-term field operation, in particular in wells exceeding their estimated service life, together with poor design, installation standards and integrity associated with wear of the well stock, usually lead over time to increased frequency of problems. These problems can be further exacerbated, for example, by increasing water cut levels, intensifying production and gas lift later during the life of the field.

Тем не менее, широко распространен обычный консенсус в том, что хотя возраст, несомненно, является серьезным вопросом, но если им правильно управлять, он не должен быть причиной структурных проблем целостности, которые могут привести к преждевременному прекращению добычи. Кроме того, полностью оскуделые зоны добычи из-за дальнейшей добычи перед закрытием обеспечивают среду снижения подземного давления, что может быть лучше подходит для размещения постоянных барьеров путем снижения склонности легких текучих сред, таких как газ, входить, например, в цемент во время размещения.However, the usual consensus is widespread that although age is undoubtedly a serious issue, if properly managed, it should not be the cause of structural integrity problems that could lead to premature termination of production. In addition, completely scarce production zones, due to further production before shutting down, provide an environment for lowering the underground pressure, which may be better suited to placing permanent barriers by reducing the tendency of light fluids such as gas to enter, for example, cement during placement.

Варианты воплощения данного изобретения обеспечивает более дешевые способы для сравнительного анализа, разработки, испытания и улучшения доступа к кольцевому пространству и для избирательного размещения нагруженных трубопроводов и скважинных барьерных элементов при необходимых подземных глубинах между кольцевым пространством при доступе, поддержании и/или закрытии частей скважины к изолированным частям, на которые влияет эрозия и коррозия. Это, в свою очередь, продлевает срок службы скважины до полного истощения пластового резервуара и, кроме того, уменьшает риск, связанный с размещением скважинных барьерных элементов и ответственность за загрязнение окружающей среды от ненадлежащим образом ликвидированной скважины.Embodiments of the present invention provides cheaper methods for comparative analysis, development, testing and improved access to the annular space and for the selective placement of loaded pipelines and downhole barrier elements at the required underground depths between the annular space when accessing, maintaining and / or closing parts of the well to isolated parts affected by erosion and corrosion. This, in turn, extends the life of the well to the complete depletion of the reservoir and, in addition, reduces the risk associated with the placement of downhole barrier elements and the responsibility for environmental pollution from improperly liquidated wells.

Уровень операций по обслуживанию, вмешательству и ремонту скважин, необходимый для технического обслуживания скважин ограничивается действительными обычными расходами, требуемыми для такой работы. Ограниченные объемы добычи истощающихся промыслов часто не могут оправдать обычную практику использования более дорогостоящих буровых установок, а обычная технология без буровой установки, как правило, не в состоянии обеспечить доступ к различным проходам или всем кольцевым пространствам в скважине.The level of well maintenance, intervention and repair operations required for well maintenance is limited by the actual normal costs required for such work. Limited production volumes of depleted fields often cannot justify the usual practice of using more expensive drilling rigs, and conventional technology without a drilling rig, as a rule, is not able to provide access to various passages or all annular spaces in the well.

Поэтому владельцы скважин, как правило, стараются избавиться от хлопотных промыслов и стремятся предотвратить проблемы в будущем с помощью усовершенствованных конструкций и не пытаются исправить плохо спроектированную скважину, что, в свою очередь, приводит к необходимости в большем внимании к ликвидации промыслов, проектированию скважин, монтажу и/или обеспечению целостности. Однако перекладывание проблемы на других при продаже скважины не означает с точки зрения ответственности решения вопроса закрытия существующих и истощенных скважин.Therefore, well owners, as a rule, try to get rid of troublesome fields and seek to prevent problems in the future with the help of improved designs and do not try to fix a poorly designed well, which, in turn, leads to the need for more attention to the elimination of fields, well design, installation and / or ensuring integrity. However, shifting the problem to others when selling wells does not mean, from the point of view of responsibility, solving the issue of closing existing and depleted wells.

Когда требуется вмешательство, крупные нефтяные и газовые компании, не желающие рисковать, обычно предпочитают такие операции, как ликвидация и замена, чем восстановление, и способствуют продаже истощенных скважинных промыслов менее крупным компаниям с более низкими накладными расходами и более высокой устойчивостью к риску. Небольшие компании, требующие более низкую прибыль для покрытия предельной стоимости, как правило, стремятся приобрести такие предельные активы, но в будущем могут оказаться не в состоянии позволить себе ликвидацию скважин, тем самым перекладывая ответственность за это на первоначального владельца, что препятствует продаже или образует ложную экономию для продавца. Дешевые надежные размещения скважинных барьерных элементов без буровой установки для задержания или выполнения закрытия, имеют решающее значение для больших или меньших компаний, если истощенные промыслы должны быть куплены и проданы и/или во избежание таких ложных экономий. Таким образом, способы и элементы данного изобретения без использования буровой установки, применимые для размещения и проверки скважинных барьерных элементов для надежного закрытия, имеют важное значение для всех компаний, работающих, продающих и/или покупающих истощенные скважины.When intervention is required, large oil and gas companies that do not want to take risks usually prefer operations such as liquidation and replacement rather than restoration, and help sell depleted well fields to smaller companies with lower overhead and higher risk tolerance. Small companies that require lower profits to cover marginal cost tend to acquire such marginal assets, but in the future may not be able to afford the liquidation of wells, thereby shifting responsibility for this to the original owner, which impedes the sale or creates a false savings for the seller. Cheap, reliable placement of downhole barrier elements without a rig to delay or perform closure is critical for larger or smaller companies if depleted fields must be bought and sold and / or to avoid such false savings. Thus, the methods and elements of the present invention without the use of a drilling rig, applicable for placement and testing of downhole barrier elements for reliable closure, are important for all companies operating, selling and / or buying depleted wells.

Таким образом, структурная целостность добывающих и закрывающихся скважин имеет решающее значение, потому что ответственность за закрытие скважин не может быть передана, если скважина, в конце концов, дает утечку загрязнений на поверхность, на уровень грунтовых вод или в океанические среды, поскольку большинство правительств делают ответственными всех предыдущих владельцев за ее закрытие и экологические последствия, связанные с последующим загрязнением. Таким образом, продажа ответственности скважин не обязательно заканчивает риск, когда промысел будет продан или закрыт, если окончательное закрытие не обеспечит постоянную структурную целостность.Thus, the structural integrity of producing and shutting wells is crucial because the responsibility for shutting down the wells cannot be transferred if the well ultimately leaks contaminants to the surface, groundwater level, or ocean environments, as most governments do responsible of all previous owners for its closure and environmental consequences associated with subsequent pollution. Thus, the sale of well liability does not necessarily end the risk when the field is sold or closed, unless the final closure provides permanent structural integrity.

Воплощения методов представляемого изобретения применимы для выполнения сравнительного анализа, разработки, испытания и совершенствования доступа к скважине и ее обслуживания без использования буровой установки с целью продления срока службы скважины путем размещения барьерных элементов для изоляции или закрытия части скважины; и затем, работы с другой частью скважины, пока существует дальнейшая рентабельная добыча или целостность скважины предотвращает дальнейшие операции извлечения или хранения. После этого скважина может быть полностью и навсегда закрыта на неопределенный период времени с помощью воплощений данного изобретения для доступа без использования буровой установки и избирательного доступа к кольцевому пространству и для размещения и проверки скважинных барьеров, в том числе барьеров, которые обеспечивают геологическое испытательное пространство для указанного выше сравнительного анализа, разработки, испытания и улучшения новой технологии.Embodiments of the methods of the present invention are applicable for comparative analysis, development, testing and improvement of access to and maintenance of a well without using a rig to extend the well’s life by placing barrier elements to isolate or close part of the well; and then, working with another part of the well while there is further cost-effective production or well integrity prevents further extraction or storage operations. After that, the well can be completely and permanently closed for an indefinite period of time using embodiments of the present invention for access without using a rig and selective access to the annular space and for placing and checking downhole barriers, including barriers that provide a geological test space for the specified above benchmarking, developing, testing and improving new technology.

Таким образом, существует потребность в улучшенной стабильности бурения и направленных буровых снарядах для работ с сочлененными и вращающимися колоннами из гибких труб.Thus, there is a need for improved drilling stability and directional drill bits for working with articulated and rotating strings of flexible pipes.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новых технологий для задержанного закрытия, которые могут быть применимы для малозатратных операций без буровой установки для размещения барьерных элементов скважин с целью увеличения отдачи на вложенный капитал для как преимущественно углеводородных и преимущественно водяных скважин через уход в сторону боковым стволом без буровой установки для усиления предельной добычи, приостановления и/или закрытия частей скважины, для повторного создания или продления структурной целостности истощающихся и сохраняющихся скважинных промыслов и предотвращения загрязнения подземных горизонтов, например горизонта грунтовых вод, поверхностных и океанских сред.There is a need for devices and methods applicable for the comparative analysis, development, testing and improvement of new technologies for delayed closure, which may be applicable for low-cost operations without a drilling rig to place barrier elements of wells in order to increase the return on invested capital for both predominantly hydrocarbon and predominantly water wells through sidetracking without a rig to enhance marginal production, suspension and / or closure I parts of the well, to re-create or extend the structural integrity of depleted and persisting well operations and to prevent pollution of underground horizons, such as the horizon of groundwater, surface and ocean environments.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новых технологий, которые могут быть использованы для работ по размещению барьерных элементов скважины без буровой вышки, требующих мало места, применимых для контроля затрат и/или управления операциями в закрытом пространстве, например операциями с электрическими кабелями или тросовыми канатами, на обычно необслуживаемых людьми платформах, от платформ над подводными морскими скважинами или в экологически чувствительной зоне, например, районах вечной мерзлоты, где вызывают опасения неблагоприятные условия окружающей среды и воздействия на окружающую среду. С этим связана также необходимость в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, применимой для работы в закрытой контролируемой оболочке под давлением для предотвращения подвержения как рабочего персонала, так и среды риску потери контроля за подземными давлениями, если столб утяжеленного раствора для глушения скважин при работе в скважине теряется, например, из-за подземных трещин.There is a need for devices and methods applicable for comparative analysis, development, testing and improvement of new technologies that can be used for placement of barrier elements of a well without a drilling tower, requiring little space, applicable for controlling costs and / or managing closed operations space, such as operations with electric cables or cable ropes, on platforms that are generally unattended by people, from platforms above subsea boreholes or in an environmental and sensitive areas, such as permafrost areas, where unfavorable environmental conditions and environmental impacts cause concern. Related to this is the need for devices and methods applicable for the comparative analysis, development, testing and improvement of new technology applicable for operation in a closed controlled enclosure under pressure to prevent exposure of both working personnel and the environment to the risk of losing control of underground pressures, if the column of the weighted solution for killing wells when working in the well is lost, for example, due to underground cracks.

Существует потребность в устройствах и способах для сравнительного анализа, разработки, испытания и совершенствования новой технологии, применимой во избежание высокой стоимости буровых установок с помощью системы без буровой установки, способной к приостановлению, забуриванию боковых стволов и/или закрытию скважин на суше и на море, поверхности и под водой, преимущественно углеводородных и преимущественно водных скважин, используя опубликованные обычные рекомендации по размещению применимых в отрасли долговременных скважинных барьерных элементов скважины для ее закрытия.There is a need for devices and methods for comparative analysis, development, testing and improvement of a new technology applicable to avoid the high cost of drilling rigs using a system without a drilling rig, capable of suspending, drilling sidetracks and / or closing wells on land and at sea, surface and under water, mainly hydrocarbon and mainly water wells, using published routine recommendations for placing industry-applicable long-term borehole bars borehole elements of the well for its closure.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новых технологий, которые могут быть применимы для предотвращения рисков и для устранения затрат на защиту персонала и окружающую среду от оборудования скважины, загрязненного радиоактивными материалами и отложениями путем размещения закрывающих барьеров без буровой установки и оставления оборудования в скважине. Еще существует необходимость в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которая может быть полезной для участков скважины без буровой установки с забуренными боковыми стволами или с трещинами в скважине для утилизации опасных материалов, которые могут получиться из циркуляции столба флюида скважин во время операций приостановления, нарезки боковых стволов или закрытия.There is a need for devices and methods applicable for comparative analysis, development, testing and improvement of new technologies that can be applied to prevent risks and to eliminate the costs of protecting personnel and the environment from well equipment contaminated with radioactive materials and deposits by placing closure barriers without a rig and leaving equipment in the well. There is still a need for devices and methods applicable for comparative analysis, development, testing and improvement of a new technology that can be useful for sections of a well without a drilling rig with drilled sidetracks or with cracks in the well for the disposal of hazardous materials that can be obtained from circulation well fluid column during suspension, sidetracking, or closure operations.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которая может быть полезной для доступа без буровой вышки к кольцевому пространству с целью измерения, приемлема ли уплотнительная цементация за обсадной колонной и для расфрезеровывания обсадной трубы без буровой установки и размещения цемента, если нет приемлемой цементации. Кроме того, существует необходимость в устройствах и способах для сравнительного анализа, разработки, испытания и улучшения новой технологии, которая может быть применима для проверки размещения барьерных элементов скважины во время операций без буровой установки для обеспечения успешного связывания и уплотнения затвердевающего материала в канале скважины или ответа на вопрос о необходимости проведения дополнительных ремонтных работ.There is a need for devices and methods applicable for comparative analysis, development, testing and improvement of a new technology that can be useful for accessing without an oil rig to the annular space in order to measure whether sealing cementation behind the casing is acceptable and for milling the casing without a drill installation and placement of cement, if there is no acceptable cementation. In addition, there is a need for devices and methods for comparative analysis, development, testing and improvement of a new technology that can be applied to verify the placement of well barrier elements during operations without a drilling rig to ensure successful bonding and compaction of the hardened material in the well channel or response to the question of the need for additional repairs.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которая может быть полезной для доступа без буровой вышки к кольцевому пространству, в настоящее время недоступному, частично с обычными канатными операциями без буровой установки и с минимальным занимаемым местом, включая обход закупорок кольцевого пространства, создаваемых, например добычными пакерами, в ходе размещения постоянных барьерных элементов скважины в пределах выбранных частей скважины от края до края покрывающих горных пород и других непроницаемых образований, необходимых для изоляции подземных давлений в течение геологического времени.There is a need for devices and methods applicable for comparative analysis, development, testing and improvement of a new technology that can be useful for access without a rig to the annular space, currently inaccessible, partly with conventional cable operations without a drilling rig and with a minimum of occupied a place, including bypassing the blockages of the annular space created, for example, by production packers, during the placement of permanent barrier elements of the well within the selected parts wells from edge to edge of the overlying rocks and other impermeable formations necessary to isolate underground pressures during geological time.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которая может быть полезной для множества постоянных скважинных барьеров, которые проверяются через выборочно доступные кольцевые каналы с помощью операций без буровой установки, которые можно использовать с обычными каротажными устройствами для поддержания структурной целостности скважины до окончательного закрытия и которые также обеспечивают доступ для размещения постоянных барьеров с целью обеспечения после этого структурной целостности пластовой скважины.There is a need for devices and methods applicable for comparative analysis, development, testing and improvement of a new technology that can be useful for a variety of permanent downhole barriers that are checked through selectively accessible annular channels using operations without a drilling rig, which can be used with conventional logging devices to maintain the structural integrity of the well until final closure and which also provide access to accommodate permanent barriers s to ensure that after formation of the structural integrity of the well.

Существует потребность в устройстве и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, применимой для предельного повышения добычи с целью компенсации производственных затрат до окончательного закрытия, в том числе обеспечения целостности скважины без буровой установки во время ожидания, пока операции по закрытию нескольких скважин можно будет использовать для дальнейшего сокращения расходов.There is a need for a device and methods applicable for comparative analysis, development, testing and improvement of a new technology applicable to maximize production to compensate for production costs before final shutdown, including ensuring the integrity of a well without a drilling rig while waiting for operations the closure of several wells can be used to further reduce costs.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которые могут быть полезными для снижения ответственности за закрытие скважины для владельцев во время выполнения своих обязанностей в отношении структурной целостности скважины, а также для безопасных и экологически чувствительных скважинных операций, приостановления и закрытия экономным образом, что согласуется с предоставлением большего капитала для разработки новых запасов с целью удовлетворения растущего спроса в мире на углеводороды путем минимизации стоимости операций, приостановления и закрытия скважин с более низкой стоимостью технологий приостановки, нарезки боковых стволов и закрытия скважин без буровых установок.There is a need for devices and methods applicable for the comparative analysis, development, testing and improvement of new technology, which may be useful for reducing the responsibility for well closure for owners during the performance of their duties regarding the structural integrity of the well, as well as for safe and environmentally sensitive downhole operations, suspension and closures in an economical manner, which is consistent with the provision of more capital for the development of new reserves in order to to meet the growing world demand for hydrocarbons by minimizing the cost of operations, suspension and closure of wells with lower costs of technology for suspension, sidetracking and closure of wells without drilling rigs.

Существует потребность в устройствах и способах, применимых для сравнительного анализа, разработки, испытания и совершенствования новой технологии, которые могут быть полезными для проверки закрытий скважины без буровой установки с целью способствования рынку, где уменьшение ответственности за закрытие скважин позволяет компаниям с более крупными накладными расходами продавать промыслы предельных скважин более мелким компаниям с более низкими накладными расходами, то есть снижением возникновения риска остаточной ответственности для предотвращения предельных извлекаемых запасов из оставленных в пласту, потому что требования более высоких накладных расходов делают такие извлекаемые запасы нерентабельными.There is a need for devices and methods applicable for the comparative analysis, development, testing and improvement of new technology that may be useful for testing well closures without a drilling rig in order to promote a market where decreasing responsibility for closing wells allows companies with larger overhead costs marginal well harvesting to smaller companies with lower overheads, i.e. reducing the risk of residual liability To prevent limit recoverable reserves from the left in the reservoir, because the demands of higher overheads make such recoverable reserves uneconomic.

Наконец, существует потребность в системах и способах, которые можно использовать с существующими и новыми технологиями для предоставления достаточно недорогих способов, требующих мало или дешевых ресурсов для получения геологического испытательного пространства с целью проверки новых или непроверенных скважинных устройств.Finally, there is a need for systems and methods that can be used with existing and new technologies to provide fairly inexpensive methods that require little or cheap resources to obtain a geological test space in order to test new or unverified downhole devices.

Хотя варианты воплощения данного изобретения могут рассматриваться с целью создания нового рынка из существующего рынка, это обобщение может быть очевидным в нескольких существенно важных предшествующих изобретениях, например, изобретение парового двигателя, который привел к образованию нового рынка, который был в ходе исторического развития обобщен как промышленная революция; изобретение каротажного устройства в процессе бурения, который сформировал рынок направленного бурения, и изобретение гидравлического забойного двигателя бурового раствора, который образовал рынок горизонтального бурения, когда обычные и предыдущие устройства существующих рынков во время каждого из этих изобретений не могли отвечать тем же необходимым потребностям. Таким образом, данное изобретение может привести к образованию рынка испытания устройств для непроверенных скважин просто потому, что в настоящее время нет такого рынка испытания устройств для скважин.Although embodiments of this invention may be considered in order to create a new market from an existing market, this generalization may be apparent in several significant prior inventions, for example, the invention of a steam engine that led to the formation of a new market that was generalized in the course of historical development as an industrial revolution; the invention of a logging device during the drilling process, which formed the directional drilling market, and the invention of the hydraulic downhole drilling mud motor, which formed the horizontal drilling market, when conventional and previous devices of existing markets during each of these inventions could not meet the same necessary needs. Thus, this invention can lead to the formation of a market for testing devices for untested wells simply because there is currently no such market for testing devices for wells.

Таким образом, данное изобретение не только предоставляет важное решение о необходимости скважинного испытания и проверки устройства, но и предоставляет новый рынок в скважинном испытании, который необходим, потому что обычно работающее скважинное устройство на практике является более искусством, чем наукой. Научные данные можно считать недостаточными, так как, например, они полностью полагаются на поверхностные показания и проходящие под землей и отраженные сигналы скважинных приборов, которые располагаются в пределах опасной геологической среды, которая подвергается воздействиям экстремальных сил, веществ, давлений и температур, миль ниже поверхности земли. Таким образом, практик обычно больше полагается на эмпирически доказанные операции, чем на научные теории работы.Thus, this invention not only provides an important decision on the need for downhole testing and device verification, but also provides a new market in downhole testing, which is necessary because a normally working downhole device is in practice more art than science. Scientific data can be considered insufficient, because, for example, they fully rely on surface readings and underground and reflected signals from downhole tools that are located within a hazardous geological environment that is exposed to extreme forces, substances, pressures and temperatures, miles below the surface land. Thus, the practitioner usually relies more on empirically proven operations than on scientific theories of work.

Вещества, давления и температуры, связанные с чередующимися слоями проницаемого и непроницаемого подземного пласта, невозможно спрогнозировать с помощью использования отскока отраженных сигналов от подземных отражающих границ геологической структуры, геологических разломов и почти бесконечное число событий подсейсмической разрешенности, стратиграфии и литологии. Таким образом, геологическая среда не может быть научно предсказана с точностью эмпирических рабочих данных скважинного устройства из вышеуказанной геологической структуры.Substances, pressures and temperatures associated with alternating layers of permeable and impermeable underground strata cannot be predicted by using the bounce of reflected signals from underground reflecting boundaries of the geological structure, geological faults and an almost infinite number of events of subseismic resolution, stratigraphy and lithology. Thus, the geological environment cannot be scientifically predicted with the accuracy of the empirical operational data of the downhole device from the above geological structure.

Соответственно, специалисты-практики часто избегают использования непроверенной технологии в геологической среде и используют устройства с эмпирически доказанной эксплуатацией в ожидаемой геологической среде в связи с потенциально экстремальными затратами и рисками, связанными с функционированием при воздействии экстремальных геологических сил, веществ, давлений и температур, миль ниже поверхности земли.Accordingly, practitioners often avoid the use of unverified technology in the geological environment and use devices with empirically proven operation in the expected geological environment due to the potentially extreme costs and risks associated with operating under the influence of extreme geological forces, substances, pressures and temperatures, miles below the surface of the earth.

Следовательно, работа в сопоставимой геологической среде, в конечном счете, является обычной приемлемой мерой, когда практики, как правило, не желают принимать риск быть первыми, кто доказал и использовал непроверенное устройство в конкретной геологии.Therefore, working in a comparable geological environment is ultimately the usual acceptable measure when practitioners are generally reluctant to take the risk of being the first to prove and use an unverified device in a particular geology.

Как правило, обычные специалисты-практики хотели бы встретиться с известной проблемой, например, гармоническим резонансом и вибрацией буровой колонны, чем принять риск испытания непроверенного устройства, а оно, например, распадалось на части и вызывало значительно больший риск и затраты в процессе удаления потерянных деталей из ствола скважины.As a rule, ordinary practitioners would like to meet a well-known problem, for example, harmonic resonance and vibration of a drill string, than to take the risk of testing an unverified device, and it, for example, fell apart and caused a significantly greater risk and cost in the process of removing lost parts from the wellbore.

Соответственно существует потребность в более низком риске и более дешевой системе и способе проверки непроверенной технологии.Accordingly, there is a need for a lower risk and cheaper system and method for verifying untested technology.

Различные аспекты данного изобретения удовлетворяют эти потребности.Various aspects of the present invention satisfy these needs.

Сущность изобретенияSUMMARY OF THE INVENTION

Настоящее изобретение относится, в общем, к системам и способам предоставления пространства, применимым для формирования геологического испытательного пространства, например, в пределах скважины с ответственностью за ее закрытие, для проверки работы непроверенного скважинного устройства (т.е. новой технологии) с помощью, например, бурового устройства (1А, 1E, 1BM, 9AA, 92D) с гидродинамическим подшипником или скважинного поршневого устройства (1А, 1AF, 92А-92C, 92E-92G), где оба эти устройства включают открывающий элемент (92) для открытия скважины, не имеющей буровой установки, который может приводиться в действие, в частности, гидравлическими средствами. Кроме того, открывающие элементы для открытия скважины могут быть дополнительно приведены в действие посредством взрыва, кабеля или их комбинацией.The present invention relates, in General, to systems and methods for providing space applicable for the formation of a geological test space, for example, within a well with the responsibility for closing it, to verify the operation of an unverified downhole device (i.e., new technology) using, for example a drilling device (1A, 1E, 1BM, 9AA, 92D) with a hydrodynamic bearing or a downhole piston device (1A, 1AF, 92A-92C, 92E-92G), where both of these devices include an opening element (92) for opening the well, not I have general drilling rig, which can be driven, in particular, by hydraulic means. In addition, the opening elements for opening the well can be further actuated by an explosion, cable, or a combination thereof.

Варианты воплощения данного изобретения обеспечивают значительное улучшение существующей техники, где геологическое испытание по данному изобретению применимо для эмпирического подтверждения любого нового или непроверенного скважинного устройства в геологической среде, в том числе, но не ограничиваясь ими, устройства или новых технологий автора изобретения, для проверенного использования на скважинах с аналогичными геологическими условиями.Embodiments of the present invention provide a significant improvement in existing technology where the geological test of this invention is applicable to empirically validate any new or unverified downhole device in the geological environment, including, but not limited to, the device or new technologies of the inventor, for proven use on wells with similar geological conditions.

Варианты воплощения могут использоваться по отдельности или могут быть в сочетании, например, с различными технологиями и способами данного изобретателя для предоставления систем и способов использования устройств без буровой установки для преобразования реальной ответственности за закрытие скважины в реальный актив скважины с геологической проверкой, что может быть применимым для проверки операций с буровой установкой или без нее непроверенного скважинного устройства, такого как гидродинамический подшипник, который может использоваться в любой вращающейся бурильной колонне и который потенциально могла бы повысить эффективность всех операций вращающегося бурения за счет сокращения последствий неблагоприятных ударов, вибрации, водоворота и гармонического резонанса операций вращения.Embodiments may be used individually or may be combined, for example, with various technologies and methods of the present inventor to provide systems and methods for using devices without a drilling rig to convert real responsibility for shutting a well into a real well asset with geological verification, which may be applicable to verify operations with or without a rig, an unverified downhole device, such as a hydrodynamic bearing, that can use entanglement in any rotating drill string and which could potentially increase the efficiency of all rotating drilling operations by reducing the effects of adverse impacts, vibration, whirlpool and harmonic resonance of rotation operations.

Предпочтительные варианты воплощения данного изобретения могут обеспечить систему предоставления пространства аппарата и способа (10, 10А-10Н) для образования геологического испытательного пространства с целью проверки операции, по крайней мере, одного непроверенного скважинного аппарата (78, 92) в истощенной геологической структуре и во время закрытия истощенной скважины без буровой установки при использовании, перераспределения работы названного по меньшей мере одного непроверенного скважинного устройства, из непроверенного состояния до проверенного состояния в приблизительно схожей истощенной геологической структуре упомянутой истощенной скважины (79), новой скважины (80) или группы упомянутых скважин (79, 80).Preferred embodiments of the present invention can provide a system for providing the space of the apparatus and method (10, 10A-10H) to form a geological test space in order to verify the operation of at least one unverified downhole apparatus (78, 92) in a depleted geological structure and during shutting down a depleted well without a drilling rig when using, redistributing the work of said at least one unverified downhole device from an unverified state to trusted state in approximately similar depleted geological structure of said depleted wells (79), the new borehole (80) or a group of said wells (79, 80).

Предпочтительные варианты воплощения могут содержать по меньшей мере одно буровое устройство с гидродинамическим подшипником (1А, 1E, 1BM, 9AA, 92D) или скважинное поршневое устройство (1А, 1AF, 92А-92C, 92E-92G), где по меньшей мере одно непроверенное скважинное устройство может содержать открывающий элемент (92) для открытия скважины без буровой установки, выполненный с возможностью приведения в действие по меньшей мере посредством гидравлических средств, причем открывающий элемент для открытия скважины без буровой установки дополнительно выполнен с возможностью приведения в действие взрывом, кабелем или их комбинацией и может быть размещен через верхний конец упомянутой истощенной скважины в пределах одного или более трубопроводов, имеющих, по меньшей мере, внутреннее отверстие в стенке по меньшей мере одного концентрического окружающего отверстия, которое входит в зацепление посредством упомянутого открывающего элемента для открытия скважины без буровой установки во время закрытия нижнего конца упомянутой истощенной скважины, так что открывающий элемент для открытия скважины без буровой установки может открыть указанное внутреннее отверстие вдоль осевого направления скважины и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия. Обломочная порода (91) с момента открытия упомянутого внутреннего отверстия может утилизироваться и сжиматься в нижнем конце истощенной скважины для размещения затвердевающего герметизирующего материала. Затвердевающий герметизирующий материал может быть размещен в осевом направлении над обломочной породой и в стенке по меньшей мере одного концентрического окружающего отверстия в нижней части истощенной скважины для обеспечения схожей геологической структуры над затвердевающим герметизирующим материалом, что сопоставимо, по меньшей мере, с одной частью геологической структуры истощенной скважины, геологической структуры другой истощенной скважины, геологической структуры новой скважины или геологической структуры группы скважин для образования, при использовании, геологического испытательного пространства.Preferred embodiments may comprise at least one hydrodynamic bearing drilling device (1A, 1E, 1BM, 9AA, 92D) or a downhole piston device (1A, 1AF, 92A-92C, 92E-92G), where at least one unchecked borehole the device may include an opening element (92) for opening a well without a drilling rig, configured to be actuated by at least hydraulic means, and the opening element for opening a well without a drilling rig is further configured the possibility of actuation by explosion, cable, or a combination thereof, and can be placed through the upper end of said depleted well within one or more pipelines having at least an internal hole in the wall of at least one concentric surrounding hole that engages by said opening element for opening a well without a drilling rig during closing of the lower end of said depleted well, so that an opening element for opening a well without a rig, it can open said inner hole along the axial direction of the well and radially inward of the wall of at least one concentric surrounding hole. Clastic rock (91) from the moment of opening of the said internal hole can be disposed of and compressed at the lower end of the depleted well to accommodate the hardening sealing material. The hardening sealing material can be axially positioned above the clastic rock and in the wall of at least one concentric surrounding hole in the lower part of the depleted well to provide a similar geological structure over the hardening sealing material, which is comparable to at least one part of the geological structure of the depleted wells, the geological structure of another depleted well, the geological structure of a new well, or the geological structure of a group of wells for the formation, when used, of a geological test space.

Кроме того, предпочтительные варианты воплощения предоставляют геологическое испытательное пространство, применимое для эмпирического измерения рабочих параметров по меньшей мере одного непроверенного скважинного устройства (78, 92), где геологическое испытательное пространство содержит по меньшей мере одно непроверенное скважинное устройство (78) для предоставления эмпирических данных с целью адаптации или проверки по меньшей мере одного непроверенного скважинного устройства, при использовании, для перераспределения работы по меньшей мере одного непроверенного скважинного устройства, из проверенной до проверенной работы в геологическом испытательном пространстве для использования в схожей геологической структуре истощенной скважины, другой истощенной скважины, новой скважины или группы упомянутых скважин.In addition, preferred embodiments provide a geological test space applicable for empirically measuring the operating parameters of at least one unverified downhole device (78, 92), where the geological test space contains at least one unverified downhole device (78) for providing empirical data with the purpose of adapting or checking at least one unverified downhole device, when used, to redistribute work to less s unverified least one downhole device, of proven proven to work in the geological testing area for use in similar geological structure depleted wells, another well-drained, new well or a group of said wells.

Различные варианты воплощения могут предоставить открывающий элемент (92) для открытия скважины без буровой установки, содержащий режущее устройство без буровой установки для высвобождения обломочной породы (91) из зацепления, что предотвращает размещение и сжатие упомянутой обломочной породы в нижнем конце истощенной скважины.Various embodiments may provide an opening element (92) for opening a well without a drilling rig, comprising a cutting device without a drilling rig for releasing debris (91) from engagement, which prevents placement and compression of said debris in the lower end of the depleted well.

Смежные варианты воплощения могут предоставить открывающий элемент (92, 1А, 1E, 1BM, 92D) для открытия скважины без буровой установки, содержащий по меньшей мере один гидродинамический подшипник (1), который расположен вокруг вала (2) и наружной стенки (5) режущего устройства (112) и расположен в упомянутой стенке упомянутого концентрического окружающего отверстия (7), по меньшей мере с одной периферийной дуговой стенкой (4) в радиальном направлении, расположенным вокруг периферии корпуса вала трубопровода (14, 14а) и расширяющимся от него, а также вокруг по меньшей мере одной внутренней стенки (6), которая примыкает по меньшей мере к одной связанной гидродинамической профилированной стенке (3). Открывающий элемент для открытия скважины без буровой установки выполнен с возможностью вращения валом или вокруг вала для смещения жидкости в осевом направлении вдоль упомянутой по меньшей мере одной внутренней стенки, которая закреплена комбинированными сцеплениями силами трения буровой жидкости по меньшей мере одной связанной гидродинамической профилированной стенки (3), по меньшей мере одной внутренней стенки (6), по меньшей мере одной периферийной дуговой стенки (4) и/или стенки по меньшей мере одного концентрического окружающего отверстия (7), чтобы обеспечить прохождение под давлением буровой жидкости между смежным набором по меньшей мере двух из упомянутых стенок. Варианты воплощения включают в себя жидкости, которые могут быть смещены для образования подпрессованной (8) подушки, которая гидравлически сообщается с набором по меньшей мере двух стенок для работы, при использовании, режущих устройств (112, 116) с целью образования обломочной породы (91), когда смазка и амортизирование связывают вращательные удары и вибрации со срезывающим усилием сцепления силами трения при удержании вала во время вращения режущего устройства в стенке по меньшей мере одного концентрического окружающего отверстия.Adjacent embodiments may provide an opening element (92, 1A, 1E, 1BM, 92D) for opening a well without a drilling rig, comprising at least one hydrodynamic bearing (1) that is located around the shaft (2) and the outer wall (5) of the cutting device (112) and is located in said wall of said concentric surrounding hole (7) with at least one peripheral arc wall (4) in a radial direction located around and extending from the periphery of the pipeline shaft housing (14, 14a), and also around at least one inner wall (6), which is adjacent to at least one associated hydrodynamic shaped wall (3). An opening element for opening a well without a drilling rig is arranged to rotate with a shaft or around the shaft to displace fluid in the axial direction along the at least one inner wall, which is fixed by combined friction forces of the drilling fluid of at least one associated hydrodynamic shaped wall (3) of at least one inner wall (6) of at least one peripheral arc wall (4) and / or wall of at least one concentric surrounding tverstiya (7) to allow passage of pressurized drilling fluid between the adjacent set of at least two of said walls. Embodiments include liquids that can be displaced to form a pre-pressed (8) cushion that hydraulically communicates with a set of at least two walls for use, when used, cutting devices (112, 116) to form debris (91) when lubrication and cushioning associate rotational shocks and vibrations with a shear friction force by friction forces while holding the shaft during rotation of the cutting device in the wall of at least one concentric surrounding hole.

Различные варианты воплощения могут предоставлять открывающий элемент (92) для открытия скважины, включающий пробку, мембрану или их комбинацию, где открывающий элемент (92) для открытия скважины без буровой установки может быть размещен рядом с обломочной породой (91) для размещения и сжатия упомянутой обломочной породы в нижней части истощенной скважины с помощью дифференциального давления жидкости через скважинное поршневое устройство. Варианты воплощения могут включать в себя нагнетание жидкости в один или более трубопроводов для образования области высокого давления на первой стороне упомянутого скважинного поршневого устройства и области низкого давления на второй стороне указанного скважинного поршневого устройства для работы упомянутого открывающего элемента для открытия скважины без буровой установки вдоль осевого направления и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия.Various embodiments may provide an opening element (92) for opening a well, including a plug, a membrane, or a combination thereof, where an opening element (92) for opening a well without a drilling rig can be placed next to a detrital rock (91) to accommodate and compress said clastic rock in the lower part of a depleted well using differential fluid pressure through a downhole piston device. Embodiments may include pumping fluid into one or more pipelines to form a high pressure region on a first side of said downhole piston device and a low pressure region on a second side of said downhole piston device to operate said opening element to open a well without a rig along an axial direction and radially into the wall of at least one concentric surrounding hole.

Другие варианты воплощения могут предоставлять открывающий элемент (92) для открытия скважины без буровой установки, содержащий гидравлический яс, взрывчатое вещество или их сочетания для стимулирования размещения и сжатия обломочных пород (91) в нижнем конце истощенной скважины.Other embodiments may provide an opening element (92) for opening a well without a drilling rig, comprising a hydraulic well, explosive, or combinations thereof, to stimulate the placement and compression of debris (91) at the lower end of the depleted well.

Различные другие варианты воплощения могут предоставлять открывающий элемент (92) для открытия скважины без буровой установки, которые содержат стреляющий перфоратор (92A), выполненный с возможностью размещения с помощью развертываемой колонны для образуемой взрывом стрельбы поршня (95) из корпуса (96), где упомянутый поршень выполнен с возможностью адаптации к отверстию, клапану или их комбинациям для сброса давления из-под упомянутого поршня при стрельбе.Various other embodiments may provide an opening member (92) for opening a well without a rig, which includes a perforating gun (92A) configured to deploy a deployable string to form a burst of firing piston (95) from the housing (96), where the piston is adapted to adapt to the bore, valve, or combinations thereof to relieve pressure from under the said piston when firing.

Тем не менее, другие варианты осуществления могут предоставлять открывающий элемент (92) для открытия скважины без буровой установки, содержащий компрессионное устройство натяжения тросов (92B, 92E, 92F, 92G) для изгиба (99) одного или более трубопроводов с целью образования обломочных пород (91) с помощью натяжения кабеля (67), который может быть закреплен (102, 103) с помощью шкива (105) на одном или более концах для сжатия в осевом направлении упомянутых обломочных пород относительно упомянутого шкива.However, other embodiments may provide an opening member (92) for opening a well without a drilling rig, comprising a compression cable tensioning device (92B, 92E, 92F, 92G) for bending (99) one or more pipelines to form debris ( 91) by tensioning the cable (67), which can be fixed (102, 103) with a pulley (105) at one or more ends to compress in the axial direction of the clastic rocks relative to the said pulley.

Связанные с этим варианты воплощения могут предоставлять кабель, проходящий через по меньшей мере одно эксцентрическое отверстие (100) из множества пластин (101), которые расположены в одном или нескольких трубопроводах, и выравнивания натягивающих кабелей упомянутых эксцентрических мембран могут вынуждать множество пластин изгибаться в радиальном направлении (99) упомянутого одного или более трубопроводов в осевом направлении вдоль и в радиальном направлении в стенку по меньшей мере одного концентрического окружающего отверстия для образования осколочных пород.Related embodiments may provide a cable passing through at least one eccentric hole (100) from a plurality of plates (101) that are located in one or more conduits, and aligning the tension cables of said eccentric membranes can cause the plurality of plates to bend radially (99) said one or more pipelines axially along and radially into the wall of at least one concentric surrounding opening for azanations of fragmentation rocks.

Различные варианты воплощения предоставляют открывающий элемент для открытия скважины без буровой установки (92), который может сжимать осколочную породу в осевом направлении вдоль или радиально в стенку по меньшей мере одного концентрического окружающего отверстия.Various embodiments provide an opening element for opening a well without a rig (92), which can compress the fragmentation rock axially along or radially into the wall of at least one concentric surrounding hole.

Другие варианты воплощения могут предоставлять каротажное устройство, имеющее транспондер, приемник или их сочетание, где каротажное устройство может быть помещено в открывающий элемент для открытия скважины без буровой установки (92), скважинное устройство (78), устье скважины, геологическое испытательное пространство, затвердевающий герметизирующий материал или их сочетаний и где упомянутый транспондер или приемник может быть размещен в корпусе, стойком к ударам и сжатию, для передачи сигналов через жидкости или корпусы упомянутой истощенной скважины.Other embodiments may provide a logging device having a transponder, a receiver, or a combination thereof, where the logging device can be placed in an opening element to open a well without a drilling rig (92), a downhole device (78), a wellhead, a geological test space that hardens the sealing material or combinations thereof and wherein said transponder or receiver may be housed in a shock and compression resistant housing for transmitting signals through liquids or bodies of said source hearth well.

Связанные с этим варианты воплощения могут предоставить каротажное устройство, которое может эмпирически измерять (93) рабочие параметры по меньшей мере одного непроверенного скважинного устройства для получения по меньшей мере одного измерения, включающего допуски, скорости вращения, удары, вибрации, прерывистые перемещения, турбулентные движения, гармонические резонансы или их сочетаний для работы по меньшей мере одного непроверенного скважинного устройства (78) в подземных веществах, давлениях и температурах упомянутой истощенной геологической структуры.Related embodiments may provide a logging device that can empirically measure (93) the operating parameters of at least one unverified downhole device to obtain at least one measurement including tolerances, rotational speeds, impacts, vibrations, intermittent movements, turbulent movements, harmonic resonances, or combinations thereof, for operating at least one unverified downhole device (78) in underground materials, pressures and temperatures of said depleted g eological structure.

Прочие связанные с этим варианты воплощения могут предоставить каротажное устройство, которое эмпирически измеряет (93) и предоставляет сопутствующие эмпирические данные геологических периодов и эпох подземных пластов, которые могут быть подобны имеющимся у другой истощенной скважины, новой скважины или группы скважин.Other related embodiments may provide a logging tool that empirically measures (93) and provides related empirical data from geologic periods and epochs of subterranean formations that may be similar to those of another depleted well, new well, or group of wells.

Другие варианты воплощения могут предоставлять производственную инфраструктуру для приводимого в действие гидравлически открывающего элемента для открытия скважины без буровой установки (92) и для жидкостного доступа упомянутой истощенной скважины через одно или более трубопроводов.Other embodiments may provide a manufacturing infrastructure for a hydraulically opening actuating member for opening a well without a rig (92) and for fluidly accessing said depleted well through one or more pipelines.

Различные связанные с этим варианты воплощения могут предоставлять производственную инфраструктуру для извлечения полезной продукции из подземного ресурса.Various related embodiments may provide a manufacturing infrastructure for extracting useful products from an underground resource.

В других вариантах воплощения может использоваться боковой отвод ствола истощенной скважины с помощью открывающего элемента для открытия скважины без буровой установки (92) или непроверенное скважинное устройство (78).In other embodiments, a lateral well bore can be used with an opening element to open a well without a rig (92) or an unverified downhole device (78).

Различные другие варианты воплощения могут обеспечить проверку непроверенного скважинного устройства (78), которое может быть развернуто и подготовлено к эксплуатации в пределах одного или более трубопроводов, и геологическое испытательное пространство, которое предоставляется открывающим элементом для открытия скважины без буровой установки (92) для проверенного использования во множестве проксимально аналогичных геологических сред другой истощенной скважины (79), новой скважины (80) и/или группы упомянутых скважин (79, 80).Various other embodiments may provide verification of an unverified downhole device (78) that can be deployed and prepared for use within one or more pipelines, and a geological test space that is provided by an opening element to open a well without a rig (92) for verified use in a variety of proximally similar geological environments of another depleted well (79), a new well (80) and / or a group of said wells (79, 80).

Краткое описание чертежейBrief Description of the Drawings

Предпочтительные варианты воплощения изобретения описаны ниже посредством только примеров со ссылкой на прилагаемые чертежи, на которых:Preferred embodiments of the invention are described below by way of examples only with reference to the accompanying drawings, in which:

На фиг.1 показан вариант воплощения системы для образования применимого геологического пространства для нарезки бокового ствола и разработки и испытания различных новых технологий, в том числе устройств данного изобретателя.Figure 1 shows an embodiment of a system for forming an applicable geological space for cutting a sidetrack and developing and testing various new technologies, including devices of this inventor.

На фиг.2, 2а и с 3 по 7 схематически показаны подземные схемы также для различных типов скважин, применимые с различными вариантами воплощения данного изобретения.Figure 2, 2A and 3 to 7 schematically shows underground schemes for various types of wells, applicable with various embodiments of the present invention.

На фиг.8 и 9 показан известный уровень техники, который может быть связан с вариантом воплощения по фиг.10 данного изобретения.FIGS. 8 and 9 show the prior art that may be associated with the embodiment of FIG. 10 of the present invention.

На фиг.10 и 11 показаны варианты воплощения со взрывом или с индикатором натяжения каната для образования пространства в подземной скважине, которое может применяться с различными другими вариантами воплощения данного изобретения.10 and 11 show embodiments with an explosion or with a rope tension indicator to form a space in an underground well that can be used with various other embodiments of the present invention.

На фиг.12 показано устройство данного изобретателя, применимое с различными вариантами воплощения данного изобретения.12 shows a device of the present invention, applicable with various embodiments of the present invention.

На фиг.13-16 показаны варианты воплощения приводных манипуляторов для расфрезеровывания с гидродинамическим подшипником, применимые с различными другими вариантами воплощения.13-16 show embodiments of drive manipulators for milling with a hydrodynamic bearing, applicable to various other embodiments.

На фиг.17-21 показаны различные компоновки с буровыми установками и без них, применимыми с различными типами скважин от А до D к различным вариантам воплощения данного изобретения.17-21 show various arrangements with and without drilling rigs applicable with various types of wells A to D to various embodiments of the present invention.

На фиг.22 показано устройство данного изобретателя, применимое с различными вариантами воплощения данного изобретения.On Fig shows the device of the present inventor, applicable with various embodiments of the present invention.

На фиг.23-27 показаны различные устройства и способы данного изобретателя, применимые с различными вариантами воплощения данного изобретения.23-27, various devices and methods of the present invention are shown, applicable with various embodiments of the present invention.

На фиг.28 и 29 показан вариант воплощения нарезки бокового ствола согласно данному изобретению с использованием различных устройств данного изобретателя.On Fig and 29 shows a variant embodiment of the sidetracking according to this invention using various devices of the present inventor.

Варианты воплощения настоящего изобретения описаны ниже со ссылкой на указанные фигуры.Embodiments of the present invention are described below with reference to these figures.

Подробное описание вариантов воплощенияDetailed Description of Embodiments

Прежде чем объяснять выбранные варианты воплощения настоящего изобретения подробно, следует понимать, что настоящее изобретение не ограничивается конкретными вариантами воплощения, описанными здесь, и может быть осуществлено на практике или реализовано различными способами. Приведенные раскрытие и описание являются иллюстративными и пояснительными примерами одного или нескольких предпочтительных вариантов воплощений, и специалистам в данной области техники понятно, что различные изменения в конструкции, организации, порядке работы, конструкциях и размещениях оборудования, методологии и использовании механических эквивалентов могут быть сделаны без отступления от сущности изобретения.Before explaining the selected embodiments of the present invention in detail, it should be understood that the present invention is not limited to the specific embodiments described herein, and can be practiced or implemented in various ways. The disclosure and description provided are illustrative and explanatory examples of one or more preferred embodiments, and those skilled in the art will understand that various changes in the design, organization, operation, structures and layouts of equipment, methodology and use of mechanical equivalents can be made without departure from the essence of the invention.

Кроме того, следует понимать, что чертежи предназначены для иллюстрации и ясного раскрытия предпочтительных вариантов для специалистов в данной области, но не предназначены для изготовления уровневых чертежей или изображений конечных продуктов и могут включать упрощенные концептуальные представления для более легкого и быстрого понимания или объяснения. Кроме того, относительный размер и расположение компонентов могут отличаться от показанного и при этом оставаться работоспособными в рамках сущности изобретения.In addition, it should be understood that the drawings are intended to illustrate and clearly disclose preferred options for specialists in this field, but are not intended for the manufacture of level drawings or images of the final products and may include simplified conceptual representations for easier and faster understanding or explanation. In addition, the relative size and location of the components may differ from the shown and at the same time remain operational in the framework of the invention.

Кроме того, следует понимать, что различные направления, такие как "верхний", "нижний", "левый", "правый" и так далее, даны только по отношению к объяснению в сочетании с чертежами и что компоненты могут быть ориентированы по-разному, например, во время транспортировки и изготовления, а также работы. Поскольку многие отличающиеся и различные варианты воплощения могут быть сделаны в пределах объема концепций, представленных здесь, и поскольку многие модификации могут быть сделаны в описанных здесь вариантах воплощения, следует понимать, что данные, описанные здесь, следует интерпретировать как иллюстративные и неограничивающие.In addition, it should be understood that various directions, such as “upper”, “lower”, “left”, “right” and so on, are given only in relation to the explanation in conjunction with the drawings and that the components can be oriented differently , for example, during transportation and manufacturing, as well as work. Since many different and different embodiments can be made within the scope of the concepts presented here, and since many modifications can be made in the embodiments described here, it should be understood that the data described here should be interpreted as illustrative and non-limiting.

На фиг.1 показана блок-схема воплощения (10A) системы обеспечения пространства (10), изображающая идентификацию скважин, доступных для закрытия (82) и завершение договора (83), представляющее, например, договорную аренду или договор купли-продажи (84) между владельцем технологии (85) и владельцем, ответственным за закрытие (86) на право использования пространства (87) и дополнительно на право пользования инфраструктурой (88) с целью образования геологического испытательного пространства для подтверждения работы непроверенного скважинного устройства (78, 92) в пределах истощенной геологической среды во время закрытия истощенной скважины без использования буровой установки.Figure 1 shows a block diagram of an embodiment (10A) of a space support system (10), depicting the identification of wells available for closure (82) and the completion of a contract (83), representing, for example, a contractual lease or sales contract (84) between the owner of the technology (85) and the owner responsible for closing (86) for the right to use the space (87) and additionally for the right to use the infrastructure (88) to form a geological test space to confirm the operation of an unverified downhole device (78, 92) within a depleted geological environment during the closure of a depleted well without using a drilling rig.

Система предоставления пространства может быть применена для сжатия скважинных устройств и обломочной породы (91) с помощью устройства сжатия (92) с целью образования применимого геологического пространства для размещения цементной пробки (89) для выполнения обязательств по закрытию скважины и обеспечения целостности для разработки новой технологии (78), например, других устройств (92) формирования пространства (92) с целью уменьшения ресурсов, необходимых для закрытия скважины или бурения бокового ствола (59) и расфрезеровывающих узлов (9) или гидродинамических подшипников (1), например, более эффективного использования существующих (79) и новых месторождений (80) с использованием меньших ресурсов в интересах региональной и глобальной частной и общественной пользы (90).The space allocation system can be used to compress downhole devices and debris (91) using a compression device (92) to create an applicable geological space for placement of cement plugs (89) to fulfill the obligations to close the well and ensure integrity for the development of a new technology ( 78), for example, other space forming devices (92) (92) in order to reduce the resources needed to close a well or drill a sidetrack (59) and milling units (9) or idrodinamicheskih bearing (1), for example, more effective use of existing (79) and new fields (80) using less resources for regional and global public and private use (90).

Эмпирические измерения (93) могут быть получены с помощью каротажных устройств или передатчик может быть помещен в защитный амортизирующий корпус (66 из фиг.22) для предоставления эмпирических данных для проектирования, реконструкции, испытания новой технологии (78) в разработке существующих (80) и новых (79) скважин (57). Различные технологии описаны в следующих патентных заявках: Патент Великобритании 2465478 и патентные заявки Великобритании GB1011290.2, РСТ GB2010/051108, GB1021305.6, GB1111482.4, GB1104278.5, GB1104278.5, GB1121743.7, GB1121741.1 и патентные заявки РСТ US2011/000377 и US2011/000372 могут быть испытаны и могут получить дальнейшее развитие с данной системой предоставления пространства. Хотя основной акцент в настоящей заявке делается на новой технологии согласно настоящему изобретению, практически любая скважинная технология, используемая через отверстие скважины (57) может быть испытана и проверена на практике, в зависимости от имеющихся ресурсов. Таким образом, представленная система образования пространства может и дальше использоваться для создания рынка для испытания и проверки новой технологии на практике, где упомянутое используемое пространство становится товарным продуктом.Empirical measurements (93) can be obtained using logging devices or the transmitter can be placed in a protective shock-absorbing case (66 of Fig. 22) to provide empirical data for the design, reconstruction, testing of new technology (78) in the development of existing (80) and new (79) wells (57). Various technologies are described in the following patent applications: UK patent 2465478 and UK patent applications GB1011290.2, PCT GB2010 / 051108, GB1021305.6, GB1111482.4, GB1104278.5, GB1104278.5, GB1121743.7, GB1121741.1 and patent applications PCT US2011 / 000377 and US2011 / 000372 can be tested and can be further developed with this space allocation system. Although the main emphasis in this application is on the new technology according to the present invention, almost any downhole technology used through the borehole (57) can be tested and tested in practice, depending on available resources. Thus, the presented space formation system can be further used to create a market for testing and testing new technology in practice, where the space used is becoming a marketable product.

Стоимость ресурсов буровой установки (58А из фиг.18) и даже некоторые операции без буровой установки (58C из фиг.19), вообще, являются такими, что применимое пространство для испытания и проверки на практике скважинных приборов, развертываемых в реальной обстановке во время закрытия скважин (57) и с затратой значительно меньших ресурсов и более интенсивными операциями с составной трубой без буровой установки (58B на фиг.17) и операций с колоннами гибких труб (58D из фиг.20) представляет собой значительное улучшение в развитии новой технологии и, следовательно, является годным к продаже. Например, компания, владеющая правами на использование полезного пространства, образованного во время закрытия, может предложить испытать и проверить на практике технологии в обмен на долю в собственности на такие технологии или за долю от прибыли.The cost of the rig’s resources (58A of FIG. 18) and even some operations without a rig (58C of FIG. 19) are generally such that the applicable space for testing and practical testing of downhole tools deployed in a real situation at the time of closure wells (57) and with the cost of significantly less resources and more intensive operations with a composite pipe without a drilling rig (58B in FIG. 17) and operations with columns of flexible pipes (58D of FIG. 20) represents a significant improvement in the development of new technology and, traces tion, is fit for sale. For example, a company that owns the rights to use the usable space created at the time of closure may propose to test and practice technologies in exchange for a share in the ownership of such technologies or for a share of the profit.

Учитывая относительно низкие капиталовложения, необходимые для выполнения закрытия без использования буровой установки, где настоящая система предоставления пространства представляет новую технологию, требующую самые минимальные ресурсы и отсутствие конкурентных сил в настоящем олигополистическом рынке поставщиков услуг, закрытие скважин представляет собой значительную стоимость ресурсов для несущих ответственность владельцев и возможность для новых технологических компаний соревноваться с крупными поставщиками услуг, которые господствуют на рынке. Кроме того, право собственности минимальных ресурсов и возможность испытать новые технологии с одним из упомянутых крупных поставщиков услуг будет стимулировать конкуренцию на относительно неконкурентоспособном рынке, по сравнению с 1970-х и в начале 1980-х. Во всех случаях использование меньшего количества ресурсов обеспечивает значительную пользу для регионов и нашего глобального общества (90), стоящего перед пиковым возрастанием цены нефти и драматическими увеличениями цен на жидкие углеводороды, потому что упомянутые ресурсы могут быть перераспределены на существующие (79) и новые (80) разработки, необходимые для ограничения упомянутых драматических увеличений цен на жидкие углеводороды, связанных с пиковой нефтью.Given the relatively low investment required to complete a shutdown without using a rig, where the present space system represents a new technology that requires the smallest resources and the lack of competitive forces in this oligopolistic market for service providers, well closures represent a significant resource cost for responsible owners and an opportunity for new technology companies to compete with major service providers who dominate the market. In addition, ownership of minimal resources and the ability to experience new technologies with one of the aforementioned large service providers will stimulate competition in a relatively uncompetitive market, compared to the 1970s and early 1980s. In all cases, the use of fewer resources provides significant benefits for the regions and our global society (90), facing a peak increase in oil prices and dramatic increases in liquid hydrocarbon prices, because these resources can be redistributed to existing (79) and new (80) ) developments necessary to limit the dramatic increases in liquid hydrocarbon prices associated with peak oil.

На фиг.17-21 показаны различные вертикальные проекции установок (58), применяемых с системами и способами согласно настоящему изобретению и показывающими, что обычно описывается как компоновки с буровой установкой (58A) и без буровой установки (58B, 58C и 58D) на примере выше срезах подземных скважин (57) и пластов (60). Буровые установки (58A) требуют больше всего ресурсов для работы с большой вышкой (94) и связанное подъемное оборудование часто способно поднять более миллиона фунтов с соответствующим большой накачкой жидкости и ресурсами емкостей хранения. Хотя колонна из спиральных или составных труб может использоваться на буровой установке (58A), обычно используются высокопрочные трубы с высоким моментом закручивания. В общем, буровые установки имеют спецификацию наиболее прочного и надежного оборудования, которое может потребовать значительных эксплуатационных затрат по сравнению с компоновками с колоннами гибких труб и другими компонентами без бурильных установок. Установки с гибкими трубами, обычно называемые установками для специальных подземных работ, требуют значительно меньше ресурсов, чем буровые установки, но значительно больше, чем, например, компоновки для работ из составных труб (58B) без буровых установок и кабельные компоновки для работ (58D) без буровых установок. Следовательно, когда специальные подземные работы по закрытию скважины и специальные подземные работы с буровыми колоннами используют компоновки без буровых установок, упомянутые работы требуют менее ресурсов.FIGS. 17-21 show various vertical projections of the rigs (58) used with the systems and methods of the present invention and showing what is usually described as arrangements with a rig (58A) and without a rig (58B, 58C and 58D) using an example higher sections of underground wells (57) and reservoirs (60). Drilling rigs (58A) require the largest amount of resources to work with a large rig (94) and associated lifting equipment is often capable of lifting more than a million pounds with the corresponding large fluid pump and storage tank resources. Although a coiled or composite pipe string can be used on a rig (58A), high strength pipes with high torque are typically used. In general, drilling rigs have a specification of the most robust and reliable equipment, which can require significant operational costs compared to layouts with tubing strings and other components without drilling rigs. Flexible pipe installations, commonly referred to as special underground installations, require significantly less resources than drilling rigs, but significantly more than, for example, composite pipe assemblies (58B) without drilling rigs and cable work assemblies (58D) without drilling rigs. Therefore, when special underground work to close the well and special underground work with drill strings use layouts without drilling rigs, the mentioned works require less resources.

Буровые установки (58A), как правило, эффективны для быстрого бурения и строительства скважин в геологические периоды и эпохи, мили и километры ниже поверхности земли. Однако такое использование ресурсов, как правило, превышает то, что требуется для закрытия скважин, испытания и разработки новой технологии. Таким образом, когда операции без буровых установок при относительно низком использовании ресурсов относительно неэффективны, например, для построения скважины (57) до 10000 футов или 3048 метров, компоновки без буровых вышек (58B, 58C и 58D) более эффективны, чем с буровыми установками (58А), если упомянутая скважина уже построена и целью является разместить долговременную цементную пробку (89), и испытать и разработать новую технологию в рамках региональных подземных условий, аналогичных тем, которые, где будут использоваться разработанные инструменты. Следовательно, по сравнению с другими методами без использования буровой установки данная система предоставления пространства подойдет и потенциально становится системой с самым малым использованием ресурсов и способом в отрасли для закрытия скважин и испытания скважинных инструментов, таким образом освобождая ресурсы для перераспределения дальнейшей новой технологии (78), разработки существующих (79) и/или новых (80) месторождений.Drilling rigs (58A) are generally effective for quick drilling and well construction in geological periods and epochs, miles and kilometers below the surface of the earth. However, this use of resources, as a rule, exceeds what is required for closing wells, testing and developing new technology. Thus, when operations without drilling rigs with relatively low resource use are relatively ineffective, for example, for constructing a well (57) up to 10,000 feet or 3048 meters, arrangements without drilling rigs (58B, 58C and 58D) are more effective than with drilling rigs ( 58A), if the mentioned well has already been built and the goal is to place a long-term cement plug (89), and to test and develop a new technology in the framework of regional underground conditions similar to those where the developed tools will be used you. Therefore, in comparison with other methods without using a drilling rig, this space allocation system is suitable and potentially becomes the system with the smallest use of resources and an industry method for closing wells and testing downhole tools, thereby freeing up resources for redistributing further new technology (78), development of existing (79) and / or new (80) deposits.

На фиг.17 приведен изометрический вид компоновки, подобной компоновке с буровой установкой (58), применяемой (58B) без буровой установки (72, 72A) обработки (58b) буровой установки, где буровая установка (58) размещается выше уровня моря (63) или уровня земли (60) и использует индивидуальную (72A) составную трубу (72) для образования колонны из составных труб без буровой установки (67A), действующей в стволе (7) скважины (57) через соответствующее устье скважины (61). Такие системы использования труб без буровой установки применимы для проверки непроверенных (78) устройств с вращающейся колонной (67).17 is an isometric view of an arrangement similar to that of a drilling rig (58) used (58B) without a drilling rig (72, 72A) of processing (58b) a drilling rig, where the drilling rig (58) is located above sea level (63) or ground level (60) and uses an individual (72A) composite pipe (72) to form a column of composite pipes without a drilling rig (67A) acting in the bore (7) of the well (57) through the corresponding wellhead (61). Such pipe-free systems without a rig are applicable for testing unverified (78) rotating column devices (67).

На фиг.18 ​​показаны вид спереди в вертикальной проекции со срезом через пласт и удаленная скважина. На фигуре показана буровая установка (58) и включает природу бурения (58A) с вышкой (94), приемниками для буровой жидкости или раствора (123), насосами (124) и диспетчерской, обычно называемая кабиной бурильщика (125). Скважина включает разработку нового месторождения (80) с помощью соединения камер (119) и соединения камеры колонны для одновременного потока (122, показан на фиг.26 и 27), которая была проверена ранее в закрытой скважине, где упомянутая технология особенно полезна для операций гидроразрыва пласта, например разрывов сланцевого газа.On Fig shows a front view in vertical projection with a slice through the reservoir and the remote well. The figure shows a drilling rig (58) and includes the nature of drilling (58A) with a derrick (94), receivers for drilling fluid or mud (123), pumps (124) and a control room, commonly referred to as a driller’s cabin (125). The well includes developing a new field (80) by connecting the chambers (119) and connecting the chamber of the column for simultaneous flow (122, shown in FIGS. 26 and 27), which was previously tested in a closed well, where the technology is especially useful for fracturing operations formation, for example shale gas fractures.

На фиг.19 показана вертикальная проекция среза через скважину и пласт, иллюстрирующая гибкую колонну (67F) и буровую установку с колонной гибких труб (58C) с головкой инжектора (126) и вышки (94), работающей на существующем месторождении (79) для проверки непроверенной технологии после закрытия нижнего конца скважины.On Fig shows a vertical projection of the cut through the well and reservoir, illustrating a flexible string (67F) and a drilling rig with a string of flexible pipes (58C) with the head of the injector (126) and towers (94) operating in the existing field (79) to check untested technology after closing the lower end of the well.

На фиг.20 показана вертикальная проекция через слой скважины и пласта, отображающая установки (58D) для бурения с использованием кабеля (67S) колонны гибких труб (67) через смазывающее устройство (130), устье скважины (61) с противовыбросным превентором (131) и корпус (56A, 56B, 56C, 56D) для развертывания маятникового бурового поршня (73, 73G) с двигателем (17L) и составной направляемой маятниковой колонной (9, 9Н), имеющей гидродинамический подшипник (1, 1U), используемый для уменьшения трения, ударов и вибрации, связанных с канатно-вращательным бурением.On Fig shows a vertical projection through the layer of the well and the formation, showing the installation (58D) for drilling using a cable (67S) of the string of flexible pipes (67) through a lubricating device (130), the wellhead (61) with a Ram preventer (131) and a housing (56A, 56B, 56C, 56D) for deploying a pendulum drill piston (73, 73G) with an engine (17L) and a composite guided pendulum string (9, 9H) having a hydrodynamic bearing (1, 1U) used to reduce friction , shock and vibration associated with wireline drilling.

На фиг.21 показана схема, иллюстрирующая устройство емкости для бурового раствора (123), применимое с устройством с колонной гибких труб, например (58D) из фиг.20 или (58C) из фиг.19, где жидкость, возвращаемая (129) с контролем давления, может быть пропущена через сепаратор (132) с целью удаления углеводородов или газов (133), утилизации обломочной породы (91) и возврата (129) циркулируемой жидкости в емкость для бурового раствора (123) или в систему с закрытым баком для перекачивания (124) обратно к операциям бурения. Бурение с отрицательной депрессией на пласт может быть выполнено, таким образом, с помощью операций без буровой вышки для дальнейшего улучшения как скоростей бурения, так и добычи из подземных ресурсов, давая другой пример возможности для снижения стоимости ресурсов с системой предоставления пространства настоящего изобретения.21 is a diagram illustrating the construction of a drilling fluid reservoir (123) applicable to a device with a string of flexible pipes, for example (58D) of FIG. 20 or (58C) of FIG. 19, where the fluid returned is (129) s by pressure control, it can be passed through a separator (132) in order to remove hydrocarbons or gases (133), dispose of debris (91) and return (129) circulated fluid to the drilling fluid tank (123) or to a system with a closed pumping tank (124) back to drilling operations. Drilling with a negative depression on the formation can thus be performed using operations without a rig to further improve both drilling speeds and production from underground resources, giving another example of the possibility of reducing the cost of resources with the space providing system of the present invention.

Варианты воплощения данной системы предоставления пространства могут работать с установками (58B-58D) для формирования геологического испытательного пространства для проверки непроверенного скважинного устройства (78, 92) в рамках истощенной геологической структуры во время закрытия истощенной скважины без буровой установки, при использовании, для перераспределения работы упомянутого непроверенного скважинного устройства от непроверенной работы до проверенной работы с бурильными установками (58A-58D) в приблизительно схожей истощенной геологической структуре упомянутой истощенной скважины (79), новой скважины (80) или группы упомянутых скважин (79, 80), обычно называемых существующими (79) и новыми месторождениями (80).Embodiments of this space provisioning system may work with facilities (58B-58D) to form a geological test space for testing an unverified downhole device (78, 92) as part of a depleted geological structure during closure of a depleted well without a rig, when used, to redistribute work said unverified downhole device from unverified work to verified work with drilling rigs (58A-58D) in approximately similar depleted ge the biological structure of said depleted well (79), a new well (80) or a group of said wells (79, 80), commonly referred to as existing (79) and new fields (80).

На фиг.2, 2А и 3 схематически показаны различные вертикальные проекции подземного среза через различные аналогичные типы скважин (57) и слоев, применимые к данному изобретению. Поскольку подземные скважины (57 на фиг.2) имеют много компонентов, то обычно для акцентирования внимания на представленных аспектах используется упрощенная схема скважины (например, 57 из фиг.2А и 3). Следовательно, следует понимать, что блок-схема скважины (например, 57 из фиг.2А) эквивалентна более подробной схеме скважины (например, 57 на фиг.2, ниже линии сечения A1-A1), и каждая из скважин, описанная на фиг.3-16, аналогична скважинам, показанным на фиг.2, если не указано иное.Figure 2, 2A and 3 schematically shows various vertical projections of an underground section through various similar types of wells (57) and layers applicable to this invention. Since underground wells (57 in FIG. 2) have many components, a simplified well diagram (for example, 57 from FIGS. 2A and 3) is usually used to focus on the presented aspects. Therefore, it should be understood that the block diagram of the well (for example, 57 from FIG. 2A) is equivalent to a more detailed diagram of the well (for example, 57 in FIG. 2, below the section line A1-A1), and each of the wells described in FIG. 3-16, similar to the wells shown in figure 2, unless otherwise indicated.

Как правило, архитектура скважин (57) включает в себя различные цементированные (64) и бесцементные обсадные трубы (56а для 56D) и отверстия (7) в пластах (от 60A до 60M). Обсадные трубы могут быть различных размеров, например, (56D) может представлять собой 7” хвостовик, (56C) 30” кондуктор, (56B) 13 3/8” обсадную трубу, и (56А) 9 5/8” эксплуатационную колонну, в пределах которой могут быть выполнены бесцементное кольцо и промышленный трубопровод (56E). Для системы образования пространства, могут быть использованы устройства для сжатия, например, промышленного трубопровода (56E), образующего осколочную породу и потенциально содержащего или покрытого сцепленной осколочной породой, например отложение нормативное или с низкой удельной активностью, где труба (56E) и другие связанные устройства и обломочная порода могут быть сжаты в бесцементном кольцевом пространстве промышленной трубы (56A) для образования полезного пространства в упомянутом промышленном трубопроводе.Typically, well architecture (57) includes various cemented (64) and cementless casing (56a for 56D) and holes (7) in formations (60A to 60M). Casing can be of various sizes, for example, (56D) can be a 7 ”liner, (56C) 30” conductor, (56B) 13 3/8 ”casing, and (56A) 9 5/8” production casing, within which a cementless ring and industrial piping (56E) can be made. For a space formation system, compression devices can be used, for example, industrial piping (56E), forming spall rock and potentially containing or coated with cohesive spall rock, for example, normative or low specific deposition, where the pipe (56E) and other related devices and debris can be compressed in the cementless annular space of an industrial pipe (56A) to form a usable space in said industrial pipeline.

Что касается новой технологии (78), разработки существующих (79) и новых (80) месторождений или проверки непроверенных (78) устройств, очень важно понять, что упомянутая новая технология (78) будет подвержена воздействию разнообразного давления, температуры и сил стратиграфии, сильно отличающихся от одной скважины к другой и образовавшихся в течение сотен миллионов лет. Следовательно, умение и практика строительства скважин и отрасли добычи в большей степени полагается на эмпирические данные, а теоретические данные показывают опасности воздействия подземных веществ, давлений и температур, где геотермальная вода может быть столь же взрывоопасной, как взрывоопасные углеводороды в различных случаях. Таким образом, испытание и проверка новой технологии в условиях, подобных ожидаемым условиям, имеет решающее значение для практиков. К сожалению, обычный анализ скважины для поставщиков услуг, как правило, поверхностный, несравнимый и, как правило, не принимается во внимание специалистами в данной области.Regarding the new technology (78), the development of existing (79) and new (80) deposits or the verification of untested (78) devices, it is very important to understand that the mentioned new technology (78) will be subject to various pressures, temperatures and stratigraphy forces, different from one well to another and formed over hundreds of millions of years. Consequently, the skill and practice of well construction and the production industry relies more on empirical data, and theoretical data show the dangers of exposure to underground substances, pressures and temperatures, where geothermal water can be as explosive as explosive hydrocarbons in various cases. Thus, testing and testing new technology under conditions similar to expected conditions is crucial for practitioners. Unfortunately, the usual well analysis for service providers is usually superficial, incomparable and, as a rule, is not taken into account by specialists in this field.

Описываемая система предоставления пространства может быть применима для испытания и проверки на месте новых технологий, таких как гидродинамические подшипники (1) и направляемые маятниковые бурильные колонны с гидродинамическим подшипником (9), испытываемые в контролируемой среде подземной скважины, где нижний конец был сделал относительно безопасным благодаря закрытию с помощью упомянутой системы предоставления пространства, оставляя место в скважине для проверки новой технологии в приближении к реальным условиям. Должно быть понятно, что пласт ниже фиг.2, фиг.2А и линии A1-A1 на фиг.3 представляет любой из эпох четвертичного и неогенового периода, а пласты ниже линии A2-A2 представляют любой из олигоценовой, эоценовой и палеоценовой эпох палеогенового периода, а пласт ниже A3-A3 представляет позднюю, среднюю и раннюю эпохи мелового, юрского, триасового, пермского или каменноугольного периодов. Пласт ниже линии А-А на фиг.17, В-В на фиг.18, C-C на фиг.19 и D-D фиг.20 представляет линии А1-А1, А2-А2 или А3-A3 эпох геологических периодов.The described space allocation system may be applicable for testing and on-site testing of new technologies, such as hydrodynamic bearings (1) and directional pendulum drillstrings with hydrodynamic bearings (9), tested in a controlled underground well environment, where the lower end was made relatively safe due to closure using the aforementioned space allocation system, leaving space in the well to test new technology in close proximity to real conditions. It should be understood that the formation below FIG. 2, FIG. 2A and the line A1-A1 in FIG. 3 represents any of the epochs of the Quaternary and Neogene, and the formations below the line A2-A2 represent any of the Oligocene, Eocene and Paleocene epochs of the Paleogene , and the reservoir below A3-A3 represents the late, middle and early epochs of the Cretaceous, Jurassic, Triassic, Permian or Carboniferous periods. The reservoir below the lines A-A in Fig. 17, B-B in Fig. 18, C-C in Fig. 19 and D-D of Fig. 20 represents lines A1-A1, A2-A2 or A3-A3 of the epochs of geological periods.

На фиг.2 и 2А показан срез по высоте через скважину и схематические виды, соответственно, скважины (57) с клапанным устьевым оборудованием (62) и срез через упомянутые подземные части скважины и устье скважины (61), предохранительные обсадные трубы (56А-56C), цементированные (64) ниже горизонтного уровня (60), который может быть либо на уровне земли или уровне линии бурового раствора ниже уровня моря (63).Figures 2 and 2A show a height section through the well and schematic views, respectively, of the well (57) with valve wellhead equipment (62) and a section through the aforementioned underground parts of the well and the wellhead (61), safety casing (56A-56C ) cemented (64) below the horizontal level (60), which can be either at ground level or the level of the mud line below sea level (63).

Выше уровня земли (60) или уровня моря (63) клапанное устьевое оборудование (62), как показано, может быть адаптировано для подводного использования, где конфигурация дерева обычных клапанов представляет собой первичный (61B) и вторичный (61A) главный вентиль, применимый для использования с эксплуатационной задвижкой (62C) для пропуска добычи через поточную линию (62F). Если колпак фонтанной арматуры (62E) удаляется и установка (например, 58D фиг.20) возводится в верхнем конце дерева, задвижка (62D) и главные задвижки (62А, 62В), могут быть открыты для доступа к трубе для добычи (56D) через предохранительный клапан (65), где предохранительный клапан может работать с линией управления (65А). В обычном устьевом оголовке (61), как правило, используется несколько клапанов кольцевого пространства (61A, 61B) для доступа к кольцевому пространству между различными скважинными трубопроводами (56A, 56B, 56C) с более мелким кольцевым пространством, подвергаемым обычно воздействию формаций, находящихся под давлением, оставленным открытым или без клапанов (61C).Above ground level (60) or sea level (63), wellhead equipment (62), as shown, can be adapted for underwater use, where the tree configuration of conventional valves is a primary (61B) and secondary (61A) main valve, suitable for Use with a production gate valve (62C) to pass production through the production line (62F). If the cap of the fountain fittings (62E) is removed and the installation (for example, 58D of FIG. 20) is erected at the upper end of the tree, the valve (62D) and the main valves (62A, 62B) can be opened to access the production pipe (56D) through safety valve (65), where the safety valve can operate with a control line (65A). A conventional wellhead (61) typically uses several annulus valves (61A, 61B) to access the annulus between different downhole pipelines (56A, 56B, 56C) with a smaller annulus typically exposed to formations under pressure left open or without valves (61C).

Доступ к пласту (60) со ствола скважины (57) может быть, как правило, классифицирован по минеральному и химическому составу, по текстуре составных частиц и по процессам, которые их образовали, что разделяет породы на изверженные, осадочные и изменчивые. Магматические породы могут содержать, например, гранит и базальт, которые особенно трудно бурить. Когда гранит часто пробуривается в скважинах, большинство пластов, намеченные для бурения, включают осадочные породы, образованные на поверхности земли или вблизи ее осаждением либо обломочных отложений, органических веществ или химических выделений (эвапориты) с последующим уплотнением частиц и цементацией в процессе диагенеза. Осадочные породы могут содержать, например, грязевые породы, такие как аргиллит, сланцы, глины, алевролит или песчаники и карбонатные породы, такие как известняк или доломит. Метаморфические породы образуются, когда любой тип породы (в том числе ранее образованная метаморфическая порода) подвергается воздействию других условий температур и давления, чем те, в которых исходная порода была образована, и, следовательно, может быть распространена во многих скважинах.Access to the formation (60) from the wellbore (57) can, as a rule, be classified by mineral and chemical composition, by the texture of composite particles and by the processes that formed them, which divides the rocks into igneous, sedimentary, and variable. Igneous rocks may contain, for example, granite and basalt, which are particularly difficult to drill. When granite is often drilled in wells, most of the formations intended for drilling include sedimentary rocks formed on or near the surface of the earth, or debris, organic matter or chemical secretions (evaporites), followed by particle compaction and cementation during diagenesis. Sedimentary rocks may contain, for example, mud rocks such as mudstone, shales, clays, siltstone or sandstones and carbonate rocks such as limestone or dolomite. Metamorphic rocks are formed when any type of rock (including a previously formed metamorphic rock) is exposed to other conditions of temperature and pressure than those in which the original rock was formed, and, therefore, can be distributed in many wells.

На фиг.3 показано использование воплощения (10H) системы предоставления пространства (10) в виде сжимающего устройства (92), содержащего байпасный разнос кольцевой блокировки со скользящим поршнем (92C) и используется для сжатия обломочной породы (91), например отложений, химически удаляемых и гидравлически выбиваемых в скважину, и пластов до размещения закрывающей цементной пробки (89) для позволения нарезки бокового ствола скважины на фиг.2А с помощью маятниковой бурильной колонны из гибких труб (67, 67А), содержащей воплощение (73А) бурильного поршня (73) с направляемой бурильной колонной (9, 9А) с тягачом реактивного момента (74), используя двигатель (17L) для вращения на тросовой развернутой составной колонне (75, 75 G), и второго встроенного в линию двигателя (17) для вращения верхнего и нижнего режущих устройств (112), что может применяться для бурения воплощения (59А) упомянутого бокового ствола скважины (59), который может размещаться, извлекаться и работать от упомянутой натяжной колонны гибких труб (67) и может накачивать давление через упомянутое ранее отверстие (7) при давлении буровой жидкости, прикладываемом через и около упомянутого трубопроводного бурильного поршня одной или более поверхностью трубопроводных насосов или моторов бурового раствора. Система предоставления пространства (10) может быть применимой для бурения второго бокового ствола (59B) и, возможно, для добычи из любых предельных ресурсов добычи, найденных до размещения пробки окончательной ликвидации (закрытия), чтобы навсегда изолировать боковые стволы (59А, 59B). Кроме того, на фиг.3 показаны гидродинамические подшипники (1, 1B, 1C и 1D).FIG. 3 shows the use of an embodiment (10H) of a space providing system (10) in the form of a compression device (92) containing a bypass spacing of an annular blocking with a sliding piston (92C) and used to compress debris (91), for example, deposits chemically removed and hydraulically driven out into the well and formations prior to the placement of the closing cement plug (89) to allow the sidetracking of the well in FIG. 2A to be cut using a pendulum drill string made of flexible pipes (67, 67A) containing the embodiment (73A) of the drill piston I (73) with a guided drill string (9, 9A) with a reactive torque tractor (74), using an engine (17L) to rotate on a cable deployed composite string (75, 75 G), and a second in-line engine (17) for rotation of the upper and lower cutting devices (112), which can be used to drill the embodiment (59A) of the aforementioned side wellbore (59), which can be placed, removed and operated from the said flexible pipe string (67) and can pump pressure through the previously mentioned hole (7) at drilling fluid pressure, applied through and near said pipeline boring piston by one or more surfaces of pipeline pumps or mud motors. The space allocation system (10) may be applicable for drilling the second sidetrack (59B) and possibly for production from any marginal production resources found before the final elimination (closure) plug was placed in order to permanently isolate the sidetracks (59A, 59B). In addition, figure 3 shows the hydrodynamic bearings (1, 1B, 1C and 1D).

На фиг.1, от 8 до 12 и 22 показаны элементы (10D, 10E, 55, 66) системы предоставления пространства (10) и известный уровень техники (51, 52). На фиг.8 и 9 показаны изометрические виды известного из уровня техники перфоратора (51) и компоненты корпуса данного приспособления (52) соответственно, иллюстрирующие корпус (52) с обсадной трубой (52А), размещаемой в камере приспособления (51B). Контакт ударника с запальным устройством (54) в мембране корпуса (52В) инициирует взрыв пороха внутри оболочки, сравнимый с развертываемым трубопроводом (56E, 56B, 56C), применимым для стрельбы шариком (53, 95A) и функционирующим как поршень (95) для выталкивания различных пуль, что сопоставимо с отделенным концом смятого трубопровода (56E, 56A, 56B, соответствующим содержащим трубопроводам) от ствола перфоратора (51A), которые могут быть сопоставимы к содержащим трубопроводам (56A, 56B, 56C, соответствующий сжатым трубопроводам) с нецементированным внутренним отверстием. Например, шарик (92) может: сжимать трубопровод (56E) внутри барельным трубопроводом (56а), сжимать трубопровод (56а) с барельным трубопроводом (56В) и так далее и тому подобное. Закрепляющее устройство может быть использовано для закрепления различных скважинных кондуитов также при взрывном сжатии или дроблении, как показано на фиг.12. Кроме того, различные устройства сжатия (92) могут использовать кабели для увеличения отверстия, сжимая, как описано, обломочную породу в нижний конец скважины. Кроме того, могут быть выполнены эмпирические измерения во время и после сжатия и/или во время скважинной проверки непроверенных устройств, использующих различные варианты воплощения.Figure 1, from 8 to 12 and 22 shows the elements (10D, 10E, 55, 66) of the space providing system (10) and the prior art (51, 52). Figures 8 and 9 are isometric views of a perforator (51) known from the prior art and the housing components of this tool (52), respectively, illustrating the body (52) with a casing (52A) placed in the chamber of the tool (51B). The contact of the striker with the ignition device (54) in the housing membrane (52B) initiates an explosion of gunpowder inside the shell, comparable to a deployable pipe (56E, 56B, 56C), suitable for firing a ball (53, 95A) and functioning as a piston (95) for expelling different bullets, which is comparable to the separated end of the crumpled pipeline (56E, 56A, 56B, corresponding to the containing pipelines) from the barrel of the punch (51A), which can be comparable to the containing pipelines (56A, 56B, 56C, corresponding to the compressed pipelines) with a cementless internal hole a haste. For example, the ball (92) can: compress the pipe (56E) inside the barrel pipe (56a), compress the pipe (56a) with the barrel pipe (56B), and so on and so forth. The fixing device can be used to secure various borehole conduits also during explosive compression or crushing, as shown in Fig. 12. In addition, various compression devices (92) can use cables to enlarge the hole by compressing, as described, debris into the lower end of the well. In addition, empirical measurements can be performed during and after compression and / or during downhole testing of unverified devices using various embodiments.

На фиг.22 показано в изометрии ударопоглощающее устройство (66) настоящего изобретателя, применимое для размещения передатчика в стволе скважины для измерений около или ниже компонентов, сжатых системой предоставления пространства согласно настоящему изобретению (например тех, которые показаны на фигурах 5-7 и 10-11). Передатчик может быть заключен в корпус передатчика (66D), который может быть размещен в контакте с обсадной трубой (например, 56A-56D фиг.2 и 2А) через крышку (66C) либо корпус (66А), где упомянутый контакт может оставаться, когда датчик амортизирован (66В) от нежелательных ударов и сил, когда, например, сжимание компонентов скважины с использованием операций системы предоставления пространства, таким образом, позволяет передачу эмпирических данных через обсадные трубы к устьевому оголовку на поверхности.FIG. 22 is an isometric view of the shock absorber device (66) of the present invention, useful for positioning a transmitter in a wellbore to measure near or below components compressed by the space providing system of the present invention (for example, those shown in FIGS. 5-7 and 10- eleven). The transmitter may be enclosed in a transmitter housing (66D), which may be placed in contact with the casing (e.g., 56A-56D of FIGS. 2 and 2A) through a cover (66C) or a housing (66A) where said contact may remain when the sensor is shock-absorbed (66V) from unwanted shocks and forces when, for example, compressing the well components using the operations of the space supply system, thus allowing the transmission of empirical data through casing pipes to the wellhead on the surface.

Датчик и/или транспондер может быть изолирован от сил сжатия и сотрясения по меньшей мере одним амортизирующим каркасом, пружиной, перемещаемым опорным механизмом, желатиновым материалом или защитным стабилизатором, обеспечивающим, при использовании, непрерывный ультразвуковой или электрический контакт со стенкой трубопровода, проходящей в кондуктор оголовка для передачи сигнала через упомянутую стенку трубопровода, когда поглощение напряжений, передаваемых к упомянутому датчику или транспондеру из, например, сминания трубопроводов под ниже поршня сминания трубопровода с кольцевым пространством, применимый для раскрытия эксплуатационной колонны с целью каротажа первичного цементирования позади, размещения барьерного элемента скважины и/или сравнительного анализа, разработки, испытания и совершенствования новой технологии.The sensor and / or transponder can be isolated from the forces of compression and shock by at least one shock absorbing frame, a spring, a movable support mechanism, gelatinous material or a protective stabilizer, providing, when used, continuous ultrasonic or electrical contact with the pipe wall passing into the conductor tip for transmitting a signal through said pipeline wall when the absorption of voltages transmitted to said sensor or transponder from, for example, crushing a pipeline in the underneath of the crushing piston of the pipeline with an annular space, applicable for opening the production string for the purpose of primary cementing behind, placing the barrier element of the well and / or comparative analysis, development, testing and improvement of new technology.

Обычный каротаж проводится в наиболее удаленной части канала и не может определить состояние первичного цементирования обсадных труб, поскольку каротажные инструменты в эксплуатационном трубопроводе не могут контактировать с обсадными трубами. Различные варианты воплощения способа по настоящему изобретению могут использоваться для образования геологического пространства, где может происходить каротаж для подтверждения первичной цементации рядом с трубопроводами. Сигналы могут быть, например, быть эфирными от каротажного устройства с отраженными сигналами, собранными в другой части каротажного устройства или сигналы могут передаваться между устьем скважины, поверхностью или подводным размещением и скважинным передатчиком или приемником. С помощью воплощений настоящего изобретения в отношении способа каротажного устройства измерительные сигналы могут быть связаны с окружностью стенок трубопровода для предоставления звуковых, акустических или различных других сигналов, образующих измерение, например, время отклика сигналов, проходящих через скрепленные и нескрепленные трубопроводные цементации для измерения степени склеивания и/или цементации в настоящее время. Процесс может быть представлен как перезвон или дребезжание стакана и полученное измерение звука или вибрации для определения, несвязно ли стоит стакан в жидкости или плотно закреплен на месте.Conventional logging is carried out in the most remote part of the channel and cannot determine the state of primary cementing of the casing, since the logging tools in the production pipeline cannot contact the casing. Various embodiments of the method of the present invention can be used to form a geological space where logging can take place to confirm primary cementation near the pipelines. The signals may, for example, be ethereal from a logging device with reflected signals collected in another part of the logging device, or the signals may be transmitted between the wellhead, surface or underwater placement and the downhole transmitter or receiver. Using embodiments of the present invention with respect to the logging method, the measurement signals may be associated with the circumference of the pipe walls to provide sound, acoustic, or various other signals forming a measurement, for example, the response time of signals passing through bonded and non-bonded pipe grouts to measure the degree of bonding and / or carburizing at present. The process can be represented as a chime or rattling of a glass and the resulting measurement of sound or vibration to determine whether the glass is disconnected in the liquid or tightly fixed in place.

Передатчики и/или приемники сигналов связаны с трубопроводами или жидкостями кольцевого пространства через проходы или через отверстия кольцевого пространства в оголовке скважины. Сигнал может быть послан от оголовка скважины или из внешнего передатчика, который функционирует таким же образом, к каротажному устройству VSP, используемому для калибровки сейсмических данных, где он может быть применим для показа существования первичного цементирования, прилегающего к пластовому отверстию и может быть откалиброван по данным каротажа, выполняемым во время и/или после строительства скважины.The signal transmitters and / or receivers are connected to pipelines or annular fluids through passages or through openings of the annular space in the well head. The signal can be sent from the wellhead or from an external transmitter that functions in the same way to the VSP logging tool used to calibrate seismic data, where it can be used to show the existence of primary cementing adjacent to the formation hole and can be calibrated using data logging performed during and / or after well construction.

В зависимости от результата измерений каротажа, различные другие элементы системы по настоящему изобретению применимы для размещения временных или постоянных барьерных элементов внутри скважины на соответствующих подземных глубинах для удовлетворения лучшим отраслевым практикам, чтобы избежать возможных будущих путей утечки и/или для моделирования закрытия скважины путем размещения цементных пробок в обсадных трубах. Кроме того, варианты могут быть совместимы с кабельной колонной и, таким образом, применимы с любой компоновкой без буровой установки или минимальными компоновками с регулированием давления для закрываемой навсегда скважины способом без использования буровой установки.Depending on the result of the logging measurements, various other elements of the system of the present invention are applicable to place temporary or permanent barrier elements inside the well at appropriate underground depths to meet industry best practices, to avoid possible future leak paths and / or to simulate well closure by placing cement casing plugs. In addition, the options can be compatible with the cable column and, thus, are applicable to any configuration without a drilling rig or minimal configurations with pressure control for permanently closed wells without using a drilling rig.

На фиг.12 показан схематический вид в вертикальном разрезе механизма закрепления трубопровода (55) с только одной частью радиального поперечного сечения отверстия (57) скважины, показанной под верхней правой частью поперечного сечения бокового вида диаметров (55A, 55B, 55C) элементов закрепляющего вала в различии конфигураций с левосторонним и правосторонним закрепляющим валом, показанным в верхнем правом углу. Гибкий вал (55A) и буровой резец (55D) могут быть использованы для бурения через различные трубопроводы (56A, 56B, 56C) обсадной трубы (56) с гибким валом (55A), применимым в качестве спина для компоновки (55) связанного закрепляющего трубопровода (55C), который может быть объединен с закреплением и/или упрочнением частичного элемента трубопровода (55B) для закрепления трубопроводов (55A, 55B и 55C) вместе. Такие соединительные компоновки могут быть применимы, например, для операций бурения, расфрезеровывания и предоставления пространства и показаны на фиг. от 3 до 7 и сжатий с использованием перфораторов на фиг.10.12 is a schematic vertical sectional view of a pipeline fastening mechanism (55) with only one part of a radial cross section of a well bore (57) shown under the upper right side cross section of a side view of diameters (55A, 55B, 55C) of elements of the fixing shaft in differences between the configurations with the left and right fixing shaft shown in the upper right corner. Flexible shaft (55A) and drill bit (55D) can be used to drill through various casing (56A, 56B, 56C) of casing (56) with a flexible shaft (55A) that can be used as a spin for arranging (55) the associated fastener (55C), which can be combined with securing and / or strengthening the partial pipe element (55B) for securing the pipelines (55A, 55B and 55C) together. Such connection arrangements may be applicable, for example, to drilling, milling and space operations and are shown in FIG. from 3 to 7 and compressions using perforators in figure 10.

На фиг.10 и 11 показаны схематические срезы в вертикальном виде через подземную скважину, показывающую пример воплощения (10D) устройства сжатия со взрывающимся элементом (92) системы предоставления пространства (10) и воплощения с тросовыми элементами (10E) соответственно. В ранее описанных патентных заявках Великобритания GB1011290.2, РСТ GB2010/051108, GB1111482.4 и GB1116098.3 также описаны применимые элементы системы предоставления пространства (10), например, устройства с осевым сжатием и/или пробкой радиального сжатия, и/или устройствами сжатия с поршнями мембраны (92) или гидравлическим ясом и/или взрывного сжатия для образования применимых подземных пространств с низкой стоимостью ресурсов, таким образом, перераспределения ресурсов, которые в ином случае были бы использованы для удовлетворения ответственности за закрытие скважины.10 and 11 are schematic vertical sections through an underground wellbore showing an embodiment (10D) of an explosive compression device (92) of a space providing system (10) and an embodiment with cable elements (10E), respectively. The previously described patent applications UK GB1011290.2, PCT GB2010 / 051108, GB1111482.4 and GB1116098.3 also describe applicable elements of the space provision system (10), for example, axial compression devices and / or radial compression plugs and / or devices compression with diaphragm pistons (92) or a hydraulic casing and / or explosive compression to form usable underground spaces with low resource costs, thus redistributing resources that would otherwise be used to meet responsibility for closures well.

На фиг.10, схематически показан вертикальный вид среза через ствол (7) подземной скважины (57) и показывает воплощение (10D) устройства сжатия (92) с элементами системы (10) предоставления пространства со взрывной поршневой системой обеспечения пространства. Корпус элемента (96) показан сцепленным с колонной из составных или гибких труб компоновки с бурильной установкой или без нее и содержит взрывчатое вещество, которое может быть инициировано стреляющей головкой (98) для запуска поршня (95) расширяемого типа (95B), например, камеры, мембраны или различных шариков, которые могут быть применены для сжатия отделенной части развернутого трубопровода (56E, 56A, 56B), нецементированного в окружающем трубопроводе (56А, 56В, 56C, относительно отсоединенного развернутого трубопровода). Мембрана или односторонний клапан (97) может быть использован для отпускания замкнутой жидкости под устройством сжатия (95B) поршня (92) типа встряхивания (92А), когда она движется в содержащем трубопроводе. Верхний конец развертываемого трубопровода (56E, 56A, 56B), который будет отделен, может быть закреплен закрепляющим механизмом (55) для позволения взрывному веществу отделить упоминаемый трубопровод и переместить его в осевом направлении вниз по отношению к его закрепленной части, удерживающей корпус элемента (96), и развернутой колонне с составных или гибких труб. Как вариант, развертывание может быть отделено перед сжатием в осевом направлении вниз для образования осколочной породы (91).10, a vertical cross-sectional view is shown through a bore (7) of an underground well (57) and shows an embodiment (10D) of a compression device (92) with elements of a space providing system (10) with an explosive piston space providing system. The housing of the element (96) is shown coupled to a string of composite or flexible pipes with or without a drilling rig and contains an explosive that can be triggered by a firing head (98) to trigger an expandable type piston (95) (95B), for example, a chamber , membranes or various balls that can be used to compress the separated portion of the expanded pipe (56E, 56A, 56B), cementless in the surrounding pipe (56A, 56B, 56C, relative to the disconnected expanded pipe). A membrane or one-way valve (97) can be used to release a closed fluid under the compression device (95B) of the piston (92) of the shaking type (92A) as it moves in the containing pipe. The upper end of the deployable pipe (56E, 56A, 56B), which will be separated, can be fixed with a fixing mechanism (55) to allow the explosive to separate the pipe and move it axially downward relative to its fixed part holding the element body (96 ), and an expanded column with composite or flexible pipes. Alternatively, the deployment may be separated before compression in the axial direction down to form a fragmentation rock (91).

На фиг.11 показан схемный план левой и правой стороны выше срезов вертикального поперечного сечения через ствол (7) подземной скважины (57) и показано воплощение (10E) кабельного типа (92B) устройства сжатия (92) системы предоставления пространства (10) перед активацией на левой стороне и после активации на правой стороне. Устройство сжатия (92B) может быть развернуто с помощью кабеля (67) из типа (67AD) изгиба (99) трубопровода и прикрепленного (102) на своем нижнем конце, проходящем через множество пластин (101) эксцентрической мембраны (100), которые могут быть расположены в пределах сжимаемого нецементированного трубопровода в содержащем трубопроводе, где натяжение упомянутого троса может изгибать упомянутый нецементированный трубопровод выравниванием мембран (100) с осью натяжного троса (67AD), таким образом позволяя осевое сжатие по отношению к креплению упомянутого изогнутого (99) трубопровода. Осколочная порода (91) может быть образована изгибом и пластически деформированием трубопровода. Устройство сжатия троса (92B) может быть объединено с, например, взрывным устройством (92А) по настоящему изобретению и/или с поршневыми мембранными устройствами сжатия (92) с пробкой осевого сжатия и/или радиального встряхивания и/или взрывными устройствами сжатия (92) настоящего изобретателя для дальнейшего изгиба и сжатия изогнутого трубопровода.11 shows a schematic diagram of the left and right sides above the vertical cross-sectional sections through the bore (7) of the underground well (57) and shows an embodiment (10E) of the cable type (92B) of the compression device (92) of the space providing system (10) before activation on the left side and after activation on the right side. The compression device (92B) can be deployed using a cable (67) from a bend type (67AD) of a pipe bend (99) and attached (102) to its lower end passing through a plurality of plates (101) of an eccentric membrane (100), which can be located within a compressible non-cemented pipe in the containing pipe, where the tension of said cable can bend said non-cemented pipe by aligning the membranes (100) with the axis of the tension cable (67AD), thereby allowing axial compression relative to the mount of said bent (99) pipeline. Fragmented rock (91) can be formed by bending and plastically deforming the pipeline. The cable compression device (92B) can be combined with, for example, the explosive device (92A) of the present invention and / or with piston diaphragm compression devices (92) with an axial compression and / or radial shaking plug and / or explosive compression devices (92) of the present inventor for further bending and compression of a curved pipe.

На фиг.4, 5, 6 и 7 показано воплощение (92D) устройства сжатия (92) и воплощения (9B) направляемой бурильной колонны для расширения (9) на фиг.4, с воплощениями (92E), (92F) и (92G) тросового устройства сжатия (92) на фиг.5, 6 и 7 соответственно.FIGS. 4, 5, 6 and 7 show an embodiment (92D) of a compression device (92) and an embodiment (9B) of a guided drill string for expansion (9) of FIG. 4, with embodiments (92E), (92F) and (92G ) cable compression device (92) in figure 5, 6 and 7, respectively.

На фиг.4 схематически показан вертикальный срез через стволы скважин и обсадные трубы, где отображается воплощение (92D) устройства сжатия (92) и воплощение (9B) для бурения расширения (9), которое может содержать воплощение (73B) тросовой (67B) развертываемой поршневой колонны (73) с помощью тягача реактивного момента (74), который может работать с двигателем (17F) для вращения воплощения (17А) маятниковых сплошных валов двигателя расфрезерования (17) подобно устройству расфрезерования (9AA) на фигурах 13-16. Натяжение кабеля (67B) и тягач (74) обеспечивает движение вверх при избытке нисходящего давления текучей среды, приложенного к поршневой колонне (73B), где трубопроводы могут быть закреплены (55) на месте для предотвращения вредного бокового движения и стабилизации дуговых стенок (4), содержащих выдвижные рычаги с изогнутыми винтами, которые могут быть радиально расширены для обрезания трубопроводов с соответствующими ножевыми и/или колесными режущими устройствами (112) на упомянутых рычагах с целью помочь и стабилизировать размалываемый пласт упомянутым бурильным узлом расширения (9) и/или обсадную трубу. Обломочная порода (91) может быть сжата в нижнем конце упомянутой скважины упомянутым дроблением скважинных устройств на более мелкие частицы, которые могут быть сжаты вниз давлением сверху.Figure 4 schematically shows a vertical section through the boreholes and casing, which shows the embodiment (92D) of the compression device (92) and the embodiment (9B) for drilling an extension (9), which may include an embodiment (73B) of a cable (67B) deployable the piston column (73) using a jet torque tractor (74), which can operate with an engine (17F) to rotate the embodiment (17A) of the pendulum continuous shafts of the milling engine (17) similar to the milling device (9AA) in figures 13-16. Cable tension (67B) and tractor (74) provide upward movement with an excess of downward pressure of the fluid applied to the piston string (73B), where the pipelines can be fixed (55) in place to prevent harmful lateral movement and stabilize the arc walls (4) containing retractable levers with curved screws that can be radially expanded to cut pipelines with corresponding knife and / or wheel cutting devices (112) on said levers in order to help and stabilize the grindable formation the aforementioned drilling assembly extension (9) and / or the casing. Clastic rock (91) can be compressed at the lower end of said well by said crushing of downhole devices into smaller particles that can be compressed downward by pressure from above.

На фиг.13 схематически показан поперечный срез устройства фрезерной колонны (9AA на фиг.14-16) с двигателем (17E), которая может шарнирно отклоняться для захвата все больших отверстий (7) при все более эффективных вращающихся диаметрах (23а) для фрезерных трубопроводов (56E, 56D, 56A, 57B, 56C), наружная стенка (5) которых имеет режущие поверхности (112), которые также действуют как арочные стенки (4).On Fig schematically shows a cross-section of the device of the milling column (9AA in Fig.14-16) with an engine (17E), which can be pivotally deflected to capture larger holes (7) with increasingly effective rotating diameters (23a) for milling pipelines (56E, 56D, 56A, 57B, 56C), the outer wall (5) of which has cutting surfaces (112), which also act as arched walls (4).

На фиг.14, 15 и 16 показан вид сверху линией E-E, поперечное вертикальное сечение по линии E-E и изометрическая проекция вдоль линии E-E соответственно и показано воплощение (1BM) гидродинамического подшипника (1) с упорным (69) подшипником упорной втулки (12AD) внешней стенки ((11AE)) с шарнирным (71) подшипником верхнего конуса, где жидкость (23) входит в (32) между профилями (3AB) и (6AG) для вращения втулки (12) вокруг вала (2). Разгрузочные мембраны (33) показаны на фиг.15. Получение воплощения (17E) двигателя (17) достигается с помощью потока жидкости (23) через канал (22) в шарнирном подшипнике (71) для вращения наружных стенок (5) втулок и связанной с этим арочной поверхности (4), содержащей режущее устройство дробления (112), которое может быть полезным при выполнении операций размола (9AA на фиг.13). Втулка (12) показывает профили (3AB) и (6AG), где, на практике, упомянутая втулка проходит в герметизирующее зацепление на шарнирной опоре (71).On Fig, 15 and 16 shows a top view of the line EE, a vertical cross section along the line EE and isometric projection along the line EE, respectively, and shows the embodiment (1BM) of the hydrodynamic bearing (1) with thrust (69) thrust bearing (12AD) outer walls ((11AE)) with an articulated (71) bearing of the upper cone, where fluid (23) enters (32) between the profiles (3AB) and (6AG) to rotate the sleeve (12) around the shaft (2). Discharge membranes (33) are shown in FIG. Obtaining the embodiment (17E) of the engine (17) is achieved by using a fluid flow (23) through a channel (22) in an articulated bearing (71) to rotate the outer walls (5) of the bushings and the associated arched surface (4) containing the crushing cutting device (112), which may be useful in performing grinding operations (9AA in FIG. 13). The sleeve (12) shows the profiles (3AB) and (6AG), where, in practice, said sleeve passes into the sealing engagement on the hinge support (71).

На фиг.5 схематически показан вид срезов через стволы скважин и обсадные трубы и показано воплощение (92E) устройства сжатия (92), которое может быть применимо с натяжным кабелем (67C) прикрепленным (102, 103) на обоих концах со шкивом (105) на нижнем конце. Трубопровод (56E) может быть прикреплен (55) к окружающему трубопроводу (56А) и напряжение может быть приложено к кабельной головке (77) в верхнем креплении (103) с использованием кабельного разъема (77A), например, для зацепления кабельной головки, натяжения связанных кабелей, части муфты (106) и изгиба развертываемого трубопровода (56E) ниже упомянутого частичного соединения с помощью кабельного шкива на нижнем конце (105) для натяжения кабеля между верхним (103) и нижним (102) анкерами. Сжатие может происходить в направлении вверх или вниз в зависимости от расположения шкива (105) в верхнем или нижнем анкере соответственно с помощью соответствующего закрепления (55) и разделения (55) или, например, взрывчатого вещества, химического или механического разрезания бесцементного трубопровода (56E), сжимаемого в окружающих трубопроводах.Figure 5 schematically shows a section through the boreholes and casing and shows an embodiment (92E) of a compression device (92) that can be used with a tension cable (67C) attached (102, 103) at both ends with a pulley (105) at the lower end. The conduit (56E) can be attached (55) to the surrounding conduit (56A) and the voltage can be applied to the cable head (77) in the upper mount (103) using a cable connector (77A), for example, to engage the cable head, tension connected the cables, the sleeve part (106) and the bend of the deployable pipe (56E) below said partial connection using a cable pulley at the lower end (105) to tension the cable between the upper (103) and lower (102) anchors. Compression can occur up or down depending on the location of the pulley (105) in the upper or lower anchor, respectively, by appropriate fastening (55) and separation (55) or, for example, explosive, chemical or mechanical cutting of a cementless pipe (56E) compressible in surrounding pipelines.

На фиг.6 и 7 схематически показан вид срезов через стволы и обсадные трубы скважин, отображающие воплощения (92F, 92G соответственно) устройства сжатия (92), которые могут применяться с натяжным кабелем (67D), прикрепленным (102, 103) на обоих концах с помощью шкива (105) на нижнем конце трубопровода, который также показан прикрепленным (105) к окружающему трубопроводу (56а). Устройства сжатия натяжения кабелей (92) для изгиба (99) скважинного устройства, например, развертываемого трубопровода (56E) и другого задействованного устройства или обломочной породы (91), при помощи натяжения кабеля (67D) между анкерами (102, 103) и шкивом (105) для изгиба трубопровода и обломочной породы, образованной или вовлеченной упомянутым изогнутым трубопроводом в незацементированном пространстве с натяжением, приложенным к кабельной головке (77) и кабельному механизму (77A).6 and 7 schematically show a section through the boreholes and casing of the wells showing embodiments (92F, 92G, respectively) of a compression device (92) that can be used with a tension cable (67D) attached (102, 103) at both ends using a pulley (105) at the lower end of the pipe, which is also shown attached (105) to the surrounding pipe (56a). Cable tension compression devices (92) for bending (99) a downhole device, such as a deployable pipe (56E) and other involved device or debris (91), by cable tension (67D) between the anchors (102, 103) and the pulley ( 105) for bending the pipeline and debris formed or involved by the said curved pipeline in an uncemented space with tension applied to the cable head (77) and cable mechanism (77A).

Устройство сжатия (92) кабельного и взрывного типа (92F) могут содержать корпус (96A) вокруг взрывчатого заряда, который, при поджиге, натягивает кабель между верхним (103) и нижним (102) анкерами для отделения нижнего обреза или ослабленного трубопровода (106А) и сжатия трубопровода (56A) в осевом направлении вверх, где зацепление кабеля (77A) может быть отключено, и развернутый трубопровод (56E) над сжатой частью между анкерами может быть обрезан, позволяя сжатому обломочному материалу падать вниз или быть вытолкнутым поршневым устройством сжатия.The cable and explosive type compression device (92) (92F) may include a housing (96A) around an explosive charge that, when ignited, pulls the cable between the upper (103) and lower (102) anchors to separate the lower edge or loose pipe (106A) and compressing the conduit (56A) upward axially, where the cable engagement (77A) can be disengaged, and the unfolded conduit (56E) above the compressed portion between the anchors can be cut off, allowing the compressed clastic material to fall down or be pushed out by the piston compression device.

Устройство сжатия (92) кабельного и поршневого типа (92G) могут включать использование и поршня (95) надувного мембранного типа (107), с обломочным материалом и жидкостью (104) с развертываемым диаметром, подобным показанному взрывному корпусу (96A), для радиального разрыва и осевого изгиба (99) развертываемого трубопровода (56E) между анкерами (102, 103) посредством натяжения на шкив (105) с помощью кабельного зацепления (77A) и кабельной головки (77) с кабелем (67D), с приложением, таким образом, натяжения для изгиба между упомянутыми анкерами.The compression device (92) of the cable and piston type (92G) may include the use of an inflatable membrane type piston (95) of membrane type (107), with debris and liquid (104) with a deployable diameter similar to the explosive body shown (96A), for radial rupture and axial bending (99) of the deployable pipe (56E) between the anchors (102, 103) by tensioning the pulley (105) by cable meshing (77A) and cable head (77) with cable (67D), with the application, thus tension for bending between said anchors.

На фиг.17-19 и 23-25 показаны различные буровые устройства для бурения с обсадной трубой и размещения с напорной колонной управления двойным жидкостным градиентом и камерными стыками данного изобретателя с буровой установкой (58A) или установкой из составных труб (58b), где может быть выполнено небольшое эмпирическое испытание, например, с компоновками из составных труб без буровых установок (58B) или установок с гибкими трубами (58C) с использованием колонны гибких труб (67F) с представленной системой предоставления пространства. После формирования пространства с устройством сжатия (92) и размещения одной или нескольких пробок для закрытия скважины (89), эмпирическая проверка селектора (121) отверстия камерных соединений (119) и доступа выходного отверстия (120) может быть осуществлена с использованием бокового отвода ствола скважины (59C), где устройства для прохождения шлама с контролируемым давлением (117, 118) с гидродинамическими подшипниками (1BP, 1BQ) могут быть проверены перед использованием упомянутых технологий с буровой установкой (58A) или установкой из составных труб (58B) с помощью колонны из составных труб. На фиг.19 показан отвод бокового канала и воплощение (9C) бурового устройства (9), которое включает рядный двигатель (17I) для вращения режущего устройства (112).17-19 and 23-25 show various drilling devices for casing drilling and placement with a dual-fluid gradient control column and chamber joints of this inventor with a drilling rig (58A) or a composite pipe installation (58b), where a small empirical test should be performed, for example, with composite pipe assemblies without drilling rigs (58B) or flexible pipe assemblies (58C) using a flexible pipe string (67F) with the space system provided. After forming a space with a compression device (92) and placing one or more plugs to close the well (89), an empirical check of the selector (121) of the chamber connection hole (119) and the access of the outlet (120) can be carried out using the lateral borehole (59C), where controlled pressure sludge passage devices (117, 118) with hydrodynamic bearings (1BP, 1BQ) can be tested before using the aforementioned technologies with a drilling rig (58A) or a composite pipe installation (5 8B) using a column of composite pipes. On Fig shows the side channel and the embodiment (9C) of the drilling device (9), which includes an in-line engine (17I) for rotating the cutting device (112).

На фиг.23 и 24 показана вертикальная проекция устройства для прохождения шлама с контролируемым давлением для верхнего (117) и нижнего (118) каналов с верхним и нижним вращающимися соединениями, адаптируемыми для поршневых маятниковых механизмов (73) и включение гидродинамических подшипников (1BP, 1BQ), где циркуляция жидкости может происходить через множество каналов внутри колонны (67N) и (67O).On Fig and 24 shows a vertical projection of a device for passing slurry with controlled pressure for the upper (117) and lower (118) channels with upper and lower rotating joints, adaptable for piston pendulum mechanisms (73) and the inclusion of hydrodynamic bearings (1BP, 1BQ ), where fluid circulation can occur through many channels inside the columns (67N) and (67O).

На фиг.25 показан в изометрии разрез скважины и пластов, где видно камерный переход (119), из которого выходные стволы (120) могут быть пробурены, где эта новая технология может быть испытана и/или проверена в верхнем конце скважины, закрытой на своем нижнем конце.On Fig shown in isometric section of the well and reservoirs, where you can see the chamber transition (119), from which the output shafts (120) can be drilled, where this new technology can be tested and / or verified at the upper end of the well, closed at its lower end.

На фиг.26 и 27 показан вид сверху по линии F-F и поперечного сечения через линию F-F соответственно, изображающие соединение камер для одновременного потока (122), используемое в качестве двойного трубопровода, например (56E) и (56А), где новая технология может быть испытана, например, многопоточная компоновка, селектор отверстий и боковой отвод ствола (59D) со съемным скважинным отклонителем (128) на фиг.28 и 29 с использованием воплощения (10F) системы предоставления пространства (10).FIGS. 26 and 27 are a top view along the FF line and a cross section through the FF line, respectively, depicting a simultaneous flow chamber connection (122) used as a dual conduit, for example (56E) and (56A), where the new technology may be tested, for example, multi-threaded layout, hole selector and lateral bore (59D) with a removable borehole diverter (128) in Fig.28 and 29 using the embodiment (10F) of the space system (10).

На фиг.28 и 29 показано поперечное сечение по скважине и пласту с помощью линии G и соответствующий увеличенный подробный вид по линии G соответственно, показывающий воплощение (73E) маятникового поршневого узла (73) с тягачом (74) с гидродинамическим подшипником (1, 1AF), включающее двигатель (17, 17J) и подшипники (1AG), содержащий жидкостный насос (18, 18F) с поворотным гидродинамическим подшипником (1AU) выше режущего устройства (112), подобным показанному на фиг.106 гидродинамическому подшипнику (1BL). Маятниковая бурильная колонна с составным трубопроводом (9, 9F) образует часть поршня (73E), приводимую двигателем (17, 17K) с тягачом (74), подвешенным из кабельной головки (77). Осевая сила (16) прикладывается на маятниковую колонну (73E) силой давления насоса (73E) в верхней части кабельного развертываемого двигателя (17K). Тягачи с реактивным моментом (74) также могут быть модифицированы с помощью гидравлического подшипника (1). На фиг.29 показан в деталях гидродинамический подшипник (1), который расположен вокруг вала (2) по меньшей мере одной периферийной дуговой стеной (4, 4H), проходящий от периметра корпуса вала трубопровода (14D).FIGS. 28 and 29 show a cross-section along the well and formation using the G line and a corresponding enlarged detailed view along the G line, respectively, showing the embodiment (73E) of the pendulum piston assembly (73) with a tractor (74) with a hydrodynamic bearing (1, 1AF ), including an engine (17, 17J) and bearings (1AG), comprising a fluid pump (18, 18F) with a slewing hydrodynamic bearing (1AU) above a cutting device (112) similar to the hydrodynamic bearing (1BL) shown in FIG. A pendulum drill string with a composite pipe (9, 9F) forms part of the piston (73E) driven by an engine (17, 17K) with a tractor (74) suspended from a cable head (77). An axial force (16) is applied to the pendulum string (73E) by the pressure of the pump (73E) at the top of the cable deployable motor (17K). Tractor units with a reactive torque (74) can also be modified using a hydraulic bearing (1). On Fig shown in detail the hydrodynamic bearing (1), which is located around the shaft (2) of at least one peripheral arc wall (4, 4H), passing from the perimeter of the pipe shaft housing (14D).

Для облегчения воплощения (59D) бокового отвода ствола скважины (59) пробка закрытия (89) была размещена после воплощения (10F) системы предоставления пространства (10) с участием сжатия обломочной породы (91) для образования полезного пространства для упомянутой пробки (89) и эмпирического испытания новой технологии (78) с боковым отводом (59D).To facilitate the embodiment (59D) of the sidetracking of the wellbore (59), the closure plug (89) was placed after the implementation (10F) of the space supply system (10) involving compression of debris (91) to form a usable space for said plug (89) and empirical test of new technology (78) with lateral branch (59D).

Хотя различные варианты воплощения настоящего изобретения были описаны с подробностями, следует понимать, что в пределах объема прилагаемой формулы изобретения настоящее изобретение может быть осуществлено на практике иначе, чем конкретно описано здесь.Although various embodiments of the present invention have been described in detail, it should be understood that, within the scope of the appended claims, the present invention may be practiced otherwise than specifically described herein.

Позиционные обозначения были включены в формулу изобретения только для помощи в понимании во время выполнения.Reference numerals have been included in the claims only to aid understanding at runtime.

Claims (32)

1. Система обеспечения пространства (10, 10А-10Н) для формирования геологического испытательного пространства для проверки работы по меньшей мере одного непроверенного скважинного прибора (78, 92) в истощенной геологической структуре во время закрытия скважины без использования буровой установки истощенной скважины для перераспределения работы, при использовании, по меньшей мере одного непроверенного скважинного устройства из непроверенной до проверенной работы в геологической структуре с максимально подобным возрастом истощенной скважины, другой истощенной скважины (79), новой скважины (80) или группы скважин (79, 80), содержащая:
по меньшей мере одно непроверенное скважинное устройство, содержащее по меньшей мере одно бурильное устройство с гидродинамическим подшипником (1A, 1E, 1BM, 9AA, 92D) или скважинное поршневое устройство (1A, 1AF, 92A-92C, 92E-92G), причем по меньшей мере одно непроверенное скважинное устройство содержит открывающий элемент (92) для открытия скважины без буровой установки, выполненный с возможностью приведения в действие по меньшей мере гидравлическими средствами, причем открывающий элемент для открытия скважины без использования буровой установки дополнительно выполнен с возможностью приведения в действие взрывом, кабелем или их комбинацией, и с возможностью развертывания через верхний конец истощенной скважины в пределах одного или более трубопроводов, имеющих по меньшей мере внутреннее отверстие в стенке по меньшей мере одного концентрического окружающего отверстия, которое входит в зацепление посредством открывающего элемента для открытия скважины без буровой установки во время закрытия нижнего конца истощенной скважины, так что открывающий элемент для открытия скважины без буровой установки открывает внутреннее отверстие в осевом направлении вдоль, и радиально в стенку по меньшей мере одного концентрического окружающего отверстия, при этом обломочная порода (91), образующаяся при открытии внутреннего отверстия, размещается и сжимается в нижнем конце истощенной скважины для размещения затвердевающего герметизирующего материала, при этом затвердевающий герметизирующий материал размещается в осевом направлении над обломочной породой и в стенке одного концентрического окружающего отверстия на нижнем конце истощенной скважины для создания сходной геологической структуры над затвердевающим герметизирующим материалом, сравнимой по меньшей мере с одной частью геологической структуры истощенной скважины, геологической структуры другой истощенной скважины, геологической структуры новой скважины или геологической структуры группы скважин для формирования, при использовании, геологического испытательного пространства; и при этом
геологическое испытательное пространство выполнено с возможностью использования для эмпирического измерения рабочих параметров по меньшей мере одного непроверенного скважинного устройства (78, 92), в котором геологическое испытательное пространство включает по меньшей мере одно непроверенное скважинное устройство (78) для предоставления эмпирических данных для адаптации или проверки по меньшей мере одного непроверенного скважинного устройства для, при использовании, перераспределения работы по меньшей мере одного непроверенного скважинного устройства от непроверенной до проверенной работы внутри геологического испытательного пространства для использования в подобной геологической структуре истощенной скважины, другой истощенной скважины, новой скважины или группы скважин.
1. A space support system (10, 10A-10H) for forming a geological test space for verifying the operation of at least one unverified downhole tool (78, 92) in a depleted geological structure during well closure without using a depleted well drilling rig to redistribute work, when using at least one unverified downhole device from unverified to verified work in a geological structure with the maximum age of a depleted well us, and the other depleted wells (79), the new borehole (80) or a group of wells (79, 80), comprising:
at least one unverified downhole device containing at least one drilling device with a hydrodynamic bearing (1A, 1E, 1BM, 9AA, 92D) or a downhole piston device (1A, 1AF, 92A-92C, 92E-92G), with at least at least one unverified borehole device contains an opening element (92) for opening a well without a drilling rig, configured to be actuated by at least hydraulic means, and an opening element for opening a well without using a drilling rig It is made with the possibility of actuation by explosion, cable or a combination thereof, and with the possibility of deployment through the upper end of a depleted well within one or more pipelines having at least an internal hole in the wall of at least one concentric surrounding hole that engages by means of an opening element for opening a well without a drilling rig during closing of the lower end of a depleted well, so that an opening element for opening a well without a drill of the installation opens the inner hole in the axial direction along and radially into the wall of at least one concentric surrounding hole, while the debris (91) formed when opening the inner hole is placed and compressed in the lower end of the depleted well to accommodate the hardening sealing material, while the hardening sealing material is placed in the axial direction above the clastic rock and in the wall of one concentric surrounding hole at the lower end and depletion of the well to create a similar geological structures above the solidifying sealing material comparable to at least one part of the geological structure depleted wells, geological structure other depleted wells, geological structure of a new well or wells of the geological structure of the group for forming, in use, the geological test area; and wherein
the geological test space is configured to empirically measure at least one unverified downhole device (78, 92), in which the geological test space includes at least one unverified downhole device (78) to provide empirical data for adaptation or verification by at least one unverified downhole device for, when using, redistributing the work of at least one unverified well a deadweight device from unverified to proven operation inside a geological test space for use in a similar geological structure of a depleted well, another depleted well, a new well or group of wells.
2. Система обеспечения пространства по п.1, отличающаяся тем, что открывающий элемент (92) для открытия скважины без буровой установки содержит режущий механизм, используемый без применения буровой установки для отсоединения осколочной породы (91) из зацеплений, что предотвращает размещение и сжатие осколочного материала в нижнем конце истощенной скважины.2. The space support system according to claim 1, characterized in that the opening element (92) for opening a well without a drilling rig comprises a cutting mechanism used without using a drilling rig to disconnect the fragmentation rock (91) from the gears, which prevents the fragmentation and placement of the fragmentation material at the lower end of the depleted well. 3. Система обеспечения пространства по п.2, отличающаяся тем, что открывающий элемент (92, 1A, 1E, 1BM, 92D) для открытия скважины без буровой установки содержит по меньшей мере один гидродинамический подшипник (1), расположенный вокруг вала, (2) и внешнюю стенку (5) режущего устройства (112) и позиционированную в стенке концентрического окружающего отверстия (7) с по меньшей мере одной периферической дуговой стенкой (4), расположенный вокруг периферии корпуса вала трубопровода (14) и радиально расширяющийся от нее, а также вокруг по меньшей мере одной внутренней стенки (6), смежной по меньшей мере с одной соответствующей гидродинамической профилированной стенкой (3), причем открывающий элемент для открытия скважины без буровой установки выполнен с возможностью вращения на вале или вокруг этого вала для смещения жидкости в осевом направлении вдоль по меньшей мере одной внутренней стенки, которая крепится комбинированными фрикционными зацеплениями жидкости, по меньшей мере одной соответствующей гидродинамической профилированной стенки (3), по меньшей мере одной внутренней стенки (6), по меньшей мере одной периферической дуговой стенки (4) и стенки по меньшей мере одного концентрического окружающего отверстия (7) для проталкивания жидкости между прилегающей группой по меньшей мере двух стенок, при этом смещение жидкостей образует подпрессованную (8) подушку, которая гидравлически сообщается с группой по меньшей мере двух стенок, при использовании, для работы режущих устройств (112) для образования осколочной породы (91), когда смазка и амортизация, связанные с ударами и вибрациями во время вращения со срезывающим усилием фрикционных зацеплений подшипника вала при вращении режущих устройств в стенке по меньшей мере одного концентрического окружающего отверстия.3. The space support system according to claim 2, characterized in that the opening element (92, 1A, 1E, 1BM, 92D) for opening a well without a drilling rig comprises at least one hydrodynamic bearing (1) located around the shaft, (2 ) and the outer wall (5) of the cutting device (112) and positioned in the wall of the concentric surrounding hole (7) with at least one peripheral arc wall (4) located around the periphery of the pipeline shaft housing (14) and radially expanding from it, and also around at least one inner a wall (6) adjacent to at least one corresponding hydrodynamic profiled wall (3), and the opening element for opening a well without a drilling rig is rotatable on the shaft or around this shaft to displace fluid in the axial direction along at least one the inner wall, which is fastened by combined frictional gearing of the liquid, at least one corresponding hydrodynamic shaped wall (3), at least one inner wall (6), at least to it of at least one peripheral arc wall (4) and the wall of at least one concentric surrounding hole (7) for pushing the fluid between the adjacent group of at least two walls, while the displacement of the liquids forms a prepressed (8) cushion that hydraulically communicates with the group along at least two walls, when used, for operation of cutting devices (112) for the formation of fragmentation rock (91), when the lubrication and shock absorption associated with shock and vibration during rotation with a shearing force is frictional x links during rotation of the shaft bearing the cutting devices into the wall of at least one concentrically surrounding the hole. 4. Система по любому из предшествующих пунктов, отличающаяся тем, что открывающий элемент (92) для открытия скважины без буровой установки содержит пробку, мембрану или их комбинацию, причем открывающий элемент (92) для открытия скважины без буровой установки расположен рядом с осколочной породой (91) для удаления и сжатия осколочной породы в нижнем конце истощенной скважины с помощью использования дифференциального давления жидкости в скважинном поршневом устройстве, при этом жидкость впрыскивается в один или более трубопроводов для создания области высокого давления на первой стороне скважинного поршневого устройства, и области низкого давления на второй стороне скважинного поршневого устройства для работы открывающего элемента для открытия скважины без буровой установки в осевом направлении вдоль и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия.4. The system according to any one of the preceding paragraphs, characterized in that the opening element (92) for opening a well without a drilling rig contains a plug, membrane or a combination thereof, and the opening element (92) for opening a well without a drilling rig is located next to the fragmentation rock ( 91) to remove and compress the fragmentation rock at the lower end of the depleted well by using the differential pressure of the fluid in the downhole piston device, the fluid being injected into one or more pipelines to create Ia high-pressure region on the first side of the piston of the downhole devices and the low pressure on the second side of the piston downhole device for opening element for opening the well without drill axially mounted along and radially inward wall at least one concentrically surrounding the hole. 5. Система по п.4, в которой открывающий элемент для открытия скважины без буровой установки (92) содержит гидравлический яс, взрывчатое вещество или их комбинацию для принудительного размещения и сжатия осколочной породы (91) в нижней части истощенной скважины.5. The system according to claim 4, in which the opening element for opening a well without a drilling rig (92) contains a hydraulic clear, explosive, or a combination thereof for forcibly placing and compressing fragmented rock (91) in the lower part of the depleted well. 6. Система по п.5, в которой открывающий элемент (92) для открытия скважины без буровой установки содержит стреляющий перфоратор (92A), размещенный на развертываемой колонне для взрывного задействования поршня (95) из корпуса (96), причем поршень выполнен с возможностью адаптации к проходному отверстию, клапану или их комбинации для сброса запертого давления под поршнем при поджиге.6. The system according to claim 5, in which the opening element (92) for opening the well without a drilling rig comprises a firing punch (92A) placed on a deployable string for explosive engagement of the piston (95) from the housing (96), the piston being configured to adapting to the bore, valve or combination thereof to relieve the trapped pressure under the piston during ignition. 7. Система по п.1, в которой открывающий элемент для открытия скважины без буровой установки (92) содержит устройство сжатия с натяжением кабеля (92B, 92E, 92F, 92G) для изгиба (99) одного или более трубопроводов для образования осколочной породы (91) с помощью использования натягиваемого кабеля (67), который закреплен (102, 103) со шкивом (105) на одном или более его концах для осевого сжатия осколочной породы по отношению к шкиву.7. The system according to claim 1, in which the opening element for opening a well without a drilling rig (92) comprises a compression device with cable tension (92B, 92E, 92F, 92G) for bending (99) one or more pipelines to form fragmentation rock ( 91) by using a pull-on cable (67) that is secured (102, 103) with a pulley (105) at one or more of its ends for axial compression of the fragmentation rock with respect to the pulley. 8. Система по п.7, в которой кабель проходит через по меньшей мере одну эксцентрическую мембрану (100) из множества пластин (101), расположенных в пределах одного или более трубопроводов, причем выравнивание натягивающего кабеля эксцентрических мембран принуждает множество пластин в радиальном направлении во внутреннем отверстии изгибать (99) один или более трубопроводов в осевом направлении вдоль и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия для образования осколочной породы.8. The system according to claim 7, in which the cable passes through at least one eccentric membrane (100) of the plurality of plates (101) located within one or more pipelines, wherein alignment of the tension cable of the eccentric membranes forces the plurality of plates in the radial direction in bend one or more pipelines (99) in the axial direction in the axial direction along and radially inward of the wall of at least one concentric surrounding hole to form fragmentation rock. 9. Система по п.1, в которой открывающий элемент (92) для открытия скважины без буровой установки сжимает обломочную породу в осевом направлении вдоль или радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия.9. The system according to claim 1, in which the opening element (92) for opening a well without a drilling rig compresses the debris in the axial direction along or radially inward of the wall of at least one concentric surrounding hole. 10. Система по п.1, дополнительно содержащая каротажное устройство, имеющее передатчик, приемник или их комбинации, при этом каротажное устройство размещено в открывающем элементе (92) для открытия скважины без буровой установки, в скважинном приборе (78), устье скважины, геологическом испытательном пространстве, затвердевающем герметизирующем материале или их комбинации, причем передатчик или приемник выполнен с возможностью размещения в корпусе, стойком к ударам и сжатию для посылки сигналов через жидкости или обсадные трубы истощенной скважины.10. The system according to claim 1, additionally containing a logging device having a transmitter, receiver, or combinations thereof, wherein the logging device is placed in an opening element (92) for opening a well without a drilling rig, in a downhole tool (78), the wellhead, geological a test space, a hardening sealing material, or a combination thereof, the transmitter or receiver being configured to be housed in a shock and compression resistant housing to send signals through liquids or casing exhausted with Vazhiny. 11. Система по п.10, в которой каротажное устройство эмпирически измеряет (93) рабочие параметры по меньшей мере одного непроверенного скважинного устройства для формирования по меньшей мере одного измерения, содержащего допуски, скорости вращения, удары, вибрации, прерывистые перемещения, вихревые движения, гармонические резонансы или их комбинации для работы по меньшей мере одного непроверенного скважинного устройства (78) в пределах подземных веществ, давлений и температур истощенной геологической структуры.11. The system of claim 10, in which the logging device empirically measures (93) the operating parameters of at least one unverified downhole device for generating at least one measurement containing tolerances, rotational speeds, impacts, vibrations, intermittent movements, swirling movements, harmonic resonances or combinations thereof for operating at least one unverified downhole device (78) within underground substances, pressures and temperatures of a depleted geological structure. 12. Система по п.10, в которой каротажное устройство эмпирически измеряет (93) и предоставляет соответствующие эмпирические данные геологических периодов и эпох подземных пластов, которые подобны другой истощенной скважине, новой скважине или группе скважин.12. The system of claim 10, in which the logging device empirically measures (93) and provides relevant empirical data of geological periods and epochs of underground formations, which are similar to another depleted well, a new well or group of wells. 13. Система по п.1, дополнительно содержащая производственную инфраструктуру для гидравлической работы открывающего элемента (92) для открытия скважины без буровой установки и для жидкостного доступа к истощенной скважине через один или более трубопроводов.13. The system according to claim 1, additionally containing a production infrastructure for hydraulic operation of the opening element (92) for opening a well without a drilling rig and for fluid access to a depleted well through one or more pipelines. 14. Система по п.13, в которой производственная инфраструктура предназначена для добычи природных ресурсов.14. The system of claim 13, wherein the manufacturing infrastructure is designed to extract natural resources. 15. Система по п.1, в которой истощенная скважина является скважиной с боковым стволом, полученным с использованием открывающего элемента (92) для открытия скважины без буровой установки или по меньшей мере одного проверенного скважинного устройства (78).15. The system according to claim 1, in which the depleted well is a side-hole well obtained using an opening member (92) to open a well without a drilling rig or at least one proven downhole device (78). 16. Система по п.1, в которой по меньшей мере одно непроверенное скважинное устройство (78) проверено в качестве развернутого и действующего в одном или более трубопроводах и геологическое испытательное пространство, которое обеспечивается открывающим элементом (92) для открытия скважины без буровой установки для проверенного использования во множестве приблизительно схожих геологических структур другой истощенной скважины (79), новой скважины (80), группы скважин (79, 80) или их комбинаций.16. The system according to claim 1, in which at least one unverified downhole device (78) is tested as deployed and operating in one or more pipelines and a geological test space, which is provided by an opening element (92) for opening a well without a drilling rig for proven use in a variety of approximately similar geological structures of another depleted well (79), a new well (80), a group of wells (79, 80), or combinations thereof. 17. Способ (10, 10А-10Н) формирования геологического испытательного пространства для проверки работы по меньшей мере одного непроверенного скважинного прибора (78, 92) в истощенной геологической структуре во время закрытия истощенной скважины без буровой установки, при использовании, для перераспределения работы по меньшей мере одного непроверенного скважинного устройства из непроверенной до проверенной работы в приблизительно схожих геологических структурах истощенной скважины, другой истощенной скважины (79), новой скважины (80) или группы скважин (79, 80), содержащий этапы, на которых осуществляют:
эмпирическое измерение (93) рабочего параметра непроверенного скважинного устройства, содержащего по меньшей мере одно бурильное устройство с гидродинамическим подшипником (1А, 1E, 1BM, 9AA, 92D) или скважинное поршневое устройство (1А, 1AF, 92А-92C, 92E-92G), при этом непроверенное скважинное устройство содержит открывающий элемент (92) для открытия скважины без буровой установки, приводимый в действие по меньшей мере гидравлическими средствами и дополнительно посредством взрыва, кабеля или их комбинацией;
развертывание открывающего элемента для открытия скважины без буровой установки через верхний конец истощенной скважины в одном или более трубопроводах, имеющих по меньшей мере внутреннее отверстие в стенке по меньшей мере одного концентрического окружающего отверстия, которое выполнено с возможностью открывания открывающим элементом для открытия скважины без буровой установки во время закрытия нижнего конца истощенной скважины;
использование открывающего элемента для открытия скважины без буровой установки для открытия внутреннего отверстия в осевом направлении вдоль и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия, причем обломочная порода (91), образующаяся при открытии внутреннего отверстия, размещается и сжимается в нижнем конце истощенной скважины;
размещение затвердевающего герметизирующего материала в осевом направлении над обломочной породой и в стенке по меньшей мере одного концентрического окружающего отверстия в нижнем конце истощенной скважины для обеспечения близкой геологической структуры над затвердевающим герметизирующим материалом, сравнимой по меньшей мере с одной частью геологической структуры истощенной скважины, геологической структуры другой истощенной скважины, геологической структуры новой скважины или геологической структуры группы скважин для образования, при использовании, геологического испытательного пространства; и
использование геологического испытательного пространства для эмпирического измерения рабочих параметров непроверенного скважинного устройства (78, 92) для предоставления эмпирических данных для адаптации или проверки упомянутого непроверенного скважинного устройства для перераспределения работы, при использовании, непроверенного скважинного устройства от непроверенной до проверенной работы в геологическом испытательном пространстве для использования в подобной геологической структуре истощенной скважины, другой истощенной скважины, новой скважины или группы скважин.
17. The method (10, 10A-10H) of forming a geological test space for checking the operation of at least one unverified downhole tool (78, 92) in a depleted geological structure during the closure of a depleted well without a drilling rig, when used, to redistribute the work of at least at least one unverified downhole device from unverified to verified operation in approximately similar geological structures of a depleted well, another depleted well (79), a new well (80) or group kvazhin (79, 80), comprising steps carried out by:
empirical measurement (93) of the operating parameter of an unverified downhole device containing at least one drilling device with a hydrodynamic bearing (1A, 1E, 1BM, 9AA, 92D) or a downhole piston device (1A, 1AF, 92A-92C, 92E-92G), wherein the unverified downhole device comprises an opening element (92) for opening a well without a drilling rig, actuated by at least hydraulic means and additionally by means of an explosion, cable, or a combination thereof;
deploying an opening element for opening a well without a drilling rig through the upper end of a depleted well in one or more pipelines having at least an inner hole in the wall of at least one concentric surrounding hole that is configured to open with an opening element for opening a well without a drilling rig in closing time of the lower end of the depleted well;
the use of an opening element to open a well without a drilling rig to open an axial hole in the axial direction along and radially inward of the wall of at least one concentric surrounding hole, and the detrital rock (91) formed when opening the inner hole is placed and compressed in the lower end of the depleted well ;
the placement of the hardening sealing material in the axial direction above the detrital rock and in the wall of at least one concentric surrounding hole in the lower end of the depleted well to provide a close geological structure over the hardening sealing material, comparable to at least one part of the geological structure of the depleted well, the geological structure of another a depleted well, the geological structure of a new well, or the geological structure of a group of wells for anija, in use, the geological test area; and
the use of a geological test space for empirical measurement of the operating parameters of an unverified downhole device (78, 92) to provide empirical data for adapting or checking the said unverified downhole device for redistributing work, when using an unverified downhole device from unverified to verified work in a geological test space for use in a similar geological structure of a depleted well, another depleted well zhiny, a new well or group of wells.
18. Способ по п. 17, дополнительно содержащий этапы, на которых обеспечивают открывающий элемент (92) для открытия скважины без буровой установки режущим устройством без буровой установки и используют режущее устройство без буровой установки для высвобождения осколочной породы (91) из зацеплений, что предотвращает размещение и сжатие осколочного материала в нижнем конце истощенной скважины.18. The method according to p. 17, further comprising stages, which provide an opening element (92) for opening a well without a drilling rig with a cutting device without a drilling rig and using a cutting device without a drilling rig to release fragmentation rock (91) from gears, which prevents placement and compression of the fragmentation material at the lower end of the depleted well. 19. Способ по п. 18, дополнительно содержащий этапы, на которых:
обеспечивают открывающий элемент (92, 1А, 1E, 1BM, 92D) для открытия скважины без буровой установки по меньшей мере с одним гидродинамическим подшипником (1), расположенным вокруг вала (2), и режущим устройством (112) наружной стенки (5), расположенным в стенке по меньшей мере одного концентрического окружающего отверстия (7) по меньшей мере с одной периферийной дуговой стенкой (4), расположенной вокруг периферии кожуха вала трубопровода (14) и расширяющейся в радиальном направлении от этой периферии, а также вокруг по меньшей мере одной внутренней стенки (6), которая примыкает к по меньшей мере одной связанной гидродинамической профилированной стенке (3), вращаемой валом или вокруг этого вала; и
смещают жидкость в осевом направлении вдоль по меньшей мере одной внутренней стенки, которая закреплена комбинированными сцеплениями за счет сил трения жидкости, по меньшей мере одной связанной гидродинамической профилированной стенки (3), по меньшей мере одной внутренней стенки (6), по меньшей мере одной периферийной дуговой стенки (4) и стенки по меньшей мере одного окружающего концентрического отверстия (7) для проталкивания жидкости между прилегающей группой по меньшей мере двух стенок, причем смещение жидкостей образует подпрессованную (8) подушку, которая гидравлически сообщается с группой по меньшей мере двух стенок для работы, при использовании, режущих устройств (112) для образования осколочного материала (91) во время смазки и амортизации, связанных с ударами и вибрациями во время вращения со срезывающим усилием фрикционных зацеплений подшипника вала при вращении режущих устройств в стенке по меньшей мере одного концентрического окружающего отверстия.
19. The method according to p. 18, further comprising stages in which:
provide an opening element (92, 1A, 1E, 1BM, 92D) for opening a well without a drilling rig with at least one hydrodynamic bearing (1) located around the shaft (2) and a cutting device (112) of the outer wall (5), located in the wall of at least one concentric surrounding hole (7) with at least one peripheral arc wall (4) located around the periphery of the casing of the pipe shaft (14) and expanding radially from this periphery, as well as around at least one inner wall (6) which is adjacent to at least one associated hydrodynamic shaped wall (3) rotated by or around the shaft; and
displace fluid axially along at least one inner wall, which is fixed by combined clutches due to friction forces of the fluid, at least one associated hydrodynamic shaped wall (3), at least one inner wall (6), at least one peripheral the arc wall (4) and the walls of at least one surrounding concentric hole (7) for pushing the fluid between the adjacent group of at least two walls, and the fluid displacement forms a prepress a cushion (8) cushion that hydraulically communicates with a group of at least two walls for use, when used, cutting devices (112) for the formation of fragmentation material (91) during lubrication and shock absorption associated with shock and vibration during rotation with shearing the frictional engagement force of the shaft bearing during the rotation of the cutting devices in the wall of at least one concentric surrounding hole.
20. Способ по одному из пп.17-19, дополнительно содержащий этап, на котором обеспечивают открывающий элемент для открытия скважины без буровой установки пробкой, мембраной или их комбинацией; размещают открывающий элемент (92) для открытия скважины без буровой установки рядом с осколочной породой (91) для размещения и сжатия осколочной породы в нижнем конце истощенной скважины с помощью использования дифференциального давления жидкости в скважинном поршневом устройстве; и впрыскивают жидкость в один или более трубопроводов для образования области высокого давления на первой стороне скважинного поршневого устройства и области низкого давления на второй стороне скважинного поршневого устройства для работы открывающего элемента для открытия скважины без буровой установки в осевом направлении вдоль и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия.20. The method according to one of paragraphs.17-19, further comprising the stage of providing an opening element for opening a well without a drilling rig with a plug, membrane or a combination thereof; placing an opening element (92) to open the well without a drilling rig next to the fragmentation rock (91) to place and compress the fragmentation rock at the lower end of the depleted well by using differential fluid pressure in the downhole piston device; and injecting fluid into one or more pipelines to form a high-pressure region on the first side of the borehole piston device and a low-pressure region on the second side of the borehole piston device for operating the opening member to open the borehole without a drilling rig in the axial direction along at least radially into the wall one concentric surrounding hole. 21. Способ по п.17, дополнительно содержащий этап, на котором обеспечивают открывающий элемент для открытия скважины без буровой установки с помощью гидравлического яса, взрывчатого вещества или их комбинаций для принудительного размещения и сжатия осколочной породы (91) в нижнем конце истощенной скважины.21. The method according to 17, further comprising providing an opening element for opening a well without a drilling rig using a hydraulic jar, explosive, or combinations thereof to force placement and compression of the fragmentation rock (91) at the lower end of the depleted well. 22. Способ по п.21, дополнительно содержащий этап, на котором обеспечивают открывающий элемент для открытия скважины без буровой установки стреляющим перфоратором (92A), размещенным на развертываемой колонне труб; и взрывное задействование поршня (95) из корпуса (96), причем поршень выполнен с возможностью адаптации к мембране, клапану или их комбинации для сброса запертого давления под поршнем при поджиге.22. The method according to item 21, further comprising the step of: providing an opening element for opening a well without a drilling rig with a perforating gun (92A) located on a deployable pipe string; and explosive activation of the piston (95) from the housing (96), the piston being adapted to adapt to the membrane, valve or a combination thereof to relieve the trapped pressure under the piston during ignition. 23. Способ по п.17, дополнительно содержащий этап, на котором обеспечивают открывающий элемент (92) для открытия скважины без буровой установки устройством сжатия с натяжением кабеля (92B, 92E, 92F, 92G) для изгиба (99) одного или более трубопроводов для образования осколочной породы (91) с помощью использования натягиваемого кабеля (67), который закреплен (102, 103) с помощью шкива (105) на одном или более его концах для осевого сжатия осколочной породы по отношению к шкиву.23. The method according to 17, further comprising providing an opening element (92) for opening the well without a drilling rig with a compression device with cable tension (92B, 92E, 92F, 92G) to bend (99) one or more pipelines for the formation of fragmentation rock (91) by using a pull-on cable (67), which is fixed (102, 103) with a pulley (105) at one or more of its ends for axial compression of the fragmentation rock with respect to the pulley. 24. Способ по п.23, дополнительно содержащий этап, на котором кабель проводят через по меньшей мере одну эксцентрическую мембрану (100) из множества пластин (101), которые расположены в одном или более трубопроводах; и осуществляют натяжение кабеля для принуждения множества пластин в радиальном направлении во внутреннем отверстии изгибать (99) один или более трубопроводов в осевом направлении вдоль и радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия для образования осколочной породы.24. The method according to item 23, further containing a stage in which the cable is passed through at least one eccentric membrane (100) from a plurality of plates (101), which are located in one or more pipelines; and tensioning the cable to force a plurality of plates in a radial direction in the inner hole to bend (99) one or more pipelines in the axial direction along and radially inward of the wall of at least one concentric surrounding hole to form a fragmentation rock. 25. Способ по п.17, дополнительно содержащий этап, на котором используют открывающий элемент (92) для открытия скважины без буровой установки для сжатия обломочной породы в осевом направлении вдоль или радиально внутрь стенки по меньшей мере одного концентрического окружающего отверстия.25. The method according to 17, further comprising the step of using an opening element (92) to open the well without a drilling rig to compress the debris in the axial direction along or radially inward of the wall of at least one concentric surrounding hole. 26. Способ по п.17, дополнительно содержащий этап, на котором размещают каротажное устройство, имеющее передатчик, приемник или их комбинацию, в открывающем элементе (92) для открытия скважины без буровой установки, скважинном устройстве (78), устье скважины, геологическом испытательном пространстве, затвердевающем герметизирующем материале или их комбинации, причем передатчик или приемник выполнен с возможностью размещения в корпусе, стойком к ударам и сжатию, для посылки сигналов через жидкости или обсадные трубы истощенной скважины.26. The method according to 17, further comprising the step of placing a logging device having a transmitter, receiver, or a combination thereof, in an opening element (92) for opening a well without a drilling rig, a downhole device (78), a wellhead, and a geological test a space that hardens the sealing material or a combination thereof, the transmitter or receiver being configured to be housed in a shock and compression resistant housing to send signals through the fluids or casing of a depleted well. 27. Способ по п.26, дополнительно содержащий этап, на котором используют каротажное устройство для эмпирического измерения (93) рабочих параметров непроверенного скважинного устройства для образования по меньшей мере одного измерения, содержащего допуски, скорости вращения, удары, вибрации, прерывистые перемещения, вихревые движения, гармонические резонансы или их комбинации для работы непроверенного скважинного устройства в пределах подземных веществ, давлений и температур истощенной геологической структуры.27. The method according to p. 26, further comprising the step of using a logging device for empirical measurement (93) of the operating parameters of an unverified downhole device to form at least one measurement containing tolerances, rotation speeds, shocks, vibrations, intermittent movements, vortex movements, harmonic resonances, or combinations thereof for operating an unverified downhole device within underground substances, pressures and temperatures of a depleted geological structure. 28. Способ по п.26, дополнительно содержащий этап, на котором используют каротажное устройство для предоставления эмпирических измерений (93) и соответствующих эмпирических данных геологических периодов и эпох подземных пластов, которые подобны другой истощенной скважине, новой скважине или группам скважин.28. The method of claim 26, further comprising using a logging tool to provide empirical measurements (93) and corresponding empirical data of geological periods and epochs of subterranean formations that are similar to another depleted well, a new well or groups of wells. 29. Способ по п.17, дополнительно содержащий этап, на котором используют промышленную инфраструктуру для гидравлического управления открывающим элементом (92) для открытия скважины без буровой установки и для гидравлического доступа к истощенной скважине через один или более трубопроводов.29. The method according to 17, further comprising the step of using the industrial infrastructure for hydraulic control of the opening element (92) to open the well without a drilling rig and for hydraulic access to the depleted well through one or more pipelines. 30. Способ по п.29, дополнительно содержащий этап, на котором используют производственную инфраструктуру для извлечения добычи из подземного ресурса.30. The method according to clause 29, further comprising the step of using production infrastructure to extract production from an underground resource. 31. Способ по п.17, дополнительно содержащий этап, на котором используют забуривание бокового ствола в истощенной скважине по направлению к подземному ресурсу при помощи открывающего элемента (92) для открытия скважины без буровой установки или скважинного устройства (78).31. The method according to claim 17, further comprising the step of drilling a sidetrack in a depleted well toward an underground resource using an opening element (92) to open a well without a drilling rig or a downhole tool (78). 32. Способ по п.17, содержащий этап, на котором осуществляют проверку непроверенного скважинного устройства (78) в геологическом испытательном пространстве, который обеспечивается открывающим элементом (92) для открытия скважины без буровой установки для проверенного использования во множестве приблизительно схожих геологических структур другой истощенной скважины (79), новой скважины (80), группы скважин (79, 80). 32. The method according to 17, containing the stage of checking an unverified downhole device (78) in a geological test space, which is provided with an opening element (92) for opening a well without a drilling rig for verified use in a variety of approximately similar geological structures of another depleted wells (79), a new well (80), a group of wells (79, 80).
RU2014103795/03A 2011-07-05 2012-07-05 Space provision system using compression devices for reallocation of resources for development of new technology of existing and new deposits RU2592623C2 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
GB1111482.4A GB2484166B (en) 2010-07-05 2011-07-05 Cable compatible rig-less operatable annuli engagable system for using and abandoning a subterranean well
GB1111482.4 2011-07-05
GB1121742.9 2011-12-16
GB1121742.9A GB2487274B (en) 2010-12-16 2011-12-16 A space provision system using compression devices for the reallocation of resources to new technology, brownfield and greenfield developments
PCT/US2012/045626 WO2013006735A2 (en) 2011-07-05 2012-07-05 A space provision system using compression devices for the reallocation of resources to new technology, brownfield and greenfield developments

Publications (2)

Publication Number Publication Date
RU2014103795A RU2014103795A (en) 2015-08-10
RU2592623C2 true RU2592623C2 (en) 2016-07-27

Family

ID=47439502

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014103795/03A RU2592623C2 (en) 2011-07-05 2012-07-05 Space provision system using compression devices for reallocation of resources for development of new technology of existing and new deposits

Country Status (5)

Country Link
CN (1) CN103781992B (en)
BR (1) BR112014001626B1 (en)
CA (1) CA2841841C (en)
RU (1) RU2592623C2 (en)
WO (1) WO2013006735A2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611073B (en) * 2018-10-15 2022-05-10 中国石油天然气股份有限公司 Method and device for optimizing fracturing horizon of mudstone of tight oil horizontal well

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1281665A1 (en) * 1984-12-25 1987-01-07 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Геофизических Методов Исследований,Испытания И Контроля Нефтегазоразведочных Скважин Well-testing apparatus
US5117685A (en) * 1989-05-24 1992-06-02 Schlumberger Technology Corporation Apparatus for testing an oil well, and corresponding method
SU1751306A1 (en) * 1990-07-02 1992-07-30 Западно-Сибирский научно-исследовательский и проектно-конструкторский институт технологии глубокого разведочного бурения Oil/gas-well testing device
US6148664A (en) * 1997-05-02 2000-11-21 Testing Drill Collar, Ltd. Method and apparatus for shutting in a well while leaving drill stem in the borehole
US20100126729A1 (en) * 2008-11-21 2010-05-27 Bruce Tunget Systems and methods for operating a plurality of wells through a single bore
US20110000668A1 (en) * 2009-07-06 2011-01-06 Tunget Bruce A Through tubing cable rotary system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0823194D0 (en) * 2008-12-19 2009-01-28 Tunget Bruce A Controlled Circulation work string for well construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1281665A1 (en) * 1984-12-25 1987-01-07 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Геофизических Методов Исследований,Испытания И Контроля Нефтегазоразведочных Скважин Well-testing apparatus
US5117685A (en) * 1989-05-24 1992-06-02 Schlumberger Technology Corporation Apparatus for testing an oil well, and corresponding method
SU1751306A1 (en) * 1990-07-02 1992-07-30 Западно-Сибирский научно-исследовательский и проектно-конструкторский институт технологии глубокого разведочного бурения Oil/gas-well testing device
US6148664A (en) * 1997-05-02 2000-11-21 Testing Drill Collar, Ltd. Method and apparatus for shutting in a well while leaving drill stem in the borehole
US20100126729A1 (en) * 2008-11-21 2010-05-27 Bruce Tunget Systems and methods for operating a plurality of wells through a single bore
US20110000668A1 (en) * 2009-07-06 2011-01-06 Tunget Bruce A Through tubing cable rotary system

Also Published As

Publication number Publication date
BR112014001626B1 (en) 2020-10-13
CN103781992A (en) 2014-05-07
CA2841841C (en) 2017-07-25
WO2013006735A2 (en) 2013-01-10
RU2014103795A (en) 2015-08-10
CN103781992B (en) 2016-11-16
CA2841841A1 (en) 2013-01-10
WO2013006735A4 (en) 2013-06-06
BR112014001626A2 (en) 2017-02-21
WO2013006735A3 (en) 2013-04-25

Similar Documents

Publication Publication Date Title
EP2729662B1 (en) A space provision system using compression devices for the reallocation of resources to new technology, brownfield and greenfield developments
GB2487274A (en) Wellbore test space creation system
GB2496095A (en) Well Abandonment with Benchmarking
US9518426B2 (en) Rotary stick, slip and vibration reduction drilling stabilizers with hydrodynamic fluid bearings and homogenizers
Sanders et al. Efficient Perforation of High-Pressure Deepwater Wells
GB2494780A (en) Apparatus and method of measuring cement bonding before and after the cementation process
RU2592623C2 (en) Space provision system using compression devices for reallocation of resources for development of new technology of existing and new deposits
Pawar et al. A screening tool for assessing feasibility of re-using existing oil and gas wells for CCUS operations
US9200504B2 (en) Space provision system using compression devices for the reallocation of resourced to new technology, brownfield and greenfield developments
GB2486592A (en) Steering system for a down-hole shaft comprising a hydrodynamic bearing system
Yamamoto et al. Offshore Deep-Water Drilling
Ojeh-Oziegbe et al. Successful Installation of the First Deep Water Single Trip Stand-Alone-Screens Completion in the Industry Saves Rig Time
EP2748422B1 (en) Apparatus and method of concentric cement bonding operations before and after cementation
Njå P&A of Valhall DP wells
Panferov et al. Maximize Efficiency of Coiled Tubing-Conveyed Perforation with Advanced Gun Deployment System and Real-Time Correlation in High-H2S/High-Pressure Wells
Bizhani et al. Plug and Abandonment Environment in British Columbia
Summers et al. The use of coiled tubing during the Wytch Farm extended reach drilling project
Dreesen et al. Developing hot dry rock reservoirs with inflatable open hole packers
de Dios et al. Light Drilling, Well Completion and Deep Monitoring
Barton et al. Genesis Project: Development Well Planning
Teodoriu Construction and completion of multifractured horizontal wells
Hoff Slender Well Design
Skoge Well Barrier Restoration Across Dual Cemented Liners
Walker et al. Sakhalin-1: Technologies to Efficiently Drill and Develop Resources While Expanding the ERD Envelope
Sweatman et al. New technology for offshore CO2 reservoir monitoring and flow control