RU2548270C1 - Drilling rig operation method - Google Patents

Drilling rig operation method Download PDF

Info

Publication number
RU2548270C1
RU2548270C1 RU2014120674/03A RU2014120674A RU2548270C1 RU 2548270 C1 RU2548270 C1 RU 2548270C1 RU 2014120674/03 A RU2014120674/03 A RU 2014120674/03A RU 2014120674 A RU2014120674 A RU 2014120674A RU 2548270 C1 RU2548270 C1 RU 2548270C1
Authority
RU
Russia
Prior art keywords
rails
rig
drilling
blocks
wheels
Prior art date
Application number
RU2014120674/03A
Other languages
Russian (ru)
Inventor
Наиль Габдулбариевич Ибрагимов
Айрат Ингелевич Аслямов
Рафаэль Расимович Гараев
Руслан Шамилевич Абсалямов
Роман Михайлович Осипов
Original Assignee
Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" им. В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority to RU2014120674/03A priority Critical patent/RU2548270C1/en
Application granted granted Critical
Publication of RU2548270C1 publication Critical patent/RU2548270C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: oil-and-gas industry.
SUBSTANCE: drilling rig operation method includes drilling in the state lifted above rails, lowering on rails, engagement of wheels of the rig with rails and movement between wells by the rig wheels on rails. The railtrack is mounted on concrete blocks above ground at least 2 m and is formed from separate mobile blocks. When moving the rig between wells the units well alternately rearranged and the drilling rig is moved on rails between blocks. When drilling the drilling rig is placed in the middle point of pair of blocks on rails, the rig is rested on rails and is lifted to the height providing a possibility of contact of lateral surfaces of wheel ribs with rails.
EFFECT: performance improvement.
2 dwg

Description

Изобретение относится к нефтяной промышленности и может найти применение при эксплуатации буровой установки при разбуривании куста скважин.The invention relates to the oil industry and may find application in the operation of a drilling rig when drilling a wellbore.

Известна система перемещения вышечно-лебедочного блока буровых установок для кустового бурения скважин, в которых вышечно-лебедочный блок перемещается в любом направлении отдельно от остальных основных систем буровой установки, размещенных неподвижно на кустовой площадке, включающая опорные основания, соединенные с подвышенным основанием, и, по меньшей мере, четыре домкратные опоры, соединенные с подвышенным основанием. Домкратная опора системы перемещения включает опорный мат, на котором расположены не менее чем два рельса, гидроцилиндр горизонтального перемещения и гидроцилиндр вертикального перемещения с опорой цилиндра, тележку, выполненную с возможностью поворота опорного мата вокруг вертикальной оси, рельсовые захваты с цилиндрическими роликами, соединенные с тележкой (Патент РФ №2459062, кл. E21B 7/02, E21B 15/00, опубл. 20.08.2012).There is a known system for moving a rig-winch block of drilling rigs for cluster drilling of wells, in which the rig-winch block moves in any direction separately from other main rig systems located motionless on the cluster site, including supporting bases connected to an elevated base, and, according to at least four jack supports connected to a raised base. The jack support of the moving system includes a support mat on which at least two rails are located, a horizontal movement hydraulic cylinder and a vertical movement hydraulic cylinder with a cylinder support, a trolley configured to rotate the support mat around a vertical axis, rail grips with cylindrical rollers connected to the trolley ( RF patent No. 2459062, CL E21B 7/02, E21B 15/00, published on 08.20.2012).

Наиболее близким к изобретению по технической сущности является устройство для перемещения буровой установки и выравнивания положения вышечного блока, содержащее направляющие, узел перемещения буровой установки по направляющим, основание вышечного блока, снабженное четырехколесными ходовыми тележками, перемещающимися по направляющим, домкраты для подъема и опускания основания вышечного блока. Домкраты установлены в основании вышечного блока с возможностью упора штоков в верхнюю часть корпуса ходовой тележки, направляющие представляют собой рельсовый путь, выполненный в виде рамы с двумя рельсами по краям для перемещения ходовых тележек, каждая из которых содержит две пары колес, соединенных между собой двумя четырехосными балансирами в виде параллелограмма, при этом устройство содержит балки с винтовыми опорами для выравнивания передачи усилия при бурении. При эксплуатации буровой установки ее перемещение от скважины к скважине производят по рельсам, а при бурении установку поднимают на домкратах над рельсами (Патент РФ на полезную модель №137053, кл. E21B 15/00, опубл. 27.01.2014 - прототип).Closest to the invention in technical essence is a device for moving the drilling rig and aligning the position of the tower block, containing guides, a node for moving the drilling rig along the guides, the base of the tower block, equipped with four-wheeled traveling trolleys moving along the guides, jacks for lifting and lowering the base of the tower block . Jacks are installed at the base of the tower block with the possibility of stopping the rods in the upper part of the chassis of the undercarriage, the guides are a rail made in the form of a frame with two rails at the edges to move the undercarriages, each of which contains two pairs of wheels interconnected by two four-axle balancers in the form of a parallelogram, while the device contains beams with screw supports for aligning the transmission of force during drilling. When operating a drilling rig, its movement from well to well is carried out on rails, and during drilling, the rig is lifted on jacks above the rails (RF Patent for Utility Model No. 137053, class E21B 15/00, published on January 27, 2014 - prototype).

Недостатком известных технических решений является сложность выполнения рельсового пути на всем участке разбуривания куста скважин, недостаточная надежность фиксации установки в поднятом над рельсами состоянии.A disadvantage of the known technical solutions is the complexity of the rail track on the entire section of drilling a wellbore, insufficient reliability of fixing the installation in a state raised above the rails.

В изобретении решается задача упрощения формирования рельсового пути и перемещения буровой установки и повышение надежности фиксации в поднятом состоянии.The invention solves the problem of simplifying the formation of the rail track and moving the drilling rig and improving the reliability of fixation in a raised state.

Задача решается тем, что в способе эксплуатации буровой установки, включающем бурение в поднятом над рельсами состоянии, опускание на рельсы, контактирование колес установки с рельсами и перемещение от скважины к скважине колесами установки по рельсам, согласно изобретению рельсовый путь монтируют на бетонных блоках над поверхностью земли не менее чем на 2 м и формируют из отдельных мобильных блоков, при перемещении установки от скважины к скважине попеременно переставляют блоки один за другим и передвигают буровую установку колесами по рельсам с одного блока на другой, при бурении буровую установку размещают посередине пары блоков на рельсах, опирают установку на рельсы и приподнимают установку на высоту, обеспечивающую возможность контакта боковых поверхностей буртиков колес с рельсами.The problem is solved in that in a method of operating a drilling rig, including drilling in a state raised above the rails, lowering onto rails, contacting the rig wheels with rails and moving the rig wheels along the rails from well to well, according to the invention, the rail track is mounted on concrete blocks above the ground at least 2 m and formed from separate mobile blocks, when moving the unit from well to well, the blocks are alternately rearranged one after another and the rig is moved with wheels about rails from one block to another, when drilling, the drilling rig is placed in the middle of a pair of blocks on the rails, the installation is supported on the rails and the installation is lifted to a height that allows the side surfaces of the wheel flanges to contact the rails.

Сущность изобретенияSUMMARY OF THE INVENTION

Выполнение длинного рельсового пути в условиях кустового бурения весьма проблематично из-за необходимости передвижения техники вокруг буровой установки. Большая длительность разбуривания куста скважин приводит к неоднократным отрицательным воздействиям на рельсовый путь, нарушает его целостность, приводит к необходимости неоднократного его восстановления, а фиксация установки в поднятом над рельсами состоянии оказывается недостаточно надежной. В изобретении решается задача упрощения формирования рельсового пути и перемещения буровой установки и повышение надежности фиксации в поднятом состоянии. Задача решается следующим образом.The implementation of a long rail track in the conditions of cluster drilling is very problematic due to the need to move equipment around the rig. The long duration of drilling a wellbore leads to repeated negative impacts on the rail track, violates its integrity, leads to the need for its repeated restoration, and fixing the installation when it is raised above the rails is not reliable enough. The invention solves the problem of simplifying the formation of the rail track and moving the drilling rig and improving the reliability of fixation in a raised state. The problem is solved as follows.

Рельсовый путь укладывают на сплошной бетонный блок высотой не менее 2 м. Тем самым поднимают рельсы и буровую установку над поверхностью земли не менее чем на 2 м. Для размещения буровой установки используют пару таких блоков, соединенных поперечно между собой. Для перемещения буровой установки используют не менее 4 таких мобильных блока.The rail track is laid on a continuous concrete block with a height of at least 2 m. Thereby, the rails and the drilling rig are lifted by at least 2 m above the ground. To place the drilling rig, a pair of such blocks are used transversely connected to each other. At least 4 such mobile units are used to move the rig.

На фиг. 1 представлена схема переезда буровой установки с одной пары блоков на другую. На фиг. 1 приняты следующие обозначения: 1 - буровая установка, 2 - колеса платформы бурой установки, 3 - рельсы, 4 - бетонный блок.In FIG. 1 shows a diagram of a drilling rig moving from one pair of blocks to another. In FIG. 1, the following designations are adopted: 1 - drilling rig, 2 - wheels of the platform of the brown rig, 3 - rails, 4 - concrete block.

При бурении буровую установку 1 колесами 2 размещают на рельсах 3 посередине пары блоков 4, опирают установку на рельсы и приподнимают установку домкратами на высоту, обеспечивающую возможность контакта боковых поверхностей колес с рельсами. Высота поднятия составляет не более высоты буртиков колес.When drilling, the drilling rig 1 with wheels 2 is placed on the rails 3 in the middle of a pair of blocks 4, the installation is supported on the rails and the installation is lifted by jacks to a height that allows the side surfaces of the wheels to contact the rails. The lifting height is not more than the height of the flange of the wheels.

На фиг. 2 представлена схема буровой установки в приподнятом состоянии. На фиг. 2 приняты следующие обозначения: 2 - колесо, 3 - рельс, 4 - бетонный блок, 5 - буртик колеса.In FIG. 2 shows a diagram of a rig in an elevated state. In FIG. 2 the following designations are accepted: 2 - wheel, 3 - rail, 4 - concrete block, 5 - wheel flange.

Проводят бурение скважины. При переезде на новую скважину рядом с блоком, на которой размещена буровая установка, выравнивают основание, отсыпают щебень, устанавливают вторую пару блоков, стыкуют рельсы блоков и перемещают буровую установку по рельсам на новую пару блоков.Drilling a well. When moving to a new well next to the block on which the drilling rig is located, level the base, pour crushed stone, install a second pair of blocks, join the rails of the blocks and move the drilling rig along the rails to a new pair of blocks.

Буровая установка передвигает себя как бы сама за счет гидроцилиндров. Они работают по принципу «тяни-толкай», то есть могут и притягивать и отталкивать. Для этого на рельсах закрепляют упоры и упирают в них наклонные гидроцилиндры. Подачей жидкости под давлением в гидроцилиндры обеспечивают перемещение штоков гидроцилиндров и соответственно буровой установки. Буровая установка перемещается вместе с бурильными трубами, забойными двигателями, расположенными на рабочей площадке станка. Следовательно, исключаются трудоемкие работы по развинчиванию колонны бурильных труб и укладке их в стороне от вышки. Это существенно облегчает работу буровой вахты, делает ее более безопасной.The drilling rig moves itself, as it were, due to the hydraulic cylinders. They work on the “push-pull” principle, that is, they can both attract and repel. For this purpose, stops are fixed on the rails and inclined hydraulic cylinders rest on them. By supplying liquid under pressure to the hydraulic cylinders, the rods of the hydraulic cylinders and, accordingly, the drilling rig are moved. The drilling rig moves along with drill pipes, downhole motors located on the working platform of the machine. Consequently, time-consuming work on unscrewing the drill pipe string and laying them away from the tower is excluded. This greatly facilitates the work of the drill, makes it safer.

Перед переездом буровой установки с рельса на рельс подгоняют колеса буровой установки к краю рельс и останавливают для начала переезда. Сам переезд выполняют за один ход штоков гидроцилиндров без остановки.Before moving the rig from rail to rail, the wheels of the rig are adjusted to the edge of the rail and stopped to begin moving. The move itself is performed in one stroke of the hydraulic cylinder rods without stopping.

Контактирование колес буровой установки с рельсами организуют постоянно, не прекращая при бурении скважины, т.к. буровую поднимают домкратами над рельсами на минимальную высоту, обеспечивая возможность контактирования боковых поверхностей буртиков колес с рельсами. Это повышает надежность крепления буровой установки на рельсах при бурении скважины.The contacting of the wheels of the drilling rig with the rails is constantly organized, without stopping when drilling the well, because the rig is lifted by jacks above the rails to a minimum height, providing the possibility of contacting the side surfaces of the wheel flanges with the rails. This increases the reliability of mounting the rig on rails when drilling a well.

Пример конкретного выполненияConcrete example

Выполняют кустовое бурение 6 нефтедобывающих скважин, расположенных в ряд. Расстояние между скважинами составляет 18 м. Монтируют 4 секции на железобетонных блоках размерами: длина 9 м, высота 2,5 м и ширина 2 м. На каждом блоке монтируют рельсовый путь. Таких блоков выполняют 4. Таким образом поднимают рельсы над поверхностью земли на 2,5 м. Ширина между блоками 10 м. На месте первой скважины разравнивают площадку, отсыпают щебень и устанавливают 2 железобетонных блока с рельсами сверху. Буровую установку размещают в центре пары блоков. Колеса буровой установки опирают на рельсы. Домкраты буровой установки опирают на рельсы и домкратами приподнимают буровую установку над рельсами на 1 мм, так что буртики колес не выходят выше рельса. Выполняют бурение в поднятом над рельсами состоянии. По окончании бурения опускают колеса на рельсы, обеспечивая полное контактирование колес установки с рельсами. Рядом с блоками, на которых находится буровая установка, выравнивают основание, отсыпают щебень, устанавливают вторую пару блоков торцами друг к другу. Фиксируют блоки и рельсы от смещения относительно друг друга. Производят перемещение буровой установки колесами по рельсам с одной пары блоков на другую. При переезде колес с одного рельса на другой организуют безостановочное движение. После переезда буровой установки с одной пары блоков на другую освободившуюся пару блоков перемещают к торцам блоков с буровой установкой, фиксируют от смещения и продолжают движение буровой установки в направлении новой скважины. Таким образом, производят перемещение буровой установки от скважины к скважине колесами установки по рельсам.Perform cluster drilling of 6 oil wells located in a row. The distance between the wells is 18 m. 4 sections are mounted on reinforced concrete blocks with dimensions: length 9 m, height 2.5 m and width 2 m. A rail track is mounted on each block. There are 4 such blocks. Thus, the rails are raised above the ground by 2.5 m. The width between the blocks is 10 m. At the site of the first well, the site is leveled, crushed stone is poured and 2 reinforced concrete blocks with rails are installed on top. The drilling rig is placed in the center of a pair of blocks. The wheels of the rig are supported on rails. The jacks of the drilling rig are supported on the rails and the jacks raise the drilling rig 1 mm above the rails, so that the wheel flanges do not extend above the rail. Drilling is performed in a state raised above the rails. At the end of drilling, the wheels are lowered onto the rails, providing full contact of the installation wheels with the rails. Next to the blocks on which the drilling rig is located, the base is leveled, crushed stone is poured, a second pair of blocks are installed with their ends facing each other. Blocks and rails are fixed from displacement relative to each other. The rig is moved by wheels along the rails from one pair of blocks to another. When moving wheels from one rail to another, they organize non-stop movement. After moving the drilling rig from one pair of blocks to another, a vacant pair of blocks is moved to the ends of the blocks with the drilling rig, fixed from displacement and the drilling rig continues to move in the direction of the new well. Thus, the rig is moved from well to well by the wheels of the rig along the rails.

Переход с точки на точку проводят за 13 перемещений. На каждое из 13 перемещений затрачивают около 8 минут. Общее время перемещения от точки на точку составляет 1 час 45 минут. Контроль за положением буровой установки при переезде осуществляют визуально.The transition from point to point is carried out in 13 movements. Each of 13 movements takes about 8 minutes. The total travel time from point to point is 1 hour 45 minutes. Monitoring the position of the rig when moving is carried out visually.

Применение предложенного способа позволит решить задачу упрощения формирования рельсового пути и перемещения буровой установки и повышение надежности фиксации в поднятом состоянии.Application of the proposed method will solve the problem of simplifying the formation of the rail track and moving the drilling rig and improving the reliability of fixation in a raised state.

Claims (1)

Способ эксплуатации буровой установки, включающий бурение в поднятом над рельсами состоянии, опускание на рельсы, контактирование колес установки с рельсами и перемещение от скважины к скважине колесами установки по рельсам, отличающийся тем, что рельсовый путь монтируют на бетонных блоках над поверхностью земли не менее чем на 2 м и формируют из отдельных мобильных блоков, при перемещении установки от скважины к скважине попеременно переставляют блоки один за другим и передвигают буровую установку колесами по рельсам с одного блока на другой, при бурении буровую установку размещают посередине пары блоков на рельсах, опирают установку на рельсы и приподнимают установку на высоту, обеспечивающую возможность контакта боковых поверхностей буртиков колес с рельсами. A method of operating a drilling rig, including drilling in a state raised above the rails, lowering onto the rails, contacting the rig wheels with the rails and moving the rig wheels along the rails from the well to the well, characterized in that the rail track is mounted on concrete blocks above the ground not less than 2 m and formed from separate mobile blocks, when moving the unit from well to well, the blocks are alternately rearranged one after another and the rig is moved with wheels along rails from one block to another, when drilling, the drilling rig is placed in the middle of a pair of blocks on the rails, the installation is supported on the rails and the installation is lifted to a height that allows the side surfaces of the wheel flanges to contact the rails.
RU2014120674/03A 2014-05-22 2014-05-22 Drilling rig operation method RU2548270C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2014120674/03A RU2548270C1 (en) 2014-05-22 2014-05-22 Drilling rig operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2014120674/03A RU2548270C1 (en) 2014-05-22 2014-05-22 Drilling rig operation method

Publications (1)

Publication Number Publication Date
RU2548270C1 true RU2548270C1 (en) 2015-04-20

Family

ID=53289243

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014120674/03A RU2548270C1 (en) 2014-05-22 2014-05-22 Drilling rig operation method

Country Status (1)

Country Link
RU (1) RU2548270C1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1062078A1 (en) * 1981-09-15 1983-12-23 Управление Львовской Ордена Трудового Красного Знамени Железной Дороги Apparatus for uncoupling non-rigid automatic couplings of railway cars
SU1221312A1 (en) * 1984-10-02 1986-03-30 Научно-Исследовательский Институт Тяжелого Машиностроения Производственного Объединения "Уралмаш" Arrangement for moving drilling rig on rails
RU2083794C1 (en) * 1995-06-06 1997-07-10 Акционерное общество открытого типа "Волгоградский завод буровой техники" Device for moving and levelling of drilling rig mast block
RU53355U1 (en) * 2005-12-16 2006-05-10 Сергей Геннадьевич Бабин DEVICE FOR MOBILE AND ALIGNMENT OF THE DRILL RIG SUPPLY UNIT
RU137053U1 (en) * 2013-09-03 2014-01-27 Общество с ограниченной ответственностью "Генерация инжиниринг" DEVICE FOR MOVING A DRILL RIG AND ALIGNING THE POSITION OF THE SUPPLY UNIT

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1062078A1 (en) * 1981-09-15 1983-12-23 Управление Львовской Ордена Трудового Красного Знамени Железной Дороги Apparatus for uncoupling non-rigid automatic couplings of railway cars
SU1221312A1 (en) * 1984-10-02 1986-03-30 Научно-Исследовательский Институт Тяжелого Машиностроения Производственного Объединения "Уралмаш" Arrangement for moving drilling rig on rails
RU2083794C1 (en) * 1995-06-06 1997-07-10 Акционерное общество открытого типа "Волгоградский завод буровой техники" Device for moving and levelling of drilling rig mast block
RU53355U1 (en) * 2005-12-16 2006-05-10 Сергей Геннадьевич Бабин DEVICE FOR MOBILE AND ALIGNMENT OF THE DRILL RIG SUPPLY UNIT
RU137053U1 (en) * 2013-09-03 2014-01-27 Общество с ограниченной ответственностью "Генерация инжиниринг" DEVICE FOR MOVING A DRILL RIG AND ALIGNING THE POSITION OF THE SUPPLY UNIT

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
КУЧЕРЕНКО В.А. (гл.ред.). - М.: СОВ. ЭНЦИКЛОПЕДИЯ, 1964 - 544 С. (ЭНЦИКЛОПЕДИЯ СОВРЕМЕННОЙ ТЕХНИКИ. СТРОИТЕЛЬСТВО. Т1). КАЗАЧЕН Г.А. - МИНСК.:БССР, 1955 - 1036 С. СПРАВОЧНИК МАСТЕРА - СТРОИТЕЛЯ. *

Similar Documents

Publication Publication Date Title
JP4956332B2 (en) Bridge girder replacement method
CN103726421B (en) Height and span adjustable track paver for metro construction
CN109210274B (en) Pipe jacking pipeline butt joint device and method
CN201513120U (en) Longitudinal and transversal movement device of drilling machine
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
RU137053U1 (en) DEVICE FOR MOVING A DRILL RIG AND ALIGNING THE POSITION OF THE SUPPLY UNIT
CN109235292B (en) Railway bridge beam replacing process
CN108487089B (en) A method of railroad bridge is removed and set up on hillside
JP2007120077A (en) Erection method of elevated road bridge, and its facility
CN107675633A (en) The method that the existing whole hole of bridge is changed
CN109235291B (en) Railway bridge beam replacing system
CN103046473A (en) Construction method for constructing double-limb hollow high-pier mould side hydraulic jacking creeping formwork and double-limb hollow high-pier
CN207536671U (en) A kind of novel piping lane pallet
CN109184261B (en) Slippage construction method for building with raft
CN104110002B (en) A kind of method for changing steel truss girder bridge floorings
CN207419281U (en) Walking pushing tow system
CN107587885B (en) Two-lining trolley structure in standard section of tunnel and assembling method
CN203684019U (en) Height and span adjustable track laying machine for subway construction
RU2548270C1 (en) Drilling rig operation method
CN105603838A (en) Track board lifting trolley and method
CN210766417U (en) Pier-spanning lifting beam support device at side position of bridge
CN108385452B (en) Lifting adjusting mechanism, system and method for treating roadbed settlement
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
CN100485128C (en) Longitudinal and transverse moving device for switch and rail row
CN102535277B (en) Device for completely moving railway turnout

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20170523

NF4A Reinstatement of patent

Effective date: 20180829