RU2499950C1 - Replacement method of main line pump on active oil pipeline - Google Patents

Replacement method of main line pump on active oil pipeline Download PDF

Info

Publication number
RU2499950C1
RU2499950C1 RU2012142798/06A RU2012142798A RU2499950C1 RU 2499950 C1 RU2499950 C1 RU 2499950C1 RU 2012142798/06 A RU2012142798/06 A RU 2012142798/06A RU 2012142798 A RU2012142798 A RU 2012142798A RU 2499950 C1 RU2499950 C1 RU 2499950C1
Authority
RU
Russia
Prior art keywords
pump
oil
hole
pipeline
water
Prior art date
Application number
RU2012142798/06A
Other languages
Russian (ru)
Inventor
Андрей Валентинович Зубов
Владимир Алексеевич Груздев
Original Assignee
Общество с ограниченной ответственностью "Балтийские магистральные нефтепроводы"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Балтийские магистральные нефтепроводы" filed Critical Общество с ограниченной ответственностью "Балтийские магистральные нефтепроводы"
Priority to RU2012142798/06A priority Critical patent/RU2499950C1/en
Application granted granted Critical
Publication of RU2499950C1 publication Critical patent/RU2499950C1/en

Links

Abstract

FIELD: machine building.
SUBSTANCE: oil pipeline is shut off before pump, filling and discharge pipelines are drained by water filling through the pump cavity above the level of drain valves. Then in filling pipeline there drilled is one hole for plugs on the level of drain valve, and the other hole is drilled 80-100 mm higher. Head piece is inserted in each hole, through the lower piece head water is supplied by flexible hoses, and through the upper piece head water is drained with oil components to tanks of emergency leaks gathering, thus forming a hydraulic lock before the pump. The pump is dismantled and a new pump is mounted, hot works are performed, then oil pressure test is conducted under operating pressure and oil pipeline is put into operation.
EFFECT: possibility to reduce labour intensity and duration of works on pump replacement excluding adverse effect of clay plugs use.
1 dwg

Description

Изобретение относится к трубопроводному транспорту, а именно к эксплуатации нефтепроводов, и предназначено для герметизации технологических трубопроводов с целью предупреждения возникновения опасных концентраций паров нефти.The invention relates to pipeline transport, namely the operation of oil pipelines, and is intended for sealing technological pipelines in order to prevent the occurrence of dangerous concentrations of oil vapor.

Известен способ проведения работ на действующем нефтепроводе, при котором возможна замена магистрального насоса и который заключается в том, что опорожняют участок нефтепровода через дренажные задвижки, производят вырезку сваркой части нефтепровода и набивают в его открытые концы уплотняемые глиняные пробки (длина пробок не менее 2-х диаметров нефтепровода) для предупреждения возникновения опасных концентраций паров нефти (см. патент РФ №2032124, кл. F16L 55/18, опубл. 27.03.1995).There is a known method of carrying out work on an existing oil pipeline, in which it is possible to replace the main pump and which consists in emptying a section of the pipeline through drainage valves, cutting out part of the pipeline by welding and stuffing clay plugs into its open ends (plug lengths of at least 2 pipeline diameters) to prevent the occurrence of dangerous concentrations of oil vapor (see RF patent No. 2032124, CL F16L 55/18, publ. 03/27/1995).

Недостаток такого способа состоит в том, что по окончании сварочных работ в полостях нефтепровода остаются затвердевшие глиняные пробки, которые необходимо в течение длительного времени вымывать. Также после запуска в работу глинистая масса попадает в корпус насоса, что может привести к нежелательным последствиям - нарушению целостности торцевых и щелевых уплотнений, закупориванию трубок отвода утечек и охлаждения торцевых уплотнений, износу лопаток рабочего колеса, повышенной вибрации насоса.The disadvantage of this method is that after welding is completed, hardened clay plugs remain in the cavities of the pipeline, which must be washed for a long time. Also, after commissioning, the clay mass enters the pump casing, which can lead to undesirable consequences - violation of the integrity of the end and gap seals, clogging of the pipes for leakage and cooling of the end seals, wear of the impeller blades, increased pump vibration.

Задачей изобретения является устранение отмеченного недостатка.The objective of the invention is to remedy this drawback.

Технический результат заключается в снижении трудоемкости и продолжительности работ по замене насоса с исключением при этом негативных последствий использования глиняных пробок.The technical result is to reduce the complexity and duration of work on replacing the pump with the exception of the negative consequences of using clay plugs.

Задача решается, а технический результат достигается тем, что способ замены магистрального насоса на действующем нефтепроводе заключается в том, что перекрывают нефтепровод перед насосом, опорожняют приемный и выкидной трубопроводы путем их заполнения водой через полость насоса выше уровня дренажных задвижек, далее в приемном трубопроводе производят засверливание под чопики одного отверстия на уровне дренажной задвижки, а другого - на 80-100 мм выше, в каждое отверстие вставляют насадок, при этом с помощью гибких рукавов через нижний насадок подводят воду, а через верхний - отводят со следами нефти в емкость аварийного сбора утечек, образуя перед насосом гидрозатвор, после чего демонтируют насос и монтируют новый, проводят огневые работы, после которых осуществляют опрессовку нефтью рабочим давлением и вводят нефтепровод в эксплуатацию.The problem is solved, and the technical result is achieved by the fact that the method of replacing the main pump on the existing oil pipeline is to block the oil pipeline in front of the pump, empty the intake and discharge pipelines by filling them with water through the pump cavity above the level of the drain valves, then drill in the receiving pipeline under the choppers of one hole at the level of the drain valve, and the other - 80-100 mm higher, nozzles are inserted into each hole, while using flexible sleeves through the lower nozzle water is supplied to the dock, and with the traces of oil, it is diverted to the emergency leak collection container, forming a water seal in front of the pump, after which the pump is dismantled and a new one is mounted, hot work is carried out, after which the pressure is crimped with oil and put into operation.

На чертеже показана схема подвода и отвода воды с поверхности гидрозатвора.The drawing shows a diagram of the inlet and outlet of water from the surface of the valve.

При замене магистрального насоса на действующем нефтепроводе предварительно перекрывают магистральной задвижкой нефтепровод до насоса 1. Опорожняют приемный и выкидной трубопроводы путем их заполнения водой через полость насоса выше уровня дренажных задвижек (на чертеже не показаны). В приемном трубопроводе 2 производят засверливание под чопики одного отверстия на уровне дренажной задвижки, а другого - на 80-100 мм выше. В каждое отверстие Ду=12 мм вставляют насадок с гибкими рукавами 3 и 4. Через нижний насадок постоянно подводится вода из емкости 5 объемом 1 м3, установленной над поверхностью пола насосной станции. Вода, попадающая в трубопровод 2 по нижнему насадку, вытекает из верхнего насадка и отводится по антистатическому гибкому рукаву 4 в емкость 6 аварийного сбора утечек, образуя тем самым перед насосом гидрозатвор. Нижняя точка емкости 5 располагается выше установившегося уровня воды гидрозатвора. Расход воды регулируется по верхнему уровню подающей емкости 5.When replacing the main pump on an existing oil pipeline, the oil pipeline to pump 1 is previously shut off by the main valve until the intake and discharge pipelines are empty by filling them with water through the pump cavity above the level of the drain valves (not shown). In the intake pipe 2, one hole is drilled under the choppers at the level of the drain valve, and the other is 80-100 mm higher. Nozzles with flexible hoses 3 and 4 are inserted into each hole DN = 12 mm. Water is constantly supplied from the nozzle 5 from the tank 5 with a volume of 1 m 3 installed above the floor surface of the pumping station through the lower nozzles. Water entering the pipe 2 through the lower nozzle flows out of the upper nozzle and is discharged along the antistatic flexible sleeve 4 into the emergency leakage tank 6, thereby forming a water seal in front of the pump. The lower point of the tank 5 is located above the steady-state water level of the hydraulic seal. The water flow is regulated by the upper level of the supply tank 5.

При появлении на поверхности гидрозатвора следов нефти за счет перетока жидкости из нижнего насадка в верхний произойдет выливание нефтяной пленки в емкость 6 аварийного сбора утечек.When traces of oil appear on the surface of the hydraulic seal due to the flow of liquid from the lower nozzle to the upper, the oil film will be poured into the tank 6 for emergency leak collection.

После этого демонтируют насос и монтируют новый, проводят огневые (сварочные) работы, после которых осуществляют опрессовку нефтью рабочим давлением и вводят нефтепровод в эксплуатацию.After that, the pump is dismantled and a new one is mounted, fire (welding) work is carried out, after which they are crimped with oil using working pressure and the pipeline is put into operation.

Способ является более удобным с точки зрения производства работ, снижает затраты времени, исключает применение глиняных пробок, позволяет контролировать наличие нефти в трубопроводе, снижает вероятность повышения загазованности в воздухе рабочей зоны, что в целом повышает безопасность производства работ.The method is more convenient from the point of view of the work, reduces the cost of time, eliminates the use of clay plugs, allows you to control the presence of oil in the pipeline, reduces the likelihood of increased gas contamination in the air of the working area, which generally increases the safety of the work.

Claims (1)

Способ замены магистрального насоса на действующем нефтепроводе, заключающийся в том, что перекрывают нефтепровод перед насосом, опорожняют приемный и выкидной трубопроводы путем их заполнения водой через полость насоса выше уровня дренажных задвижек, далее в приемном трубопроводе производят засверливание под чопики одного отверстия на уровне дренажной задвижки, а другого - на 80-100 мм выше, в каждое отверстие вставляют насадок, при этом с помощью гибких рукавов через нижний насадок подводят воду, а через верхний - отводят со следами нефти в емкость аварийного сбора утечек, образуя перед насосом гидрозатвор, после чего демонтируют насос и монтируют новый, проводят огневые работы, после которых осуществляют опрессовку нефтью рабочим давлением и вводят нефтепровод в эксплуатацию. The method of replacing the main pump on an existing oil pipeline, which consists in blocking the oil pipeline in front of the pump, emptying the intake and discharge pipelines by filling them with water through the pump cavity above the level of the drain valves, then drill one hole at the level of the drain valve under the choppers, and the other - 80-100 mm higher, nozzles are inserted into each hole, while using flexible hoses, water is supplied through the lower nozzles, and oil is removed through the upper nozzle with traces a capacitance Emergency collecting leakages, forming a hydraulic lock in front of the pump, then the pump dismantled and assembled new firing operation is carried out, after which the molding is performed and the oil pressure working oil is introduced into service.
RU2012142798/06A 2012-10-09 2012-10-09 Replacement method of main line pump on active oil pipeline RU2499950C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012142798/06A RU2499950C1 (en) 2012-10-09 2012-10-09 Replacement method of main line pump on active oil pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012142798/06A RU2499950C1 (en) 2012-10-09 2012-10-09 Replacement method of main line pump on active oil pipeline

Publications (1)

Publication Number Publication Date
RU2499950C1 true RU2499950C1 (en) 2013-11-27

Family

ID=49710568

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012142798/06A RU2499950C1 (en) 2012-10-09 2012-10-09 Replacement method of main line pump on active oil pipeline

Country Status (1)

Country Link
RU (1) RU2499950C1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1083026A1 (en) * 1982-09-03 1984-03-30 Предприятие П/Я А-3159 Method of preparing pipe-line for repair
US5285806A (en) * 1992-12-30 1994-02-15 Public Service Company Of Colorado Method and apparatus for temporarily sealing off pipelines
RU2016349C1 (en) * 1991-07-02 1994-07-15 Уфимский Нефтяной Институт Pre-repair procedures for main pipeline
RU2032124C1 (en) * 1990-06-01 1995-03-27 Татьяна Васильевна Молочная Method of repairing pipe line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1083026A1 (en) * 1982-09-03 1984-03-30 Предприятие П/Я А-3159 Method of preparing pipe-line for repair
RU2032124C1 (en) * 1990-06-01 1995-03-27 Татьяна Васильевна Молочная Method of repairing pipe line
RU2016349C1 (en) * 1991-07-02 1994-07-15 Уфимский Нефтяной Институт Pre-repair procedures for main pipeline
US5285806A (en) * 1992-12-30 1994-02-15 Public Service Company Of Colorado Method and apparatus for temporarily sealing off pipelines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Катунян С.А. и др. Опорожнение поврежденного участка нефтепровода при авариях, 1975. *

Similar Documents

Publication Publication Date Title
CN106925577B (en) A kind of discarded oil-gas pipeline residue cleaning method
TWI496987B (en) Method for flushing a fuel system of a gas turbine and associated fuel system
JP4938479B2 (en) Gas shutoff method for gas piping
CN103915124A (en) Nuclear power station conventional island desalted water distribution system full-stop overhauling method
CN205315291U (en) Efflux drinking device
KR101210969B1 (en) T-shaped strainer for pump suction
RU2499950C1 (en) Replacement method of main line pump on active oil pipeline
KR100982158B1 (en) Reinforcing methods and repairing apparatus for damaged pipe
CN105605364A (en) Sealing clamp of pipe fitting and method for pipe fitting sealing
CN101912883B (en) Circulation heating system for steam heater
KR20140002105A (en) Pipe cleaning apparatus
RU160830U1 (en) JET PRESSURE-VACUUM INSTALLATION FOR RINSING THE SUCTION INLET PIPES OF THE JET PUMPS AND THE SILVERED PIPELINES
CN204328482U (en) A kind of LPG tank pipe-line system
CN113770135B (en) Liquid drainage and cleaning system and method in pipeline penetrating through river section
RU2343330C1 (en) Method of repair of active pipelines damages without their shutdown
KR101771034B1 (en) Apparatus for removing residual coal tar inside the pipe
CN106813104A (en) A kind of pipeline is moved and changes engineering oil recovery systems
CN102269320B (en) Sewage discharge device for gas cabinet
RU2330210C2 (en) Method of pipeline repair
CN206626410U (en) A kind of pipeline, which moves, changes engineering oil recovery systems
KR100903997B1 (en) A shut off valve for high pressured air's leak test
KR100930817B1 (en) Cleaning module for using pig cleaner
KR101582513B1 (en) Boiler vacuum releasing apparatus for protection of water supply pump
RU160791U1 (en) MAIN GAS PIPELINE
CN204783866U (en) Negative pressure soil pick -up equipment

Legal Events

Date Code Title Description
PD4A Correction of name of patent owner
TK4A Correction to the publication in the bulletin (patent)

Free format text: AMENDMENT TO CHAPTER -PD4D - IN JOURNAL: 4-2015 FOR TAG: (73)