RU2455476C1 - Method of heavy oil production - Google Patents

Method of heavy oil production Download PDF

Info

Publication number
RU2455476C1
RU2455476C1 RU2010152264/03A RU2010152264A RU2455476C1 RU 2455476 C1 RU2455476 C1 RU 2455476C1 RU 2010152264/03 A RU2010152264/03 A RU 2010152264/03A RU 2010152264 A RU2010152264 A RU 2010152264A RU 2455476 C1 RU2455476 C1 RU 2455476C1
Authority
RU
Russia
Prior art keywords
formation
wells
underground
working chambers
valves
Prior art date
Application number
RU2010152264/03A
Other languages
Russian (ru)
Inventor
Рауф Нухович Рахманов (RU)
Рауф Нухович Рахманов
Марат Рауфович Рахманов (RU)
Марат Рауфович Рахманов
Original Assignee
Рауф Нухович Рахманов
Марат Рауфович Рахманов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Рауф Нухович Рахманов, Марат Рауфович Рахманов filed Critical Рауф Нухович Рахманов
Priority to RU2010152264/03A priority Critical patent/RU2455476C1/en
Application granted granted Critical
Publication of RU2455476C1 publication Critical patent/RU2455476C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: oil and gas production.
SUBSTANCE: method of heavy oil production includes construction of vertical well, exposing of formation from vertical well by method of pressing by casing puller, horizontal injection and production wells. Heat-transfer medium is supplied to the formation, the product is gathered into underground storage tank and pumped to the surface by pumps. The casing puller is made in a form of cylinders temporary coaxially located with centralisers in opposite working chambers equipped with perforated areas and guides at the opposite ends for jointed tubes with perforated areas and end pieces interacting with pistons. The pistons are located inside the cylinders. Note that the cylinders are regularly interconnected by telescopic fitting pipes forming a sealed cavity connected to the hydro-pump. In the course of hydro-pump operation the pistons move in opposite directions together with jointed tubes. All well pairs are constructed according to the project. Note that the jointed tubes together with working chambers form annular cavities connected to the formation and through the corresponding damper valves and manifolds - to the steam pipeline and underground storage tank that are also connected through the corresponding damper valves and manifolds to the steam pipeline and underground storage tank, and their central channels are closed by equal damper valves. Heat-transfer medium is supplied to the formation through steam pipe line, manifold, damper valves, perforated areas of jointed tubes of injection wells and annular cavities of working chambers at other closed damper valves.
EFFECT: increase of heavy oil production efficiency.
6 cl, 3 dwg

Description

Изобретение относится к области нефтяной промышленности, а более конкретно к способам добычи углеводородов скважинными методами со вскрытием продуктивного пласта из вертикальной скважины подземными горизонтальными скважинами с последующим воздействием на него методами, приводящими его продукцию в текучее состояние, и может быть использовано для добычи тяжелой нефти и природных битумов.The invention relates to the field of the oil industry, and more particularly to methods for producing hydrocarbons by borehole methods with opening a productive formation from a vertical well by underground horizontal wells with subsequent exposure to it by methods that bring its products into a fluid state, and can be used for the production of heavy oil and natural bitumen.

Известен способ разработки залежей высоковязких нефтей и битумов (патент RU №2330950, Е21В 43/24, опубл. Бюл. №22 от 10.08.2008 г.), включающий строительство вертикальной скважины с образованием подземной емкости для продукции, вскрытие продуктивного пласта из вертикальной скважины горизонтальными скважинами методом их вдавливания с подъемом от скважины, обвязку горизонтальных скважин через соответствующие задвижки и коллекторы с паропроводом и подземной емкостью, предварительную подготовку продукции в подземной емкости и раздельную откачку продукции, воды и газа на поверхность.A known method of developing deposits of highly viscous oils and bitumen (patent RU No. 2330950, ЕВВ 43/24, publ. Bull. No. 22 of 08/10/2008), including the construction of a vertical well with the formation of an underground reservoir for products, opening a reservoir from a vertical well horizontal wells by the method of indenting them with the rise from the well, strapping of horizontal wells through the corresponding valves and manifolds with a steam line and underground capacity, preliminary preparation of products in the underground capacity and separate pumping of products ktsii, water and gas to the surface.

Недостатком данного способа является то, что из-за несоосности горизонтальных скважин каждую из них строят отдельно, периодически вдавливая домкратом трубы в пласт до проектной длины. При этом домкрат упирают на противоположную стенку вертикальной скважины, которая должна выдерживать значительные нагрузки. Дополнительное укрепление стенок вертикальной скважины удорожает строительство. Кроме того, из-за стесненных обстоятельств в вертикальной скважине ход домкрата будет небольшим и потребуется больше времени и средств для строительства горизонтальных скважин, что также удорожает их строительство. Оснащение горизонтальных скважин дорогими противопесочными фильтрами также удорожает строительство. В подземной емкости происходит только предварительная подготовка продукции. Необходимо строить наземные трубопроводы и системы подготовки продукции.The disadvantage of this method is that due to the misalignment of horizontal wells, each of them is built separately, periodically pressing the pipe into the reservoir with the jack up to the design length. In this case, the jack rests on the opposite wall of the vertical well, which must withstand significant loads. Additional strengthening of the walls of a vertical well increases the cost of construction. In addition, due to cramped circumstances in a vertical well, the jack stroke will be small and more time and money will be required for the construction of horizontal wells, which also increases the cost of their construction. Equipping horizontal wells with expensive sand filters also makes construction more expensive. In the underground tank, only preliminary product preparation takes place. It is necessary to build onshore pipelines and product preparation systems.

Наиболее близким является способ добычи нефти подземными горизонтальными скважинами (патент RU №2354817, Е21В 43/24, 7/00, опубл. Бюл. №13 от 10.05.2009 г.) с применением теплового воздействия на продуктивный пласт, включающий бурение с дневной поверхности вертикального шахтного ствола и крепление его стенок, сооружение подземной рабочей камеры, строительство двухуровневых горизонтальных нагнетательных и добывающих скважин, устья которых находятся в рабочей камере, закачку в продуктивный пласт через нагнетательные скважины теплоносителя, подаваемого с дневной поверхности по паропроводу, извлечение из продуктивного пласта добывающими скважинами в подземную рабочую камеру нефти, сбор ее в емкость на забое шахтного ствола и откачку на дневную поверхность. Рабочую камеру сооружают в виде симметрично расположенных относительно оси кондукторных горизонтальных труб, которые домкратом задавливают в продуктивный пласт, по направлениям горизонтальных скважин, после освобождения внутренней полости кондукторных труб от породы продуктивного пласта производят строительство двухуровневых горизонтальных нагнетательных и добывающих скважин продавливанием трубчатых фильтров в продуктивный пласт телескопическим домкратом, выполненным с возможностью размещения в противоположно расположенных кондукторных трубах для увеличения рабочего хода.The closest is the method of oil production by underground horizontal wells (patent RU No. 2354817, ЕВВ 43/24, 7/00, publ. Bull. No. 13 of 05/10/2009) using thermal action on the reservoir, including drilling from the surface vertical shaft shaft and fixing its walls, the construction of an underground working chamber, the construction of two-level horizontal injection and production wells, the mouths of which are located in the working chamber, injection into the reservoir through the injection wells of the coolant supplied from the surface of the steam pipe, the extraction from the reservoir production wells in underground working oil chamber, collecting it in a container at the bottom of the shaft and pumping to the surface. The working chamber is constructed in the form of horizontal conduit pipes symmetrically positioned relative to the axis, which are pushed with a jack into the reservoir, in the directions of the horizontal wells, after releasing the inner cavity of the conductor tubes from the reservoir rock, two-level horizontal injection and production wells are built by pushing the tube filters into the reservoir with telescopic a jack made with the possibility of placement in opposite onduktornyh tubes to increase the working stroke.

Недостатком способа является то, что домкрат упирают на противоположную стенку рабочей камеры, которая должна выдерживать значительные нагрузки. Дополнительное укрепление стенок рабочих камер удорожает строительство. Кроме того, при откачке продукции с водой, газом и механическими примесями изнашивается и неэффективно работает насосное оборудование, не исключены условия для образования стойких эмульсий. Необходимо строить наземные трубопроводы и системы подготовки продукции, которые занимают значительные земельные угодия.The disadvantage of this method is that the jack rests on the opposite wall of the working chamber, which must withstand significant loads. Additional strengthening of the walls of the working chambers increases the cost of construction. In addition, when pumping products with water, gas and mechanical impurities, pumping equipment wears out and works inefficiently, conditions for the formation of stable emulsions are not ruled out. It is necessary to build onshore pipelines and product preparation systems that occupy large land areas.

Технической задачей предложения является повышение эффективности добычи тяжелой нефти значительным снижением капитальных, эксплуатационных затрат и себестоимости продукции за счет исключения строительства наземных установок подготовки нефти и парогенератора, уменьшения количества наземных трубопроводов, снижения сроков и себестоимости строительства горизонтальных скважин, уменьшения теплопотерь и закупок насосного оборудования, увеличения дебита, применения эффективных и гибких технологий воздействия на нефтяной пласт и качественной подготовки продукции в подземной емкости, уменьшения отводимых земель и рационального их использования.The technical task of the proposal is to increase the efficiency of heavy oil production by significantly reducing capital, operating costs and production costs by eliminating the construction of surface oil treatment plants and a steam generator, reducing the number of onshore pipelines, reducing the time and cost of building horizontal wells, reducing heat losses and procurement of pumping equipment, increasing flow rate, the use of effective and flexible technologies for impacting the oil reservoir and the quality of Tween preparation of products in the underground capacity, reducing the allotted land and their rational use.

Поставленная задача решается способом добычи тяжелой нефти, включающим строительство вертикальной скважины, вскрытие пласта из вертикальной скважины методом надавливания домкратом, размещенным в соосных рабочих камерах, горизонтальными нагнетательными и добывающими скважинами, подвод теплоносителя в пласт, сбор продукции в подземную емкость и откачку ее на поверхность насосами.The problem is solved by a method of producing heavy oil, including the construction of a vertical well, opening a formation from a vertical well by applying a jack placed in coaxial working chambers, horizontal injection and producing wells, supplying coolant to the formation, collecting products into an underground tank and pumping it to the surface with pumps .

Новым является то, что домкрат выполняют в виде цилиндров, временно соосно размещенных с центраторами в противоположных рабочих камерах, снабженных перфорированными участками и на противоположных торцах направляющими для составных труб с перфорированными участками и наконечниками, взаимодействующих с поршнями, размещенными внутри цилиндров, соединенными гибким элементом, причем цилиндры периодически соединяют между собой телескопическими патрубками, образуя герметичную полость, соединенную с гидронасосом, при работе которого поршни двигаются в противоположных направлениях вместе со составными трубами, строят все пары скважин согласно проекту, причем составные трубы совместно с рабочими камерами образуют кольцевые полости, сообщающиеся с пластом и через соответствующие задвижки и коллекторы - с паропроводом и подземной емкостью, которые также соединяют через соответствующие задвижки и коллекторы с паропроводом и подземной емкостью, а их центральные каналы закрывают равнопроходными задвижками, подвод теплоносителя в пласт осуществляют через паропровод, коллектор, задвижки, перфорированные участки составных труб нагнетательных скважин и кольцевых полостей рабочих камер при закрытых остальных задвижках, продукция пласта из добывающих скважин поступает через соответствующие задвижки, коллектор и патрубок в наклонную, регулируемую в зависимости от ее состава и вязкости плоскость, снабженную устройством для регулирования толщины потока, где происходит предварительное отделение от нее газа и воды, которую размещают в верхней части подземной емкости, внешне радиально соединенной каналами с дополнительной скважиной для насосов, соединенной с системой улавливания легких фракций, причем нижний канал снабжен фильтром.What is new is that the jack is made in the form of cylinders temporarily coaxially placed with centralizers in opposite working chambers, provided with perforated sections and guides for composite pipes with perforated sections and tips interacting with pistons located inside the cylinders connected by a flexible element, moreover, the cylinders are periodically interconnected by telescopic nozzles, forming a sealed cavity connected to the hydraulic pump, during which the piston they move in opposite directions together with composite pipes, build all pairs of wells according to the project, and composite pipes together with working chambers form annular cavities communicating with the formation and through the corresponding valves and collectors with the steam line and underground capacity, which also connect through the corresponding valves and collectors with a steam line and an underground tank, and their central channels are closed with equal bore valves, the coolant is supplied to the formation through a steam pipe, collect torus, valves, perforated sections of the composite pipes of injection wells and annular cavities of the working chambers with the remaining valves closed, the production of the formation from the producing wells enters through the corresponding valves, the collector and the nozzle into an inclined plane equipped with a device for regulating depending on its composition and viscosity the thickness of the stream, where there is a preliminary separation of gas and water from it, which is placed in the upper part of the underground tank, externally radially connected by channels to olnitelnoy borehole pumps connected to the light ends recovery system, wherein the channel bottom is provided with a filter.

Новым является также то, что оптимальную скорость поступления продукции из пласта в горизонтальные добывающие скважины и ее течения по ним в подземную емкость, при которой не выносятся механические примеси, определяют регулированием величины их проходных сечений.New is also the fact that the optimal rate of production from the reservoir into horizontal production wells and its flow through them into the underground tank, at which mechanical impurities are not carried out, is determined by controlling the magnitude of their cross sections.

Новым является также то, что сначала строят дополнительную скважину с забоем ниже забоя подземной емкости, уточняя при этом геологические и другие параметры разреза и пласта.It is also new that first they build an additional well with a bottom below the bottom of the underground reservoir, while specifying the geological and other parameters of the section and the formation.

Новым является также то, что для подготовки продукции в подземной емкости применяют термогравитационный, термохимические и электрические методы.Also new is the fact that thermogravitational, thermochemical and electrical methods are used to prepare products in an underground tank.

Новым является также то, что для периодической гидравлической очистки подземной емкости от механических примесей применяют наземное оборудование с гибким рукавом с необходимым набором инструментов и приспособлений.Also new is the fact that for periodic hydraulic cleaning of an underground tank from mechanical impurities, ground-based equipment with a flexible sleeve with the necessary set of tools and devices is used.

Новым является также то, что парогенератор размещают в вертикальной скважине и в его работе используют попутный газ и воду из подземной емкости.It is also new that the steam generator is placed in a vertical well and associated gas and water from an underground tank are used in its operation.

На фиг.1 приведена общая схема размещения скважин и оборудования в разрезе нефтяного пласта (на заднем плане между коллекторами устья горизонтальных скважин условно не показаны).Figure 1 shows the general arrangement of wells and equipment in the context of the oil reservoir (in the background between the collectors of the mouth of horizontal wells are not conventionally shown).

На фиг.2 - схема строительства горизонтальных скважин, сечение А-А по фиг.1.Figure 2 is a diagram of the construction of horizontal wells, section AA in figure 1.

На фиг.3 - схема предварительной подготовки продукции в подземной емкости, выноска Б фиг.1.Figure 3 - diagram of the preliminary preparation of products in an underground tank, leader B of figure 1.

Для осуществления способа добычи тяжелой нефти (нефти) сначала строят дополнительную скважину 1 (фиг.1) с забоем 2 ниже забоя 3 подземной емкости 4, уточняя при этом геологические и другие параметры разреза 5 и пласта 6. При необходимости вносят изменения в проект строительства вертикальной скважины 7. Далее строят вертикальную герметичную скважину 7, закрывают на уровне подошвы 8 пласта 6 горизонтальной герметичной теплоизолированной крышкой 9, образуя емкость 4 для последующего сбора продукции. Сверху скважину 7 закрывают герметичной камерой 10 с полом 11, в которой размещают рабочий лифт, систему вентиляции и другое необходимое оборудование (на фиг. не показаны). В зонах выше кровли 12 и ниже подошвы 8 пласта 6 проводят водоизоляционные работы. Из вертикальной скважины 7 строят горизонтальные соосные рабочие камеры 13, разбуривая пласт 6 известными средствами (например, шнеком), которые обсаживают перфорированными трубами 14 с направляющими 15 на противоположных торцах 16. Необходимое количество рабочих камер 13 определяют проектом с учетом параметров пласта 6 и принятой технологией добычи. Их количество может быть восемь в одном сечении, несколько рядов по высоте и более 10 м по длине. Трубы 14 могут быть составными. Сопряжения труб 14 со стенкой 17 вертикальной скважины 7 герметизируют известными методами (прокладками). После завершения строительства всех рабочих камер 13 начинают строить горизонтальные скважины 18. В соосных рабочих камерах 13 (фиг.2) размещают домкрат 19 в виде цилиндров 20 с центраторами (не показаны), в направляющие 15 которых поочередно вводят и наращивают до расчетной длины составные трубы 21 (трубы) с перфорированными участками 22 и наконечниками 23. Затем в цилиндры 20 вводят поршни 24 до соприкосновения с трубами 21. На концах цилиндров 20 предусматривают ограничители (не показаны) для поршней 24. На поршнях 24 предусмотрены уплотнители (не показаны) и прикреплены гибкие элементы 25 расчетной длины. Далее цилиндры 20 соединяют между собой телескопическими патрубками 26, образуя герметичную полость 27, соединенную через шланги 28 с гидронасосом (не показаны). На этом «зарядка» домкрата 19 заканчивается.To implement the method of producing heavy oil (oil), first build an additional well 1 (Fig. 1) with a face 2 below the bottom 3 of an underground tank 4, while specifying the geological and other parameters of section 5 and formation 6. If necessary, make changes to the design for the construction of a vertical wells 7. Next, build a vertical sealed well 7, close at the level of the sole 8 of the formation 6 with a horizontal sealed heat-insulated cover 9, forming a container 4 for subsequent product collection. From above, the well 7 is closed with a sealed chamber 10 with a floor 11 in which a working elevator, a ventilation system, and other necessary equipment are placed (not shown in FIG.). In areas above the roof 12 and below the sole 8 of the layer 6, waterproofing is carried out. Horizontal coaxial working chambers 13 are built from a vertical well 7, drilling a formation 6 with known means (for example, a screw), which are surrounded by perforated pipes 14 with guides 15 at opposite ends 16. The required number of working chambers 13 is determined by the design taking into account the parameters of the formation 6 and adopted technology booty. Their number can be eight in one section, several rows in height and more than 10 m in length. Pipes 14 may be integral. The pair of pipes 14 with the wall 17 of the vertical well 7 is sealed by known methods (gaskets). After the construction of all the working chambers 13 is started, horizontal wells 18 begin to be built 18. A jack 19 in the form of cylinders 20 with centralizers (not shown) is placed in the coaxial working chambers 13 (Fig. 2), into the guides 15 of which the composite pipes are introduced and extended to the design length 21 (pipes) with perforated sections 22 and tips 23. Then, pistons 24 are introduced into the cylinders 20 until they contact the pipes 21. At the ends of the cylinders 20, stoppers (not shown) are provided for the pistons 24. Seals are provided on the pistons 24 (not shown) ny) and flexible elements 25 of the estimated length are attached. Next, the cylinders 20 are interconnected by telescopic pipes 26, forming a sealed cavity 27, connected through hoses 28 to a hydraulic pump (not shown). This "charging" of the jack 19 ends.

Включают гидронасос и создают рабочее давление в полости 27. При этом поршни 24 двигаются в противоположных направлениях и надавливают трубы 21 с наконечниками 23 в пласт 6. При одинаковых сопротивлениях на трубы 21 с наконечниками 23 оба поршня 24 надавливают их на длину хода в пласт 6. Усилие надавливания регулируют изменением давления в полости 27 гидронасосом. Далее освобождают полость 27 от жидкости, раздвигают патрубки 26 и вытягивают поршни 24 из цилиндров 20 за гибкие элементы 25. Затем снова «заряжают» домкрат 19, и процесс повторяется до достижения горизонтальных скважин 18 до проектных длин. Если в процессе работы только один поршень 24 прошел полный ход по цилиндру 20, а другой - частично, то домкрат 19 также «перезаряжают» и т.д. Таким образом, строят все остальные пары горизонтальных скважин 18. Для уменьшения сопротивлений надавливанию составных труб 21 в пласт 6 можно применять известные приемы (подача горячего растворителя и т.п.). Если по проекту предусмотрено строительство горизонтальных скважин 18 в два яруса по высоте, то одновременно можно строить их две пары и т.д. При окончании строительства горизонтальных скважин 18 составные трубы 21 с трубами 14 рабочих камер 13 образуют кольцевые полости 29 (фиг.1), сообщающиеся с пластом 6 и через соответствующие задвижки 30 и коллекторы 31 - с паропроводом 32 и подземной емкостью 4. Горизонтальные скважины 18 через соответствующие задвижки 30 и коллекторы 31 также сообщаются с паропроводом 32 и подземной емкостью 4, а их центральные каналы 33 закрывают равнопроходными задвижками 34. Устья рабочих камер 13, горизонтальных скважин 18 и сопряжения составных труб 21 с направляющими 15 герметизируют известными способами. Нижние коллекторы 31 через патрубки 35 сообщают с подземной емкостью 4, причем в ее верхней части помещают наклонную регулируемую плоскость 36 (фиг.3), снабженную устройством 37 для регулирования толщины потока продукции и перегородкой 38. Подземную емкость 4 соединяют через каналы 39 (фиг.1) с дополнительной скважиной 1, которая соединена с наземной системой улавливания легких фракций и парогенератором, причем нижний канал 39 снабжают фильтром 40. В дополнительную скважину 1 помещают насосы 41 для откачки продукции. В верхней части скважины 7 размещают парогенератор 42, соединенный с паропроводом 32. Там же размещают системы подачи и подготовки газа и воды из подземной емкости 4 (не показаны). Монтаж оборудования в скважине производят с использованием рабочего лифта. Оборудование выполняют во взрывозащищенном быстросборном модульном исполнении, снабжают приборами безопасности, контроля и видеонаблюдения. Рабочий персонал обеспечивают средствами индивидуальной защиты для работы в этих условиях.Turn on the hydraulic pump and create a working pressure in the cavity 27. In this case, the pistons 24 move in opposite directions and press the pipes 21 with the tips 23 into the reservoir 6. With the same resistance to the pipes 21 with the tips 23, both pistons 24 press them on the stroke length into the reservoir 6. The pressure force is regulated by a change in pressure in the cavity 27 of the hydraulic pump. Next, the cavity 27 is freed from the liquid, the nozzles 26 are extended, and the pistons 24 are pulled out of the cylinders 20 by the flexible elements 25. Then, the jack 19 is again “charged”, and the process is repeated until the horizontal wells 18 reach the design lengths. If during operation only one piston 24 has gone full stroke along cylinder 20 and the other partially, then jack 19 is also “recharged”, etc. Thus, all other pairs of horizontal wells are built 18. To reduce the resistance to pressure of the composite pipes 21 into the formation 6, well-known techniques can be applied (supply of a hot solvent, etc.). If the project provides for the construction of horizontal wells 18 in two tiers in height, then at the same time you can build two pairs of them, etc. At the end of the construction of horizontal wells 18, the composite pipes 21 with the pipes 14 of the working chambers 13 form annular cavities 29 (Fig. 1), communicating with the formation 6 and through the corresponding valves 30 and manifolds 31 with the steam line 32 and the underground capacity 4. Horizontal wells 18 through the corresponding valves 30 and manifolds 31 also communicate with the steam line 32 and the underground tank 4, and their central channels 33 are closed by equal-way valves 34. The mouths of the working chambers 13, horizontal wells 18 and the coupling of the composite pipes 21 with the guides 1 5 are sealed by known methods. The lower collectors 31 through the nozzles 35 communicate with the underground capacity 4, and in its upper part is placed an inclined adjustable plane 36 (FIG. 3), equipped with a device 37 for regulating the thickness of the product flow and a partition 38. The underground tank 4 is connected through channels 39 (FIG. 1) with an additional well 1, which is connected to a ground-based system for trapping light fractions and a steam generator, the lower channel 39 being provided with a filter 40. Pumps 41 are placed in the additional well 1 for pumping products. In the upper part of the well 7, a steam generator 42 is placed connected to the steam line 32. The systems for supplying and preparing gas and water from an underground tank 4 (not shown) are also placed there. Installation of equipment in the well is carried out using a working elevator. The equipment is carried out in explosion-proof quick-assembled modular design, equipped with safety, control and video surveillance devices. Workers are provided with personal protective equipment to work in these conditions.

Предложенный способ добычи тяжелой нефти позволяет использовать для снижения вязкости продукции и приведения ее в текучее состояние различные технологические приемы. Для примера рассмотрим применение технологии парогравитационного дренирования с закачкой перегретого пара с температурой порядка 250°С при двухъярусном расположении горизонтальных скважин. Сущность технологии заключается в том, что пласт нагревают перегретым паром для снижения вязкости продукции и приведения ее в текучее состояние. На первом этапе эксплуатации залежи пар закачивают расчетное время через паропровод 32 и верхние коллекторы 31 при открытых верхних задвижках 30 во все горизонтальные скважины 18 и полости 19 рабочих камер 13 для более полного прогрева пласта 6. В это время нижние задвижки 30, сообщающие их через нижние коллекторы 31 и патрубки 35 с емкостью 4, закрыты. После достаточного прогрева пласта открывают дистанционно нижние задвижки 30, сообщающие полости 19 рабочих камер 13 и горизонтальные скважины 18 через нижние коллекторы 31, патрубки 35 с емкостью 4. В это время остальные задвижки закрыты. В гравитационном режиме и под действием пластового давления продукция попадает наклонную плоскость 36 (фиг.3), где происходит ее предварительная подготовка. В зависимости от принятой технологии глубокой подготовки продукции можно применять, в зависимости от ее состава, горячий гравитационный, термохимический и электрические методы. При этом газ и воду используют для работы парогенератора, а товарную нефть откачивают насосами 41 (фиг.1) из дополнительной скважины 1. Оптимальную скорость поступления продукции из пласта 6 в полости 19 и горизонтальные добывающие скважины 18 и ее течения по ним в подземную емкость 4, при которой не выносятся механические примеси, определяют экспериментально регулированием величины проходного сечения задвижек 30. При закрытых задвижках скорость равна нулю. При полностью открытых задвижках скорость продукции имеет максимальное значение.The proposed method for the production of heavy oil allows you to use various technological methods to reduce the viscosity of the product and bring it into a fluid state. As an example, consider the use of steam gravity drainage technology with the injection of superheated steam with a temperature of about 250 ° C with a two-tier arrangement of horizontal wells. The essence of the technology lies in the fact that the reservoir is heated with superheated steam to reduce the viscosity of the product and bring it into a fluid state. At the first stage of operation, the steam deposits pump the estimated time through the steam line 32 and the upper headers 31 with the upper valves open 30 to all horizontal wells 18 and the cavities 19 of the working chambers 13 for a more complete heating of the formation 6. At this time, the lower valves 30 communicating through the lower collectors 31 and nozzles 35 with a capacity of 4 are closed. After a sufficient warming up of the formation, the lower valves 30 remotely open, communicating cavities 19 of the working chambers 13 and horizontal wells 18 through the lower manifolds 31, pipes 35 with a capacity of 4. At this time, the other valves are closed. In the gravitational mode and under the influence of reservoir pressure, the product enters an inclined plane 36 (figure 3), where it is pre-prepared. Depending on the technology adopted for the deep preparation of products, hot gravity, thermochemical and electrical methods can be applied, depending on its composition. In this case, gas and water are used to operate the steam generator, and marketable oil is pumped out by pumps 41 (Fig. 1) from additional well 1. The optimal rate of production from the formation 6 in the cavity 19 and horizontal production wells 18 and its flow through them into the underground tank 4 , at which mechanical impurities are not carried out, is determined experimentally by adjusting the passage size of the valves 30. With closed valves, the speed is zero. With fully open valves, production speed is at its maximum.

В зависимости от применяемого технологического режима эксплуатации пласта полости 19 и горизонтальные скважины 18 в горизонтальном сечении и вертикальных рядах могут быть как паронагнетательными, так и эксплуатационными. Например, в верхний ряд всех полостей и скважин (или в часть их) закачивают пар, а с нижнего ряда всех полостей и скважин (или из части) ведут добычу продукции. В зависимости от принятой технологии эксплуатации пласта могут быть любые варианты совместной эксплуатации полостей 19 и горизонтальных скважин 18. Для интенсификации добычи возможно применение химических реагентов и растворителей. Для периодической гидравлической очистки подземной емкости применяют известное наземное оборудование с гибким рукавом с необходимым набором инструментов и приспособлений. Управление технологическими процессами осуществляет оператор с дневной поверхности. После выработки участка пласта охватываемой скважиной ее можно использовать в технологическом цикле разработки месторождения в качестве подземного резервуара (для хранения нефти, воды, промышленных отходов и т.п.).Depending on the applied technological mode of the reservoir operation, the cavities 19 and horizontal wells 18 in horizontal section and vertical rows can be either steam injection or production wells. For example, steam is pumped into the upper row of all cavities and wells (or to a part of them), and products are produced from the lower row of all cavities and wells (or from a part). Depending on the adopted technology of reservoir operation, there can be any options for the joint operation of cavities 19 and horizontal wells 18. To intensify production, it is possible to use chemical reagents and solvents. For periodic hydraulic cleaning of an underground tank, the well-known ground equipment with a flexible sleeve is used with the necessary set of tools and devices. Technological processes are controlled by the operator from the day surface. After developing a section of a reservoir by a covered well, it can be used in the technological cycle of field development as an underground reservoir (for storing oil, water, industrial waste, etc.).

Технико-экономическое преимущество предлагаемого способа добычи тяжелой нефти заключается в следующем. Появляется возможность строительства из вертикальной скважины одновременно двух соосных горизонтальных скважин на одном ярусе, четырех скважин на двух ярусах и т.д. При этом усилия заталкивания поршнями труб горизонтальных скважин в пласт практически не действуют на конструкцию вертикальной скважины. Изменением рабочего давления в герметичной полости между поршнями гидронасосом можно регулировать усилие надавливания труб горизонтальных скважин в пласт в широких пределах. Рабочий ход поршня домкрата определяется длиной его цилиндра и может быть более 10 м. Тогда, в благоприятном случае, для строительства двух горизонтальных скважин длиной 700 м каждая необходимо «перезарядить» домкрат 70 раз. Если на одном ярусе вертикальной скважины необходимо построить 8 горизонтальных скважин (4 пары), то домкрат «перезаряжают» 280 раз. Если на одну «зарядку» и рабочие ходы поршней домкрата потратить 4 часов времени, то на строительство 4 пар горизонтальных скважин потребуется 1120 часов - 46,7 суток, то есть всего 11,7 суток на одну пару горизонтальных скважин. Домкрат имеет простую схему исполнения, «перезарядки» и работы. Размещение парогенератора в вертикальной скважине и использование в его работе попутного газа и воды из подземной емкости исключает строительство дорогих наземных паропроводов, водоводов, установок для улавливания легких фракций и значительно снижает потери тепла. Применение оптимальной скорости течения продукции из пласта в подземную емкость, при которой исключен вынос песка, позволяет не оснащать горизонтальные скважины дорогими противопесочными фильтрами и экономить денежные средства. Строительство дополнительной скважины для насосов до строительства вертикальной скважины позволяет получить достоверную информацию о геологических параметрах разреза и пласта и, при необходимости, оперативно вносить изменения в проект, повышая качество дальнейшего строительства. Кроме того, появляется возможность применять известные насосные установки, монтировать и обслуживать их, применяя обычное наземное оборудование и известные технологические приемы, как на обычных скважинах. Способ позволяет вскрывать продуктивный пласт с минимальным на него воздействием, применять, в зависимости от стадии разработки месторождения, различные технологические приемы воздействия на пласт без переналадки оборудования и вести рациональный сбор продукции с различных участков пласта в подземную емкость без применения насосов. Добывающие горизонтальные скважины не оказывают противодавления на пласт, что улучшает поступление продукции и сбор ее в подземной емкости. То, что качественная подготовка продукции происходит в подземной емкости с применением эффективных устройств и технологий, легкие фракции поступают в наземную систему их сбора или сжигаются в парогенераторе и откачивают ее на поверхность в виде товарной продукции, исключает затраты средств на строительство дорогостоящих наземных систем переработки, трубопроводов и улучшают экологические условия. Появляется возможность товарную продукцию и воду откачивать из подземной емкости раздельно, причем воду можно использовать в работе парогенератора.The technical and economic advantage of the proposed method for the production of heavy oil is as follows. There is the possibility of building simultaneously from a vertical well two coaxial horizontal wells on one tier, four wells on two tiers, etc. At the same time, the forces of the pistons pushing the pipes of horizontal wells into the formation practically do not affect the design of the vertical well. By changing the working pressure in the sealed cavity between the pistons of the hydraulic pump, it is possible to regulate the pressure force of the pipes of horizontal wells into the reservoir over a wide range. The stroke of the piston of the jack is determined by the length of its cylinder and can be more than 10 m. Then, in the favorable case, for the construction of two horizontal wells 700 m long, each jack must be "recharged" 70 times. If it is necessary to build 8 horizontal wells (4 pairs) on one tier of a vertical well, then the jack is "recharged" 280 times. If you spend 4 hours on one “charging” and working strokes of the jack pistons, then it will take 1120 hours — 46.7 days to build 4 pairs of horizontal wells — that is, only 11.7 days for one pair of horizontal wells. The jack has a simple scheme of execution, "recharge" and work. Placing a steam generator in a vertical well and using associated gas and water from an underground tank in its operation precludes the construction of expensive ground-based steam pipelines, water pipelines, light fraction traps and significantly reduces heat loss. The use of the optimal flow rate of products from the reservoir to the underground tank, at which sand removal is excluded, allows not to equip horizontal wells with expensive sand filters and save money. The construction of an additional well for pumps before the construction of a vertical well allows obtaining reliable information about the geological parameters of the section and the formation and, if necessary, promptly making changes to the project, improving the quality of further construction. In addition, it becomes possible to use well-known pumping units, to mount and maintain them, using conventional ground equipment and well-known technological methods, as in conventional wells. The method allows you to open a productive formation with minimal impact on it, apply, depending on the stage of field development, various technological methods of impacting the formation without changing equipment and conduct rational collection of products from various sections of the formation into an underground tank without the use of pumps. Horizontal production wells do not provide backpressure to the reservoir, which improves the flow of products and their collection in an underground tank. The fact that high-quality product preparation takes place in an underground tank using effective devices and technologies, light fractions enter the ground-based collection system or are burned in a steam generator and pump it to the surface in the form of commercial products, eliminating the cost of building expensive land-based processing systems, pipelines and improve environmental conditions. There is an opportunity for commercial products and water to be pumped out of the underground tank separately, and water can be used in the operation of a steam generator.

Приводим некоторые оценочные параметры добычи тяжелой нефти с применением предложенного способа. Представим объем пласта, охватываемый скважинами в виде цилиндра. При этом считаем, что нефть в пласте неподвижна, а длины горизонтальных скважин одинаковы. Тогда для определения количества нефти, которое можно извлечь из пласта, можно написать:Here are some estimated parameters for the production of heavy oil using the proposed method. Imagine the volume of the reservoir covered by the wells in the form of a cylinder. At the same time, we believe that the oil in the reservoir is stationary, and the lengths of horizontal wells are the same. Then, to determine the amount of oil that can be extracted from the reservoir, you can write:

Q=πR2Hpha,Q = πR 2 Hpha,

где R - радиус основания цилиндра, равный длине горизонтальных скважин, м; Н - высота цилиндра, равная мощности пласта, м; Р - плотность нефти, т/м3; h - нефтеизвлечение из пласта, %; а - нефтенасыщенность пласта, %.where R is the radius of the base of the cylinder, equal to the length of horizontal wells, m; H is the height of the cylinder, equal to the thickness of the reservoir, m; P is the density of oil, t / m 3 ; h - oil recovery from the reservoir,%; a - oil saturation of the reservoir,%.

Если принять R=700 м, Н=20 м, Р=0,96 т/м3, h=0,9, а=0,15, то получаем:If we take R = 700 m, H = 20 m, P = 0.96 t / m 3 , h = 0.9, a = 0.15, then we get:

Q=3,14×7002×20×0,96×0,9×0,15=3988051 т.Q = 3.14 × 700 2 × 20 × 0.96 × 0.9 × 0.15 = 3988051 t.

При этом не учли поступление нефти из приграничных зон пласта по периметру, которая, по-видимому, будет увеличивать этот объем нефти.At the same time, the flow of oil from the boundary zones of the reservoir along the perimeter, which, apparently, will increase this volume of oil, was not taken into account.

Количество общей выручки от продажи нефти на внутреннем рынке России:The amount of total revenue from oil sales on the domestic market of Russia:

Д=QЦ,D = QC,

где Ц - стоимость одной тонны нефти на внутреннем рынке, руб.where C is the cost of one ton of oil in the domestic market, rubles.

Если принять стоимость нефти 6500 руб. (ориентировочно, для оценки), то получаем:If we take the cost of oil to 6500 rubles. (tentatively, for evaluation), we obtain:

Д=3988051×6500=25922331500 руб.D = 3988051 × 6500 = 25922331500 rub.

Для определения суточного дебита вертикальной скважины можно написать:To determine the daily production rate of a vertical well, you can write:

Qcyт.=qn,Q cit. = qn,

где q - суточный дебит добывающей горизонтальной скважины, т/сут.; n - количество добывающих горизонтальных скважин.where q is the daily production rate of the producing horizontal well, t / day; n is the number of producing horizontal wells.

Предположим, что из вертикальной скважины построено восемь пар горизонтальных скважин, из которых половина - добывающие. Дебит по нефти существующих добывающих наклонно горизонтальных скважин на Ашальчинском месторождении, горизонтальная часть которых примерно 300 м проходит по пласту - более 30 т/сут. Если горизонтальная добывающая скважина работает в тех же условиях, но ее длина, проходящая по пласту, более чем в два раза больше, и она работает в депрессионном режиме, то можно предположить, что ее дебит увеличится. Есть сведения, что в Канаде и Венесуэле из горизонтальных скважин длиной 500-700 м добывают высоковязкой продукции порядка 150 т/сут. Принимаем суточный дебит добывающей горизонтальной скважины 75 т/сут. Тогда суточный дебит составит:Suppose that eight pairs of horizontal wells were constructed from a vertical well, of which half are producing. Oil production rate of existing producing inclined horizontal wells at the Ashalchinskoye field, the horizontal part of which is about 300 m, passes through the reservoir - more than 30 tons / day. If a horizontal production well operates under the same conditions, but its length passing through the formation is more than twice as long and it operates in a depressed mode, then it can be assumed that its production rate will increase. There is evidence that in Canada and Venezuela from horizontal wells with a length of 500-700 m produce highly viscous products of about 150 tons / day. We accept a daily production rate of a producing horizontal well of 75 tons / day. Then the daily rate will be:

Qcyт=75×8=600 т/сут.Q cyt = 75 × 8 = 600 t / day.

Для определения годовой добычи нефти можно написать:To determine the annual oil production, you can write:

Qгод.=365×Qcyт=365×600=219000 т,Q year. = 365 × Q cyt = 365 × 600 = 219000 t,

где 365 - количество дней в году.where 365 is the number of days in a year.

Годовая выручка от продажи этой нефти:Annual revenue from the sale of this oil:

Д год.=219000×6500=1423500000 руб.D year. = 219000 × 6500 = 1,423,500,000 rubles.

Предлагаемое количество лет работы скважин:Proposed number of years of well operation:

Н лет.=Q:Qгод.=3988051:219000=18 лет.N years. = Q: Q year. = 3988051: 219000 = 18 years.

Таким образом, применение предложенного способа повышает эффективность добычи тяжелой нефти значительным снижением капитальных, эксплуатационных затрат и себестоимости продукции за счет исключения строительства наземных установок подготовки нефти и парогенератора, значительного уменьшения количества наземных трубопроводов, снижения сроков и себестоимости строительства горизонтальных скважин, уменьшения теплопотерь и закупок насосного оборудования, фильтров, увеличения дебита, применения эффективных и гибких технологий воздействия на нефтяной пласт без переналадки подземного оборудования и подготовки продукции в подземной емкости, уменьшения отводимых земель и рационального их использования. Вследствие того, что отсутствуют наземные установки подготовки нефти, уменьшено количество наземных трубопроводов подвода пара и отвода продукции, устья горизонтальных скважин компактно и герметично обвязаны в вертикальной скважине под землей, а подземная емкость сообщена с наземной системой улавливания легких фракций продукции и парогенератором, наиболее полно выполняются экологические требования.Thus, the application of the proposed method improves the efficiency of heavy oil production by a significant reduction in capital, operating costs and production costs due to the exclusion of the construction of ground-based oil treatment plants and a steam generator, a significant reduction in the number of land pipelines, a reduction in the timing and cost of constructing horizontal wells, reduction in heat losses and pumping purchases equipment, filters, increase flow rate, use effective and flexible technologies They will be supplied to the oil reservoir without re-adjustment of underground equipment and preparation of products in the underground capacity, reduction of allotted land and their rational use. Due to the fact that there are no ground-based oil treatment facilities, the number of land-based steam supply and production pipelines has been reduced, the mouths of horizontal wells are compactly and hermetically tied in a vertical well underground, and the underground tank is connected to a ground-based system for trapping light fractions of products and a steam generator are most fully implemented environmental requirements.

Claims (6)

1. Способ добычи тяжелой нефти, включающий строительство вертикальной скважины, вскрытие пласта из вертикальной скважины методом надавливания домкратом, размещенным в соосных рабочих камерах, горизонтальными нагнетательными и добывающими скважинами, подвод теплоносителя в пласт, сбор продукции в подземную емкость и откачку ее на поверхность насосами, отличающийся тем, что домкрат выполняют в виде цилиндров, временно соосно размещенных с центраторами в противоположных рабочих камерах, снабженных перфорированными участками и на противоположных торцах направляющими для составных труб с перфорированными участками и наконечниками, взаимодействующих с поршнями, размещенными внутри цилиндров, соединенными гибким элементом, причем цилиндры периодически соединяют между собой телескопическими патрубками, образуя герметичную полость, соединенную с гидронасосом, при работе которого поршни двигаются в противоположных направлениях вместе с составными трубами, строят все пары скважин, согласно проекта, причем составные трубы совместно с рабочими камерами образуют кольцевые полости, сообщающиеся с пластом и через соответствующие задвижки и коллекторы - с паропроводом и подземной емкостью, которые также соединяют через соответствующие задвижки и коллекторы с паропроводом и подземной емкостью, а их центральные каналы закрывают равнопроходными задвижками, подвод теплоносителя в пласт осуществляют через паропровод, коллектор, задвижки, перфорированные участки составных труб нагнетательных скважин и кольцевых полостей рабочих камер при закрытых остальных задвижках, продукция пласта из добывающих скважин поступает через соответствующие задвижки, коллектор и патрубок в наклонную, регулируемую в зависимости от ее состава и вязкости плоскость, снабженную устройством для регулирования толщины потока, где происходит предварительное отделение от нее газа и воды, которую размещают в верхней части подземной емкости, внешне радиально соединенной каналами с дополнительной скважиной для насосов, соединенной с системой улавливания легких фракций, причем нижний канал снабжен фильтром.1. A method of producing heavy oil, including the construction of a vertical well, opening a formation from a vertical well by pressing the jack in coaxial working chambers, horizontal injection and producing wells, supplying coolant to the formation, collecting products into an underground tank and pumping it to the surface with pumps, characterized in that the jack is made in the form of cylinders temporarily coaxially placed with centralizers in opposite working chambers, provided with perforated sections and against the supporting ends of the guides for composite pipes with perforated sections and tips interacting with pistons located inside the cylinders connected by a flexible element, and the cylinders are periodically connected to each other by telescopic pipes, forming a sealed cavity connected to the hydraulic pump, during which the pistons move in opposite directions together with composite pipes, all pairs of wells are built according to the project, and composite pipes together with working chambers form annular e cavities communicating with the formation and through the corresponding valves and collectors - with the steam line and underground capacity, which also connect through the corresponding valves and collectors with the steam line and underground capacity, and their central channels are closed with equal passage valves, the coolant is supplied to the formation through the steam pipe, collector , valves, perforated sections of composite pipes of injection wells and annular cavities of working chambers with the remaining valves closed, production of a formation from production wells flows through the corresponding valves, the collector and the nozzle into an inclined plane, depending on its composition and viscosity, equipped with a device for regulating the flow thickness, where gas and water are preliminarily separated from it, which is placed in the upper part of the underground tank externally radially connected by channels with an additional well for pumps connected to a trapping system for light fractions, and the lower channel is equipped with a filter. 2. Способ по п.1, отличающийся тем, что оптимальную скорость поступления продукции из пласта в горизонтальные добывающие скважины и ее течения по ним в подземную емкость, при которой не выносятся механические примеси, определяют регулированием величины их проходных сечений.2. The method according to claim 1, characterized in that the optimal rate of production from the reservoir into horizontal production wells and its flow through them into the underground tank, at which mechanical impurities are not carried out, is determined by adjusting the magnitude of their cross sections. 3. Способ по п.1, отличающийся тем, что сначала строят дополнительную скважину с забоем ниже забоя подземной емкости, уточняя при этом геологические и другие параметры разреза и пласта.3. The method according to claim 1, characterized in that first they build an additional well with a bottom below the bottom of the underground reservoir, while specifying the geological and other parameters of the section and the formation. 4. Способ по п.1, отличающийся тем, что для подготовки продукции в подземной емкости применяют термогравитационный, термохимические и электрические методы.4. The method according to claim 1, characterized in that for the preparation of products in an underground tank, thermogravitational, thermochemical and electrical methods are used. 5. Способ по п.1, отличающийся тем, что для периодической гидравлической очистки подземной емкости от механических примесей применяют наземное оборудование с гибким рукавом с необходимым набором инструментов и приспособлений.5. The method according to claim 1, characterized in that for periodic hydraulic cleaning of the underground tank from mechanical impurities, ground equipment with a flexible sleeve with the necessary set of tools and devices is used. 6. Способ по п.1, отличающийся тем, что парогенератор размещают в вертикальной скважине и в его работе используют попутный газ и воду из подземной емкости. 6. The method according to claim 1, characterized in that the steam generator is placed in a vertical well and associated gas and water from the underground tank are used in its operation.
RU2010152264/03A 2010-12-20 2010-12-20 Method of heavy oil production RU2455476C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010152264/03A RU2455476C1 (en) 2010-12-20 2010-12-20 Method of heavy oil production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010152264/03A RU2455476C1 (en) 2010-12-20 2010-12-20 Method of heavy oil production

Publications (1)

Publication Number Publication Date
RU2455476C1 true RU2455476C1 (en) 2012-07-10

Family

ID=46848612

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010152264/03A RU2455476C1 (en) 2010-12-20 2010-12-20 Method of heavy oil production

Country Status (1)

Country Link
RU (1) RU2455476C1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756640A (en) * 2014-12-15 2016-07-13 中国石油天然气股份有限公司 SAGD horizontal well system
RU2599118C1 (en) * 2015-10-28 2016-10-10 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method for development of high-viscosity oil deposit
RU2661952C1 (en) * 2017-08-30 2018-07-23 Андрей Владиславович Ковалев Method of thermal-mining development of deposits of high-viscosity oil mine workings and device for implementation the same
RU2661958C1 (en) * 2017-08-30 2018-07-23 Андрей Владиславович Ковалев Method of underground-surface development of high-viscosity oil field in the pass of mine workings and the device of micro-tunnel for implementation the same
RU2775630C1 (en) * 2021-11-11 2022-07-05 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method for extracting extra-viscous oil and/or bitumen from deposits with small formation thicknesses (options)
CN115370335A (en) * 2022-10-25 2022-11-22 中国石油大学(华东) Hydrate enhanced mining experimental system and method with self-heating assisted depressurization

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU691557A1 (en) * 1978-04-04 1979-10-15 Северо-Кавказский научно-исследовательский институт природных газов Method of putting a deep well into operation
SU853092A1 (en) * 1979-07-23 1981-08-07 Всесоюзный Нефтегазовый Научно- Исследовательский Институт Well-starting method
RU2088752C1 (en) * 1992-03-11 1997-08-27 Крючков Владимир Иванович Method of development of oil deposit
RU2165007C2 (en) * 1999-05-25 2001-04-10 Открытое акционерное общество "Северо-Кавказский научно-исследовательский проектный институт природных газов" Открытого акционерного общества "Газпром" Technology to clear horizontal well from sand plug in process of overhaul
RU2263206C2 (en) * 2003-04-22 2005-10-27 Белей Иван Васильевич Method of formation fluid inflow stimulation
EP1766185B1 (en) * 2004-05-13 2009-10-21 Baker Hughes Incorporated System stabilizers and performance enhancers for aqueous fluids gelled with viscoelastic surfactants

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU691557A1 (en) * 1978-04-04 1979-10-15 Северо-Кавказский научно-исследовательский институт природных газов Method of putting a deep well into operation
SU853092A1 (en) * 1979-07-23 1981-08-07 Всесоюзный Нефтегазовый Научно- Исследовательский Институт Well-starting method
RU2088752C1 (en) * 1992-03-11 1997-08-27 Крючков Владимир Иванович Method of development of oil deposit
RU2165007C2 (en) * 1999-05-25 2001-04-10 Открытое акционерное общество "Северо-Кавказский научно-исследовательский проектный институт природных газов" Открытого акционерного общества "Газпром" Technology to clear horizontal well from sand plug in process of overhaul
RU2263206C2 (en) * 2003-04-22 2005-10-27 Белей Иван Васильевич Method of formation fluid inflow stimulation
EP1766185B1 (en) * 2004-05-13 2009-10-21 Baker Hughes Incorporated System stabilizers and performance enhancers for aqueous fluids gelled with viscoelastic surfactants

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756640A (en) * 2014-12-15 2016-07-13 中国石油天然气股份有限公司 SAGD horizontal well system
RU2599118C1 (en) * 2015-10-28 2016-10-10 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method for development of high-viscosity oil deposit
RU2661952C1 (en) * 2017-08-30 2018-07-23 Андрей Владиславович Ковалев Method of thermal-mining development of deposits of high-viscosity oil mine workings and device for implementation the same
RU2661958C1 (en) * 2017-08-30 2018-07-23 Андрей Владиславович Ковалев Method of underground-surface development of high-viscosity oil field in the pass of mine workings and the device of micro-tunnel for implementation the same
RU2775630C1 (en) * 2021-11-11 2022-07-05 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method for extracting extra-viscous oil and/or bitumen from deposits with small formation thicknesses (options)
CN115370335A (en) * 2022-10-25 2022-11-22 中国石油大学(华东) Hydrate enhanced mining experimental system and method with self-heating assisted depressurization
CN115370335B (en) * 2022-10-25 2022-12-16 中国石油大学(华东) Hydrate enhanced mining experiment system and method with self-heating assisted depressurization

Similar Documents

Publication Publication Date Title
RU2455476C1 (en) Method of heavy oil production
CA2742565C (en) Methods and systems for providing steam
RU2334867C1 (en) Method of simultaneous-separate operation of several payout beds and installation of well for implementation of this method
CA2742563C (en) Methods and systems for providing steam
RU2330950C1 (en) Method of high vicous oil and bitumen deposits development
CN102330546A (en) Open hole staged fracturing well completion pipe string provided with controllable valve and hydraulic control switching pipe string
CN204941492U (en) Regulation device is injected in water injection well umbilical duct holostrome position
CN104832143A (en) Water injection well umbilical pipe full-horizon injection regulation device
RU2296213C2 (en) Packer pumping plant for well formations operation
CN203383786U (en) Closed-loop water distribution, ground watering and pressurization output integrated device
CN209067182U (en) CO2Simulation device for gas drive shaft scaling
RU2418163C1 (en) Development method of deposits of high-viscosity oils or bitumens
RU2339807C1 (en) Method of extraction of heavy and high viscous hydrocarbons from undeground deposits
RU2526047C1 (en) Development of extra-heavy crude oil
CN202810812U (en) An oil extraction pipe column lifting thickened oil with steam power
RU2558354C1 (en) Device for suspension of steel and polymer pipe and method of its use
CN207177776U (en) Oil well sand washing pipe column and oil well sand washing system
RU2395675C1 (en) Method of ultraviscous oil recovery
RU2344320C1 (en) Method for control of water-driven pump set of oil-producing wells and device for its realisation
RU2339808C1 (en) Method for extraction of heavy and high viscous hydrocarbons out of underground deposit
RU2285116C2 (en) Method for extracting deposits of bitumen and highly viscous oil and complex system of equipment for realization of said method
CA2609090A1 (en) Method and apparatus for removing production limiting liquid volumes from natural gas wells
CN201045290Y (en) Large hollow stem oil pumping system
CN209145562U (en) A kind of device of gas-lift production well Paraffin Removal
RU2516077C1 (en) Method for construction and operation of vertical well for steam assisted gravity drainage of high-viscosity oil or bitumen

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20151221