RU2329463C1 - Shortened monolithic stemming plug - Google Patents

Shortened monolithic stemming plug Download PDF

Info

Publication number
RU2329463C1
RU2329463C1 RU2006139570/03A RU2006139570A RU2329463C1 RU 2329463 C1 RU2329463 C1 RU 2329463C1 RU 2006139570/03 A RU2006139570/03 A RU 2006139570/03A RU 2006139570 A RU2006139570 A RU 2006139570A RU 2329463 C1 RU2329463 C1 RU 2329463C1
Authority
RU
Russia
Prior art keywords
monolithic
stemming
stemming plug
shortened
plug
Prior art date
Application number
RU2006139570/03A
Other languages
Russian (ru)
Inventor
Александр Валентинович Лещинский (RU)
Александр Валентинович Лещинский
Евгений Борисович Шевкун (RU)
Евгений Борисович Шевкун
Original Assignee
Государственное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" filed Critical Государственное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет"
Priority to RU2006139570/03A priority Critical patent/RU2329463C1/en
Application granted granted Critical
Publication of RU2329463C1 publication Critical patent/RU2329463C1/en

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

FIELD: blasting.
SUBSTANCE: invention relates to the field of drilling and blasting in hard rock quarries and may be applied in various industries where blasting in rock masses is used. A shortened monolithic stemming plug is made of a concrete mixture. The bottom portion of the stemming plug receives a hollow conical pressboard or plastic element that is mounted with its tip pointing upwards and occupies up to a half of the stemming plug height. The conical element is mounted onto a foam polystyrene or foam plastic pack being placed between an explosive charge and the monolithic stemming plug.
EFFECT: reducing the volume of concrete mixture required for making a monolithic concrete stemming plug.
2 dwg

Description

Изобретение относится к области буровзрывных работ в крепких горных породах на карьерах и может быть использовано в различных отраслях, применяющих взрывные работы в скальных массивах горных пород.The invention relates to the field of drilling and blasting in strong rocks in quarries and can be used in various industries using blasting in rock massifs of rocks.

Известна забойка в виде самозаклинивающейся пробки из отвердевшего бетона, состоящая из конического элемента, размещенного на глиняной пробке над зарядом ВВ, и направленного острием вверх, и боковых клиньев, насаживаемых на конус [1]. Такая пробка обладает достаточной прочностью, хорошим сопротивлением выталкивающим силам, так как с их увеличением возрастает боковой распор, увеличивающий силу трения между стенками шпура и боковыми клиньями.Known stemming in the form of self-jamming corks from hardened concrete, consisting of a conical element placed on a clay cork above the explosive charge and directed with its tip pointing upwards and side wedges mounted on a cone [1]. Such a plug has sufficient strength, good resistance to buoyancy forces, since with their increase the lateral spacer increases, which increases the friction force between the walls of the hole and the side wedges.

Недостатком такой конструкции является плохое сцепление боковых бетонных клиньев со стенками скважины нарушенной структуры (с вывалами стенок), а также необходимость устанавливать защитную пробку из глины между конусом и зарядом ВВ, что усложняет работы по формированию забойки.The disadvantage of this design is the poor adhesion of the side concrete wedges to the walls of the well of a disturbed structure (with wall outfalls), as well as the need to install a protective plug made of clay between the cone and the explosive charge, which complicates the work on the formation of clogging.

Наиболее близкой по существу решаемой задачи является бетонная забойка, выполняемая из бетонной смеси, затвердевающей в шпуре или скважине [2]. Применение такой забойки увеличивает в несколько раз полезное действие взрыва.The closest to the essentially solvable problem is concrete jamming, made of concrete mix, hardening in a hole or well [2]. The use of such clogging increases the beneficial effect of an explosion several times.

Недостатком такой забойки является необходимость доставки больших объемов бетонной смеси на заряжаемый блок.The disadvantage of this clogging is the need to deliver large volumes of concrete mixture to the charging unit.

Технической задачей, на решение которой направлено предлагаемое изобретение, является уменьшение объемов бетонной смеси на изготовление монолитной бетонной забойки.The technical problem, the solution of which the invention is directed, is to reduce the volume of concrete mix for the manufacture of monolithic concrete clogging.

Поставленная задача достигается тем, что в укороченной монолитной забойке, выполненной из бетонной смеси согласно изобретению, в нижней части забойки установлен полый конический элемент из плотного картона или пластика, направленный острием вверх и занимающий до половины высоты забойки, при этом конический элемент установлен на пробке из пенополистирола или из пенопласта, которая размещена между зарядом ВВ и монолитной забойкой.The problem is achieved in that in a shortened monolithic stemming made of concrete mixture according to the invention, a hollow conical element made of thick cardboard or plastic is installed in the lower part of the stemming, pointed upward and occupying up to half the stemming height, while the conical element is mounted on a cork of polystyrene foam or polystyrene foam, which is placed between the explosive charge and monolithic stemming.

Сущность изобретения поясняется чертежами.The invention is illustrated by drawings.

На фиг.1 схематично показан процесс заливки бетонной смеси на конический элемент; на фиг.2 - укороченная монолитная забойка в скважине.Figure 1 schematically shows the process of pouring concrete mixture on a conical element; figure 2 - shortened monolithic stemming in the well.

Укороченная монолитная забойка включает конический элемент 1, выполненный из плотного картона или пластика диаметром на 4-8% меньше диаметра шпура или скважины. Конический элемент 1 размещен на пробке 2 из пенополистирола, расположенной над зарядом ВВ 3, размещенным в шпуре или скважине 4, и залит бетонной смесью 5.The shortened monolithic stemming includes a conical element 1 made of dense cardboard or plastic with a diameter of 4-8% less than the diameter of the hole or well. The conical element 1 is placed on a plug 2 of polystyrene foam, located above the explosive charge 3, placed in the hole or well 4, and poured with concrete mixture 5.

Укороченную монолитную забойку формируют следующим образом. В шпуре или скважине 4 формируют заряд ВВ 3 заданной высоты и выводят проводник инициирующего импульса 6 (детонирующий шнур, волновод, провода от электродетонатора и т.п.) вдоль стенки шпура или скважины 4 на поверхность. Над зарядом ВВ 3 размещают пробку 2 из пенополистирола засыпкой гранулированного вспененного полистирола на расчетную высоту. В связи с тем, что стенки скважин в верхней части часто бывают нарушены, периодически замеряют высоту полученной пробки 2. Для облегчения процесса формирования пробки 2 может быть использован пенопласт в виде параллелепипеда заданной высоты с наибольшим размером в сечении 0,52 диаметра скважины, а зазор между ним и стенками скважины засыпают пенополистиролом. На пробку 2 опускают конический элемент 1 острием вверх. Затем заливают бетонную смесь 5. Вспененный полистирол препятствует утечке жидкой части бетонной смеси. На этом процесс формирования укороченной монолитной забойки заканчивается, и она остается до набора бетонной смесью 5 необходимой прочности. При использовании быстротвердеющего бетона этот процесс завершается в течение нескольких часов, а зарядка блоков обычно продолжается в несколько раз дольше. После отвердевания бетонной смеси 5 забойка превращается в монолит и получает прочное сцепление со стенками скважины.Shortened monolithic stemming is formed as follows. In a hole or well 4, an explosive charge 3 of a given height is formed and the initiating pulse conductor 6 (detonating cord, waveguide, wires from an electric detonator, etc.) is brought out along the wall of the hole or well 4 to the surface. Over the explosive charge 3 place a plug 2 of polystyrene foam backfill granular foamed polystyrene to the calculated height. Due to the fact that the walls of the wells in the upper part are often broken, periodically measure the height of the obtained plug 2. To facilitate the formation of plug 2, a foam can be used in the form of a parallelepiped of a given height with the largest cross-sectional area of 0.52 well diameters, and the gap between it and the walls of the well fall polystyrene foam. The conical element 1 is lowered onto the cork 2 with its tip upward. Then pour the concrete mixture 5. Foamed polystyrene prevents the leakage of the liquid part of the concrete mixture. This completes the process of forming a shortened monolithic stemming, and it remains until the concrete mix 5 has the necessary strength. When using quick-hardening concrete, this process is completed within several hours, and the charging of blocks usually lasts several times longer. After the concrete mixture 5 has hardened, the stemming becomes a monolith and obtains strong adhesion to the walls of the well.

Замеры показали, что как гранулированный вспененный полистирол, так и пенопласт выдерживают достаточно высокую нагрузку при приемлемой величине осадки.Measurements showed that both granular foamed polystyrene and foam can withstand a fairly high load with an acceptable amount of precipitation.

При детонации заряда конический элемент 1 сгорает, за счет сил сцепления со стенками шпура или скважины 4 отвердевшая бетонная смесь 5 оказывает сопротивление выталкивающему действию продуктов взрыва вплоть до начала разрушения стенок скважины. Дополнительное положительное воздействие оказывает и распор газами взрыва конической части монолитной забойки в стенки скважины. Уменьшение за счет пробки из пенополистирола высоты забойки позволяет повысить зону регулируемого дробления в скважине, а запирание продуктов детонации до полного разрушения пород массива увеличивает время действия взрыва на массив, что повышает использование энергии взрыва на массив горных пород. Использование полого конического элемента позволяет ускорить процесс формирования забойки и уменьшить объем доставляемой на блок бетонной смеси.When the detonation of the charge, the conical element 1 burns out, due to the forces of adhesion to the walls of the hole or well 4, the hardened concrete mixture 5 resists the repulsive effect of the explosion products until the destruction of the walls of the well. An additional positive effect is also exerted by the expansion by gases of the explosion of the conical part of the monolithic stemming into the walls of the well. Reducing the stemming height due to the foam polystyrene plug allows you to increase the zone of controlled crushing in the well, and locking detonation products until the rock mass is completely destroyed increases the duration of the explosion on the mass, which increases the use of explosion energy on the rock mass. The use of a hollow conical element allows you to speed up the process of formation of stemming and reduce the volume of concrete delivered to the block.

Таким образом, заявляемая укороченная монолитная забойка позволяет запирать продукты взрыва в зарядной полости шпуров или скважин до полного разрушения массива и тем самым повысить эффективность использования энергии взрыва на дробление горных пород и решить поставленную техническую задачу снижения расхода бетонной смеси.Thus, the claimed shortened monolithic stemming allows you to lock the products of the explosion in the charging cavity of holes or wells until the destruction of the array and thereby increase the efficiency of the use of explosion energy for crushing rocks and solve the technical problem of reducing the consumption of concrete mix.

Источники информацииInformation sources

1. Беришвили Г.А. Влияние забойки шпуров на эффективность взрыва в условиях Чиатурского марганцевого месторождения // Взрывное дело №57/14. М: Недра. 1965. С.330-338.1. Berishvili G.A. The effect of drilling holes on the efficiency of an explosion in the conditions of the Chiatura manganese deposit // Blasting No. 57/14. M: Subsoil. 1965. S.330-338.

2. Легастаев Е.Г. Исследование влияния расширяющейся забойки шпуров на результаты взрыва // Сб. Взрывное дело №59/16. М.: Недра, 1966. - С.262-266 (прототип).2. Legastaev EG Investigation of the effect of expanding drilled holes on the results of the explosion // Sat. Blasting business No. 59/16. M .: Nedra, 1966. - S.262-266 (prototype).

Claims (1)

Укороченная монолитная забойка, выполненная из бетонной смеси, отличающаяся тем, что в нижней части забойки установлен полый конический элемент из плотного картона или пластика, направленный острием вверх и занимающий до половины высоты забойки, при этом конический элемент установлен на пробке из пенополистирола или из пенопласта, которая размещена между зарядом ВВ и монолитной забойкой.Shortened monolithic stemming made of concrete mixture, characterized in that in the lower part of the stemming there is a hollow conical element made of thick cardboard or plastic, pointed upward and occupying up to half the height of the stemming, while the conical element is mounted on a foam polystyrene or foam plug, which is placed between the explosive charge and monolithic stemming.
RU2006139570/03A 2006-11-07 2006-11-07 Shortened monolithic stemming plug RU2329463C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2006139570/03A RU2329463C1 (en) 2006-11-07 2006-11-07 Shortened monolithic stemming plug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2006139570/03A RU2329463C1 (en) 2006-11-07 2006-11-07 Shortened monolithic stemming plug

Publications (1)

Publication Number Publication Date
RU2329463C1 true RU2329463C1 (en) 2008-07-20

Family

ID=39809228

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2006139570/03A RU2329463C1 (en) 2006-11-07 2006-11-07 Shortened monolithic stemming plug

Country Status (1)

Country Link
RU (1) RU2329463C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2656629C1 (en) * 2017-07-05 2018-06-06 Сергей Викторович Лукша Method of composite hardening tamping installation in the groove cavity in the form of a blast-hole or a well during drilling and blasting works and a thrust means for its implementation (variants)
WO2018102858A1 (en) 2016-12-07 2018-06-14 Rise Mining Developments Pty Ltd Improved stemming plugs

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ЛЕГАСТАЕВ Е.Г. Исследования влияния расширяющейся забойки шпуров на результаты взрыва, Взрывное дело N59/16, Недра, 1966, с.262-266. *
МИНДЕЛИ Э.О. и др. Забойка шпуров. - М.: Недра, 1967, с.13-15, 46-50. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018102858A1 (en) 2016-12-07 2018-06-14 Rise Mining Developments Pty Ltd Improved stemming plugs
US11150068B2 (en) 2016-12-07 2021-10-19 Rise Mining Development Pty Ltd Stemming plugs
RU2656629C1 (en) * 2017-07-05 2018-06-06 Сергей Викторович Лукша Method of composite hardening tamping installation in the groove cavity in the form of a blast-hole or a well during drilling and blasting works and a thrust means for its implementation (variants)

Similar Documents

Publication Publication Date Title
CN113383206A (en) Blasting method using jet unit charged in blast hole
RU2371670C1 (en) Combined plug
RU2526950C1 (en) Fill stemming of blast holes with elements of stone material
RU2462688C1 (en) Combined charging tamping of wells
RU2329463C1 (en) Shortened monolithic stemming plug
RU2498064C2 (en) Gas generator for destruction or cracking of natural and artificial objects, and method of destruction or cracking of natural and artificial objects
RU2338152C1 (en) Shortened hardening stem bag
KR101658016B1 (en) Multisected bench cut blasting method and explosive container used therein and execution method thereof
RU2331042C1 (en) Combined concrete plug
CN204514208U (en) Water resistant is cracked multistage spalling gripper formula perforation plugging device
US4690058A (en) Smooth wall blasting in rock
KR200222683Y1 (en) Blast Structure of Deck Charge for using Spacer
CN107989611A (en) Loading method for the fracturing hole internal solid carbon dioxide of non-explosive excavation rock
CN203239368U (en) Hollow slip casting anchor rod adopting blasting reaming technology
CN101004133B (en) Sound wave shock and pulse combustion type pressing crack apparatus
CN108195242B (en) Rock blasting method
RU2409805C1 (en) Suspension well stemming
CN114353609B (en) Structure and method for sectional charging in downward blast hole
CN203239369U (en) Improved expanding end anchor device
RU2229684C1 (en) Deep-hole stemming
RU2308674C1 (en) Combination stemming
RU2372583C1 (en) Combined plug
RU102782U1 (en) EXPLOSIVE WELL CHARGE FOR WATERFILLED WELLS
RU2312303C1 (en) Combined stemming
RU2439484C1 (en) Combined organic plug

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20081108