RU2252338C1 - Method to prepare well jet plant for logging horizontal wells - Google Patents

Method to prepare well jet plant for logging horizontal wells Download PDF

Info

Publication number
RU2252338C1
RU2252338C1 RU2004102726/06A RU2004102726A RU2252338C1 RU 2252338 C1 RU2252338 C1 RU 2252338C1 RU 2004102726/06 A RU2004102726/06 A RU 2004102726/06A RU 2004102726 A RU2004102726 A RU 2004102726A RU 2252338 C1 RU2252338 C1 RU 2252338C1
Authority
RU
Russia
Prior art keywords
flexible pipe
jet pump
smooth flexible
support
well
Prior art date
Application number
RU2004102726/06A
Other languages
Russian (ru)
Inventor
Зиновий Дмитриевич Хоминец (UA)
Зиновий Дмитриевич Хоминец
Original Assignee
Зиновий Дмитриевич Хоминец
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Зиновий Дмитриевич Хоминец filed Critical Зиновий Дмитриевич Хоминец
Priority to RU2004102726/06A priority Critical patent/RU2252338C1/en
Application granted granted Critical
Publication of RU2252338C1 publication Critical patent/RU2252338C1/en

Links

Landscapes

  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)

Abstract

FIELD: oil producing industry; pumping facilities.
SUBSTANCE: method includes lowering of tubing with packer and support into well. Support is provided with bypass ports and seat. Then releasing of packer is carried out. Equipment is fitted on smooth flexible pipe on the ground. For this purpose lower end of flexible pipe is first passed through channel of sealing unit for displacing flexible pipe relative to sealing unit, and then pipe end is passed through stepped through channel and pumped out medium supply channel in jet pump housing, after which end piece is connected to lower end of smooth flexible pipe and instrument for surveying or treatment of producing formation is connected to lower end of flexible pipe, for instance, logging device or perforator and then sealing unit is arranged in stepped through channel of jet pump and flexible pipe with jet pump and instrument for surveyor treatment of producing formation is lowered through tubing into well. When jet pump reaches support, jet pump is fitted in seat in support after which smooth flexible pipe is lowered until instrument for surveying or treatment of producing formation reaches zone of surveying or treatment of producing formation. In process of lowering of smooth flexible pipe, recording of background values of physical parameters of rocks, for instance, temperature patterns, is carried out.
EFFECT: optimization of preparation of jet plant for operation, increased of jet plant at surveying and treatment of crooked and horizontal wells with open or cased hole.
2 cl, 1 dwg

Description

Изобретение относится к области насосной техники, преимущественно к скважинным насосным установкам для освоения скважин.The invention relates to the field of pumping technology, mainly to downhole pumping units for well development.

Известен способ подготовки к работе скважинной струйной установки, включающий спуск в скважину колонны труб с пакером и опорой, в которой выполнены перепускные окна и посадочное место, далее спуск каротажного кабеля со струйным насосом и прибором для проведения исследований или обработки продуктивного пласта через колонну труб в скважину, по достижении струйным насосом опоры производят установку струйного насоса на посадочное место опоры, после чего продолжают спуск каротажного кабеля до тех пор, пока прибор для исследования или обработки продуктивного пласта не достигнет зоны исследования или обработки (см. RU 2176337 C1, F 04 F 5/02, опубл. 27.12.2001).There is a method of preparing for operation a downhole jet installation, which includes lowering a string of pipes with a packer and a support into the well, in which overflow windows and a seat are made, then lowering a wireline with a jet pump and a device for conducting research or processing a productive formation through a pipe string into the well , upon reaching the support by the jet pump, the jet pump is installed at the support seat, and then the wireline cable is continued to be lowered until the instrument for research or processing the reservoir will not reach the study or treatment zone (see RU 2176337 C1, F 04 F 5/02, publ. 12/27/2001).

Данный способ работы установки позволяет проводить откачку из скважины различных добываемых сред, например нефти, с одновременной обработкой добываемой среды из прискважинной зоны пласта, однако данный способ работы предусматривает одновременный спуск в скважину струйного насоса и прибора для исследования продуктивного пласта, причем замена прибора возможна только при приостановке работ и подъеме на поверхность струйного насоса вместе с прибором для исследования продуктивного пласта. Данный вид подготовки к работе достаточно трудоемок и приводит к увеличению срока проведения работ по исследованию скважин.This method of operation of the installation allows pumping out various produced media, for example oil, from the well with simultaneous processing of the produced medium from the near-wellbore zone of the formation, however, this method of operation involves the simultaneous descent of a jet pump and a device for researching a productive formation, and the device can only be replaced when suspension of work and lifting to the surface of the jet pump together with the device for the study of the reservoir. This type of preparation for work is rather laborious and leads to an increase in the duration of work on the study of wells.

Наиболее близким к изобретению по технической сущности и достигаемому результату является способ подготовки к работе скважинной струйной установки, включающий спуск в скважину колонны труб с пакером и опорой, в которой выполнены перепускные окна и посадочное место с последующей распакеровкой пакера, далее спуск кабеля с герметизирующим узлом, струйным насосом и прибором для проведения исследований или обработки продуктивного пласта через колонну труб в скважину, по достижении струйным насосом опоры проводят установку струйного насоса на посадочное место опоры, прибор для исследования или обработки продуктивного пласта размещают в зоне исследования или обработки продуктивного пласта (см. RU патент 2188970, МПК 7 F 04 F 5/54, опубл. 10.09.2002).The closest to the invention in technical essence and the achieved result is a method of preparing for operation a downhole jet installation, which includes lowering a string of pipes with a packer and a support into the well, in which bypass windows and a seat are made, followed by unpacking the packer, then lowering the cable with a sealing unit, with a jet pump and a device for conducting research or processing a productive formation through a pipe string into a well, when the jet pump reaches the support, the jet pump is installed and on the seat support, the device for examination or treatment of the producing formation is placed in a sensing zone of the producing formation or processing (see. RU patent 2188970, IPC 7 F 04 F 5/54, publ. 10.09.2002).

Данный способ подготовки скважинной струйной установки позволяет проводить различные технологические операции в скважине ниже уровня установки струйного насоса, в том числе путем снижения перепада давлений над и под герметизирующим узлом. Однако способ не позволяет в полной мере использовать возможности установки, что связано с тем, что проведение работ возможно только в вертикальных скважинах, что сужает область использования данного способа подготовки.This method of preparing a downhole jet installation allows for various technological operations in the well below the installation level of the jet pump, including by reducing the pressure drop above and below the sealing unit. However, the method does not allow full use of the installation capabilities, due to the fact that the work is possible only in vertical wells, which narrows the scope of use of this preparation method.

Задачей, на решение которой направлено настоящее изобретение, является оптимизация действий по подготовке к эксплуатации скважинной струйной установки и за счет этого повышение производительности работы скважинной струйной установки при исследовании и обработке криволинейных и горизонтальных скважин с открытым или обсаженным стволом.The task to which the present invention is directed is to optimize the steps for preparing for operation a downhole jet installation and thereby increase the productivity of a downhole jet installation in the study and treatment of curved and horizontal wells with an open or cased hole.

Указанная задача решается за счет того, что способ подготовки к работе скважинной струйной установки для каротажа горизонтальных скважин включает спуск в скважину колонны труб с пакером и опорой, в которой выполнены перепускные окна и посадочное место с последующей распакеровкой пакера, далее на поверхности осуществляют монтаж оборудования на гладкую гибкую трубу, для чего нижний конец гибкой трубы сначала пропускают через проходной канал герметизирующего узла с возможностью перемещения гладкой гибкой трубы относительно герметизирующего узла, затем его пропускают через ступенчатый проходной канал и канал подвода откачиваемой среды корпуса струйного насоса, после чего к нижнему концу гладкой гибкой трубы подсоединяют наконечник и посредством последнего закрепляют на гладкой гибкой трубе прибор для проведения исследований или обработки продуктивного пласта скважины, например каротажный прибор или перфоратор, затем размещают герметизирующий узел в ступенчатом проходном канале струйного насоса и проводят спуск гладкой гибкой трубы со струйным насосом и прибором для проведения исследований или обработки продуктивного пласта через колонну труб в скважину, по достижении струйным насосом опоры проводят установку струйного насоса на посадочное место опоры, после чего продолжают спуск гладкой гибкой трубы до тех пор, пока прибор для исследования или обработки продуктивного пласта не достигнет зоны исследования или обработки продуктивного пласта, при этом в процессе спуска гибкой трубы прибором для проведения исследования продуктивного пласта проводят регистрацию фоновых значений физических параметров горных пород, например температурных полей.This problem is solved due to the fact that the method of preparing for operation of a well jet installation for logging horizontal wells includes lowering a string of pipes with a packer and a support into the well, in which bypass windows and a seat are made, followed by unpacking the packer, then the equipment is mounted on the surface smooth flexible pipe, for which the lower end of the flexible pipe is first passed through the passage channel of the sealing unit with the ability to move the smooth flexible pipe relative to the sealing unit, then it is passed through a stepped passage channel and a supply channel for the pumped medium of the jet pump body, after which a tip is connected to the lower end of a smooth flexible pipe and, with the latter, a device for researching or processing a productive formation of a well, for example, a logging tool, is fixed on a smooth flexible pipe or a perforator, then place the sealing unit in the stepped passage channel of the jet pump and carry out the descent of a smooth flexible pipe with the jet pump and the device to conduct research or treat the producing formation through the pipe string into the well, when the jet pump reaches the support, install the jet pump on the support seat, and then continue the descent of the smooth flexible pipe until the device for research or processing of the productive formation reaches the study area or treatment of the reservoir, while during the descent of the flexible pipe by the device for conducting research on the reservoir, the background values of physical pairs are recorded meters of rock, such as temperature fields.

Через гладкую гибкую трубу предварительно может быть пропущен каротажный кабель, который затем подключают к прибору для проведения исследований или обработки продуктивного пласта при его закреплении на наконечнике гладкой гибкой трубы.A logging cable can be preliminarily passed through a smooth flexible pipe, which is then connected to the device for conducting research or processing a productive formation when it is fixed on the tip of a smooth flexible pipe.

Анализ работы скважинной струйной установки показал, что производительность работы установки можно повысить путем оптимизации действий по подготовке оборудования к эксплуатации в скважине, что особенно актуально при эксплуатации оборудования в криволинейных и горизонтальных скважинах, где имеются трудности по доставке оборудования в зону продуктивного пласта.An analysis of the operation of a downhole jet installation showed that the productivity of the installation can be improved by optimizing the preparation of equipment for operation in the well, which is especially important when operating equipment in curved and horizontal wells, where there are difficulties in delivering equipment to the zone of the productive formation.

В ходе подготовки к работе установки проводится исследование различных режимов работы скважины. Приходится устанавливать и снимать корпус со струйным насосом в колонне труб. Как указано выше, при этом необходимо перемещать с помощью гибкой трубы приборы и оборудование вдоль скважины и в тоже время необходимо минимизировать перетекание среды через осевой канал герметизирующего узла.In preparation for the operation of the installation, a study is conducted of various modes of operation of the well. It is necessary to install and remove the housing with the jet pump in the pipe string. As indicated above, it is necessary to move instruments and equipment along the well with a flexible pipe, and at the same time it is necessary to minimize the flow of medium through the axial channel of the sealing unit.

Таким образом достигнуто выполнение поставленной в изобретении задачи - оптимизация действий по подготовке к эксплуатации скважинной струйной установки и за счет этого повышение производительности работы скважинной струйной установки при исследовании и обработке криволинейных и горизонтальных скважин с открытым или обсаженным стволом.Thus, the achievement of the objective of the invention has been achieved - optimization of the preparations for the operation of the downhole jet installation and, thereby, increasing the productivity of the downhole jet installation in the study and processing of curved and horizontal wells with an open or cased hole.

На чертеже представлен продольный разрез скважинной струйной установки.The drawing shows a longitudinal section of a downhole jet unit.

Скважинная струйная установка содержит пакер 1, колонну труб 2 с опорой 3, в которой выполнены перепускные окна 4 и на которой установлен в корпусе 5 струйный насос 6, при этом в корпусе 5 выполнены: сообщенный с перепускными окнами 4 канал 7 подвода рабочей среды в сопло 8 струйного насоса 6 из окружающего колонну труб 2 пространства, канал 9 подвода откачиваемой среды в струйный насос 6 и канал 10 отвода смеси сред из струйного насоса 6 во внутреннюю полость колонны труб 2 выше струйного насоса 6, а в корпусе 5 над каналом 9 подвода откачиваемой среды выполнен сообщенный с ним ступенчатый проходной канал 11 с посадочньм местом 12 для установки герметизирующего узла 13 и в последнем выполнен осевой канал 14 с возможностью пропуска через него и канал 9 подвода откачиваемой среды гладкой гибкой трубы 15 для установки в скважине под струйным насосом 6 на нижнем конце гладкой гибкой трубы 15 наконечника 21, посредством которого закреплен на гладкой гибкой трубе 15 прибор 16 для проведения исследований или обработки продуктивного пласта 19 скважины, например каротажный прибор или перфоратор, с возможностью его перемещения вдоль ствола скважины при работающем или не работающем струйном насосе 6.The downhole jet installation comprises a packer 1, a pipe string 2 with a support 3, in which the bypass ports 4 are made and on which the jet pump 6 is installed in the housing 5, while in the housing 5 the following are made: a channel 7 for supplying the working medium to the nozzle communicated with the bypass windows 4 8 jet pump 6 from the space surrounding the pipe string 2, a channel 9 for supplying a pumped medium to the jet pump 6 and a channel 10 for discharging a mixture of media from a jet pump 6 into the internal cavity of the pipe string 2 above the jet pump 6, and in the housing 5 above the channel 9 for pumping a pumped medium Wednesday in A step-by-step passage channel 11 connected with it was made with a seat 12 for installing the sealing unit 13, and in the latter an axial channel 14 was made with the possibility of passing through it and the supply channel 9 of the pumped medium a smooth flexible pipe 15 for installation in the well under the jet pump 6 at the lower end smooth flexible pipe 15 of the tip 21, through which is mounted on a smooth flexible pipe 15 device 16 for conducting research or treatment of the productive formation 19 of the well, for example a logging tool or perforator, with the ability of its movement along the wellbore with a working or not working jet pump 6.

На корпусе 5 струйного насоса 6 могут быть установлены уплотнительные кольца 17 и фиксирующий механизм 18, а через гладкую гибкую трубу 15 предварительно может быть пропущен каротажный кабель (не показан на чертеже), который затем подключают через наконечник 21 к прибору 16 для проведения исследований или обработки продуктивного пласта 19, а в нижней части гладкой гибкой трубы 15 могут быть выполнены отверстия 20 для закачки в продуктивный пласт 19 различного рода реагентов, например, реагентов для химической обработки прискважинной зоны продуктивного пласта.O-rings 17 and a locking mechanism 18 can be installed on the housing 5 of the jet pump 6, and a wireline cable (not shown in the drawing) can be preliminarily passed through a smooth flexible pipe 15, which is then connected through a tip 21 to the device 16 for research or processing productive formation 19, and in the lower part of the smooth flexible pipe 15 can be made holes 20 for injection into the productive formation 19 of various kinds of reagents, for example, reagents for chemical treatment of the borehole zone of the product Foot formation.

Способ подготовки к работе скважинной струйной установки для каротажа горизонтальных скважин реализуют следующим образом.The method of preparation for operation of a downhole jet installation for logging horizontal wells is implemented as follows.

Осуществляют спуск в скважину колонны труб 2 с пакером 1 и опорой 3, в которой выполнены перепускные окна 4 и посадочное место. Проводят распакеровку пакера 1. Далее на поверхности осуществляют монтаж оборудования на гладкую гибкую трубу 15, для чего нижний конец гладкой гибкой трубы 15 сначала пропускают через проходной канал 14 герметизирующего узла 13 с возможностью перемещения гладкой гибкой трубы 15 относительно герметизирующего узла 13. Затем нижний конец гладкой гибкой трубы 15 пропускают через ступенчатый проходной канал 11 и канал 9 подвода откачиваемой среды корпуса 5 струйного насоса 6, после чего к нижнему концу гладкой гибкой трубы 15 подсоединяют наконечник 21 и посредством последнего закрепляют на гладкой гибкой трубе 15 прибор 16 для проведения исследований или обработки продуктивного пласта скважины, например каротажный прибор или перфоратор. Затем размещают герметизирующий узел 13 в ступенчатом проходном канале 11 струйного насоса 6 и проводят спуск гладкой гибкой трубы 15 со струйным насосом 6 и прибором 16 для проведения исследований или обработки продуктивного пласта через колонну труб 2 в скважину. По достижении струйным насосом 6 опоры 3 проводят установку струйного насоса 6 на посадочное место опоры 3 и фиксируют в опоре 3 корпус 5 со струйным насосом 6 посредством фиксирующего механизма 18. После этого продолжают спуск гладкой гибкой трубы 15 до тех пор, пока прибор 16 для исследования или обработки продуктивного пласта 19 не достигнет зоны исследования или обработки продуктивного пласта 19, при этом в процессе спуска гладкой гибкой трубы 15 прибором 16 для проведения исследования продуктивного пласта 19 проводят регистрацию фоновых значений физических параметров горных пород, например температурных полей.A pipe string 2 is run into the well with a packer 1 and a support 3, in which bypass windows 4 and a seat are made. The packer 1 is unpacked. Next, the equipment is mounted on the surface on a smooth flexible pipe 15, for which the lower end of the smooth flexible pipe 15 is first passed through the passage channel 14 of the sealing assembly 13 with the possibility of moving the smooth flexible pipe 15 relative to the sealing assembly 13. Then, the lower end of the smooth the flexible pipe 15 is passed through a stepped passage channel 11 and the channel 9 for supplying a pumped medium of the housing 5 of the jet pump 6, after which a tip is connected to the lower end of the smooth flexible pipe 15 21, and by means of the latter, a device 16 is mounted on a smooth flexible pipe 15 for researching or treating a productive formation of a well, for example, a logging tool or a perforator. Then, the sealing unit 13 is placed in the stepped passage channel 11 of the jet pump 6 and a smooth flexible pipe 15 with the jet pump 6 and the device 16 is lowered to conduct research or treat the reservoir through the pipe string 2 into the well. Upon reaching the support 3 with the jet pump 6, the jet pump 6 is installed on the seat of the support 3 and fixed in the support 3 of the housing 5 with the jet pump 6 by means of the fixing mechanism 18. After that, the smooth flexible pipe 15 is continued to descend until the research device 16 or treatment of the reservoir 19 does not reach the zone of research or processing of the reservoir 19, while during the descent of the smooth flexible pipe 15 by the device 16 for conducting a study of the reservoir 19, background values are recorded physical parameters of rocks, for example, temperature fields.

При необходимости через гладкую гибкую трубу 15 предварительно пропускают каротажный кабель, который затем подключают через наконечник 21 к прибору 16 для проведения исследований или обработки продуктивного пласта при его закреплении на наконечнике 21 гладкой гибкой трубы 15.If necessary, a wireline cable is preliminarily passed through a smooth flexible pipe 15, which is then connected through a tip 21 to a device 16 for conducting research or processing a producing formation when it is fixed on the tip 21 of a smooth flexible pipe 15.

В окружающее колонну труб 2 затрубное пространство закачивают рабочую среду, например воду или солевой раствор, нефть и др. Из затрубного пространства рабочая среда поступает через окна 4 и канал 7 в сопло 8 струйного насоса 6. В течение нескольких секунд после прокачки рабочей среды через сопло 8 на выходе из него формируется устойчивая струя, которая, истекая из сопла 8, увлекает в струйный насос 6 окружающую ее среду, что вызывает снижение давления сначала в канале 9 подвода откачиваемой среды, а затем и в подпакерном пространстве скважины, создавая депрессию на продуктивный пласт 19. Величина снижения давления зависит от скорости сопло прохождения рабочей среды через сопло 8, которая зависит, в свою очередь, от величины давления нагнетания рабочей среды в затрубное пространство скважины выше пакера 1. В результате пластовая среда из продуктивного пласта 19 и через канал 9 поступает в струйный насос 6, где смешивается с рабочей средой и смесь сред за счет энергии рабочей среды по колонне труб 2 поступает из скважины на поверхность. Во время откачки пластовой среды с помощью установленного на гибкой трубе 15 прибора 16 для проведения исследований или обработки продуктивного пласта проводят контроль параметров откачиваемой пластовой среды, а также воздействие на продуктивный пласт 19, например, физическими полями. Возможна закачка в продуктивный пласт 19 по гибкой трубе 15 химических реагентов. В зависимости от решаемой задачи возможно перемещение приборов 16 для проведения исследований или обработки продуктивного пласта 19 вдоль скважины.A working medium is pumped into the annular space surrounding the pipe string 2, for example, water or saline, oil, etc. From the annular space, the working medium enters through the windows 4 and channel 7 into the nozzle 8 of the jet pump 6. Within a few seconds after pumping the working medium through the nozzle 8 at the exit from it, a stable jet is formed, which, flowing out of the nozzle 8, entrains its environment into the jet pump 6, which causes a decrease in pressure, first in the supply channel 9 of the pumped-out medium, and then in the under-packer space of the well, creating a depression on the reservoir 19. The magnitude of the pressure reduction depends on the speed of the nozzle passing the working medium through the nozzle 8, which depends, in turn, on the magnitude of the pressure of the working medium into the annulus of the well above the packer 1. As a result, the reservoir medium from the reservoir 19 and through the channel 9 enters the jet pump 6, where it is mixed with the working medium and the mixture of media due to the energy of the working medium through the pipe string 2 comes from the well to the surface. During pumping out of the formation medium using the device 16 installed on the flexible pipe 15 for research or treatment of the reservoir, the parameters of the pumped reservoir medium are monitored, as well as the impact on the reservoir 19, for example, by physical fields. Possible injection into the reservoir 19 through a flexible pipe 15 of chemicals. Depending on the problem being solved, it is possible to move the instruments 16 for conducting research or processing the reservoir 19 along the well.

Изобретение может найти применение при испытании, освоении и эксплуатации нефтяных и газоконденсатных скважин, а также при их капитальном ремонте.The invention can find application in the testing, development and operation of oil and gas condensate wells, as well as in their overhaul.

Claims (2)

1. Способ подготовки к работе скважинной струйной установки для каротажа горизонтальных скважин, включающий спуск в скважину колонны труб с пакером и опорой, в которой выполнены перепускные окна и посадочное место, с последующей распакеровкой пакера, далее на поверхности осуществляют монтаж оборудования на гладкую гибкую трубу, для чего нижний конец гладкой гибкой трубы сначала пропускают через проходной канал герметизирующего узла с возможностью перемещения гладкой гибкой трубы относительно герметизирующего узла, затем его пропускают через ступенчатый проходной канал и канал подвода откачиваемой среды корпуса струйного насоса, после чего к нижнему концу гладкой гибкой трубы подсоединяют наконечник и посредством последнего закрепляют на гладкой гибкой трубе прибор для проведения исследований или обработки продуктивного пласта скважины, например каротажный прибор или перфоратор, затем размещают герметизирующий узел в ступенчатом проходном канале струйного насоса и проводят спуск гладкой гибкой трубы со струйным насосом и прибором для проведения исследований или обработки продуктивного пласта через колонну труб в скважину, по достижении струйным насосом опоры проводят установку струйного насоса на посадочное место опоры, после чего продолжают спуск гладкой гибкой трубы до тех пор, пока прибор для исследования или обработки продуктивного пласта не достигнет зоны исследования или обработки продуктивного пласта, при этом в процессе спуска гладкой гибкой трубы прибором для проведения исследования продуктивного пласта проводят регистрацию фоновых значений физических параметров горных пород, например температурных полей.1. A method of preparing for operation a downhole jet installation for logging horizontal wells, comprising lowering a string of pipes with a packer and a support into the well, in which bypass windows and a seat are made, followed by unpacking the packer, then the equipment is mounted on a smooth flexible pipe on the surface, why the lower end of the smooth flexible pipe is first passed through the passage channel of the sealing assembly with the possibility of moving the smooth flexible pipe relative to the sealing assembly, then its passage t through the stepped passage channel and the supply channel of the pumped-over medium of the jet pump body, after which the tip is connected to the lower end of the smooth flexible pipe and, by means of the latter, a device for conducting research or processing of the productive formation of the well, for example, a logging tool or perforator, is fixed, then sealing unit in the stepped passage channel of the jet pump and carry out the descent of a smooth flexible pipe with a jet pump and a device for research and and treatment of the reservoir through the pipe string into the well, upon reaching the support by the jet pump, the jet pump is installed on the support seat, and then the descent of the smooth flexible pipe is continued until the device for research or processing of the productive formation reaches the research or processing zone of the productive formation, while during the descent of a smooth flexible pipe by a device for researching a productive formation, the background values of the physical parameters of rocks are recorded, n For example, temperature fields. 2. Способ по п.1, отличающийся тем, что через гладкую гибкую трубу предварительно пропускают каротажный кабель, который затем через наконечник подключают к прибору для проведения исследований или обработки продуктивного пласта.2. The method according to claim 1, characterized in that the wireline is preliminarily passed through a smooth flexible pipe, which is then connected through a tip to the device for research or processing of the reservoir.
RU2004102726/06A 2004-02-02 2004-02-02 Method to prepare well jet plant for logging horizontal wells RU2252338C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2004102726/06A RU2252338C1 (en) 2004-02-02 2004-02-02 Method to prepare well jet plant for logging horizontal wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2004102726/06A RU2252338C1 (en) 2004-02-02 2004-02-02 Method to prepare well jet plant for logging horizontal wells

Publications (1)

Publication Number Publication Date
RU2252338C1 true RU2252338C1 (en) 2005-05-20

Family

ID=35820616

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2004102726/06A RU2252338C1 (en) 2004-02-02 2004-02-02 Method to prepare well jet plant for logging horizontal wells

Country Status (1)

Country Link
RU (1) RU2252338C1 (en)

Similar Documents

Publication Publication Date Title
RU2287095C1 (en) Jet well installation and method of its operation
RU2303172C1 (en) Well jet plant and its operation method
WO2007061335A1 (en) Well jet device and the operating method thereof
WO2009048351A1 (en) Bore-hole jet device for formation hydraulic fracturing and horizontal well examination and a method for the operation thereof
RU2334131C1 (en) Well jet unit "эмпи-угис-(31-40)ш"
RU2310103C1 (en) Method for operation of well jet plant during hydro-fracturing of multi-bed formations of hydrocarbons
RU2273772C1 (en) Method of operation of oil-well jet plant at hydraulic fracturing of formation
RU2307959C1 (en) Method of operation of jet plant at completion and operation of oil and gas wells
RU2473821C1 (en) Borehole jetting unit for hydrofrac and well tests
RU2246049C1 (en) Well pumping unit for operation in horizontal wells
RU2324843C1 (en) Bore hole jet stream installation эмпи-угис-(1-10)кд - for logging and tests of horisontal bores
RU2329410C1 (en) "эмпи-угис-(31-40)д" deep-well jet pump unit
RU2252338C1 (en) Method to prepare well jet plant for logging horizontal wells
RU2239730C1 (en) Oil-well jet plant for logging horizontal wells and method of its operation
RU2404374C1 (en) Method of operating well injection plant in testing multipay wells
RU2397375C1 (en) Downhole spray unit кэу-12 for logging and development of horizontal wells
EA200501656A1 (en) WELL JET INSTALLATION AND METHOD OF ITS WORK UNDER CAROSING HORIZONTAL WELLS
RU2289042C1 (en) Well fluid plant and method for operation thereof
RU2253761C1 (en) Method of operation of well jet plant at horizontal well logging
RU2282760C1 (en) Oil-well jet pump and method of its operation
RU2253760C1 (en) Pump-ejector impulse well jet plant for hydraulic factoring of formation
RU2256102C1 (en) Ejector multifunctional formation tester for testing and completion of horizontal wells
RU2320900C1 (en) Oil well jet plant
RU2222713C1 (en) Method of operation of pump-ejector impulse well plant
RU2332592C1 (en) Horizontal well jet acidising and analysing plant

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20100203