Данное техническое решение относится к башенным кранам, выполненным со средствами их монтажа и демонтажа. Техническое решение предназначено для использования в конструкциях так называемых кранов-сити, которые крупными узлами собираются монтажным краном на строительной площадке и монтируются и демонтируются с его помощью, причем башня устанавливается вертикально, а стрела и противовесная консоль крепятся к башне в воздухе горизонтально. Эти операции проводятся на большой высоте и связаны с маневрированием для совмещения точек соединения оголовка с оттяжками стрелы и противовесной консоли, посредством которых стрела и противовесная консоль удерживаются в рабочем положении крана в горизонтальном положении. This technical solution relates to tower cranes made with the means of their installation and dismantling. The technical solution is intended for use in the construction of the so-called city cranes, which are assembled in large units by an assembly crane at a construction site and are mounted and dismantled with it, the tower being installed vertically, and the boom and counterweight console are mounted horizontally to the tower in the air. These operations are carried out at high altitude and are associated with maneuvering to combine the connection points of the head with the guy rods and the counterweight console, by means of which the boom and counterweight console are held in the working position of the crane in a horizontal position.
Известен башенный кран, включающий башню с оголовком, к которому шарнирно прикреплены стрела и противовесная консоль, связанные с оголовками оттяжками, при этом каждая оттяжка выполнена из ряда шарнирно соединенных между собой звеньев, имеющих возможность их фиксации на стреле и противовесной консоли в предмонтажных положениях посредством стоек, которые установлены на стреле и противовесной консоли, при этом крайние звенья оттяжек, расположенные ближе к оголовку, зафиксированы в ложементах, закрепленных на концах стоек [1]. A tower crane is known, which includes a tower with a head to which an arrow and a counterweight console are pivotally attached, connected to the ends of the braces, each guy being made of a number of links articulated to each other, which can be fixed on the boom and the counterweight console in pre-installation positions by means of racks which are installed on the boom and counterweight console, while the extreme links of the guy rods located closer to the head are fixed in the lodges fixed at the ends of the struts [1].
Известный башенный кран монтируется и демонтируется монтажным стреловым краном, который последовательно поднимает на монтажную высоту противовесную консоль и стрелу, шарнирно соединяемые с оголовком, при этом концы оттяжек о консоли и стрелы соединяют с монтажными звеньями, закрепленными на конце оголовка, для чего совмещают отверстия монтажных звеньев с отверстиями оттяжек. Совмещение отверстий монтажных звеньев и звеньев оттяжек производят путем поворота монтажных звеньев, которые имеют значительный вес, причем монтаж или демонтаж башенного крана производятся на большой высоте монтажником, находящемся на монтажной площадке. Последняя закреплена на верхней части оголовка башни, что оказывает влияние на трудоемкость операций совмещения отверстий звеньев. The well-known tower crane is mounted and dismantled by a jib crane, which sequentially raises the counterweight console and boom to the mounting height, pivotally connected to the head, while the ends of the guy wires on the console and boom are connected to the mounting links fixed to the end of the head, for which the holes of the mounting links are combined with holes for guy wires. The combination of the holes of the mounting links and the guy links is done by turning the mounting links, which have significant weight, and the installation or dismantling of the tower crane is carried out at a high height by the installer located on the installation site. The latter is fixed on the upper part of the tower head, which affects the complexity of the operations of combining the holes of the links.
Наиболее близким техническим решением по сущности и достигаемому эффекту к заявленному техническому решению является башенный кран, включающий башню с оголовком, выполненным с площадкой для монтажника, шарнирно соединенные с оголовком, противовесную консоль и стрелу, шарнирно установленные на конце оголовка с возможностью поворота в вертикальной плоскости монтажные звенья, оттяжки стрелы и противовесной консоли, выполненные из шарнирно соединенных посредством серег промежуточных и крайних звеньев, при этом расположенные ближе к оголовку крайние звенья оттяжек выполнены с возможностью установки их в наклонных в сторону оголовка монтажных положениях крана и возможностью опирания на закрепленные на стреле и противовесной консоли стойки с ложементами, в которых расположены крайние звенья оттяжек, соединенные в рабочем положении крана соединительными пальцами с монтажными звеньями [2]. The closest technical solution in essence and the achieved effect to the claimed technical solution is a tower crane, including a tower with a head made with a platform for the installer, pivotally connected to the head, a counterweight console and an arrow pivotally mounted on the end of the head with the possibility of rotation in the vertical plane links, braces of the boom and counterweight console, made of pivotally connected by means of earrings of intermediate and extreme links, while being located closer to the extreme links of the guy rods are made with the possibility of installing them in the mounting positions of the crane inclined toward the head and the possibility of supporting them on the racks with lodgements fixed on the boom and counterweight console, in which the extreme links of guy wires are connected in the working position of the crane by connecting fingers with the mounting links [2 ].
В этом известном башенном кране предусматривается способ его монтажа, включающий установку в вертикальное положение башни крана, подъем в заданной последовательности в собранном виде противовесной консоли и стрелы и соединение их с оголовком башни в воздухе посредством шарниров, оттяжек и монтажных звеньев, причем перед операцией подъема противовесной консоли и стрелы на них в монтажных положениях фиксируют промежуточные звенья оттяжек консоли и стрелы, а посредством монтажных стоек, закрепленных на противовесной консоли и стреле, в наклонных положениях в сторону оголовка фиксируют ближние к нему крайние звенья оттяжек. This known tower crane provides a method for mounting it, including installing the crane tower in a vertical position, lifting the counterweight console and boom in a predetermined sequence in assembled form and connecting them to the tower head in the air by means of hinges, guy rods and mounting links, and before the operation of lifting the counterweight the consoles and booms on them in the mounting positions fix the intermediate links of the guy rods of the console and the boom, and through the mounting racks mounted on the counterweight console and the boom, Pull positions toward the proximal tip fixed thereto extreme links braces.
Дополнительно перед монтажом и подъемом противовесной консоли и стрелы их оттяжки вытягивают монтажным краном на земле таким образом, что во время стыковки противовесной консоли и стрелы с оголовком эти оттяжки находятся в натянутом монтажном положении, близком к рабочему положению. Additionally, before mounting and lifting the counterweight console and the boom, their guy rods are pulled by a mounting crane on the ground so that during the docking of the counterweight console and the boom with the head these braces are in a tightened mounting position, close to the working position.
Стыковка упомянутых узлов крана является трудоемкой и дорогостоящей операцией в связи с использованием для монтажно-демонтажных работ специального монтажного крана, причем стоимость монтажа башенного крана связана с эффективностью и временем стыковки противовесной консоли и стрелы с оголовком башни. Docking of the mentioned crane units is a labor-consuming and expensive operation in connection with the use of a special erection crane for installation and dismantling, and the cost of installing a tower crane is related to the efficiency and time of docking the counterweight console and boom with the tower head.
Решаемой и достигаемой технической задачей заявленного технического решения является повышение удобства и снижение трудоемкости монтажа башенного крана. Solved and achievable technical task of the claimed technical solution is to increase the convenience and reduce the complexity of the installation of a tower crane.
Эта цель достигается тем, что в башенном кране, включающем башню с оголовком, выполненным с площадкой для монтажника, шарнирно соединенные с оголовком стрелу и противовесную консоль, шарнирно соединенные с оголовком с возможностью поворота в вертикальной плоскости монтажные звенья, оттяжки стрелы и противовесной консоли, выполненные из шарнирно соединенных между собой посредством серег промежуточных и крайних звеньев, при этом крайние звенья оттяжек, расположенные ближе к оголовку, выполнены с возможностью установки их в наклонных в сторону оголовка положениях при монтаже крана и возможностью их опирания на закрепленные на стреле и противовесной консоли стойки с ложементами, в которых расположены крайние звенья оттяжек, соединенные в рабочем положении крана соединительными пальцами с монтажными звеньями, отличающийся тем, что по крайней мере конец одного промежуточного звена оттяжки, соединенный с крайним звеном последней, выполнен с ограничителем поворота серег в вертикальной продольной плоскости крана, причем ограничитель поворота выполнен из жестко закрепленной на конце промежуточного звена пластины, расположенной на верхней части промежуточного звена с возможностью взаимодействия с серьгами при их повороте вокруг пальцев соединения серег с концом промежуточного звена оттяжки, а каждое монтажное звено шарнирно закреплено на его нижнем конце с дополнительным монтажным звеном, выполненным из поворотных вокруг пальца одна относительно другой пары пластин, посредством которого пластины соединены с основным монтажным звеном и между собой, при этом дополнительные монтажные звенья свободно расположены на упомянутом пальце с возможностью установки в вертикальное положение, нижний конец каждого дополнительного монтажного звена расположен над площадкой для монтажника за пределами верхней части оголовка таким образом, что в предмонтажном положении крана основные и дополнительные монтажные звенья расположены с возможностью образования над монтажной площадкой образного контура.This goal is achieved by the fact that in a tower crane including a tower with a head made with a platform for an installer, an arrow and a counterweight console are pivotally connected to the head, mounting links are pivotally connected to the head with a vertical head and the arms are drawn and the counterweight console are made from pivotally interconnected by means of earrings of intermediate and extreme links, while the extreme links of guy wires located closer to the head are made with the possibility of installing them in inclined c the position of the head during installation of the crane and the possibility of their support on the racks with lodgements fixed on the boom and counterweight console, in which the extreme links of guy wires are located, connected in the working position of the crane by connecting fingers with mounting links, characterized in that at least the end of one intermediate link guy rods connected to the last link of the latter are made with a rotation limiter of earrings in the vertical longitudinal plane of the crane, and the rotation limiter is made of rigidly fixed at the end of the intermediate link of the plate located on the upper part of the intermediate link with the possibility of interaction with the earrings when they rotate around the fingers, connect the earrings to the end of the intermediate guy link, and each mounting link is pivotally mounted on its lower end with an additional mounting link made of swivels around finger one relative to the other pair of plates, through which the plates are connected to the main mounting link and among themselves, with additional mounting links freely put on said finger to be mounted in a vertical position, the lower end of each additional unit is positioned above the mounting platform for assembling outside the top of the well head so that the pre-assembly position of the crane main and additional mounting units are arranged to formation of the mounting pad shaped contour.
Предусмотрен способ монтажа башенного крана, включающий установку в вертикальное положение башни, подъем в заданной последовательности в собранном виде противовесной консоли и стрелы и соединение их с оголовком башни в воздухе посредством шарниров, оттяжек и монтажных звеньев, причем перед операцией подъема противовесной консоли и стрелы на них в монтажных положениях фиксируют промежуточные звенья оттяжек противовесной консоли и стрелы, а посредством монтажных стоек, закрепленных на противовесной консоли и стреле, в наклонных положениях в сторону оголовка фиксируют ближние к оголовку крайние звенья оттяжек, отличающийся тем, что соединение каждого крайнего звена оттяжки стрелы или противовесной консоли с оголовком производят при зафиксированном в монтажном положении неподвижном относительно оголовка монтажном звене и при неподвижном относительно стрелы или противовесной консоли крайнем звене оттяжки с помощью дополнительного монтажного звена, шарнирно соединенного одним концом с основным монтажным звеном, для чего поворачивают дополнительное монтажное звено в вертикальной плоскости относительно зафиксированного неподвижного основного монтажного звена до совмещения отверстия проушины крайнего звена оттяжки с отверстием проушины дополнительного монтажного звена. A method for mounting a tower crane is provided, including installing the tower in a vertical position, lifting the counterweight console and boom in the assembled sequence and connecting them to the tower head in the air through hinges, guy rods and mounting links, and before lifting the counterweight console and boom on them in the mounting positions, the intermediate links of the guy rods of the counterweight console and the boom are fixed, and by means of the mounting racks mounted on the counterweight console and the boom, in the inclined position In the direction to the head, the extreme guy links closest to the head are fixed, characterized in that the connection of each extreme guy link of the boom or counterweight console with the head is made when the mounting link is fixed in the mounting position and relative to the head of the arm, and the extreme guy link is fixed relative to the arrow or counterweight using an additional mounting link pivotally connected at one end to the main mounting link, for which the additional mounting link is rotated in the vertical plane relative to the fixed stationary main link mounting holes to align lugs extreme care backstay eyelet with a hole of the installation unit.
Совокупность изложенных существенных признаков башенного крана и способа его монтажа обеспечивает возможность соединения оттяжек противовесной консоли и стрелы с оголовком минимальными усилиями монтажника, находящемся на монтажной площадке в верхней части оголовка башни в опасных условиях работы, что снижает трудоемкость монтажа крана. The combination of the essential features of the tower crane and the method of its installation provides the ability to connect the guy rods of the counterweight console and boom with the head with the minimum efforts of the installer located on the installation site in the upper part of the tower head in dangerous working conditions, which reduces the complexity of installing the crane.
На фиг. 1 показана передняя часть башенного крана со стрелой в рабочем положении,
на фиг.2 - стойка стрелы башенного крана в транспортном положении, узел I на фиг.1,
на фиг.3 - сечение А-А на фиг.2,
на фиг.4 - сечение Б-Б на фиг.2,
на фиг. 5 - задняя часть башенного крана с противовесной консолью в рабочем положении,
на фиг. 6 - оголовок башенного крана с траверсами и монтажными звеньями (повернуто на 180o),
на фиг.7 - вид В на фиг.6,
на фиг. 8 - противовесная консоль в промежуточном монтажном положении, соединенная с оголовком,
на фиг. 9 - противовесная консоль в промежуточном монтажном положении, соединенная с оголовком оттяжкой,
на фиг.10 - вид Г на фиг.9,
на фиг.11 - узел II на фиг.10,
на фиг.12 - противовесная консоль перед подъемом с уложенной на ней оттяжкой,
на фиг.13 - оттяжка противовесной консоли,
на фиг.14 - сечение Д-Д на фиг.13,
на фиг.15 - сечение Е-Е на фиг.13,
на фиг.16 - стрела башенного крана в процессе монтажа и ее соединения с оголовком,
на фиг.17 - шарнир соединения стрелы с оголовком, узел III на фиг.16,
на фиг.18 - положение стрелы башенного крана в процессе монтажа, стрела, соединенная с оголовком оттяжкой,
на фиг.19 - сечение Ж-Ж на фиг.18,
на фиг. 20 - схема соединения крайних звеньев оттяжек противовесной консоли и стрелы с монтажными звеньями посредством дополнительных монтажных звеньев.In FIG. 1 shows the front of a tower crane with an arrow in the working position,
figure 2 - rack boom tower crane in the transport position, the node I in figure 1,
figure 3 is a section aa in figure 2,
figure 4 is a section bB in figure 2,
in FIG. 5 - the back of the tower crane with a counterweight console in the working position,
in FIG. 6 - the tip of the tower crane with traverses and mounting links (rotated 180 o ),
Fig.7 is a view In Fig.6,
in FIG. 8 - counterweight console in an intermediate mounting position, connected to the head,
in FIG. 9 - counterweight console in an intermediate mounting position, connected to the tip of the guy,
figure 10 is a view of figure 9,
figure 11 - node II in figure 10,
Fig.12 is a counterweight console before lifting with a guy laid on it,
on Fig - guy counterweight console,
on Fig - section DD in Fig.13,
on Fig - section EE in Fig.13,
on Fig - arrow tower crane during installation and its connection with the tip,
in Fig.17 - hinge connecting the boom with the tip, node III in Fig.16,
in Fig.18 - the position of the arrow of the tower crane during installation, the arrow connected to the head by a guy,
in Fig.19 - section FJ in Fig.18,
in FIG. 20 is a connection diagram of the extreme links of the guy rods of the counterweight console and the boom with the mounting links by means of additional mounting links.
Башенный кран включает башню 1 с закрепленным на ней оголовком 2, шарнирно соединенные с оголовком 2 стрелу 3 и противовесную консоль 4, установленные на конце оголовка монтажное звено 5 для крепления оттяжки 6 противовесной консоли 4, а также монтажное звено 7 для крепления оттяжки 8 стрелы 3. Монтажные звенья 5 и 7 являются основными монтажными звеньями и они установлены на конце оголовка 2 на оси 9 с возможностью поворота в вертикальной фронтальной плоскости башенного крана. На концах монтажных звеньев 5 и 7 шарнирно закреплены на пальцах 10 дополнительные монтажные звенья 11 и 12, имеющие возможность свободного поворота вокруг пальцев 10 (фиг.6) от небольшого усилия руки монтажника в вертикальной фронтальной плоскости. Каждое дополнительное монтажное звено выполнено легким, длина его намного меньше длины основного монтажного звена с целью облегчения совмещения отверстий стыкуемых элементов при стыковке стрелы и противовесной консоли с оголовком. The tower crane includes a
Каждое дополнительное монтажное звено (фиг.6 и 8) в монтажном положении крана занимает под собственным весом вертикальное положение. Дополнительные монтажные звенья 11 и 12 и основные монтажные звенья 5 и 7 образуют во фронтальной плоскости образный контур, при этом образный контур и дополнительные монтажные звенья 11 и 12 расположены над монтажной площадкой 13 оголовка. Дополнительные монтажные звенья 11 и 12 расположены между концами основных монтажных звеньев 5 и 7 и монтажной площадкой 13 таким образом, что нижние концы дополнительных монтажных звеньев 11 и 12 расположены приблизительно на уровне плеча монтажника, обеспечивающем максимальное удобство работы монтажника при незначительных усилиях, направленных на совмещение отверстий крайних звеньев оттяжек с отверстиями дополнительных монтажных звеньев при соединении этих звеньев.Each additional mounting link (6 and 8) in the mounting position of the crane occupies a vertical position under its own weight.
Каждое дополнительное монтажное звено 11 или 12 выполнено из двух параллельно расположенных пластин 14 (фиг.11), которые соединены пальцами 10, расположенными в отверстиях пластин. Каждая пластина 14 одного монтажного звена установлена на пальце 10 с возможностью ее свободного поворота вокруг пальца 10 независимо от положения смежной пластины 14 этого же звена. Между пластинами 14 дополнительного монтажного звена 12 (фиг.19) расположены проушина 15 основного монтажного звена 7 и проушина 16 оттяжки 8 стрелы. В отверстиях проушин 15 и 16 расположены пальцы 10. Each
Оттяжка 8 стрелы 3 (фиг.1) выполнена из ряда промежуточных звеньев 17, которые шарнирно соединены серьгами. Расположенное ближе к оголовку 2 крайнее звено 18 оттяжки 8 установлено на стреле в монтажном положении таким образом, что оно может располагаться в ложементе 19, закрепленном на откидной стойке 20, которая соединена со стрелой 3 с возможностью фиксации в двух положениях. Конец крайнего звена 18 оттяжки (фиг.18) представляет собой проушину 16 (фиг.19) и эта проушина направлена при монтаже крана на пластины 14 дополнительного монтажного звена 12 (фиг.18). Остальные промежуточные звенья 17 оттяжки 8 в предмонтажном положении расположены на стреле в горизонтальном положении и в этом положении зафиксированы на ней от боковых смещений. The
Оттяжка 6 противовесной консоли 4 (фиг.5, 9) выполнена из соединенных серьгами 21 звеньев, включая ближнее к оголовку 2 крайнее звено 22, которое соединено в рабочем положении крана с дополнительным монтажным звеном 11, а в монтажном положении крайнее звено 22 оттяжки направлено на пластины 14 дополнительного монтажного звена 11 (фиг.11) и расположено в ложементе 23 стойки 24, которая закреплена на противовесной консоли 4. Верхний конец крайнего звена 22 (фиг.11) заканчивается проушиной 25, выполненной в виде пластины с отверстием в ней под палец 10 крепления дополнительного монтажного звена 11 к крайнему звену 22 оттяжки 6. Между пластинами 14 дополнительного монтажного звена 11 расположена проушина 26 основного монтажного звена 5, которое выполнено с двумя дополнительными монтажными звеньями 11 (фиг.10), каждое из которых соединено с основным монтажным звеном посредством пальцев 10. Звенья обеих оттяжек 6 и 8 выполнены жесткими. The
Крайние звенья 18 и 22 оттяжек стрелы и противовесной консоли выполнены удлиненными, имеют значительный вес. Например, крайнее звено 22 (фиг.12), уложенное в ложемент 23 стойки 24, образует коромысло с равнодействующей силой G, показанной на примере противовесной консоли (фиг.8, 12). Сила G образует момент вращения М относительно ложемента 23 (фиг.8 и 12). Сила G стремится повернуть по часовой стрелке относительно ложемента 23 крайнее звено 22 оттяжки (фиг. 12), а серьгу 21 (фиг.13) - против часовой стрелки вокруг левого пальца 10 (фиг. 14) и приподнять вверх правый конец промежуточного звена 22 оттяжки, что ведет к дестабилизации положения звена 22 (фиг.9) при монтаже крана. The
С целью исключения поворота крайнего звена 22 оттяжки 6 конец промежуточного звена 27 (фиг.14) выполнен с ограничителем 28, исключающим поворот серьги 21 (фиг.12-15) в вертикальной плоскости. Ограничитель 28 выполнен из пластины, жестко закрепленной сварным швом 29 (фиг.15) на конце промежуточного звена 27. Ограничитель 28 расположен с возможностью взаимодействия его поверхности 30 (фиг.15) с серьгой 21 в случае ее поворота вокруг пальца 10 (слева на фиг.13), когда крайнее звено 22 стремится повернуться относительно ложемента 23 и повернуть правый конец серьги 21 вверх. Аналогичным образом может при необходимости быть выполнено соединение промежуточного звена 17 оттяжки 8 стрелы (фиг.1) с серьгой 21 и крайним звеном 18 оттяжки 8. При этом следует отметить, что для соединения звеньев оттяжки 8 стрелы применены серьги 21 (фиг.1), конструкция которых идентична серьгам 21, посредством которых соединены между собой звенья оттяжки - противовесной консоли. In order to exclude the rotation of the
На чертежах показаны также элементы конструкции крана, необходимые для пояснения способа монтажа крана. Стрела 3 (фиг.16) крепится к оголовку 2 посредством подпятника 31 (фиг.17), закрепленного на оголовке, и оси 32, закрепленной на стреле 3. Ось 32 закрыта крышкой 33. Аналогичным образом закреплена на оголовке 2 противовесная консоль 4. На фиг.8 и 18 показан крюк 34 монтажного стрелового крана, посредством которого производятся подъем на монтажную высоту противовесной консоли и стрелы и их присоединение к вертикально установленной башне 1 башенного крана. The drawings also show the crane structural elements necessary to explain the crane installation method. The arrow 3 (Fig. 16) is attached to the
Работает башенный кран следующим образом. При подъеме груза и его перемещениях кран работает известным образом, при этом нагрузки от стрелы 3 и противовесной консоли 4 (фиг.1 и 5) передаются на подпятники 31 оголовка 2, а также на монтажные звенья 5 и 7, дополнительные монтажные звенья 11 и 12, серьги 21 и звенья оттяжек 6 и 8. The tower crane operates as follows. When lifting the load and its movements, the crane works in a known manner, while the loads from the
Монтаж башенного крана осуществляется следующей последовательностью операций. Крюком 34 монтажного крана сначала вертикально устанавливают башню 1 и закрепляют ее на ходовой тележке или на основании строительной площадки известным образом. Затем собирают на земле противовесную консоль, фиксируют на ней промежуточное звено 27 и крайнее звено 22 (фиг.8) оттяжки 6 на стойке 24 в ложементе 23 и в этом виде поднимают противовесную консоль 4 крюком 34 монтажного крана на монтажную высоту так, как это показано на фиг.8. Installation of a tower crane is carried out by the following sequence of operations. With the
Далее соединяют ось 32 противовесной консоли 4 с подпятником 31 оголовка 2 (фиг.9 и 17), затем монтажным краном поворачивают противовесную консоль 4 вверх (фиг. 9) вокруг оси 32, монтажник совмещает отверстия пластин 14 дополнительных монтажных звеньев 11 с отверстиями проушин 25 и в эти отверстия монтажник вставляет пальцы 10 (фиг.10 и 11), которые затем фиксируют в рабочем положении. Для облегчения и обеспечения удобства ввода соединительных пальцев 10 в отверстия проушин 25 и пластин 14 последние могут быть повернуты вокруг пальцев 10 не одновременно, а последовательно, при этом каждый соединительный палец 10 может быть вставлен сначала лишь в отверстие одной пластины 14, после чего совмещают отверстие этой пластины 14 с отверстием проушины 25 и отверстием другой пластины 14, затем вводят (досылают) соединительный палец 10 в отверстие проушины 25 и отверстие другой пластины 14 дополнительного монтажного звена 11. После соединения оттяжки 6 с оголовком описанным образом крюк 34 монтажного крана опускают и противовесная консоль занимает горизонтальное рабочее положение, показанное на фиг.5. Next, the
Монтаж стрелы 3 башенного крана производят аналогичным образом: также на земле производят сборку стрелы - соединяют ее секции между собой, аналогичным образом, описанным выше, укладывают на стреле промежуточные звенья 17 оттяжки 8, крайнее звено 18 оттяжки 8, фиксируют в ложементе 19 стойки 20 (фиг.16), далее зачаливают стрелу 3, поднимают ее крюком 34 монтажного крана на монтажную высоту, стыкуют ее с оголовком 2, для чего ось 32 стрелы 3 (фиг. 17) соединяют с подпятником 31 оголовка 2, поворачивают вверх стрелу 3 вокруг оси 32 в вертикальной плоскости крюком 34 в положение, показанное на фиг. 16. Монтажник, находящийся на площадке 13, вручную поворачивает поочередно или одновременно пластины 14 дополнительного монтажного звена 12 в вертикальной плоскости и совмещает отверстие проушины 16 (фиг.19) крайнего звена 18 с отверстиями пластин 14, а затем вводит в эти совмещенные отверстия палец 10 (правый палец на фиг.19). Последний перед операцией совмещения отверстия проушины 16 с отверстиями пластин 14 может быть лишь частично или полностью введен в отверстие одной пластины 14 и зафиксирован (или незафиксирован) в этом положении, после чего совмещают отверстие проушины 18 с отверстием одной пластины 14 или с отверстиями обеих пластин 14 одновременно и вводят палец 10 в отверстия пластин 14 и проушины 16. После фиксации пальца 10 в отверстиях упомянутых элементов крюк 34 монтажного крана опускают и стрела 3 занимает рабочее горизонтальное положение, показанное на фиг. 1. The installation of the
Таким образом, в совокупности с дополнительными монтажными звеньями 11 и 12 ограничители поворота крайних звеньев, или по крайней мере один ограничитель 28 поворота крайнего звена 22 оттяжки 6 противовесной консоли 4, обеспечивает существенное повышение удобства монтажа крана и значительное снижение усилий монтажника при совмещении соединяемых элементов крана. Причем существенным является расположение приблизительно на уровне плеча монтажника дополнительных монтажных звеньев 11 и 12, в большей мере влияющее на повышение удобства проведения монтажных операций, связанных с применением ручного труда, так как воздействие руки монтажника на дополнительное монтажное звено крана на уровне плеча монтажника обеспечивает при минимальных мускульных усилиях максимальную силу, воздействующую на дополнительное монтажное звено, что имеет существенное значение в крайне опасных условиях выполнения монтажных работ на большой высоте, когда башня башенного крана и присоединяемые к ней в воздухе противовесная консоль или стрела имеют пространственные амплитуды колебаний. Ограничитель 28 поворота крайнего звена 22 оттяжки 6 обеспечивает возможность не только стабилизации положения крайнего звена 22 во время проведения монтажных операций, но также позволяет расположить промежуточное звено 27 (фиг.12) по верхнему контуру противовесной консоли 4, например, с целью улучшения компоновки противовесной консоли 4, включая оттяжку 6 и ее месторасположение на противовесной консоли. В частности, обеспечивается возможность использования короткой стойки 24 при максимальной ее удаленности от оголовка 2. Thus, in conjunction with additional mounting
Источники информации
1. Проспект Das Кransystom EC-H. LIEBHERR-WERK BIBERACH GMBH. 1996.Sources of information
1. Prospect Das Kransystom EC-H. LIEBHERR-WERK BIBERACH GMBH. 1996.
2. Описание изобретения к заявке RU N 94021633, кл. В 66 С 23/02, 1994, авторы Мишель Лесандр (Фр.), Ив Мийе (Фр.), заявитель Потен С.А. (Фр.) или патент RU N 2145934 С1, кл. В 66 С 23/64, 1994, те же авторы и заявитель (прототип). 2. Description of the invention to the application RU N 94021633, class. B 66
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001129820/11A RU2225345C2 (en) | 2001-11-08 | 2001-11-08 | Tower crane and method of its mounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001129820/11A RU2225345C2 (en) | 2001-11-08 | 2001-11-08 | Tower crane and method of its mounting |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2001129820A RU2001129820A (en) | 2003-08-20 |
RU2225345C2 true RU2225345C2 (en) | 2004-03-10 |
Family
ID=32390099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2001129820/11A RU2225345C2 (en) | 2001-11-08 | 2001-11-08 | Tower crane and method of its mounting |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2225345C2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264965A (en) * | 2012-12-06 | 2013-08-28 | 浙江虎霸建设机械有限公司 | Novel tower crane standard knot introducing system |
CN103922224A (en) * | 2014-04-28 | 2014-07-16 | 徐工集团工程机械股份有限公司 | Reversible channel connection structure and crawler crane |
-
2001
- 2001-11-08 RU RU2001129820/11A patent/RU2225345C2/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264965A (en) * | 2012-12-06 | 2013-08-28 | 浙江虎霸建设机械有限公司 | Novel tower crane standard knot introducing system |
CN103922224A (en) * | 2014-04-28 | 2014-07-16 | 徐工集团工程机械股份有限公司 | Reversible channel connection structure and crawler crane |
CN103922224B (en) * | 2014-04-28 | 2016-01-13 | 徐工集团工程机械股份有限公司 | A kind of reversible expanding channels structure and crawler crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4243148A (en) | Counterbalanced tower crane | |
CN107614417B (en) | Modular self-adaptive folding device for climbing crane | |
DK2707322T3 (en) | Tower Turntable | |
CN102383588A (en) | Lifting platform for protecting safety of high-level construction | |
JP3554583B2 (en) | Method and apparatus for assembling a boom of a tower crane | |
CN107635906B (en) | Crane with the door frame power and cantilever crane power that are effectively overlapped in superstructure | |
JP6638718B2 (en) | Crane erecting method | |
US2720694A (en) | Method for erecting elevated structures | |
CA3008500A1 (en) | Lifting device for lifting a component of a wind turbine and method for assembling components of a wind turbine | |
RU2200699C2 (en) | Method and device for mounting tension guys of tower crane load-lifting boom | |
RU2225345C2 (en) | Tower crane and method of its mounting | |
JPH0245274Y2 (en) | ||
CN113716472A (en) | Double-arm holding pole | |
CN111576227A (en) | Construction method of main arch and auxiliary arch of double-flying-wing arch bridge and lifting appliance used by same | |
RU2065397C1 (en) | Tower crane | |
CN109083146B (en) | Method for vertically setting upright post and inclined strut of pile driver | |
CN216974109U (en) | Suspension bridge type double-outward-exploration operating platform | |
JP2006225158A (en) | Climbing crane | |
JP2017137171A (en) | Crane and method for mounting boom of crane | |
US10850950B2 (en) | Crane having effectively coincident gantry and boom forces upon an upperstructure | |
CN212712478U (en) | Dismounting device for cargo boom and balance arm of tower crane | |
JP2515531B2 (en) | Boom swiveling crane | |
RU2744873C1 (en) | Construction of double-level subframe of raisable work platform | |
CN209082340U (en) | Large-span steel beam hoisting tool | |
CN219751719U (en) | Portal crane for short-distance lifting and slag turning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20081109 |