RU2117740C1 - Method for erection of vault - Google Patents

Method for erection of vault Download PDF

Info

Publication number
RU2117740C1
RU2117740C1 RU96122616A RU96122616A RU2117740C1 RU 2117740 C1 RU2117740 C1 RU 2117740C1 RU 96122616 A RU96122616 A RU 96122616A RU 96122616 A RU96122616 A RU 96122616A RU 2117740 C1 RU2117740 C1 RU 2117740C1
Authority
RU
Russia
Prior art keywords
bricks
zone
vault
laying
arch
Prior art date
Application number
RU96122616A
Other languages
Russian (ru)
Other versions
RU96122616A (en
Inventor
Майдан Комекович Кусаинов
Юлия Борисовна Фендт
Original Assignee
Майдан Комекович Кусаинов
Юлия Борисовна Фендт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Майдан Комекович Кусаинов, Юлия Борисовна Фендт filed Critical Майдан Комекович Кусаинов
Priority to RU96122616A priority Critical patent/RU2117740C1/en
Application granted granted Critical
Publication of RU2117740C1 publication Critical patent/RU2117740C1/en
Publication of RU96122616A publication Critical patent/RU96122616A/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

FIELD: construction engineering. SUBSTANCE: this is used for erection and reconstruction of vaults made of brick and stone. According to method, vault is conditionally divided into two zones. Lower or first zone of vault which begins from abutment is built by placing successive rows of bricks using traditional methods of erection when mortar layer is spread for bedding and successive rows of bricks is placed on bedding. When bricklaying of first zone is finished, second zone which is located higher is respectively started from that row in which bricks can not be laid on mortar bedding by traditional methods because of substantial incline of mortar bedding to horizon. Bricks are placed in second zone of vault over shuttering by dry method that is with leaving clearances between bricks. After complete laying of bricks by dry method, clearances left between bricks are filled in pouring-in cast mortar. Application of aforesaid method allows due to substantial simplification of technology to increase productivity, reduce labour-intensity and to cut vault erection periods. EFFECT: higher efficiency. 4 cl

Description

Изобретение относится к области строительства и может быть использовано при возведении, реконструкции и ремонте сводов из кирпича и камня. The invention relates to the field of construction and can be used in the construction, reconstruction and repair of vaults made of brick and stone.

Наиболее близким техническим решением к предлагаемому изобретению по своей сущности и достигаемому результату является способ возведения свода по классической технологии, включающей установку опалубки, укладку кирпича последовательными рядами по направлению от пяты свода к его ключу, разборку опалубки (см. Н.И.Аистов, Б.Д.Васильев, В.Ф.Иванов и др. История строительной техники. -Л.: Госстройиздат, 1962, стр.123). The closest technical solution to the proposed invention in its essence and the achieved result is a method of erecting a vault using classical technology, including installing formwork, laying bricks in successive rows in the direction from the heel of the vault to its key, dismantling the formwork (see N.I. Aistov, B .D. Vasiliev, V.F. Ivanov and others. The history of construction equipment. -L .: Gosstroyizdat, 1962, p. 123).

Недостатком известного способа является то, что он характеризуется значительно трудоемкостью работ и большой продолжительностью возведения свода при сравнительно низкой производительности труда. The disadvantage of this method is that it is characterized by significantly the complexity of the work and the long duration of the construction of the arch with a relatively low productivity.

Целью изобретения является ускорение производства работ по возведению свода при одновременном повышении производительности труда и снижении трудоемкости работ. The aim of the invention is to accelerate the production of works on the construction of the vault while increasing labor productivity and reducing the complexity of the work.

Указанная цель достигается тем, что в известном способе возведения свода, включающем установку опалубки, укладку кирпичей последовательными рядами по направлению от пяты свода к его ключу, разборку опалубки, нижнюю, первую, из двух зон свода, начинающуюся от его пяты, выкладывают последовательными рядами традиционным методом наращивания, чередуя по всему горизонтальному сечению тела свода расстилание слоя растворной постели и укладку на нее очередного ряда кирпичей, при этом кладку первой зоны заканчивают, а второй, выше расположенной, зоны соответственно начинают тем рядом, при кладке которого уложить кирпичи на растворную постель традиционным методом не возможно в силу значительного наклона к горизонту растворной постели последнего ряда кладки первой зоны свода, причем кирпичи во вторую зону укладывают по опалубке на сухо симметрично относительно оси свода, последовательными рядами по направлению от нижней части второй зоны свода к его ключу, оставляя между кирпичами зазоры, причем после полной раскладки насухо кирпичей оставленные между ними во второй зоне зазоры заливают литым раствором. This goal is achieved by the fact that in the known method of erecting a vault, including installing formwork, laying bricks in successive rows in the direction from the heel of the vault to its key, dismantling the formwork, the lower, first, of the two zones of the vault, starting from its heel, is laid out in sequential rows with the traditional by building method, alternating over the entire horizontal section of the body of the arch, spreading the mortar bed layer and laying another row of bricks on it, while the laying of the first zone is completed, and the second, higher than that, respectively, they start on the same side when laying the bricks on the mortar bed by the traditional method is not possible due to the significant inclination of the last row of masonry of the first arch zone to the horizontal of the mortar bed; in the direction from the bottom of the second zone of the arch to its key, leaving gaps between the bricks, and after the bricks are completely laid dry, the gaps left between them in the second zone pour cast solution.

Использование предлагаемого способа возведения свода позволяет, при одновременном повышении производительности и снижении трудоемкости, существенно упростить технологию и сократить сроки его возведения, причем достигается это за счет раздельной укладки во вторую, верхнюю, зону свода вначале только кирпича, а затем только раствора. В свою очередь быстрое и масштабное заполнение швов литым раствором позволяет уплотнять его вибрирование кладки соответствующим вибратором, что повышает плотность раствора и соответственно прочность кладки свода. Using the proposed method of erection of the arch allows, while increasing productivity and reducing labor intensity, significantly simplify the technology and reduce the time of its construction, and this is achieved by separately laying in the second, upper, arch zone, at first, only brick, and then only mortar. In turn, the rapid and large-scale filling of joints with cast mortar allows it to be compacted by vibrating the masonry with an appropriate vibrator, which increases the density of the mortar and, accordingly, the strength of the masonry of the arch.

Предлагаемый способ осуществляется следующим образом. После установки соответствующих лесов и опалубки для возведения свода и выверки из положения приступают к непосредственному возведению самого свода, предварительно условно поделив его на две зоны. При этом первая, нижняя, зона начинается от пяты свода, а вторая, верхняя, зона располагается над первой и заканчивается ключом свода. В первой зоне свод выкладывают последовательными рядами традиционным методом наращивания, чередуя по всему горизонтальному сечению тела свода расстилание слоя раствора (растворной постели) и укладку соответствующим образом на эту растворную постель очередного ряда, например, кирпичей. Так постепенно ряд за рядом, симметрично относительно оси свода, кирпичи укладывают в первую зону свода. Причем кладку первой зоны заканчивают, а второй, вышерасположенной, зоны соответственно начинают тем рядом, при кладке которого уложить кирпичи на растворную постель традиционным методом весьма затруднительно или практически не возможно из-за значительного, по отношению к горизонту, наклона растворной постели последнего ряда кладки первой зоны свода. По этой причине во вторую зону свода кирпичи укладывают на опалубку насухо, симметрично относительно оси свода, последовательными рядами по направлению от нижней части второй зоны свода к его ключу, оставляя между кирпичами соответствующие зазоры. После полной раскладки насухо кирпичей во второй зоне, оставленные между ними зазоры заливают литым раствором. А после достижения раствором соответствующей прочности опалубку свода разбивают. The proposed method is as follows. After the installation of the appropriate scaffolding and formwork for the construction of the arch and reconciliation from the situation, they proceed to the direct construction of the arch itself, tentatively dividing it into two zones. Moreover, the first, lower, zone starts from the heel of the arch, and the second, upper, zone is located above the first and ends with the key of the arch. In the first zone, the arch is laid out in consecutive rows by the traditional method of building, alternating over the entire horizontal section of the body of the arch, spreading the solution layer (mortar bed) and laying the next row, for example, bricks accordingly on this mortar bed. So gradually row after row, symmetrically with respect to the axis of the arch, the bricks are laid in the first zone of the arch. Moreover, the laying of the first zone is completed, and the second, upstream, zones, respectively, start the next, when laying which it is very difficult or practically impossible to lay bricks on the mortar bed by the traditional method due to the significant inclination of the mortar bed of the last row of the first masonry with respect to the horizon arch zones. For this reason, in the second zone of the arch, bricks are laid on the formwork dry, symmetrically with respect to the axis of the arch, in successive rows in the direction from the bottom of the second zone of the arch to its key, leaving the corresponding gaps between the bricks. After fully laying dry bricks in the second zone, the gaps left between them are poured with cast solution. And after the solution reaches the appropriate strength, the formwork is broken.

В случае необходимости для ускорения производства работ при укладке кирпичей насухо именно с требуемыми зазорами их раскрепляют во второй зоне свода соответствующими фиксаторами, предупреждающими кроме того самопроизвольное смещение уложенных кирпичей. До заполнения во второй зоне зазоров между кирпичами литым раствором кирпичи, уложенные насухо, в случае необходимости смачивают водой. При необходимости для ускорения производства работ при одновременном повышении их качества после заливки зазоров между кирпичами литым раствором кладку второй зоны вибрируют, например, поверхностным вибратором. If necessary, in order to speed up the work when laying bricks dry, it is with the required gaps that they are fastened in the second zone of the vault with appropriate clamps, which also prevent spontaneous displacement of the stacked bricks. Before filling in the second zone of the gaps between the bricks with a cast mortar, the bricks laid dry, if necessary, moisten with water. If necessary, to speed up the production of work while improving their quality after filling the gaps between the bricks with the cast mortar, the masonry of the second zone is vibrated, for example, with a surface vibrator.

В случае необходимости для кладки сводов используют мелкоблочные камни. If necessary, small-block stones are used for laying arches.

Данный способ позволяет существенно упростить технологию и сократить сроки возведения свода при повышении прочности его кладки. This method can significantly simplify the technology and reduce the time of construction of the arch with increasing strength of its masonry.

Claims (5)

1. Способ возведения свода, включающий установку опалубки, укладку кирпичей посдедовательными рядами по направлению от пяты своды к его ключу, разборку опалубки, отличающийся тем, что нижнюю, первую, из двух зон свода, начинающуюся от его пяты, выкладывают последовательными рядами традиционным методом наращивания, чередуя по всему горизонтальному сечению тела свода расстилание слоя растворной постели и укладку на нее очередного ряда кирпичей, при этом кладку первой зоны заканчивают, а второй, выше расположенной, зоны соответственно начинают тем рядом, при кладке которого уложить кирпичи на растворную постель традиционным методом невозможно в силу значительного наклона к горизонту растворной постели последнего ряда кладки первой зоны свода, причем кирпичи во вторую зону укладывают по опалубке насухо симметрично относительно оси свода, последовательными рядами по направлению от нижней части второй зоны свода к его ключу, оставляя между кирпичами зазоры, причем после полной раскладки насухо кирпичей оставленные между ними во второй зоне зазоры заливают литым раствором. 1. A method of erecting a vault, including installing formwork, laying bricks in successive rows in the direction from the heel of the vault to its key, disassembling the formwork, characterized in that the lower, first, of the two zones of the vault, starting from its heel, is laid out in successive rows using the traditional building method By alternating over the entire horizontal section of the body of the arch, spreading the mortar bed layer and laying another row of bricks on it, the masonry of the first zone is finished, and the second, higher located, zone, respectively, will begin they are placed next to it, when laying it is impossible to lay bricks on the mortar bed by the traditional method due to the significant inclination of the last row of masonry of the first arch zone to the horizon of the mortar bed, moreover, the bricks are laid in the second zone along the formwork dry symmetrically with respect to the arch axis, in successive rows in the direction from the bottom parts of the second zone of the arch to its key, leaving gaps between the bricks, and after fully laying dry bricks, the gaps left between them in the second zone are poured with cast solution. 2. Способ по п.1, отличающийся тем, что во второй зоне во время укладки кирпичей насухо последние раскрепляют фиксаторами. 2. The method according to claim 1, characterized in that in the second zone, during the laying of bricks dry, the latter is secured with clamps. 3. Способ по п.1 или 2, отличающийся тем, что до заполнения во второй зоне зазоров между кирпичами литым раствором последние смачивают водой. 3. The method according to claim 1 or 2, characterized in that before filling in the second zone of the gaps between the bricks of the cast solution, the latter are wetted with water. 4. Способ по любому из пп.1 - 3, отличающийся тем, что после заливки зазоров между кирпичами литым раствором кладку второй зоны вибрируют. 4. The method according to any one of claims 1 to 3, characterized in that after filling the gaps between the bricks with the cast mortar, the masonry of the second zone vibrates. 5. Способ по любому из пп.1 - 4, отличающийся тем, что для кладки свода используют мелкоблочные камни. 5. The method according to any one of claims 1 to 4, characterized in that small-block stones are used for laying the arch.
RU96122616A 1996-11-20 1996-11-20 Method for erection of vault RU2117740C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96122616A RU2117740C1 (en) 1996-11-20 1996-11-20 Method for erection of vault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96122616A RU2117740C1 (en) 1996-11-20 1996-11-20 Method for erection of vault

Publications (2)

Publication Number Publication Date
RU2117740C1 true RU2117740C1 (en) 1998-08-20
RU96122616A RU96122616A (en) 1999-02-20

Family

ID=20187628

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96122616A RU2117740C1 (en) 1996-11-20 1996-11-20 Method for erection of vault

Country Status (1)

Country Link
RU (1) RU2117740C1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Аистов Н.И., Васильев Б.Д. и др. История строительной техники. - Л.: Госстройиздат, 1962, с.123. *

Similar Documents

Publication Publication Date Title
US1809504A (en) Building construction
DE59310069D1 (en) Method of erecting a concrete wall using braced formwork
CN213448989U (en) Thin plastering sand aerated block wall
US3559361A (en) Method for construction
RU2117740C1 (en) Method for erection of vault
RU2148130C1 (en) Method for erection of stratified monolithic wall and hollow ceramic stone used in it
RU2225487C2 (en) Method of building block production and wall (variants) including building blocks
RU2148135C1 (en) Method for erection of faced sectional wall
EP0327563A1 (en) In situ brick or block making formwork.
RU96122616A (en) CONSTRUCTION METHOD
CN209369596U (en) Windowsill coping concrete prefabricated section
RU2726712C1 (en) Monolithic wall erection method
CN218374656U (en) Windowsill coping prefabricated part
SU1451234A1 (en) Method of producing composite wall block
SU10864A1 (en) The method of building walls
RU2023826C1 (en) Method of making constructions for buildings
SU881352A1 (en) Method of erecting artificial support
SU1067161A1 (en) Method of constructing a massive ferroconcrete structure of complex shape
RU2052042C1 (en) Method for erecting monolithic wall structures
SU1606585A1 (en) Method of erecting concrete dam
SU863814A1 (en) Method of securing corners at chain system of laying brick walls and uprights
RU2052038C1 (en) Method for erecting monolithic building walls
SU709372A1 (en) Method of erecting monolithic ferroconcrete structures in forms
SU1728346A1 (en) Method for construction of round-head concrete dam
RU2208093C2 (en) Process of treatment of monolithic structures with concrete