RU2069766C1 - Method for construction of isolation connection - Google Patents

Method for construction of isolation connection Download PDF

Info

Publication number
RU2069766C1
RU2069766C1 RU94028549A RU94028549A RU2069766C1 RU 2069766 C1 RU2069766 C1 RU 2069766C1 RU 94028549 A RU94028549 A RU 94028549A RU 94028549 A RU94028549 A RU 94028549A RU 2069766 C1 RU2069766 C1 RU 2069766C1
Authority
RU
Russia
Prior art keywords
concrete
working
filled
addition
nrs
Prior art date
Application number
RU94028549A
Other languages
Russian (ru)
Other versions
RU94028549A (en
Inventor
А.Г. Кузнецов
В.А. Шалауров
А.Н. Анушенков
В.Б. Колесаев
А.А. Решетников
Original Assignee
Отдел проблем освоения недр СО РАН
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Отдел проблем освоения недр СО РАН filed Critical Отдел проблем освоения недр СО РАН
Priority to RU94028549A priority Critical patent/RU2069766C1/en
Publication of RU94028549A publication Critical patent/RU94028549A/en
Application granted granted Critical
Publication of RU2069766C1 publication Critical patent/RU2069766C1/en

Links

Landscapes

  • Sealing Material Composition (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

FIELD: mining industry; applicable in underground mining of mineral deposits. SUBSTANCE: interdeck space of forms installed in mine working is filled with concrete mix, and added to concrete mix within arch of working is nonexplosive destroying substance in certain ratio. Water-proof material is laid on the boundary of concrete mixes. Besides, marginal part of working is filled with concrete mix with addition of nonexplosive destroying substance NRS-1. EFFECT: higher efficiency. 2 cl, 1 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при подземной разработке месторождений полезных ископаемых. The invention relates to the mining industry and can be used in underground mining of mineral deposits.

Известен способ возведения изолирующих перемычек, включающий установку деревянного щита, опоры и укосин на расстрел (Справочник по закладочным работам / Под ред. Д. М. Бронникова и М.Н. Цыганкова. М. Недра, 1989, с. 127). A known method of erecting insulating jumpers, including the installation of a wooden shield, supports and jibs for execution (Reference bookmarking works / Under the editorship of D. M. Bronnikov and MN Tsygankov. M. Nedra, 1989, p. 127).

Недостатком данного способа является ненадежность конструкции при значительных нагрузках на перемычку. The disadvantage of this method is the unreliability of the design with significant loads on the jumper.

Наиболее близким к изобретению по технической сущности и достигаемому результату является способ возведения изолирующей перемычки, включающий установку в горной выработке опалубки и заполнение межопалубочного пространства бетонной смесью (Справочник по закладочным работам / Под ред. Д.М. Бронникова и М.Н. Цыганкова. М. Недра, 1980, с. 124). Closest to the invention in terms of technical nature and the achieved result is a method of erecting an insulating bridge, including installing formwork in the mine working and filling the interdeck space with concrete mixture (Bookmark on laying works / Edited by DM Bronnikov and MN Tsygankov. M Nedra, 1980, p. 124).

Недостатком данного способа является недостаточная герметичность перемычки вследствие неровности сводовой части выработки и усадки бетона при затвердевании. The disadvantage of this method is the lack of tightness of the lintel due to the unevenness of the arched part of the production and shrinkage of concrete during solidification.

Цель изобретения повышение качества изоляции. The purpose of the invention is improving the quality of insulation.

Цель достигается тем, что, в отличие от известного способа, включающего установку в горной выработке опалубки и заполнения межопалубочного пространства бетонной смесью, в предлагаемом способе межопалубочное пространство в пределах высоты коробового свода выработки заполняют бетонной смесью с добавкой невзрывчатого разрушающего средства (НРС-1) в соотношении, мас. The goal is achieved in that, in contrast to the known method, including the installation of formwork in the mine and filling the interdeck space with concrete mixture, in the proposed method, the interdeck space is filled with concrete mixture with the addition of non-explosive destructive means (NRS-1) in ratio, wt.

Песчано-гравийная смесь 72,0
Цемент 18,0
НРС-1 2,0
Вода 8,0
На границе раздела бетонных смесей укладывают гидроизоляционный материал. Кроме того, бетонной смесью с добавкой НРС-1 заполняют приконтурную часть опалубки.
Sand and gravel mix 72.0
Cement 18.0
LDC-1 2.0
Water 8.0
At the interface of concrete mixtures, waterproofing material is laid. In addition, the concrete part with the addition of NRS-1 fill the side part of the formwork.

Способ поясняется чертежом заключается в следующем. The method is illustrated by the drawing is as follows.

В горной выработке 1 устанавливают опалубку 2 и заполняют межопалубочное пространство до высоты коробового свода выработки (h1) обычной бетонной смесью. На бетонную смесь укладывают гидроизоляционный материал 3, например полиэтиленовую пленку.In the mine working 1, the formwork 2 is installed and the interdeck space is filled to the height of the box arch of the working (h 1 ) with the usual concrete mixture. A waterproofing material 3, for example a plastic film, is placed on the concrete mixture.

Межопалубочное пространство в пределах высоты коробового свода выработки (h2) заполняют бетонной смесью с добавкой НРС-1 в приведенных выше соотношениях, мас.The interdeck space within the height of the box vault of the mine (h 2 ) is filled with concrete mix with the addition of НРС-1 in the above ratios, wt.

С началом реакции гидратации происходит объемное расширение бетонной смеси с добавкой НРС-1 на 4-5 чем обеспечивается полнота заполнения межопалубочного пространства горной выработки в коробовом своде. При сооружении перемычки в горной выработке, пройденной в сильнотрещиноватых породах, в опалубке устанавливаются дополнительные перегородки, чем выделяется приконтурная часть объема перемычки по бортам и своду выработки, которая заполняется во вторую очередь бетонной смесью с добавкой НРС-1. Это обеспечивает заполнение неровностей контура и раскрытых трещин пород. With the beginning of the hydration reaction, the concrete mixture is expanded with the addition of NRS-1 by 4-5, which ensures the completeness of filling the interdeck space of the mine working in the box arch. During the construction of the lintel in the mine excavation, passed in highly fractured rocks, additional partitions are installed in the formwork, which distinguishes the near-edge part of the bulk of the lintel along the sides and the vault of the excavation, which is filled in the second place with concrete mixture with the addition of NRS-1. This ensures the filling of irregularities in the contour and open rock cracks.

Таким образом, предлагаемый способ возведения изолирующей перемычки имеет следующие преимущества по сравнению с прототипом:
обеспечивает повышение качества изоляции сводовой части горной выработки;
при сооружении перемычки в горной выработке, пройденной в сильнотрещиноватых горных породах, позволяет заполнить трещины, что важно при герметизации газонасыщенных пространств.
Thus, the proposed method of construction of an insulating jumper has the following advantages compared to the prototype:
provides improved insulation quality of the vaulted part of the mine;
during the construction of the lintel in the mine working in deeply cracked rocks, it allows filling cracks, which is important when sealing gas-saturated spaces.

Claims (2)

1. Способ возведения изолирующей перемычки, включающий установку в горной выработке опалубки и заполнение межопалубочного пространства бетонной смесью, отличающийся тем, что межопалубочное пространство в пределах высоты свода выработки заполняют бетонной смесью с добавкой невзрывчатого разрушающего средства НРС-1 в соотношении, мас. 1. The method of construction of an insulating bridge, including the installation of formwork in the mine and filling the interdeck space with concrete mixture, characterized in that the interdeck space within the height of the excavation arch is filled with concrete mixture with the addition of non-explosive destructive means NRS-1 in the ratio, wt. Песчано-гравийная смесь 72,0
Цемент 18,0
НРС-1 2,0
Вода 8,0
укладывая на границе раздела бетонных смесей гидроизоляционный материал.
Sand and gravel mix 72.0
Cement 18.0
LDC-1 2.0
Water 8.0
laying waterproofing material at the interface of concrete mixtures.
2. Способ по п. 1, отличающийся тем, что бетонной смесью с добавкой НРС-1 заполняют приконтурную часть опалубки. 2. The method according to p. 1, characterized in that the concrete mixture with the addition of NRS-1 fill the side part of the formwork.
RU94028549A 1994-07-28 1994-07-28 Method for construction of isolation connection RU2069766C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU94028549A RU2069766C1 (en) 1994-07-28 1994-07-28 Method for construction of isolation connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU94028549A RU2069766C1 (en) 1994-07-28 1994-07-28 Method for construction of isolation connection

Publications (2)

Publication Number Publication Date
RU94028549A RU94028549A (en) 1996-06-10
RU2069766C1 true RU2069766C1 (en) 1996-11-27

Family

ID=20159153

Family Applications (1)

Application Number Title Priority Date Filing Date
RU94028549A RU2069766C1 (en) 1994-07-28 1994-07-28 Method for construction of isolation connection

Country Status (1)

Country Link
RU (1) RU2069766C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA014007B1 (en) * 2008-10-24 2010-08-30 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of damp proof bulkhead erection in underground working
RU2503817C1 (en) * 2012-07-17 2014-01-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Erection method of non-cutting connection strap in drift way made in mountain slope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Справочник по закладочным работам / Под ред. Бронникова Д.М. и Цыганова М.Н., М.: Недра, 1989, с. 124, 127. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA014007B1 (en) * 2008-10-24 2010-08-30 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of damp proof bulkhead erection in underground working
RU2503817C1 (en) * 2012-07-17 2014-01-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Erection method of non-cutting connection strap in drift way made in mountain slope

Also Published As

Publication number Publication date
RU94028549A (en) 1996-06-10

Similar Documents

Publication Publication Date Title
CN1714227A (en) Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
RU2382883C1 (en) Erection method of filling connection strap
RU2069766C1 (en) Method for construction of isolation connection
RU2060398C1 (en) Method for preparation of waterproofing stopping for operation under emergency conditions
RU2099534C1 (en) Method for support of underground working in water-logged frozen grounds
RU2087720C1 (en) Method of support of mine workings and device for its embodiment
SU1155786A1 (en) Method of isolating the excavated space
RU2289694C1 (en) Method for reclamation of limestone quarries during construction of industrial structures
Williams et al. Design of cut-and-cover tunnels and stations: current practice
SU1710699A1 (en) Drill hole plugging-back method
RU2503817C1 (en) Erection method of non-cutting connection strap in drift way made in mountain slope
SU883522A1 (en) Mine partition erecting method
RU2410544C2 (en) Method of making stowing bulkhead
RU2675118C1 (en) Method for hardening hydraulic stowage mass
SU756043A1 (en) Method of filling-up underground working
RU2444624C1 (en) Method of full development of gently sloping coal beds with power-driven systems without any preparatory mine workings
RU2159332C1 (en) Process of support of mine workings ( alternative approaches )
SU1629372A1 (en) Method for construction of concreate dam
RU1789697C (en) Method for mining useful minerals
SU947296A1 (en) Method of protection of foundation of structures erected on undermined territory
RU2504660C1 (en) Method for construction of stowing barricade in mine working
RU1796024C (en) Method for supporting stopes
SU1642003A1 (en) Method of mining mineral deposits
DiLouie Jr Practical Considerations in Tieback Construction
SU1608354A1 (en) Method of constructing temporary hydraulic isolation dam