RU2014131411A - METHOD FOR OIL PRODUCTION FROM WATERED WELLS - Google Patents

METHOD FOR OIL PRODUCTION FROM WATERED WELLS Download PDF

Info

Publication number
RU2014131411A
RU2014131411A RU2014131411A RU2014131411A RU2014131411A RU 2014131411 A RU2014131411 A RU 2014131411A RU 2014131411 A RU2014131411 A RU 2014131411A RU 2014131411 A RU2014131411 A RU 2014131411A RU 2014131411 A RU2014131411 A RU 2014131411A
Authority
RU
Russia
Prior art keywords
mode
maximum
minimum
determined
curve
Prior art date
Application number
RU2014131411A
Other languages
Russian (ru)
Inventor
Рафаиль Саитович Нурмухаметов
Марат Мадарисович Хамидуллин
Игорь Степанович Ванюрихин
Фарит Азгарович Галиев
Дмитрий Вадимович Пищаев
Original Assignee
Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" им. В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority to RU2014131411A priority Critical patent/RU2014131411A/en
Publication of RU2014131411A publication Critical patent/RU2014131411A/en

Links

Landscapes

  • Physical Water Treatments (AREA)

Abstract

Способ добычи нефти из обводненных скважин, включающий в себя этапы, на которых осуществляют отбор жидкости в нестационарном режиме с изменением дебита от максимального до минимального, при этом определяют временные интервалы нестационарного режима по изменению обводненности добываемой продукции и по изменению забойного давления, причем определяют интервал продолжительности работы на максимальном режиме отбора продукции по восстановлению максимального забойного давления, при котором наступает стационарный режим дренирования пласта, но не ниже давления разгазирования нефти, и осуществляют работу на минимальном режиме отбора продукции в интервале, продолжающемся до восстановления забойного давления при текущем минимальном дебите жидкости, отличающийся тем, что определяют указанные временные интервалы по кривой откачки при максимальном режиме отбора жидкости и кривой восстановления уровня при минимальном режиме, задаваемых посредством частотного регулятора тока, соединенного с электродвигателем привода штангового насоса, с одновременным отбором проб на обводненность добываемой продукции, при этом снятие указанных кривых осуществляют в течение не менее чем трех циклов.The method of oil production from waterlogged wells, which includes the stages at which fluid is taken in an unsteady mode with a change in flow rate from maximum to minimum, while the time intervals of an unsteady mode are determined by changing the water content of the produced products and by changing the bottomhole pressure, and the duration interval is determined work at the maximum production selection mode to restore the maximum bottomhole pressure, at which the stationary mode of drainage of the plains occurs one, but not lower than the oil degassing pressure, and they operate at the minimum production selection mode in an interval that continues until bottomhole pressure is restored at the current minimum fluid flow rate, characterized in that the indicated time intervals are determined from the pumping curve at the maximum fluid recovery mode and recovery curve level at the minimum mode, set by means of a frequency current regulator connected to a rod pump drive motor, with simultaneous sampling nennost extracted product, wherein the removal of said curve is carried out for at least three cycles.

Claims (1)

Способ добычи нефти из обводненных скважин, включающий в себя этапы, на которых осуществляют отбор жидкости в нестационарном режиме с изменением дебита от максимального до минимального, при этом определяют временные интервалы нестационарного режима по изменению обводненности добываемой продукции и по изменению забойного давления, причем определяют интервал продолжительности работы на максимальном режиме отбора продукции по восстановлению максимального забойного давления, при котором наступает стационарный режим дренирования пласта, но не ниже давления разгазирования нефти, и осуществляют работу на минимальном режиме отбора продукции в интервале, продолжающемся до восстановления забойного давления при текущем минимальном дебите жидкости, отличающийся тем, что определяют указанные временные интервалы по кривой откачки при максимальном режиме отбора жидкости и кривой восстановления уровня при минимальном режиме, задаваемых посредством частотного регулятора тока, соединенного с электродвигателем привода штангового насоса, с одновременным отбором проб на обводненность добываемой продукции, при этом снятие указанных кривых осуществляют в течение не менее чем трех циклов. The method of oil production from waterlogged wells, which includes the stages at which fluid is taken in an unsteady mode with a change in flow rate from maximum to minimum, while the time intervals of an unsteady mode are determined by changing the water content of the produced products and by changing the bottomhole pressure, and the duration interval is determined work at the maximum production selection mode to restore the maximum bottomhole pressure, at which the stationary mode of drainage of the plains occurs one, but not lower than the oil degassing pressure, and they operate at the minimum production selection mode in an interval that continues until bottomhole pressure is restored at the current minimum fluid flow rate, characterized in that the indicated time intervals are determined from the pumping curve at the maximum fluid recovery mode and recovery curve level at the minimum mode, set by means of a frequency current regulator connected to a rod pump drive motor, with simultaneous sampling nennost extracted product, wherein the removal of said curve is carried out for at least three cycles.
RU2014131411A 2014-07-29 2014-07-29 METHOD FOR OIL PRODUCTION FROM WATERED WELLS RU2014131411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2014131411A RU2014131411A (en) 2014-07-29 2014-07-29 METHOD FOR OIL PRODUCTION FROM WATERED WELLS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2014131411A RU2014131411A (en) 2014-07-29 2014-07-29 METHOD FOR OIL PRODUCTION FROM WATERED WELLS

Publications (1)

Publication Number Publication Date
RU2014131411A true RU2014131411A (en) 2016-02-20

Family

ID=55313398

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014131411A RU2014131411A (en) 2014-07-29 2014-07-29 METHOD FOR OIL PRODUCTION FROM WATERED WELLS

Country Status (1)

Country Link
RU (1) RU2014131411A (en)

Similar Documents

Publication Publication Date Title
MY186645A (en) Fluid inflow
AR102540A1 (en) METHODS TO HANDLE THE REPLACEMENT OF VACUUM TRAINING IN WATER INJECTION PRODUCTION OPERATIONS TO INCREASE OIL RECOVERY
EA201400880A1 (en) METHOD OF OIL EXTRACTION
MX2016013205A (en) Subterranean pump with pump cleaning mode.
EA201270450A1 (en) REGULATORY METHOD AND DEVICE FOR WELL OPERATIONS
MX2016016569A (en) Method for planning production and injection wells.
RU2015150604A (en) METHOD OF OPERATION FOR A PUMP, FEATURES FOR A MULTIPHASE PUMP, AND A PUMP
UA111979C2 (en) METHOD OF LUTEINE EXTRACTION FROM NATURAL MATERIALS
GB2546932A (en) Method and system for pressure regulation of well fluid from a hydrocarbon well
RU2016133036A (en) METHOD FOR PREVENTING LOSS OF PARAFFINS IN OIL WELLS WITH PACKERS
EA201690615A1 (en) HYDRAULIC SUPPORT WELLS
NO20181583A1 (en) Method and system for managed pressure drilling
NO20171693A1 (en) Apparatus and method for injecting a chemical to facilitate operation of a submersible well pump
EA202091498A1 (en) METHOD FOR REMOVING DEPOSITS ACCUMULATED IN PIPELINE FOR TRANSPORTATION OF GAS
MY193976A (en) Bottom hole assembly including a multi-stage reciprocating and automatically reset pump
RU2014131411A (en) METHOD FOR OIL PRODUCTION FROM WATERED WELLS
RU2016123932A (en) OPTIMIZED ACID TREATMENT OF PRODUCING AND STRESSING WELLS
AU2015264330A8 (en) A system for controlling wellbore pressure during pump shutdowns
EA201400598A1 (en) METHOD OF MANAGING THE PROCESS OF FEEDING A DEEP PUMP AND A DEVICE FOR ITS IMPLEMENTATION
EA201400794A1 (en) METHOD FOR DETERMINING PLASTIC HYDROCONDUCTION
MX2017004915A (en) Positive-displacement pump and pumping group for fluid products and method for the use thereof.
RU2014136152A (en) Method for isolating formation water inflow in a well
BR112017004002A2 (en) multi-chamber with ultra-high-pressure or hydraulic motor-compressors or motor-pumps for compressing gas or liquid at ultra-high-pressure, consisting of several concentrically sized different chambers, where each chamber contains smaller chambers inside
RU2014108064A (en) METHOD OF GAS PUMPING FROM THE DISABLED PART OF THE GAS PIPELINE
RU2004129979A (en) METHOD FOR NON-STATIONARY OIL RECOVERY