NO20181583A1 - Method and system for managed pressure drilling - Google Patents
Method and system for managed pressure drillingInfo
- Publication number
- NO20181583A1 NO20181583A1 NO20181583A NO20181583A NO20181583A1 NO 20181583 A1 NO20181583 A1 NO 20181583A1 NO 20181583 A NO20181583 A NO 20181583A NO 20181583 A NO20181583 A NO 20181583A NO 20181583 A1 NO20181583 A1 NO 20181583A1
- Authority
- NO
- Norway
- Prior art keywords
- value
- plc
- annulus
- control choke
- flow rate
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000005553 drilling Methods 0.000 title abstract 2
- 239000012530 fluid Substances 0.000 abstract 5
- 238000005259 measurement Methods 0.000 abstract 3
- 238000000605 extraction Methods 0.000 abstract 2
- 238000005086 pumping Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Feedback Control In General (AREA)
- Earth Drilling (AREA)
Abstract
A method for use with a managed pressure drilling (MPD) system, the system comprising a drill string having a drill bit, an annulus defined outside of the drill string, a mud pump for pumping mud down through the drill string and back up through the annulus, a control choke in an extraction path coupled to the annulus, a back pressure pump also coupled to the extraction path, and a programmable logic controller (PLC) for controlling the control choke, the method comprising: a) performing measurements to determine a dataset comprising, for each of a plurality of time steps k: a value of fluid flow rate through the drill bit q bit [k], a value of fluid flow rate through the control choke q c [k], a value of fluid flow rate from the back pressure pump q bpp [k] and a value of fluid pressure at the control choke p c [k]; b) executing an inversion algorithm on the PLC to obtain a value for the bulk modulus of a fluid within the annulus, the inversion algorithm taking the dataset as an input, wherein the inversion algorithm accounts for a measurement bias b q in one or more of said measurements; c) updating one or more control parameters of the PLC based on the value for the bulk modulus; and d) manipulating the control choke using the PLC to attain a desired pressure in the system.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1609894.9A GB2551141B (en) | 2016-06-07 | 2016-06-07 | Method and system for managed pressure drilling |
PCT/NO2017/050143 WO2017213513A1 (en) | 2016-06-07 | 2017-06-02 | Method and system for managed pressure drilling |
Publications (1)
Publication Number | Publication Date |
---|---|
NO20181583A1 true NO20181583A1 (en) | 2018-12-10 |
Family
ID=56508164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20181583A NO20181583A1 (en) | 2016-06-07 | 2018-12-10 | Method and system for managed pressure drilling |
Country Status (8)
Country | Link |
---|---|
US (1) | US10689928B2 (en) |
AU (1) | AU2017279451B2 (en) |
BR (1) | BR112018075383B1 (en) |
CA (1) | CA3027001A1 (en) |
GB (1) | GB2551141B (en) |
MX (1) | MX2018015191A (en) |
NO (1) | NO20181583A1 (en) |
WO (1) | WO2017213513A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236281B (en) * | 2018-11-28 | 2023-08-01 | 中国石油天然气集团有限公司 | Device and method for detecting annular pressure of gas storage and natural gas well |
CN109779568B (en) * | 2018-12-14 | 2022-01-04 | 中国石油天然气集团有限公司 | Closed-loop control method and system for automatically controlling pressure to implement well killing |
WO2021071686A1 (en) * | 2019-10-10 | 2021-04-15 | Ameriforge Group Inc. | Intermittent well state sampling in managed pressure drilling applications |
CN113605878B (en) * | 2021-08-09 | 2023-05-26 | 中国石油大学(华东) | Stratum information inversion system and method in pressure control drilling process |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020112888A1 (en) | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US20050092523A1 (en) * | 2003-10-30 | 2005-05-05 | Power Chokes, L.P. | Well pressure control system |
CN100353027C (en) | 2003-10-31 | 2007-12-05 | 中国石油化工股份有限公司 | Under balance drilling bottom pressure automatic control system and method |
US7308952B2 (en) | 2004-06-04 | 2007-12-18 | Strazhgorodskiy Semen Iosiphov | Underbalanced drilling method and apparatus |
DE102005011125A1 (en) * | 2005-03-10 | 2006-09-14 | Siemens Ag | Measured data processing method for medical research, involves verifying, before evaluation of data, whether functions has orthogonal portions in dataset represented section of dependency on parameter for evaluations in adequate measure |
US7610251B2 (en) | 2006-01-17 | 2009-10-27 | Halliburton Energy Services, Inc. | Well control systems and associated methods |
FR2931189B1 (en) * | 2008-05-16 | 2010-05-14 | Total Sa | METHOD FOR ESTIMATING PHYSICAL PARAMETERS OF A GEOLOGICAL FORMATION |
GB2473672B (en) * | 2009-09-22 | 2013-10-02 | Statoilhydro Asa | Control method and apparatus for well operations |
AU2013327663B2 (en) * | 2012-10-03 | 2016-03-10 | Shell Internationale Research Maatschappij B.V. | Optimizing performance of a drilling assembly |
WO2014204316A1 (en) | 2013-06-19 | 2014-12-24 | National Oilwell Varco Norway As | Method and apparatus for real-time fluid compressibility measurements |
CA2949675C (en) | 2014-05-19 | 2022-10-25 | Danny Spencer | A system for controlling wellbore pressure during pump shutdowns |
US10054917B2 (en) * | 2014-12-30 | 2018-08-21 | National Oilwell Varco, L.P. | Drilling direct control user interface |
WO2016140650A1 (en) | 2015-03-03 | 2016-09-09 | Halliburton Energy Services, Inc. | Managed pressure drilling with hydraulic modeling that incorporates an inverse model |
US20180172860A1 (en) * | 2015-08-05 | 2018-06-21 | Halliburton Energy Services, Inc | Time-Lapsed Seismic Wavefield Monitoring of Downhole Formations |
US20170037690A1 (en) * | 2015-08-06 | 2017-02-09 | Schlumberger Technology Corporation | Automatic and integrated control of bottom-hole pressure |
-
2016
- 2016-06-07 GB GB1609894.9A patent/GB2551141B/en active Active
-
2017
- 2017-06-02 WO PCT/NO2017/050143 patent/WO2017213513A1/en active Application Filing
- 2017-06-02 AU AU2017279451A patent/AU2017279451B2/en active Active
- 2017-06-02 CA CA3027001A patent/CA3027001A1/en active Pending
- 2017-06-02 MX MX2018015191A patent/MX2018015191A/en unknown
- 2017-06-02 US US16/307,839 patent/US10689928B2/en active Active
- 2017-06-02 BR BR112018075383-1A patent/BR112018075383B1/en active IP Right Grant
-
2018
- 2018-12-10 NO NO20181583A patent/NO20181583A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
US10689928B2 (en) | 2020-06-23 |
AU2017279451A1 (en) | 2019-01-03 |
AU2017279451B2 (en) | 2022-04-28 |
BR112018075383B1 (en) | 2023-04-11 |
US20190301254A1 (en) | 2019-10-03 |
MX2018015191A (en) | 2019-09-09 |
WO2017213513A1 (en) | 2017-12-14 |
CA3027001A1 (en) | 2017-12-14 |
BR112018075383A2 (en) | 2019-03-19 |
GB2551141B (en) | 2020-05-13 |
GB201609894D0 (en) | 2016-07-20 |
GB2551141A (en) | 2017-12-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20181583A1 (en) | Method and system for managed pressure drilling | |
MX2017001110A (en) | Control of a managed pressure drilling system. | |
GB2477880A (en) | Pressure and flow control in drilling operations | |
GB2561720A (en) | Control system for managed pressure well bore operations | |
GB2540283A (en) | Elastic pipe control and compensation with managed pressure drilling | |
MY175727A (en) | Method of drilling a subterranean borehole | |
GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
MX2016016569A (en) | Method for planning production and injection wells. | |
MY192204A (en) | A method of plugging and abandoning a well | |
NO20181414A1 (en) | Method and apparatus for estimating down-hole process variables of gas lift system | |
MX2015007067A (en) | Control of managed pressure drilling. | |
EA201690615A1 (en) | HYDRAULIC SUPPORT WELLS | |
MX2020011784A (en) | Cement pulsation for subsea wellbore. | |
GB2566403A (en) | Systems and methods for managing fluid pressure in a borehole during drilling operations | |
NO20181377A1 (en) | Downhole apparatus with a valve arrangement | |
AU2015264330A8 (en) | A system for controlling wellbore pressure during pump shutdowns | |
GB2548257A (en) | Regulating downhole fluid flow rate using an multi-segmented fluid circulation system model | |
EA201690981A1 (en) | WELL DRILLING METHOD WITH CONTINUOUS CIRCULATION AND A DEVICE FOR THE INTERCEPTION AND REDISTRIBUTION OF WASHING LIQUID USED IN THIS METHOD | |
MX2016014059A (en) | Fluidic oscillator bypass system. | |
EA201400598A1 (en) | METHOD OF MANAGING THE PROCESS OF FEEDING A DEEP PUMP AND A DEVICE FOR ITS IMPLEMENTATION | |
MX2018002552A (en) | Proportional control of rig drilling mud flow. | |
RU2598268C1 (en) | Method for initial exposing of complex cavernous-fracture of carbonate oil and gas saturated formation with horizontal shaft of long length | |
GB2557129A (en) | Drilling apparatus including a fluid bypass device and methods of using same | |
GB2542928A (en) | Determination of downhole conditions using circulated non-formation gasses | |
MX340331B (en) | Pressure and flow control in drilling operations. |