RU2013112573A - INSTALLATION FOR PREPARATION OF TREATMENT WATER HEAT ELECTROCENTRAL - Google Patents

INSTALLATION FOR PREPARATION OF TREATMENT WATER HEAT ELECTROCENTRAL Download PDF

Info

Publication number
RU2013112573A
RU2013112573A RU2013112573/06A RU2013112573A RU2013112573A RU 2013112573 A RU2013112573 A RU 2013112573A RU 2013112573/06 A RU2013112573/06 A RU 2013112573/06A RU 2013112573 A RU2013112573 A RU 2013112573A RU 2013112573 A RU2013112573 A RU 2013112573A
Authority
RU
Russia
Prior art keywords
water
steam turbine
condenser
make
industrial
Prior art date
Application number
RU2013112573/06A
Other languages
Russian (ru)
Other versions
RU2531682C1 (en
Inventor
Леонид Павлович Шелудько
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный технический университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный технический университет" filed Critical Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный технический университет"
Priority to RU2013112573/06A priority Critical patent/RU2531682C1/en
Publication of RU2013112573A publication Critical patent/RU2013112573A/en
Application granted granted Critical
Publication of RU2531682C1 publication Critical patent/RU2531682C1/en

Links

Landscapes

  • Physical Water Treatments (AREA)
  • Degasification And Air Bubble Elimination (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

Установка для подготовки подпиточной воды теплоэлектроцентрали с открытой теплофикационной системой, содержащая: паровую турбину с конденсатором, снабженным встроенным пучком, конденсационную паровую турбину, химводоочистку, вакуумный деаэратор, трубопровод сырой подпиточной воды, трубопровод обратной сетевой воды, трубопровод сырой подпиточной воды соединен через встроенный пучок конденсатора с химводоочисткой, химводоочистка через вакуумный деаэратор соединена трубопроводом умягченной подпиточной воды с обратным трубопроводом сетевой воды теплосети, отличающаяся тем, что паровая турбина с конденсатором имеет промышленный отбор пара, в поверхностном конденсаторе конденсационный паровой турбины по ходу отработавшего пара последовательно размещены первая и вторая поверхности нагрева; паропровод промышленного отбора пара паровой турбины связывает ее промышленный отбор с конденсационной паровой турбиной, трубопровод сырой подпиточной воды через встроенный пучок конденсатора паровой турбины с промышленным отбором пара, подогреватель расширителя непрерывной продувки, первую поверхность нагрева конденсатора конденсационной паровой турбины и трубопровод подогретой сырой подпиточной воды связан с входом химводоочистки, выход которой через декарбонизатор, вторую поверхность нагрева конденсатора и трубопровод умягченной подпиточной воды связан с входом вакуумного деаэратора, его выход через бак-аккумулятор и трубопровод подпиточной воды связан с трубопроводом обратной линии теплосети.Installation for the preparation of make-up water of a combined heat and power plant with an open heating system, comprising: a steam turbine with a condenser equipped with an integrated beam, a condensing steam turbine, chemical water treatment, a vacuum deaerator, a raw make-up water pipe, a return mains water pipe, a raw make-up water pipe connected through an integrated condenser bundle with chemical water treatment, chemical water treatment through a vacuum deaerator is connected by a softened make-up water pipe to a return pipe m of heating network water, characterized in that the steam turbine with a condenser has industrial steam extraction, the first and second heating surfaces are sequentially placed in the surface condenser of the condensing steam turbine along the exhaust steam; a steam turbine industrial steam extraction line connects its industrial extraction to a condensing steam turbine, a raw make-up water pipeline through an integrated steam turbine condenser bundle with industrial steam extraction, a continuous purge expander heater, a first condensing steam turbine condenser heating surface and a heated raw make-up water pipeline connected to chemical water inlet, the output of which is through a decarbonizer, a second condenser heating surface and a softening pipeline water is connected to the inlet of the vacuum deaerator; its output through the storage tank and the make-up water pipe is connected to the return pipe of the heating network.

Claims (1)

Установка для подготовки подпиточной воды теплоэлектроцентрали с открытой теплофикационной системой, содержащая: паровую турбину с конденсатором, снабженным встроенным пучком, конденсационную паровую турбину, химводоочистку, вакуумный деаэратор, трубопровод сырой подпиточной воды, трубопровод обратной сетевой воды, трубопровод сырой подпиточной воды соединен через встроенный пучок конденсатора с химводоочисткой, химводоочистка через вакуумный деаэратор соединена трубопроводом умягченной подпиточной воды с обратным трубопроводом сетевой воды теплосети, отличающаяся тем, что паровая турбина с конденсатором имеет промышленный отбор пара, в поверхностном конденсаторе конденсационный паровой турбины по ходу отработавшего пара последовательно размещены первая и вторая поверхности нагрева; паропровод промышленного отбора пара паровой турбины связывает ее промышленный отбор с конденсационной паровой турбиной, трубопровод сырой подпиточной воды через встроенный пучок конденсатора паровой турбины с промышленным отбором пара, подогреватель расширителя непрерывной продувки, первую поверхность нагрева конденсатора конденсационной паровой турбины и трубопровод подогретой сырой подпиточной воды связан с входом химводоочистки, выход которой через декарбонизатор, вторую поверхность нагрева конденсатора и трубопровод умягченной подпиточной воды связан с входом вакуумного деаэратора, его выход через бак-аккумулятор и трубопровод подпиточной воды связан с трубопроводом обратной линии теплосети. Installation for the preparation of make-up water of a combined heat and power plant with an open heating system, comprising: a steam turbine with a condenser equipped with an integrated beam, a condensing steam turbine, chemical water treatment, a vacuum deaerator, a raw make-up water pipe, a return mains water pipe, a raw make-up water pipe connected through an integrated condenser bundle with chemical water treatment, chemical water treatment through a vacuum deaerator is connected by a softened make-up water pipe to a return pipe m of heating network water, characterized in that the steam turbine with a condenser has industrial steam extraction, the first and second heating surfaces are sequentially placed in the surface condenser of the condensing steam turbine along the exhaust steam; a steam turbine industrial steam extraction line connects its industrial extraction to a condensing steam turbine, a raw make-up water pipeline through an integrated steam turbine condenser bundle with industrial steam extraction, a continuous purge expander heater, a first condensing steam turbine condenser heating surface and a heated raw make-up water pipeline connected to chemical water inlet, the output of which is through a decarbonizer, a second condenser heating surface and a softening pipeline water is connected to the inlet of the vacuum deaerator; its output through the storage tank and the make-up water pipe is connected to the return pipe of the heating network.
RU2013112573/06A 2013-03-20 2013-03-20 Plant for treatment of make-up water of heat and power plant RU2531682C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013112573/06A RU2531682C1 (en) 2013-03-20 2013-03-20 Plant for treatment of make-up water of heat and power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013112573/06A RU2531682C1 (en) 2013-03-20 2013-03-20 Plant for treatment of make-up water of heat and power plant

Publications (2)

Publication Number Publication Date
RU2013112573A true RU2013112573A (en) 2014-09-27
RU2531682C1 RU2531682C1 (en) 2014-10-27

Family

ID=51656327

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013112573/06A RU2531682C1 (en) 2013-03-20 2013-03-20 Plant for treatment of make-up water of heat and power plant

Country Status (1)

Country Link
RU (1) RU2531682C1 (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1328563A1 (en) * 1986-02-24 1987-08-07 В. И. Шарапов Thermal power station
SU1590568A1 (en) * 1988-02-01 1990-09-07 В.И..Шарапов Method of conditioning make-up water of central heating network and of additional feed water of boilers
SU1539341A1 (en) * 1988-04-04 1990-01-30 Куйбышевский политехнический институт им.В.В.Куйбышева Central heating plant
SU1751168A1 (en) * 1990-03-06 1992-07-30 Ульяновский политехнический институт Plant for preparation of make-up water of heat-supply systems
RU2261338C1 (en) * 2004-11-01 2005-09-27 Общество с ограниченной ответственностью "Самара-Авиагаз" Steam power plant with additional steam turbines
JP5484811B2 (en) * 2009-07-17 2014-05-07 三菱重工業株式会社 Carbon dioxide recovery system and method
RU2412358C1 (en) * 2009-08-17 2011-02-20 Государственное образовательное учреждение высшего профессионального образования Самарский государственный технический университет Plant for preparing make-up water of combined electric power-and-heat generating plant with open heat-extraction system
US20110120130A1 (en) * 2009-11-25 2011-05-26 Hitachi, Ltd. Fossil Fuel Combustion Thermal Power System Including Carbon Dioxide Separation and Capture Unit
RU118360U1 (en) * 2012-03-11 2012-07-20 Игорь Владимирович Долотовский INSTALLATION OF ELECTRIC-HEAT-WATER SUPPLY OF ENTERPRISES OF MINING, TRANSPORT AND PROCESSING OF HYDROCARBON RAW MATERIALS

Also Published As

Publication number Publication date
RU2531682C1 (en) 2014-10-27

Similar Documents

Publication Publication Date Title
RU2013112573A (en) INSTALLATION FOR PREPARATION OF TREATMENT WATER HEAT ELECTROCENTRAL
RU2012124393A (en) INSTALLATION FOR PREPARATION OF TREATMENT WATER HEAT ELECTROCENTRAL
RU2012127953A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2011151117A (en) METHOD OF VACUUM DEAERATION OF HEATING NETWORK WATER AT THE HEAT POWER PLANT
RU2012131193A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012126834A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2011151642A (en) METHOD OF VACUUM DEAERATION OF HEATING NETWORK WATER AT THE HEAT POWER PLANT
RU2012131192A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012126837A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012127936A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2011151643A (en) METHOD OF VACUUM DEAERATION OF HEATING NETWORK WATER AT THE HEAT POWER PLANT
RU2011151641A (en) METHOD OF VACUUM DEAERATION OF HEATING NETWORK WATER AT THE HEAT POWER PLANT
RU2012126826A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2013151542A (en) HEAT INSTALLATION
RU2010113494A (en) HEAT ELECTRIC STATION
RU2010110609A (en) HEAT ELECTRIC STATION
RU2015109028A (en) Heating cogeneration plant
RU2010120791A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012127934A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012127931A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2010124063A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012126725A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2010120789A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION
RU2012125807A (en) INDUSTRIAL HEATING HEAT ELECTROCENTRAL WITH AN OPEN HEATING SYSTEM
RU2010122921A (en) METHOD OF WORK OF THE HEAT ELECTRIC STATION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150321