RU2012116262A - METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS - Google Patents

METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS Download PDF

Info

Publication number
RU2012116262A
RU2012116262A RU2012116262/03A RU2012116262A RU2012116262A RU 2012116262 A RU2012116262 A RU 2012116262A RU 2012116262/03 A RU2012116262/03 A RU 2012116262/03A RU 2012116262 A RU2012116262 A RU 2012116262A RU 2012116262 A RU2012116262 A RU 2012116262A
Authority
RU
Russia
Prior art keywords
transverse
temporary load
transverse elements
elements
time load
Prior art date
Application number
RU2012116262/03A
Other languages
Russian (ru)
Inventor
Юрий Георгиевич Халисов
Original Assignee
Юрий Георгиевич Халисов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Юрий Георгиевич Халисов filed Critical Юрий Георгиевич Халисов
Priority to RU2012116262/03A priority Critical patent/RU2012116262A/en
Publication of RU2012116262A publication Critical patent/RU2012116262A/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Способ снижения временной нагрузки на поперечные элементы, отличающийся тем, что поперечные элементы, воспринимающие временную нагрузку от колесных пар, располагают в плане косо к направлению движения для того, чтобы когда одно колесо наезжает, то другое еще не доехало, а когда оно доедет, то первое уже переехало, что и дает уменьшение общей временной нагрузки в любой момент времени на один поперечный элемент: деформационный шов, шкафную стенку, ригель, поперечную балку, мостобрус, шпалу, стержень поперечной арматуры плиты проезжей части или защитного слоя, особенно в местах омоноличивания температурно неразрезных пролетных строений, рельс и уголок на железнодорожном переезде.A method of reducing the temporary load on the transverse elements, characterized in that the transverse elements that receive the temporary load from the wheelsets are positioned obliquely in the plan so that when one wheel drives, the other has not arrived, and when it arrives, then the first has already moved, which makes it possible to reduce the total temporary load at any moment by one transverse element: a deformation seam, a cabinet wall, a crossbar, a transverse beam, a bridge beam, a railroad tie, a rod of transverse reinforcement of a plate of a roadway and and a protective layer, particularly in the areas of continuous grouting temperature of superstructures, rails and corner of the railway crossing.

Claims (1)

Способ снижения временной нагрузки на поперечные элементы, отличающийся тем, что поперечные элементы, воспринимающие временную нагрузку от колесных пар, располагают в плане косо к направлению движения для того, чтобы когда одно колесо наезжает, то другое еще не доехало, а когда оно доедет, то первое уже переехало, что и дает уменьшение общей временной нагрузки в любой момент времени на один поперечный элемент: деформационный шов, шкафную стенку, ригель, поперечную балку, мостобрус, шпалу, стержень поперечной арматуры плиты проезжей части или защитного слоя, особенно в местах омоноличивания температурно неразрезных пролетных строений, рельс и уголок на железнодорожном переезде. A method of reducing the temporary load on the transverse elements, characterized in that the transverse elements that receive the temporary load from the wheelsets are positioned obliquely in the plan so that when one wheel drives, the other has not arrived, and when it arrives, then the first has already moved, which makes it possible to reduce the total temporary load at any moment by one transverse element: a deformation seam, a cabinet wall, a crossbar, a transverse beam, a bridge beam, a railroad tie, a rod of transverse reinforcement of a plate of a roadway and and a protective layer, especially in the areas of continuous grouting temperature of superstructures, rails and corner of the railway crossing.
RU2012116262/03A 2012-04-19 2012-04-19 METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS RU2012116262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012116262/03A RU2012116262A (en) 2012-04-19 2012-04-19 METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012116262/03A RU2012116262A (en) 2012-04-19 2012-04-19 METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS

Publications (1)

Publication Number Publication Date
RU2012116262A true RU2012116262A (en) 2013-10-27

Family

ID=49446378

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012116262/03A RU2012116262A (en) 2012-04-19 2012-04-19 METHOD FOR REDUCING TIME LOAD ON TRANSVERSE ELEMENTS

Country Status (1)

Country Link
RU (1) RU2012116262A (en)

Similar Documents

Publication Publication Date Title
HRP20161561T1 (en) Panelized structural system for building construction
MY189480A (en) Overhead crane and assembly of at least two overhead cranes
DK2423014T3 (en) Rail vehicle, in particular a railway vehicle and method of operating the same
FR2990178B1 (en) METHOD FOR SECURING THE MOVEMENT OF A RAILWAY VEHICLE AND RAILWAY VEHICLE
RU2015112354A (en) CRANE, BRIDGE OR GATE, WITH AT LEAST TWO SPAN BEAMS
MA38550A1 (en) Rail sleepers with reinforced rails for protection against silting
GB2568341B (en) A shear plate arrangement and attachment method for turnout/crossover sections of a railway track
CN204059184U (en) Railroad bridge is across pier
MX2018003920A (en) Stoneblower for rail applications.
EP2690218A3 (en) Method for crack repair on concrete sleepers for railway tracks
CN103835232A (en) Bridge deck structure with longitudinal beams and transverse beam combined
HRP20090145T3 (en) RAILWAY TRANSITION AT RANGE LEVEL
IT1399286B1 (en) PLAN IN CUSTOMS FOR FURNITURE WITH TIE ROD
EP2931976A4 (en) FOUNDATION SYSTEM FOR BRIDGES AND OTHER STRUCTURES
CA192418S (en) Railroad tie
CN204080561U (en) VIADUCTS IN URBAN RAIL TRANSIT non-fragment orbit template system
RU2016143796A (en) METHOD FOR INSTALLATION OF REM-500
CN204675637U (en) A kind of anchor fitting of cement beam up train track
CN204531618U (en) A kind of can be for convenience detach fence
FR2975066B3 (en) ARRANGEMENT FOR HEIGHT COMPENSATION OF A RAILWAY WAGON
EP3492392A4 (en) BOGIE FOR RAILWAY WAGON, AND RAIL WAGON EQUIPPED WITH THIS BOGIE
Portnov Interaction Modeling of CWR Track with Bridge Spans Using Finite Elements Method
AT510523A3 (en) RAILWAY WITH A TRACKBOARD
Aggarwal et al. Structural Design of Plate Girder Railway Bridge
Džajić et al. Rehabilitation of Railway Steel Bridges by Implementation of UHPFRC Deck