RU2011106310A - METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT OF A MASSIVE TYPE - Google Patents

METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT OF A MASSIVE TYPE Download PDF

Info

Publication number
RU2011106310A
RU2011106310A RU2011106310/03A RU2011106310A RU2011106310A RU 2011106310 A RU2011106310 A RU 2011106310A RU 2011106310/03 A RU2011106310/03 A RU 2011106310/03A RU 2011106310 A RU2011106310 A RU 2011106310A RU 2011106310 A RU2011106310 A RU 2011106310A
Authority
RU
Russia
Prior art keywords
reservoir
oil
wellbore
horizontal
well
Prior art date
Application number
RU2011106310/03A
Other languages
Russian (ru)
Other versions
RU2464414C1 (en
Inventor
Ильшат Мухаметович Бакиров (RU)
Ильшат Мухаметович Бакиров
Надежда Васильевна Музалевская (RU)
Надежда Васильевна Музалевская
Айдар Ильшатович Бакиров (RU)
Айдар Ильшатович Бакиров
Original Assignee
Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU)
Открытое акционерное общество "Татнефть" имени В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU), Открытое акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU)
Priority to RU2011106310/03A priority Critical patent/RU2464414C1/en
Publication of RU2011106310A publication Critical patent/RU2011106310A/en
Application granted granted Critical
Publication of RU2464414C1 publication Critical patent/RU2464414C1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Способ разработки многопластовой нефтяной залежи массивного типа, включающий определение геолого-физических условий залегания залежи и ранжирование нефтяных пластов по убыванию гидропроводности, первичное вскрытие нефтяных пластов бурением, заканчивание и обустройство скважин для подъема пластового флюида и нагнетания вытесняющей жидкости для поддержания пластового давления, отличающийся тем, что бурят по крайней мере одну скважину с обеспечением первичного вскрытия каждого нефтяного пласта в купольной и нижней частях залежи вертикальным и горизонтальным участками ее ствола, горизонтальный участок ствола скважины размещают параллельно и выше водонефтяного контакта, при заканчивании скважины осуществляют одновременное вторичное вскрытие нефтяных пластов в вертикальном и горизонтальном участках ствола скважины последовательно, начиная с нефтяного пласта с наибольшей гидропроводностью, причем каждый последующий нефтяной пласт вторично вскрывают по мере выработки предыдущего нефтяного пласта до остаточных запасов, равных начальным запасам последующего нефтяного пласта с учетом разницы в их гидропроводности, обустраивают скважину с возможностью нагнетания вытесняющей жидкости в горизонтальный участок ствола скважины при одновременном подъеме пластового флюида из вертикального участка ствола скважины. The method of developing a multilayer oil reservoir of massive type, including determining the geological and physical conditions of occurrence of the reservoir and ranking the oil reservoirs in decreasing hydraulic conductivity, initial drilling of the oil reservoirs, completion and arrangement of wells for raising the reservoir fluid and injecting the displacing fluid to maintain reservoir pressure, characterized in that at least one well is drilled with the primary opening of each oil reservoir in the dome and lower parts of the reservoir In the horizontal and horizontal sections of its trunk, the horizontal section of the wellbore is placed parallel to and above the oil-water contact, when the well is completed, the oil reservoirs are simultaneously re-opened in the vertical and horizontal sections of the wellbore sequentially, starting from the oil reservoir with the highest hydraulic conductivity, each subsequent oil reservoir being secondary open as the previous oil reservoir develops to residual reserves equal to the initial reserves of the subsequent oil the reservoir, taking into account the difference in their hydraulic conductivity, equip the well with the possibility of pumping the displacing fluid into a horizontal section of the wellbore while lifting the formation fluid from the vertical section of the wellbore.

Claims (1)

Способ разработки многопластовой нефтяной залежи массивного типа, включающий определение геолого-физических условий залегания залежи и ранжирование нефтяных пластов по убыванию гидропроводности, первичное вскрытие нефтяных пластов бурением, заканчивание и обустройство скважин для подъема пластового флюида и нагнетания вытесняющей жидкости для поддержания пластового давления, отличающийся тем, что бурят по крайней мере одну скважину с обеспечением первичного вскрытия каждого нефтяного пласта в купольной и нижней частях залежи вертикальным и горизонтальным участками ее ствола, горизонтальный участок ствола скважины размещают параллельно и выше водонефтяного контакта, при заканчивании скважины осуществляют одновременное вторичное вскрытие нефтяных пластов в вертикальном и горизонтальном участках ствола скважины последовательно, начиная с нефтяного пласта с наибольшей гидропроводностью, причем каждый последующий нефтяной пласт вторично вскрывают по мере выработки предыдущего нефтяного пласта до остаточных запасов, равных начальным запасам последующего нефтяного пласта с учетом разницы в их гидропроводности, обустраивают скважину с возможностью нагнетания вытесняющей жидкости в горизонтальный участок ствола скважины при одновременном подъеме пластового флюида из вертикального участка ствола скважины. The method of developing a multilayer oil reservoir of massive type, including determining the geological and physical conditions of occurrence of the reservoir and ranking the oil reservoirs in decreasing hydraulic conductivity, initial drilling of the oil reservoirs, completion and arrangement of wells for raising the reservoir fluid and injecting the displacing fluid to maintain reservoir pressure, characterized in that at least one well is drilled with the primary opening of each oil reservoir in the dome and lower parts of the reservoir In the horizontal and horizontal sections of its trunk, the horizontal section of the wellbore is placed parallel to and above the oil-water contact, when the well is completed, the oil reservoirs are simultaneously re-opened in the vertical and horizontal sections of the wellbore sequentially, starting from the oil reservoir with the highest hydraulic conductivity, each subsequent oil reservoir being secondary open as the previous oil reservoir develops to residual reserves equal to the initial reserves of the subsequent oil the reservoir, taking into account the difference in their hydraulic conductivity, equip the well with the possibility of pumping the displacing fluid into a horizontal section of the wellbore while lifting the formation fluid from the vertical section of the wellbore.
RU2011106310/03A 2011-02-18 2011-02-18 Method of developing multi-bed massive oil deposit RU2464414C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011106310/03A RU2464414C1 (en) 2011-02-18 2011-02-18 Method of developing multi-bed massive oil deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011106310/03A RU2464414C1 (en) 2011-02-18 2011-02-18 Method of developing multi-bed massive oil deposit

Publications (2)

Publication Number Publication Date
RU2011106310A true RU2011106310A (en) 2012-08-27
RU2464414C1 RU2464414C1 (en) 2012-10-20

Family

ID=46937324

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011106310/03A RU2464414C1 (en) 2011-02-18 2011-02-18 Method of developing multi-bed massive oil deposit

Country Status (1)

Country Link
RU (1) RU2464414C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2513390C1 (en) * 2013-06-24 2014-04-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2753229C1 (en) * 2021-03-18 2021-08-12 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method for development of multilayer oil deposits

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2065040C1 (en) * 1993-05-26 1996-08-10 Акционерное общество открытого типа "Сибирская инновационная нефтяная корпорация" Method for exploitation of oil deposits
RU2066370C1 (en) * 1995-06-08 1996-09-10 Акционерное общество открытого типа "Булгарнефть" Method for exploitation of multilayer oil pool
US6012520A (en) * 1996-10-11 2000-01-11 Yu; Andrew Hydrocarbon recovery methods by creating high-permeability webs
RU2126543C1 (en) * 1997-12-30 1999-02-20 Научно-исследовательский институт измерительных приборов Method of radar detection and tracking of objects
RU2285795C1 (en) * 2005-02-22 2006-10-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2334084C1 (en) * 2007-09-24 2008-09-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of well operation at stack oil deposit
RU2395674C1 (en) * 2009-07-24 2010-07-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of oil pool development
RU101082U1 (en) * 2010-08-24 2011-01-10 Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) FORMATION OF A BRANCHED WELL FOR OPERATION OF WATERFILLING HYDROCARBON DEPOSITS

Also Published As

Publication number Publication date
RU2464414C1 (en) 2012-10-20

Similar Documents

Publication Publication Date Title
RU2015154787A (en) METHOD FOR OIL PRODUCTION FROM ARTIFICIALLY EDUCATED CRACKS USING A SINGLE BORE HOLE AND A MULTI-CHANNEL PIPE
RU2526937C1 (en) Method of low-permeable oil deposit development
RU2526430C1 (en) Development of low-permeability oil pools by horizontal wells with maintenance of seam pressure
WO2014038983A3 (en) Method for developing oil and gas fields using laser radiation
RU2007101345A (en) METHOD FOR DEVELOPING A MULTIPLAYER HETEROGENEOUS OIL DEPOSIT FORMED BY HORIZONTAL WELLS
RU2008100754A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
WO2014096271A3 (en) Method and apparatus for treating a subterranean region
RU2485291C1 (en) Development method of productive formation with low-permeability section
Jianchun et al. Reservoir stimulation techniques to minimize skin factor of Longwangmiao Fm gas reservoirs in the Sichuan Basin
RU2013142746A (en) METHOD OF IMPROVED GRAVITATIONAL DRAINAGE IN A HYDROGEN HYDROLASTIC
RU2010137055A (en) METHOD FOR DEVELOPING OIL DEPOSITS IN CARBONATE COLLECTORS WITH WATER-OIL ZONES
RU2011106310A (en) METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT OF A MASSIVE TYPE
RU2012112194A (en) METHOD FOR DEVELOPING A HIGH-VISCOUS OIL DEPOSIT
RU2550642C1 (en) Method of oil field development with horizontal wells
RU2008101051A (en) METHOD FOR OPERATING HYDROCARBON DEPOSITS
RU2013101990A (en) METHOD FOR DEVELOPING OIL LOW-PERMEABLE DEPOSITS
RU2695906C1 (en) Method for development of weakly permeable oil deposit with application of horizontal wells and water and gas impact
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
RU2012101395A (en) METHOD FOR DEVELOPING AN OIL DEPOSIT LOCATED UNDER A GAS DEPOSIT AND SEPARATED FROM IT BY AN IMPRESSIBLE PLASTIC
RU144119U1 (en) INSTALLATION FOR SIMULTANEOUSLY SEPARATE OPERATION OF TWO LAYERS (OPTIONS)
RU2012142099A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU2011132231A (en) METHOD FOR DEVELOPING A CRACKED OIL DEPOSIT OF HIGH-VISCOUS OIL
RU2584467C1 (en) Method of developing high-viscosity oil field
CN104213884B (en) A kind of pumpingh well rod control type seam change switch and layering production method thereof
RU2012151762A (en) METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH CARBONATE COLLECTOR

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20180219