RU2010132231A - Системы и способы для анализа скважинных данных - Google Patents

Системы и способы для анализа скважинных данных Download PDF

Info

Publication number
RU2010132231A
RU2010132231A RU2010132231/03A RU2010132231A RU2010132231A RU 2010132231 A RU2010132231 A RU 2010132231A RU 2010132231/03 A RU2010132231/03 A RU 2010132231/03A RU 2010132231 A RU2010132231 A RU 2010132231A RU 2010132231 A RU2010132231 A RU 2010132231A
Authority
RU
Russia
Prior art keywords
pressure
determining
confidence indicator
indicator
display
Prior art date
Application number
RU2010132231/03A
Other languages
English (en)
Other versions
RU2482273C2 (ru
Inventor
Джулиан Дж. ПОП (US)
Джулиан Дж. ПОП
Жан-Марк ФОЛЛИНИ (US)
Жан-Марк ФОЛЛИНИ
Original Assignee
Шлюмбергер Текнолоджи Б.В. (Nl)
Шлюмбергер Текнолоджи Б.В.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шлюмбергер Текнолоджи Б.В. (Nl), Шлюмбергер Текнолоджи Б.В. filed Critical Шлюмбергер Текнолоджи Б.В. (Nl)
Publication of RU2010132231A publication Critical patent/RU2010132231A/ru
Application granted granted Critical
Publication of RU2482273C2 publication Critical patent/RU2482273C2/ru

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Landscapes

  • Mining & Mineral Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Analytical Chemistry (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Complex Calculations (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Testing Or Measuring Of Semiconductors Or The Like (AREA)

Abstract

1. Способ определения достоверности измерений, выполняемых прибором для испытания в процессе бурения, расположенным в стволе скважины, проходящем через подземный пласт, заключающийся в том, что: ! устанавливают связь по давлению между датчиком давления прибора и пластом; ! выполняют первое снижение давления прибором; ! измеряют данные, указывающие на давление, датчиком давления; ! определяют по меньшей мере один показатель достоверности на основании данных о давлении; и ! отображают по меньшей мере один показатель достоверности; ! причем по меньшей мере один показатель достоверности является представляющим наклон кривой давления в конце цикла повышения давления. ! 2. Способ по п.1, в котором дополнительно ! осуществляют идентификацию скважинного условия; и ! отображают идентифицированное условие. ! 3. Способ по 1, в котором при определении по меньшей мере одного показателя достоверности используют методику сравнения параметров. ! 4. Способ по п.1, в котором при определении по меньшей мере одного показателя достоверности используют методику анализа рассеяния шума. ! 5. Способ по п.1, в котором при определении по меньшей мере одного показателя достоверности используют методику анализа тренда. ! 6. Способ по п.5, в котором методика анализа тренда содержит отражение данных о давлении за конец цикла повышения давления. ! 7. Способ по п.5, в котором методика представляет собой методику глобального анализа. ! 8. Способ по п.1, в котором дополнительно осуществляют второе снижение давления. !9. Способ по п.8, в котором параметры второго снижения давления основаны по меньшей мере частично на по меньшей мере одном показателе досто

Claims (14)

1. Способ определения достоверности измерений, выполняемых прибором для испытания в процессе бурения, расположенным в стволе скважины, проходящем через подземный пласт, заключающийся в том, что:
устанавливают связь по давлению между датчиком давления прибора и пластом;
выполняют первое снижение давления прибором;
измеряют данные, указывающие на давление, датчиком давления;
определяют по меньшей мере один показатель достоверности на основании данных о давлении; и
отображают по меньшей мере один показатель достоверности;
причем по меньшей мере один показатель достоверности является представляющим наклон кривой давления в конце цикла повышения давления.
2. Способ по п.1, в котором дополнительно
осуществляют идентификацию скважинного условия; и
отображают идентифицированное условие.
3. Способ по 1, в котором при определении по меньшей мере одного показателя достоверности используют методику сравнения параметров.
4. Способ по п.1, в котором при определении по меньшей мере одного показателя достоверности используют методику анализа рассеяния шума.
5. Способ по п.1, в котором при определении по меньшей мере одного показателя достоверности используют методику анализа тренда.
6. Способ по п.5, в котором методика анализа тренда содержит отражение данных о давлении за конец цикла повышения давления.
7. Способ по п.5, в котором методика представляет собой методику глобального анализа.
8. Способ по п.1, в котором дополнительно осуществляют второе снижение давления.
9. Способ по п.8, в котором параметры второго снижения давления основаны по меньшей мере частично на по меньшей мере одном показателе достоверности.
10. Способ по любому из пп.1-9, в котором дополнительно осуществляют определение второго показателя достоверности с использованием одной из методики из группы, состоящей из методики сравнения давлений, методики прогнозирования параметров, методики корреляции модели, методики сравнения датчиков и методики избыточного давления.
11. Способ определения достоверности измерений, выполняемых прибором, расположенным в стволе скважины, проходящем через подземный пласт, заключающийся в том, что:
выбирают множество скважинных условий;
связывают отличающееся значение с каждым из скважинных условий;
выполняют скважинное измерение;
идентифицируют одно из скважинных условий на основании скважинного измерения;
передают на наземный дисплей значение, связанное с идентифицированным условием;
принимают значение на наземном дисплее; и
отображают знаки, указывающие на идентифицированное скважинное условие.
12. Способ по п.11, в котором дополнительно определен по меньшей мере один показатель достоверности и отображают показатель достоверности.
13. Способ по п.11, в котором идентификация одного из скважинных условий содержит определение множества показателей достоверности и сравнение каждого показателя достоверности с заданным порогом.
14. Способ по п.11, дополнительно содержащий этапы, на которых:
идентифицируют множество событий, связанных с работой скважинного прибора;
выбирают точки данных для передачи скважинным прибором, при этом точки данных выбирают в зависимости от событий и функции роста;
определяют значения, связанные с событиями и точками данных, для передачи скважинным прибором;
передают на наземный дисплей определенные значения; и
отображают переданные данные на скважинной каротажной диаграмме.
RU2010132231/03A 2007-12-31 2008-12-29 Способ для анализа скважинных данных (варианты) RU2482273C2 (ru)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US11/968,026 2007-12-31
US11/968,026 US8136395B2 (en) 2007-12-31 2007-12-31 Systems and methods for well data analysis
PCT/US2008/088396 WO2009088816A2 (en) 2007-12-31 2008-12-29 Systems and methods for well data analysis

Publications (2)

Publication Number Publication Date
RU2010132231A true RU2010132231A (ru) 2012-02-10
RU2482273C2 RU2482273C2 (ru) 2013-05-20

Family

ID=40796499

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010132231/03A RU2482273C2 (ru) 2007-12-31 2008-12-29 Способ для анализа скважинных данных (варианты)

Country Status (7)

Country Link
US (1) US8136395B2 (ru)
EP (1) EP2240669B1 (ru)
CN (1) CN101960087B (ru)
BR (1) BRPI0821665B1 (ru)
MX (1) MX2010007106A (ru)
RU (1) RU2482273C2 (ru)
WO (1) WO2009088816A2 (ru)

Families Citing this family (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7774141B2 (en) * 2008-01-17 2010-08-10 Baker Hughes Incorporated Methods for the identification of bubble point pressure
US8042387B2 (en) 2008-05-16 2011-10-25 Schlumberger Technology Corporation Methods and apparatus to control a formation testing operation based on a mudcake leakage
AU2009302317A1 (en) * 2008-10-09 2010-04-15 Chevron U.S.A. Inc. Iterative multi-scale method for flow in porous media
US8448703B2 (en) 2009-11-16 2013-05-28 Schlumberger Technology Corporation Downhole formation tester apparatus and methods
US8584519B2 (en) 2010-07-19 2013-11-19 Halliburton Energy Services, Inc. Communication through an enclosure of a line
US9157316B2 (en) * 2011-01-31 2015-10-13 Baker Hughes Incorporated System and method for determining pressure transition zones
US9581019B2 (en) * 2011-03-23 2017-02-28 Schlumberger Technology Corporation Measurement pretest drawdown methods and apparatus
EP2546456A1 (en) * 2011-07-11 2013-01-16 Welltec A/S Positioning method
US8839668B2 (en) * 2011-07-22 2014-09-23 Precision Energy Services, Inc. Autonomous formation pressure test process for formation evaluation tool
CA2842791C (en) * 2011-07-25 2017-03-14 Halliburton Energy Services, Inc. Automatic optimizing methods for reservoir testing
CN102354501B (zh) * 2011-09-27 2012-10-17 北京航空航天大学 一种用于钻柱声传输技术的单向回波噪声抑制方法
US9611931B2 (en) * 2012-05-24 2017-04-04 GM Global Technology Operations LLC Method to detect loss of fluid or blockage in a hydraulic circuit using exponentially weighted moving average filter
WO2013187890A1 (en) 2012-06-13 2013-12-19 Halliburton Energy Services, Inc. Apparatus and method for pulse testing a formation
US9309747B2 (en) * 2012-09-14 2016-04-12 Baker Hughes Incorporated System and method for generating profile-based alerts/alarms
US9823373B2 (en) 2012-11-08 2017-11-21 Halliburton Energy Services, Inc. Acoustic telemetry with distributed acoustic sensing system
EP2920466B1 (en) * 2012-11-19 2018-07-11 Lufkin Industries, LLC Real-time pump diagnostic algorithms and application thereof
WO2014120323A1 (en) * 2013-01-31 2014-08-07 Schlumberger Canada Limited Methods for analyzing formation tester pretest data
WO2014130342A1 (en) * 2013-02-20 2014-08-28 Apache Corporation Methods for determining well log attributes for formation characterization
US9303510B2 (en) * 2013-02-27 2016-04-05 Schlumberger Technology Corporation Downhole fluid analysis methods
CN104704395A (zh) * 2013-06-14 2015-06-10 雷米技术有限责任公司 伽马探针健康检测组合件
CA2916067C (en) 2013-06-19 2021-06-08 National Oilwell Varco Norway As Method and apparatus for real-time fluid compressibility measurements
CN105705730A (zh) * 2013-11-27 2016-06-22 兰德马克绘图国际公司 用于优化欠平衡钻井的方法和装置
US9557312B2 (en) 2014-02-11 2017-01-31 Schlumberger Technology Corporation Determining properties of OBM filtrates
US10731460B2 (en) * 2014-04-28 2020-08-04 Schlumberger Technology Corporation Determining formation fluid variation with pressure
US10125558B2 (en) * 2014-05-13 2018-11-13 Schlumberger Technology Corporation Pumps-off annular pressure while drilling system
US10435973B2 (en) 2014-11-19 2019-10-08 Halliburton Energy Services, Inc. Assessment of pumpoff risk
CN105781262B (zh) * 2014-12-16 2018-03-30 中国石油化工股份有限公司 一种产能试井方法
WO2016108883A1 (en) 2014-12-31 2016-07-07 Halliburton Energy Services, Inc. Optimizing stimulation and fluid management operations
WO2016108891A1 (en) 2014-12-31 2016-07-07 Halliburton Energy Services, Inc. Optimizing running operations
WO2016108893A1 (en) * 2014-12-31 2016-07-07 Halliburton Energy Services, Inc. Optimizing completion operations
CN104675345B (zh) * 2015-01-19 2017-05-03 西南石油大学 一种固井前置液冲洗效率工程模拟量化评价装置及方法
US20170139077A1 (en) * 2015-03-17 2017-05-18 Halliburton Energy Services, Inc Optimization of Downhole Logging Tool Data Resolution
US10419018B2 (en) 2015-05-08 2019-09-17 Schlumberger Technology Corporation Real-time annulus pressure while drilling for formation integrity test
CN104989385B (zh) * 2015-05-12 2017-12-22 四川大学 基于表皮系数计算的高温高压油气直井射孔参数优化方法
CN105224312A (zh) * 2015-09-07 2016-01-06 中国石油天然气股份有限公司 一种基于公式解析的石油测井模型处理方法及系统
CN105227503B (zh) * 2015-09-08 2019-01-18 北京航空航天大学 一种基于无线随钻测量系统的井下信源信道联合编码方法
CN105569652A (zh) * 2016-01-07 2016-05-11 陕西华晨石油科技有限公司 一种小层压力测试分析方法
US9965841B2 (en) * 2016-02-29 2018-05-08 Schneider Electric USA, Inc. Monitoring system based on image analysis of photos
CN110300788A (zh) * 2017-02-22 2019-10-01 哈利伯顿能源服务公司 通过组成分析利用废产物
WO2020065365A1 (en) 2018-09-25 2020-04-02 Cgg Services Sas Automatically detecting and correcting anomalies in log data
US20210355814A1 (en) * 2018-11-08 2021-11-18 Halliburton Energy Services, Inc. Method for estimating wellbore compressibility
CN109374217A (zh) * 2018-12-07 2019-02-22 中国石油集团渤海钻探工程有限公司 一种固井水泥车小容积短管线精准hse试压方法
US11839446B2 (en) * 2020-06-02 2023-12-12 GE Precision Healthcare LLC Wireless patient monitoring system and method
CN111859701A (zh) * 2020-07-29 2020-10-30 西南石油大学 一种固井水泥浆塑性体积收缩与孔隙压降评价方法
CN114183130B (zh) * 2020-09-14 2024-02-23 中国石油化工股份有限公司 基于电测井的碳同位素预测方法、装置、电子设备及介质
US11643922B2 (en) 2021-07-07 2023-05-09 Saudi Arabian Oil Company Distorted well pressure correction
CN113803003B (zh) * 2021-08-10 2023-05-05 中石化石油工程技术服务有限公司 纳微米发育泥页岩孔隙的封堵方法
US20230235645A1 (en) * 2022-01-27 2023-07-27 Saudi Arabian Oil Company Pressure-pulsing for effective mudcake removal
CN117147075A (zh) * 2023-10-30 2023-12-01 四川宏大安全技术服务有限公司 一种井控装备水密封试压方法及系统
CN117271980B (zh) * 2023-11-17 2024-02-02 中国水利水电科学研究院 钻进数据处理方法、装置、电子设备及存储介质

Family Cites Families (89)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3321965A (en) 1964-10-08 1967-05-30 Exxon Production Research Co Method for testing wells
US3352361A (en) 1965-03-08 1967-11-14 Schlumberger Technology Corp Formation fluid-sampling apparatus
US3448611A (en) 1966-09-29 1969-06-10 Schlumberger Technology Corp Method and apparatus for formation testing
US3898877A (en) 1971-12-20 1975-08-12 Sperry Sun Well Surveying Co Method and apparatus for measuring pressure related parameters
US3811321A (en) 1972-12-08 1974-05-21 Schlumberger Technology Corp Methods and apparatus for testing earth formations
US3859851A (en) 1973-12-12 1975-01-14 Schlumberger Technology Corp Methods and apparatus for testing earth formations
US3934468A (en) * 1975-01-22 1976-01-27 Schlumberger Technology Corporation Formation-testing apparatus
SU964124A1 (ru) * 1981-03-06 1982-10-07 Всесоюзный научно-исследовательский институт нефтепромысловой геофизики Способ исследовани пластов в необсаженных скважинах
US4416152A (en) 1981-10-09 1983-11-22 Dresser Industries, Inc. Formation fluid testing and sampling apparatus
US4953399A (en) 1982-09-13 1990-09-04 Western Atlas International, Inc. Method and apparatus for determining characteristics of clay-bearing formations
FR2544790B1 (fr) 1983-04-22 1985-08-23 Flopetrol Methode de determination des caracteristiques d'une formation souterraine produisant un fluide
US4507957A (en) 1983-05-16 1985-04-02 Dresser Industries, Inc. Apparatus for testing earth formations
US4513612A (en) 1983-06-27 1985-04-30 Halliburton Company Multiple flow rate formation testing device and method
NO170037C (no) 1985-07-23 1992-09-02 Flopetrol Services Inc Fremgangsmaate for maaling av stroemningshastigheter i en borebroenn.
US4745802A (en) 1986-09-18 1988-05-24 Halliburton Company Formation testing tool and method of obtaining post-test drawdown and pressure readings
US4742459A (en) 1986-09-29 1988-05-03 Schlumber Technology Corp. Method and apparatus for determining hydraulic properties of formations surrounding a borehole
US5201974A (en) 1990-02-06 1993-04-13 West Frederick A Method and apparatus for making patterned electrically conductive structures
US4890487A (en) 1987-04-07 1990-01-02 Schlumberger Technology Corporation Method for determining horizontal and/or vertical permeability of a subsurface earth formation
US4949575A (en) 1988-04-29 1990-08-21 Anadrill, Inc. Formation volumetric evaluation while drilling
US4879900A (en) 1988-07-05 1989-11-14 Halliburton Logging Services, Inc. Hydraulic system in formation test tools having a hydraulic pad pressure priority system and high speed extension of the setting pistons
US4843878A (en) 1988-09-22 1989-07-04 Halliburton Logging Services, Inc. Method and apparatus for instantaneously indicating permeability and horner plot slope relating to formation testing
US4860581A (en) * 1988-09-23 1989-08-29 Schlumberger Technology Corporation Down hole tool for determination of formation properties
US4936139A (en) * 1988-09-23 1990-06-26 Schlumberger Technology Corporation Down hole method for determination of formation properties
US5072387A (en) * 1989-12-20 1991-12-10 Chevron Research And Technology Company Method for determining a transit time for a radioactive tracer
US5184508A (en) 1990-06-15 1993-02-09 Louisiana State University And Agricultural And Mechanical College Method for determining formation pressure
US5095745A (en) * 1990-06-15 1992-03-17 Louisiana State University Method and apparatus for testing subsurface formations
US5230244A (en) 1990-06-28 1993-07-27 Halliburton Logging Services, Inc. Formation flush pump system for use in a wireline formation test tool
US5144589A (en) 1991-01-22 1992-09-01 Western Atlas International, Inc. Method for predicting formation pore-pressure while drilling
US5233866A (en) * 1991-04-22 1993-08-10 Gulf Research Institute Apparatus and method for accurately measuring formation pressures
US5265015A (en) 1991-06-27 1993-11-23 Schlumberger Technology Corporation Determining horizontal and/or vertical permeability of an earth formation
US5335542A (en) 1991-09-17 1994-08-09 Schlumberger Technology Corporation Integrated permeability measurement and resistivity imaging tool
US5247830A (en) 1991-09-17 1993-09-28 Schlumberger Technology Corporation Method for determining hydraulic properties of formations surrounding a borehole
US5269180A (en) 1991-09-17 1993-12-14 Schlumberger Technology Corp. Borehole tool, procedures, and interpretation for making permeability measurements of subsurface formations
US5353637A (en) 1992-06-09 1994-10-11 Plumb Richard A Methods and apparatus for borehole measurement of formation stress
US5635631A (en) 1992-06-19 1997-06-03 Western Atlas International, Inc. Determining fluid properties from pressure, volume and temperature measurements made by electric wireline formation testing tools
US5708204A (en) 1992-06-19 1998-01-13 Western Atlas International, Inc. Fluid flow rate analysis method for wireline formation testing tools
US5303582A (en) 1992-10-30 1994-04-19 New Mexico Tech Research Foundation Pressure-transient testing while drilling
US5329811A (en) 1993-02-04 1994-07-19 Halliburton Company Downhole fluid property measurement tool
US5602334A (en) 1994-06-17 1997-02-11 Halliburton Company Wireline formation testing for low permeability formations utilizing pressure transients
CA2155918C (en) 1994-08-15 2001-10-09 Roger Lynn Schultz Integrated well drilling and evaluation
US5555945A (en) 1994-08-15 1996-09-17 Halliburton Company Early evaluation by fall-off testing
US6157893A (en) 1995-03-31 2000-12-05 Baker Hughes Incorporated Modified formation testing apparatus and method
US6047239A (en) 1995-03-31 2000-04-04 Baker Hughes Incorporated Formation testing apparatus and method
AU5379196A (en) * 1995-03-31 1996-10-16 Baker Hughes Incorporated Formation isolation and testing apparatus and method
AUPN497195A0 (en) 1995-08-23 1995-09-14 Commonwealth Scientific And Industrial Research Organisation Methods for determining irreducible water resistivity and estimating oil well reserves
US5703286A (en) 1995-10-20 1997-12-30 Halliburton Energy Services, Inc. Method of formation testing
DE69636665T2 (de) 1995-12-26 2007-10-04 Halliburton Co., Dallas Vorrichtung und Verfahren zur Frühbewertung und Unterhalt einer Bohrung
US5770798A (en) 1996-02-09 1998-06-23 Western Atlas International, Inc. Variable diameter probe for detecting formation damage
US5644076A (en) 1996-03-14 1997-07-01 Halliburton Energy Services, Inc. Wireline formation tester supercharge correction method
US5741962A (en) 1996-04-05 1998-04-21 Halliburton Energy Services, Inc. Apparatus and method for analyzing a retrieving formation fluid utilizing acoustic measurements
US5969241A (en) * 1996-04-10 1999-10-19 Schlumberger Technology Corporation Method and apparatus for measuring formation pressure
FR2747729B1 (fr) 1996-04-23 1998-07-03 Elf Aquitaine Methode d'identification automatique de la nature d'un puits de production d'hydrocarbures
US5934374A (en) 1996-08-01 1999-08-10 Halliburton Energy Services, Inc. Formation tester with improved sample collection system
US6058773A (en) 1997-05-16 2000-05-09 Schlumberger Technology Corporation Apparatus and method for sampling formation fluids above the bubble point in a low permeability, high pressure formation
US6176323B1 (en) 1997-06-27 2001-01-23 Baker Hughes Incorporated Drilling systems with sensors for determining properties of drilling fluid downhole
US5789669A (en) 1997-08-13 1998-08-04 Flaum; Charles Method and apparatus for determining formation pressure
US6026915A (en) 1997-10-14 2000-02-22 Halliburton Energy Services, Inc. Early evaluation system with drilling capability
US6006834A (en) 1997-10-22 1999-12-28 Halliburton Energy Services, Inc. Formation evaluation testing apparatus and associated methods
US6758090B2 (en) 1998-06-15 2004-07-06 Schlumberger Technology Corporation Method and apparatus for the detection of bubble point pressure
US6343507B1 (en) 1998-07-30 2002-02-05 Schlumberger Technology Corporation Method to improve the quality of a formation fluid sample
US6178815B1 (en) 1998-07-30 2001-01-30 Schlumberger Technology Corporation Method to improve the quality of a formation fluid sample
US6230557B1 (en) * 1998-08-04 2001-05-15 Schlumberger Technology Corporation Formation pressure measurement while drilling utilizing a non-rotating sleeve
US6157032A (en) 1998-11-04 2000-12-05 Schlumberger Technologies, Inc. Sample shape determination by measurement of surface slope with a scanning electron microscope
US6325146B1 (en) 1999-03-31 2001-12-04 Halliburton Energy Services, Inc. Methods of downhole testing subterranean formations and associated apparatus therefor
US6334489B1 (en) 1999-07-19 2002-01-01 Wood Group Logging Services Holding Inc. Determining subsurface fluid properties using a downhole device
US6147437A (en) 1999-08-11 2000-11-14 Schlumberger Technology Corporation Pressure and temperature transducer
US6343650B1 (en) 1999-10-26 2002-02-05 Halliburton Energy Services, Inc. Test, drill and pull system and method of testing and drilling a well
US6340062B1 (en) 2000-01-24 2002-01-22 Halliburton Energy Services, Inc. Early formation evaluation tool
US6568487B2 (en) 2000-07-20 2003-05-27 Baker Hughes Incorporated Method for fast and extensive formation evaluation using minimum system volume
EP1676976B1 (en) 2000-07-20 2008-11-19 Baker Hughes Incorporated Drawdown apparatus and method for in-situ analysis of formation fluids
US6427530B1 (en) 2000-10-27 2002-08-06 Baker Hughes Incorporated Apparatus and method for formation testing while drilling using combined absolute and differential pressure measurement
US6474152B1 (en) 2000-11-02 2002-11-05 Schlumberger Technology Corporation Methods and apparatus for optically measuring fluid compressibility downhole
US6761062B2 (en) 2000-12-06 2004-07-13 Allen M. Shapiro Borehole testing system
CN1256578C (zh) 2001-06-07 2006-05-17 西安石油大学 全储层取样测试器
US7011155B2 (en) * 2001-07-20 2006-03-14 Baker Hughes Incorporated Formation testing apparatus and method for optimizing draw down
US7395703B2 (en) * 2001-07-20 2008-07-08 Baker Hughes Incorporated Formation testing apparatus and method for smooth draw down
US7059179B2 (en) 2001-09-28 2006-06-13 Halliburton Energy Services, Inc. Multi-probe pressure transient analysis for determination of horizontal permeability, anisotropy and skin in an earth formation
US6843118B2 (en) * 2002-03-08 2005-01-18 Halliburton Energy Services, Inc. Formation tester pretest using pulsed flow rate control
US6932167B2 (en) * 2002-05-17 2005-08-23 Halliburton Energy Services, Inc. Formation testing while drilling data compression
US6672386B2 (en) 2002-06-06 2004-01-06 Baker Hughes Incorporated Method for in-situ analysis of formation parameters
US6820702B2 (en) * 2002-08-27 2004-11-23 Noble Drilling Services Inc. Automated method and system for recognizing well control events
US6832515B2 (en) 2002-09-09 2004-12-21 Schlumberger Technology Corporation Method for measuring formation properties with a time-limited formation test
RU2349751C2 (ru) * 2003-03-10 2009-03-20 Бейкер Хьюз Инкорпорейтед Способ и устройство для контроля качества откачки флюида с помощью анализа скорости притока флюида из породы
US7178392B2 (en) * 2003-08-20 2007-02-20 Schlumberger Technology Corporation Determining the pressure of formation fluid in earth formations surrounding a borehole
US7114562B2 (en) * 2003-11-24 2006-10-03 Schlumberger Technology Corporation Apparatus and method for acquiring information while drilling
US7181960B2 (en) 2004-08-26 2007-02-27 Baker Hughes Incorporated Determination of correct horizontal and vertical permeabilities in a deviated well
EP1703076B1 (en) 2005-02-28 2009-03-25 Services Petroliers Schlumberger Method for measuring formation properties with a formation tester
US20090037206A1 (en) * 2007-07-31 2009-02-05 Brian Dara Byrne Method of forecasting maintenance of a machine
US8121971B2 (en) * 2007-10-30 2012-02-21 Bp Corporation North America Inc. Intelligent drilling advisor

Also Published As

Publication number Publication date
CN101960087A (zh) 2011-01-26
BRPI0821665A2 (pt) 2015-06-16
US8136395B2 (en) 2012-03-20
MX2010007106A (es) 2010-08-12
CN101960087B (zh) 2013-12-25
EP2240669A2 (en) 2010-10-20
RU2482273C2 (ru) 2013-05-20
WO2009088816A2 (en) 2009-07-16
WO2009088816A3 (en) 2009-12-30
WO2009088816A8 (en) 2010-07-15
BRPI0821665B1 (pt) 2018-12-11
US20090165548A1 (en) 2009-07-02
EP2240669B1 (en) 2018-07-25

Similar Documents

Publication Publication Date Title
RU2482273C2 (ru) Способ для анализа скважинных данных (варианты)
AU2017435485B2 (en) Measurement-while-drilling method and device for assessing outburst risk of coal seam
CN107476822B (zh) 煤层突出危险性随钻测试方法及装置
CN104793264B (zh) 应用于钻机的地质状况实时反映与超前探测系统及方法
US20150083405A1 (en) Method of conducting diagnostics on a subterranean formation
CN105041293A (zh) 用于监测钻井系统的系统及方法
RU2011153423A (ru) Мониторинг гидравлического разрыва пласта
CN111364981B (zh) 用于测量近钻头随钻岩性的方法及监测随钻岩性的系统
US9291015B2 (en) Systems and methods for determining enhanced equivalent circulating density and interval solids concentration in a well system using multiple sensors
CA2472436A1 (en) Method and apparatus for performing diagnostics on a downhole communication system
RU2011138961A (ru) Способ и устройство для оценки состояния бурового долота
CN101743377A (zh) 临界解吸压力的现场确定
WO2006120366A8 (en) Methods for analysis of pressure response in underground formations
CN104989389A (zh) 一种煤体强度分布特征连续探测方法及装置
EA010955B1 (ru) Способ и система для определения положения бурового долота
BR112017022730B1 (pt) Aparelho e método para estimar e exibir propriedades de formação e de fluido de formação
CA2574479A1 (en) Method and apparatus for estimating a permeability distribution during a well test
AU2012376842B2 (en) Compressional velocity correction apparatus, methods, and systems
AU2012233076B2 (en) Lag calculation with caving correction in open hole
CN204327076U (zh) 钻井液漏失综合判识系统
CN103352689B (zh) 一种利用放射性示踪测井技术确定井径的方法
CN107605463B (zh) 一种用于钻井堵漏施工的井筒动液面监测方法
CN102121376A (zh) 智能型煤层瓦斯压力测试仪
CN102278109A (zh) 井漏位置地面与井下综合检测系统及方法
CN109736771B (zh) 基于凿岩台车随钻参数的围岩分析方法及系统

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20181230