RU2005102137A - Способ определения давления в подземных пластах - Google Patents

Способ определения давления в подземных пластах Download PDF

Info

Publication number
RU2005102137A
RU2005102137A RU2005102137/03A RU2005102137A RU2005102137A RU 2005102137 A RU2005102137 A RU 2005102137A RU 2005102137/03 A RU2005102137/03 A RU 2005102137/03A RU 2005102137 A RU2005102137 A RU 2005102137A RU 2005102137 A RU2005102137 A RU 2005102137A
Authority
RU
Russia
Prior art keywords
specified
pressure
interval
determining
formations
Prior art date
Application number
RU2005102137/03A
Other languages
English (en)
Other versions
RU2362875C2 (ru
Inventor
Александр ЗАЗОВСКИ (US)
Александр ЗАЗОВСКИ
Джулиан Дж. ПОП (US)
Джулиан Дж. ПОП
Пол С. ХАММОНД (GB)
Пол С. ХАММОНД
Original Assignee
Шлюмбергер Текнолоджи Бв (Nl)
Шлюмбергер Текнолоджи Бв
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шлюмбергер Текнолоджи Бв (Nl), Шлюмбергер Текнолоджи Бв filed Critical Шлюмбергер Текнолоджи Бв (Nl)
Publication of RU2005102137A publication Critical patent/RU2005102137A/ru
Application granted granted Critical
Publication of RU2362875C2 publication Critical patent/RU2362875C2/ru

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Claims (21)

1. Способ определения первоначального пластового давления на отдельном интервале глубин подземных пластов, окружающих скважину, пробуренную с использованием бурового раствора, и на которой образовалась глинистая корка, содержащий следующие этапы: отслеживание времени после прекращения бурения на указанном интервале глубин, получение проницаемости пластов на указанном интервале глубин, побуждение давления в стволе скважины к периодическому изменению во времени и определение на указанном интервале глубин периодической составляющей и непериодической составляющей давления, измеряемого в пластах, прилегающих к глинистой корке, определение коэффициента диффузии давления и гидропроводности пластов путем использования указанного времени, указанной периодической составляющей и указанной проницаемости и оценивание размера зоны повышения давления вокруг ствола скважины на указанном интервале глубин пластов, определение показателя фильтрации глинистой корки на указанном интервале глубин путем использования указанного времени, указанного коэффициента диффузии давления и гидропроводности пластов и указанной непериодической составляющей, определение градиента давления в пластах, прилегающих к глинистой корке на указанном интервале глубин, путем использования указанного показателя фильтрации и экстраполяцию для того, чтобы определить первоначальное пластовое давление путем использования указанного градиента давления и указанного размера зоны повышения давления.
2. Способ по п.1, в котором указанный этап определения периодической составляющей и непериодической составляющей давления, измеряемого в пластах, прилегающих к глинистой корке, включает в себя доставку устройства для испытания пластов на указанный интервал глубин и измерение пластового давления зондом указанного устройства, который вводят через глинистую корку в пласты, прилегающие к глинистой корке.
3. Способ по п.2, в котором указанный этап определения периодической составляющей и непериодической составляющей указанного давления, измеряемого в пластах, прилегающих к глинистой корке, включает в себя определение указанной непериодической составляющей по среднему значению давления, измеренного указанным зондом, и определение указанной периодической составляющей по вариациям от указанного среднего значения.
4. Способ по п.3, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на каротажном кабеле.
5. Способ по п.3, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на буровой колонне.
6. Способ определения первоначального пластового давления на отдельном интервале глубин подземных пластов, окружающих скважину, пробуренную с использованием бурового раствора, и на которой образовалась глинистая корка, содержащий следующие этапы: побуждение давления в стволе скважины к периодическому изменению во времени, определение на указанном интервале глубин периодической составляющей и непериодической составляющей давления, измеряемого в пластах, прилегающих к глинистой корке, определение и оценивание размера зоны повышения давления вокруг ствола скважины на указанном интервале глубин пластов путем использования указанной периодической составляющей, определение показателя фильтрации глинистой корки на указанном интервале глубин путем использования указанной непериодической составляющей и определение первоначального пластового давления путем использования указанного показателя фильтрации и указанного размера зоны повышения давления.
7. Способ по п.6, в котором указанный этап определения первоначального пластового давления путем использования указанного показателя фильтрации включает в себя определение градиента давления в пластах, прилегающих к глинистой корке на указанном интервале глубин, по указанному показателю фильтрации и экстраполяцию для того, чтобы определить указанное первоначальное пластовое давление путем использования указанного градиента давления и указанного размера зоны повышения давления.
8. Способ по п.7, дополнительно содержащий этап отслеживания времени после бурения на указанном интервале глубин, и в котором указанное время используют на указанном этапе определения оценки размера указанной зоны повышения давления и на указанном этапе определения указанного градиента давления.
9. Способ по п.6, в котором указанный этап определения периодической составляющей и непериодической составляющей давления, измеряемого в пластах, прилегающих к глинистой корке, включает в себя доставку устройства для испытания пластов на указанный интервал глубин и измерение пластового давления зондом указанного устройства, который вводят через глинистую корку в пласты, прилегающие к глинистой корке.
10. Способ по п.9, в котором указанный этап определения периодической составляющей и непериодической составляющей указанного давления, измеряемого в пластах, прилегающих к глинистой корке, включает в себя определение указанной непериодической составляющей по среднему значению давления, измеренного указанным зондом, и определение указанной периодической составляющей по вариациям от указанного среднего значения.
11. Способ по п.9, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на каротажном кабеле.
12. Способ определения первоначального пластового давления на отдельном интервале глубин подземных пластов, окружающих скважину, пробуренную с использованием бурового раствора, и на которой образовалась глинистая корка, содержащий следующие этапы: отслеживание времени после прекращения бурения, получение проницаемости пластов на указанном интервале глубин, побуждение давления в стволе скважины к периодическому изменению во времени и измерение на указанном интервале глубин изменяющегося во времени давления в скважине и изменяющегося во времени давления в пластах, прилегающих к глинистой корке, определение на указанном интервале глубин оценки сопротивления потоку глинистой корки по указанной полученной проницаемости и составляющим указанного измеренного давления в скважине и указанного измеренного давления в пластах, прилегающих к глинистой корке, определение на указанном интервале глубин показателя фильтрации глинистой корки по указанному оцененному сопротивлению потоку и указанному измеренному давлению в скважине, и указанному измеренному давлению в пластах, прилегающих к глинистой корке, определение на указанном интервале глубин избытка давления в пластах, прилегающих к глинистой корке, по указанной полученной проницаемости, указанному показателю фильтрации и указанному времени после прекращения бурения, и определение на указанном интервале глубин первоначального пластового давления по указанному измеренному давлению в пластах, прилегающих к глинистой корке, и указанному избытку давления в пластах.
13. Способ по п.12, в котором указанный этап измерения изменяющегося во времени давления в скважине и изменяющегося во времени давления в пластах, прилегающих к глинистой корке, включает в себя доставку устройства для испытания пластов на указанный интервал глубин и измерение пластового давления зондом указанного устройства, который вводят через глинистую корку в пласты, прилегающие к глинистой корке.
14. Способ по п.13, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на каротажном кабеле.
15. Способ по п.13, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на буровой колонне.
16. Способ определения показателя фильтрации глинистой корки, образовавшейся на отдельном интервале глубин на скважине, пробуренной в пластах с использованием бурового раствора, содержащий следующие этапы: получение проницаемости пластов на указанном интервале глубин, побуждение давления в стволе скважины к периодическому изменению во времени и измерение на указанном интервале глубин изменяющегося во времени давления в скважине и изменяющегося во времени давления в пластах, прилегающих к глинистой корке, определение на указанном интервале глубин оценки сопротивления потоку глинистой корки по указанной полученной проницаемости и составляющим указанного измеренного давления в скважине и указанного измеренного давления в пластах, прилегающих к глинистой корке, и определение на указанном интервале глубин показателя фильтрации глинистой корки по указанному оцененному сопротивлению потоку и указанному измеренному давлению в скважине, и указанному измеренному давлению в пластах, прилегающих к глинистой корке.
17. Способ по п.16, в котором указанный этап измерения изменяющегося во времени давления в скважине и изменяющегося во времени давления в пластах, прилегающих к глинистой корке, включает в себя доставку устройства для испытания пластов на указанный интервал глубин и измерение пластового давления зондом указанного устройства, который вводят через глинистую корку в пласты, прилегающие к глинистой корке.
18. Способ по п.17, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на каротажном кабеле.
19. Способ по п.17, в котором указанный этап доставки устройства для испытания пластов содержит доставку указанного устройства в указанную скважину на буровой колонне.
20. Способ по п.16, дополнительно содержащий: определение на протяжении временного интервала скорости циркуляции и соответствующего репрессионного давления в скважине, определение на протяжении временного интервала показателя фильтрации для скорости каждой циркуляции и соответствующего репрессионного давления в скважине, определение на протяжении временного интервала взаимосвязи между показателем фильтрации и скоростью каждой циркуляции и соответствующим репрессионным давлением и оценивание показателя фильтрации для предыдущего временного интервала, основанное на определенной взаимосвязи.
21. Способ по п.20, дополнительно содержащий уточнение измеренного пластового давления, основанное на оцененном показателе фильтрации.
RU2005102137/03A 2004-01-30 2005-01-28 Способ определения давления в подземных пластах RU2362875C2 (ru)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/769,014 2004-01-30
US10/769,014 US7031841B2 (en) 2004-01-30 2004-01-30 Method for determining pressure of earth formations

Publications (2)

Publication Number Publication Date
RU2005102137A true RU2005102137A (ru) 2006-07-10
RU2362875C2 RU2362875C2 (ru) 2009-07-27

Family

ID=34080911

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005102137/03A RU2362875C2 (ru) 2004-01-30 2005-01-28 Способ определения давления в подземных пластах

Country Status (9)

Country Link
US (1) US7031841B2 (ru)
CN (1) CN100432372C (ru)
AU (1) AU2004237814B2 (ru)
CA (1) CA2491192C (ru)
FR (1) FR2865762B1 (ru)
GB (1) GB2410511B (ru)
MX (1) MXPA05000490A (ru)
NO (1) NO20045471L (ru)
RU (1) RU2362875C2 (ru)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459950C2 (ru) * 2007-03-05 2012-08-27 Шлюмбергер Текнолоджи Б.В. Системы и способы для сжатия данных скважины

Families Citing this family (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8210260B2 (en) * 2002-06-28 2012-07-03 Schlumberger Technology Corporation Single pump focused sampling
US8899323B2 (en) 2002-06-28 2014-12-02 Schlumberger Technology Corporation Modular pumpouts and flowline architecture
US8555968B2 (en) * 2002-06-28 2013-10-15 Schlumberger Technology Corporation Formation evaluation system and method
US7178591B2 (en) * 2004-08-31 2007-02-20 Schlumberger Technology Corporation Apparatus and method for formation evaluation
GB2419424B (en) * 2004-10-22 2007-03-28 Schlumberger Holdings Method and system for estimating the amount of supercharging in a formation
MX2007014065A (es) * 2005-05-10 2008-02-07 Schlumberger Technology Bv Metodos para analisis de respuesta de presion en formaciones subterraneas.
US7361887B2 (en) * 2005-07-26 2008-04-22 Baker Hughes Incorporated Measurement of formation gas pressure in cased wellbores using pulsed neutron instrumentation
CA2653587C (en) * 2006-04-20 2011-06-21 Baker Hughes Incorporated A system and method for estimating supercharge pressure and initial pressure of a formation
BRPI0714972A2 (pt) * 2006-08-14 2012-12-25 Exxonmobil Upstream Res Co mÉtodos para modelar fluxo de um fluido dentro de um reservatàrio, para predizer fluxo em um reservatàrio, para predizer uma ou mais propriedades de material baseadas em fluxo de um reservatàrio, e para predizer o gradiente de pressço em um reservatàrio, e, meio de armazenamentoo legÍvel por computador
US7594541B2 (en) 2006-12-27 2009-09-29 Schlumberger Technology Corporation Pump control for formation testing
US20080230221A1 (en) * 2007-03-21 2008-09-25 Schlumberger Technology Corporation Methods and systems for monitoring near-wellbore and far-field reservoir properties using formation-embedded pressure sensors
US7577023B2 (en) * 2007-05-04 2009-08-18 Qimonda North America Corp. Memory including write circuit for providing multiple reset pulses
US7542853B2 (en) * 2007-06-18 2009-06-02 Conocophillips Company Method and apparatus for geobaric analysis
US8397809B2 (en) 2007-10-23 2013-03-19 Schlumberger Technology Corporation Technique and apparatus to perform a leak off test in a well
US7765862B2 (en) * 2007-11-30 2010-08-03 Schlumberger Technology Corporation Determination of formation pressure during a drilling operation
US8042387B2 (en) * 2008-05-16 2011-10-25 Schlumberger Technology Corporation Methods and apparatus to control a formation testing operation based on a mudcake leakage
WO2009142868A2 (en) 2008-05-23 2009-11-26 Schlumberger Canada Limited Drilling wells in compartmentalized reservoirs
US8120357B2 (en) * 2008-05-30 2012-02-21 Schlumberger Technology Corporation Method and system for fluid characterization of a reservoir
US8015869B2 (en) * 2008-09-02 2011-09-13 Schlumberger Technology Corporation Methods and apparatus to perform pressure testing of geological formations
CN101403294B (zh) * 2008-11-06 2012-05-23 中国石化集团胜利石油管理局地质录井公司 一种pdc钻头与牙轮钻头互换时的地层压力检测方法
US8473214B2 (en) * 2009-04-24 2013-06-25 Schlumberger Technology Corporation Thickness-independent computation of horizontal and vertical permeability
GB2515411B (en) * 2009-10-09 2015-06-10 Senergy Holdings Ltd Well simulation
IT1402183B1 (it) * 2010-09-14 2013-08-28 Torino Politecnico Procedimento di prova di pozzo, in particolare per idrocarburi, a interferenza armonica
RU2449122C9 (ru) * 2010-11-18 2012-07-20 Государственное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" Способ определения упругих характеристик горной породы по данным измерений в скважине
US20120179379A1 (en) * 2011-01-10 2012-07-12 Saudi Arabian Oil Company Flow Profile Modeling for Wells
US9581019B2 (en) * 2011-03-23 2017-02-28 Schlumberger Technology Corporation Measurement pretest drawdown methods and apparatus
PL408174A1 (pl) * 2011-07-11 2014-12-22 Schlumberger Technology B.V. Układ i sposób przeprowadzania operacji stymulacji odwiertu
US9638034B2 (en) 2012-06-13 2017-05-02 Halliburton Energy Services, Inc. Apparatus and method for pulse testing a formation
CN102720487B (zh) * 2012-06-29 2015-10-14 中国石油天然气股份有限公司 一种获取气藏地层压力系统及其方法
CN103015996B (zh) * 2012-12-31 2014-03-19 中国石油大学(华东) 钻前预测高陡构造地层漏失速率的方法
CN103244108B (zh) * 2013-06-05 2014-06-25 中国石油大学(华东) 井喷无法关井情况下的地层压力确定方法
US20150057935A1 (en) * 2013-08-22 2015-02-26 Baker Hughes Incorporated Modified flow rate analysis
GB2533847B (en) * 2014-11-06 2017-04-05 Logined Bv Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory
US10513909B2 (en) * 2015-07-06 2019-12-24 The Regents Of The University Of California Determination of the optimal fluid pulses for enhancement of reservoir permeability and productivity
CA2991324A1 (en) 2015-07-20 2017-01-26 Pietro Fiorentini Spa Systems and methods for monitoring changes in a formation while dynamically flowing fluids
CN105484722B (zh) * 2015-11-25 2018-06-05 中国石油大学(华东) 一种模拟通道压裂泵注方式及测量通道率的装置和工作方法
US10927659B2 (en) * 2015-12-11 2021-02-23 Halliburton Energy Services, Inc. Mud cake correction of formation measurement data
CN106194164B (zh) * 2016-08-10 2019-04-12 中国石油天然气股份有限公司 边底水油藏开发岩心实验模拟方法
EA034881B1 (ru) * 2017-01-11 2020-04-01 Общество С Ограниченной Ответственностью "Сонограм" Способ определения гидродинамических параметров многопластовых скважин
US11162358B2 (en) 2017-06-21 2021-11-02 Schlumberger Technology Corporation Downhole characterization of formation pressure
US10704369B2 (en) * 2017-06-22 2020-07-07 Saudi Arabian Oil Company Simultaneous injection and fracturing interference testing
CN109577969B (zh) * 2018-12-07 2021-10-22 中国地质大学(武汉) 一种基于岩石压缩系数计算碳酸盐岩地层孔隙压力的方法
CN111608647B (zh) * 2020-04-14 2023-07-21 中国石油化工股份有限公司 一种注水注聚井区地层压力预测方法
US11649724B2 (en) * 2020-06-25 2023-05-16 Halliburton Energy Services, Inc. Formation testing and sampling tool for stimulation of tight and ultra-tight formations
CN111963149B (zh) * 2020-08-26 2024-03-01 中国石油天然气集团有限公司 一种考虑滞地液量增压的压裂后地层压力求取方法
US11501623B1 (en) * 2021-05-14 2022-11-15 China University Of Geosciences (Wuhan) Arrangement apparatus for multiple integrated sensors in deep position of sliding mass and arrangement method
CN113605879B (zh) * 2021-08-02 2023-03-21 中国石油大学(北京) 煤储层原始地层压力的计算方法及装置
US11913329B1 (en) 2022-09-21 2024-02-27 Saudi Arabian Oil Company Untethered logging devices and related methods of logging a wellbore

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934468A (en) 1975-01-22 1976-01-27 Schlumberger Technology Corporation Formation-testing apparatus
FR2544790B1 (fr) 1983-04-22 1985-08-23 Flopetrol Methode de determination des caracteristiques d'une formation souterraine produisant un fluide
US4833914A (en) 1988-04-29 1989-05-30 Anadrill, Inc. Pore pressure formation evaluation while drilling
US4860581A (en) 1988-09-23 1989-08-29 Schlumberger Technology Corporation Down hole tool for determination of formation properties
US5138877A (en) * 1990-06-25 1992-08-18 Louisiana State University And Agricultural And Mechanical College Method and apparatus for intersecting a blowout well from a relief well
US5226310A (en) 1990-08-31 1993-07-13 Exxon Production Research Company Methods and apparatuses for measurement of the strengths, pore pressures, and mechanical properties of low permeability geologic materials
US5205164A (en) * 1990-08-31 1993-04-27 Exxon Production Research Company Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters
US5144589A (en) 1991-01-22 1992-09-01 Western Atlas International, Inc. Method for predicting formation pore-pressure while drilling
US5233866A (en) * 1991-04-22 1993-08-10 Gulf Research Institute Apparatus and method for accurately measuring formation pressures
NO930044L (no) 1992-01-09 1993-07-12 Baker Hughes Inc Fremgangsmaate til vurdering av formasjoner og borkronetilstander
US5282384A (en) 1992-10-05 1994-02-01 Baroid Technology, Inc. Method for calculating sedimentary rock pore pressure
US5602334A (en) 1994-06-17 1997-02-11 Halliburton Company Wireline formation testing for low permeability formations utilizing pressure transients
CA2155918C (en) 1994-08-15 2001-10-09 Roger Lynn Schultz Integrated well drilling and evaluation
US6157893A (en) 1995-03-31 2000-12-05 Baker Hughes Incorporated Modified formation testing apparatus and method
US5672819A (en) 1996-03-13 1997-09-30 Halliburton Energy Services, Inc. Formation evaluation using phase shift periodic pressure pulse testing
US5644076A (en) 1996-03-14 1997-07-01 Halliburton Energy Services, Inc. Wireline formation tester supercharge correction method
US6148912A (en) * 1997-03-25 2000-11-21 Dresser Industries, Inc. Subsurface measurement apparatus, system, and process for improved well drilling control and production
US5789669A (en) 1997-08-13 1998-08-04 Flaum; Charles Method and apparatus for determining formation pressure
US6609568B2 (en) * 2000-07-20 2003-08-26 Baker Hughes Incorporated Closed-loop drawdown apparatus and method for in-situ analysis of formation fluids
US6544076B2 (en) * 2001-07-10 2003-04-08 Alan L. Pocrass Dual function RJ connector
US6907797B2 (en) 2002-11-12 2005-06-21 Baker Hughes Incorporated Method and apparatus for supercharging downhole sample tanks
US7331223B2 (en) * 2003-01-27 2008-02-19 Schlumberger Technology Corporation Method and apparatus for fast pore pressure measurement during drilling operations
US6904365B2 (en) * 2003-03-06 2005-06-07 Schlumberger Technology Corporation Methods and systems for determining formation properties and in-situ stresses

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459950C2 (ru) * 2007-03-05 2012-08-27 Шлюмбергер Текнолоджи Б.В. Системы и способы для сжатия данных скважины

Also Published As

Publication number Publication date
MXPA05000490A (es) 2005-08-16
CN1648410A (zh) 2005-08-03
FR2865762A1 (fr) 2005-08-05
CA2491192C (en) 2008-06-17
US7031841B2 (en) 2006-04-18
GB2410511B (en) 2006-10-18
NO20045471L (no) 2005-08-01
CN100432372C (zh) 2008-11-12
FR2865762B1 (fr) 2007-03-30
CA2491192A1 (en) 2005-07-30
AU2004237814B2 (en) 2006-11-30
RU2362875C2 (ru) 2009-07-27
AU2004237814A1 (en) 2005-08-18
GB2410511A (en) 2005-08-03
US20050171699A1 (en) 2005-08-04
NO20045471D0 (no) 2004-12-15
GB0426945D0 (en) 2005-01-12

Similar Documents

Publication Publication Date Title
RU2005102137A (ru) Способ определения давления в подземных пластах
CA2034444C (en) Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability
US20150083405A1 (en) Method of conducting diagnostics on a subterranean formation
RU2505672C1 (ru) Способ определения профиля притока и параметров околоскважинного пространства в многопластовой скважине
US20030213591A1 (en) Well testing using multiple pressure measurements
CA2962574C (en) Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool
RU2371576C1 (ru) Способ одновременно-раздельного исследования и разработки многопластовых месторождений (варианты)
EP0176410B1 (en) Method for uniquely estimating permeability and skin factor for at least two layers of a reservoir
RU2460878C2 (ru) Способ определения профиля притока флюидов и параметров околоскважинного пространства
CN103237957A (zh) 用于测量地下地层中的压力的方法
RU2535324C2 (ru) Способ определения параметров забоя и призабойной зоны скважины
US9988902B2 (en) Determining the quality of data gathered in a wellbore in a subterranean formation
US4222438A (en) Reservoir fluid sampling method and apparatus
RU2290507C2 (ru) Способ определения фильтрационных параметров сложнопостроенных коллекторов и многопластовых объектов
RU2680566C1 (ru) Способ определения профиля притока в низкодебитных горизонтальных скважинах с многостадийным гидроразрывом пласта
EA034881B1 (ru) Способ определения гидродинамических параметров многопластовых скважин
RU2366813C1 (ru) Способ испытания скважин, исследования пластов в процессе бурения и устройство для его осуществления
RU2527960C1 (ru) Способ исследования скважины
RU2269000C2 (ru) Способ определения проницаемых зон скважины
DK201370421A1 (en) Method of determining well productivity along a section of a wellbore
Screaton et al. In situ permeability tests at Site 892: characteristics of a hydrogeologically active fault zone on the Oregon accretionary prism
US11248999B2 (en) Method and apparatus for measuring slip velocity of drill cuttings obtained from subsurface formations
SU727842A1 (ru) Гидравлический испытатель приемистости пластов
SU933973A1 (ru) Способ определени глубины залегани поглощающего пласта
RU2184232C2 (ru) Способ определения статистических характеристик коэффициента бокового распора пласта пористой горной породы

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20170129