RU2003131011A - METHOD FOR INSTALLING COMPLEX PROFILES - Google Patents

METHOD FOR INSTALLING COMPLEX PROFILES Download PDF

Info

Publication number
RU2003131011A
RU2003131011A RU2003131011/03A RU2003131011A RU2003131011A RU 2003131011 A RU2003131011 A RU 2003131011A RU 2003131011/03 A RU2003131011/03 A RU 2003131011/03A RU 2003131011 A RU2003131011 A RU 2003131011A RU 2003131011 A RU2003131011 A RU 2003131011A
Authority
RU
Russia
Prior art keywords
wells
contour
ledge
vertical
deviated
Prior art date
Application number
RU2003131011/03A
Other languages
Russian (ru)
Other versions
RU2265794C2 (en
Inventor
Иль Николаевич Александров (RU)
Илья Николаевич Александров
Григорий Владимирович Шубин (RU)
Григорий Владимирович Шубин
Дмитрий Иванович Кирюшин (RU)
Дмитрий Иванович Кирюшин
Original Assignee
Акционерна Компани "АЛРОСА" (ЗАО) (RU)
Акционерная компания "АЛРОСА" (ЗАО)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерна Компани "АЛРОСА" (ЗАО) (RU), Акционерная компания "АЛРОСА" (ЗАО) filed Critical Акционерна Компани "АЛРОСА" (ЗАО) (RU)
Priority to RU2003131011/03A priority Critical patent/RU2265794C2/en
Publication of RU2003131011A publication Critical patent/RU2003131011A/en
Application granted granted Critical
Publication of RU2265794C2 publication Critical patent/RU2265794C2/en

Links

Landscapes

  • Earth Drilling (AREA)

Claims (1)

Способ заоткоски уступов сложного профиля, включающий забуривание контурных наклонных скважин с верхнего уступа на высоту сдвоенного уступа для образования отрезной щели при формировании верхней наклонной части уступа, и контурных вертикальных скважин с промежуточного уступа на ту же глубину для формирования нижней вертикальной части уступа, заряжание и взрывание, отличающийся тем, что бурение скважин контурного ряда с промежуточного уступа производят в три этапа: первоначально на первом этапе бурят часть наклонных скважин от начальной до конечной точки участка заоткоски с одним направлением наклона, на втором этапе бурят наклонные скважины контурного ряда, имеющие тот же наклон и то же расстояние между скважинами, что и на первом этапе, но во встречном направлении, на третьем этапе между упомянутыми наклонными контурными скважинами бурят вертикальные контурные скважины, заряжают наклонные скважины контурного ряда постоянным от забоя к устью скважин по величине зарядом, а в вертикальных контурных скважинах, размещенных между наклонными контурными скважинами, изменяют величину заряда последовательно от забоя к устью, при этом минимальному расстоянию между наклонными и вертикальной контурными скважинами у подошвы нижнего уступа соответствует минимальный заряд в вертикальной контурной скважине, который по мере удаления от подошвы нижнего уступа последовательно увеличивается, достигая своего максимального значения у подошвы промежуточного уступа, при максимальном расстоянии между наклонными и вертикальной контурными скважинами у подошвы нижнего уступа изменение величины заряда в вертикальной контурной скважине от забоя к устью производят в обратном порядке.The method of ejection of ledges of complex profile, including drilling contour deviated wells from the upper ledge to the height of the double ledge to form a cutting gap when forming the upper inclined part of the ledge, and contour vertical wells from the intermediate ledge to the same depth to form the lower vertical part of the ledge, loading and blasting , characterized in that the contour row wells are drilled from an intermediate step in three stages: initially, at the first stage, part of the deviated wells are drilled from the initial to the end point of the offshoot section with one direction of inclination, at the second stage, deviate wells of the contour row having the same inclination and the same distance between the wells as at the first stage, but in the opposite direction, at the third stage between the mentioned inclined contour wells they drill vertical contour wells, charge the deviated wells of the contour row constant from the bottom to the wellhead by the magnitude of the charge, and in vertical contour wells located between the deviated contour wells, measure charge value is sequentially from the bottom to the mouth, while the minimum distance between the deviated and vertical contour wells at the bottom of the lower ledge corresponds to the minimum charge in the vertical contour well, which gradually increases with distance from the bottom of the bottom ledge, reaching its maximum value at the bottom of the intermediate ledge , at the maximum distance between the deviated and vertical contour wells at the bottom of the lower ledge, the change in the magnitude of the charge in the vertical th contour borehole from the bottom to the mouth produce in the reverse order.
RU2003131011/03A 2003-10-21 2003-10-21 Method for sloping of configured benches RU2265794C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2003131011/03A RU2265794C2 (en) 2003-10-21 2003-10-21 Method for sloping of configured benches

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2003131011/03A RU2265794C2 (en) 2003-10-21 2003-10-21 Method for sloping of configured benches

Publications (2)

Publication Number Publication Date
RU2003131011A true RU2003131011A (en) 2005-04-27
RU2265794C2 RU2265794C2 (en) 2005-12-10

Family

ID=35635645

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2003131011/03A RU2265794C2 (en) 2003-10-21 2003-10-21 Method for sloping of configured benches

Country Status (1)

Country Link
RU (1) RU2265794C2 (en)

Also Published As

Publication number Publication date
RU2265794C2 (en) 2005-12-10

Similar Documents

Publication Publication Date Title
EA200500372A1 (en) METHOD OF IMPROVING DRILLING DEPTH MEASUREMENTS
WO2006101606A3 (en) Method for running tubulars in wellbores
CA2491192A1 (en) Method for determining pressure of earth formations
CN101824970A (en) Elastic rigid centralizer
RU2003131011A (en) METHOD FOR INSTALLING COMPLEX PROFILES
RU2007112903A (en) METHOD FOR SURFACE OF UNSTABLE ROCKS WHILE DRILLING WELLS
RU2205935C1 (en) Method of multiple hole construction
RU2379492C2 (en) Development method at wells re-entry and oil field in general
RU2181425C2 (en) Method of drilling of branch wellbore from cased development well
RU2002113778A (en) The method of production of high viscosity oil
RU2544938C1 (en) Horizontal well making in formation with low thickness
RU2172384C2 (en) Method of drilling of auxiliary wellbore from flow string
RU2520033C1 (en) Method of horizontal oil well construction
RU2005101988A (en) METHOD FOR INTEGRATED DEVELOPMENT OF OIL DEPOSIT WITH A GAS CAP
RU2541985C1 (en) Cementing method for horizontal shaft of well
SU787611A1 (en) Method of driving and casing a multibottom well
RU2810359C1 (en) Method for developing multi-layer oil deposit with horizontal well
SU1472657A1 (en) Method of identifying oil- and gas-bearing stringers
RU2002134645A (en) METHOD FOR COMBINED OPEN-UNDERGROUND DEVELOPMENT OF ENVIRONMENT OF GENDER COAL PLASES
RU2298080C2 (en) Method for bit wear determination during well drilling or secondary hole predrilling
RU2370620C1 (en) Method of making directional well
RU2003109932A (en) METHOD OF KATTOKOSKY HIGH PROTECTION ON THE CAREER CIRCUIT
RU1802123C (en) Method for formation of chambers
RU2270908C1 (en) Wedgeless method for multibranch well drilling
RU2001128103A (en) The method of mining excavation blocks in the underground mining of blind ore bodies

Legal Events

Date Code Title Description
PD4A Correction of name of patent owner
PD4A Correction of name of patent owner
MM4A The patent is invalid due to non-payment of fees

Effective date: 20181022