RU2002107745A - The method of reclamation work - Google Patents

The method of reclamation work

Info

Publication number
RU2002107745A
RU2002107745A RU2002107745/13A RU2002107745A RU2002107745A RU 2002107745 A RU2002107745 A RU 2002107745A RU 2002107745/13 A RU2002107745/13 A RU 2002107745/13A RU 2002107745 A RU2002107745 A RU 2002107745A RU 2002107745 A RU2002107745 A RU 2002107745A
Authority
RU
Russia
Prior art keywords
site
reclamation work
well
wells
work according
Prior art date
Application number
RU2002107745/13A
Other languages
Russian (ru)
Other versions
RU2218459C1 (en
Inventor
Валерий Владимирович Кульчицкий
Геннадий Александрович Григашкин
Original Assignee
Закрытое акционерное общество Научно-производственная фирма "Самарские Горизонты"
Filing date
Publication date
Application filed by Закрытое акционерное общество Научно-производственная фирма "Самарские Горизонты" filed Critical Закрытое акционерное общество Научно-производственная фирма "Самарские Горизонты"
Priority to RU2002107745/13A priority Critical patent/RU2218459C1/en
Priority claimed from RU2002107745/13A external-priority patent/RU2218459C1/en
Publication of RU2002107745A publication Critical patent/RU2002107745A/en
Application granted granted Critical
Publication of RU2218459C1 publication Critical patent/RU2218459C1/en

Links

Claims (4)

1. Способ осуществления мелиоративных работ, включающий прокладку горизонтальных скважин под плодородным слоем участка, установку перфорированных обсадных труб, размещение вокруг них фильтрующего материала и проведение работ по осушению или деминерализации, отличающийся тем, что под участком бурят по меньшей мере, одну горизонтальную двухустьевую скважину, устанавливают в них перфорированные обсадные трубы, через которые в зону около наружной поверхности обсадных труб подают водную суспензию песка или нерастворимых в воде гранул.1. A method of reclamation work, including laying horizontal wells under the fertile layer of the site, installing perforated casing pipes, placing filter material around them and draining or demineralizing, characterized in that at least one horizontal two-well hole is drilled under the site, perforated casing pipes are installed in them, through which an aqueous suspension of sand or water-insoluble granules is supplied to the zone near the outer surface of the casing pipes. 2. Способ осуществления мелиоративных работ по п.1, отличающийся тем, что прокладку горизонтальных двухустьевых скважин под плодородным слоем участка осуществляют без его вывода из сельхозоборота.2. The method of reclamation work according to claim 1, characterized in that the laying of horizontal double-well wells under the fertile layer of the site is carried out without its withdrawal from agricultural turnover. 3. Способ осуществления мелиоративных работ по п.1 или 2, отличающийся тем, что бурение скважин осуществляют посредством буровой установки, содержащей в своем составе породоразрушающий инструмент в форме плоской пластины, установленной под углом к колонне бурильных труб и телеметрическую систему передающую на поверхность сведения об азимуте, угле наклона скважины к горизонту и положении отклонителя, совмещенного с породоразрушающим инструментом.3. The method of reclamation work according to claim 1 or 2, characterized in that the drilling of wells is carried out by means of a drilling rig containing a rock cutting tool in the form of a flat plate mounted at an angle to the drill pipe string and a telemetry system transmitting information about azimuth, the angle of inclination of the well to the horizon and the position of the diverter combined with the rock cutting tool. 4. Способ осуществления мелиоративных работ по любому из пп.1-3, отличающийся тем, что дополнительно с одной стороны участка, например против водоема или по периметру участка возводят подземный барьер локализации загрязнения, для этого бурят одну или несколько горизонтальных двухустьевых скважин, расположенных в вертикальной плоскости, устанавливают перфорированные обсадные колонны и цементируют пространство между ними.4. The method of reclamation work according to any one of claims 1 to 3, characterized in that, in addition, on one side of the site, for example, an underground pollution barrier is erected against the reservoir or along the perimeter of the site, for this one or several horizontal double-well wells are located vertical plane, set perforated casing strings and cement the space between them.
RU2002107745/13A 2002-03-28 2002-03-28 Method of amelioration work RU2218459C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2002107745/13A RU2218459C1 (en) 2002-03-28 2002-03-28 Method of amelioration work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2002107745/13A RU2218459C1 (en) 2002-03-28 2002-03-28 Method of amelioration work

Publications (2)

Publication Number Publication Date
RU2002107745A true RU2002107745A (en) 2003-10-10
RU2218459C1 RU2218459C1 (en) 2003-12-10

Family

ID=32066195

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2002107745/13A RU2218459C1 (en) 2002-03-28 2002-03-28 Method of amelioration work

Country Status (1)

Country Link
RU (1) RU2218459C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100651454B1 (en) 2004-03-05 2006-11-29 삼성전자주식회사 Method for allocating a subchannel in an orthogonal frequency division multiple access cellular communication system
RU2762404C1 (en) * 2021-01-21 2021-12-21 Федеральное государственное бюджетное образовательное учреждение высшего образования "Российский государственный аграрный университет - МСХА имени К.А. Тимирязева" (ФГБОУ ВО РГАУ - МСХА имени К.А. Тимирязева) Method for creating shell-less reclamation water lines-moisture exchangers

Similar Documents

Publication Publication Date Title
US6681855B2 (en) Method and system for management of by-products from subterranean zones
US9551209B2 (en) System and method for accessing subterranean deposits
US6968893B2 (en) Method and system for production of gas and water from a gas bearing strata during drilling and after drilling completion
RU2259480C2 (en) Method for horizontal drainage system forming in gas production, method for drain hole forming and method for gas recovery from coal bed (variants)
US20110005762A1 (en) Forming Multiple Deviated Wellbores
US7493951B1 (en) Under-balanced directional drilling system
US20160024904A1 (en) System and Method for Subterranean Deposit Access
CA2395746A1 (en) Method and apparatus for a combined exit guide and sectional mill for sidetracking
RU2382166C1 (en) Method of drilling-in
RU2002107745A (en) The method of reclamation work
CA2454494C (en) Retrievable pre-milled window with deflector
RU2074944C1 (en) Drilling and supporting of multiface well
RU2235881C1 (en) Method for extraction of slanted bed of hard mineral resource by means of method of well hydro-extraction (variants)
RU2218459C1 (en) Method of amelioration work
Gebrekristos et al. Hydrogeological properties of the UG2 pyroxenite aquifers of the Bushveld Complex
RU2208119C2 (en) Process of construction and running of multiple face hole
Ammirante Innovative drilling technology
AU2015205856B2 (en) Improvements to recovery of hydrocarbons
RU2235882C1 (en) Method for well hydraulic extraction of hard mineral resource from slanted bed (variants)
RU2215146C1 (en) Method of salt deposit mining
AU2002360274B2 (en) Method and system for management of by-products from subterranean zones
CN116556865A (en) Multi-sleeve coring method and device for karst broken stratum in multi-pipeline site
Myal Slant hole completion test (1991) sidetrack``as built``report
SU1687799A1 (en) A method of degassing coal stratum
TOWNSITE RESOURCE MANAGEMENT TECHNICAL REPORT 283