RU199872U1 - Selective hydraulic fracturing assembly in horizontal wells - Google Patents
Selective hydraulic fracturing assembly in horizontal wells Download PDFInfo
- Publication number
- RU199872U1 RU199872U1 RU2019130105U RU2019130105U RU199872U1 RU 199872 U1 RU199872 U1 RU 199872U1 RU 2019130105 U RU2019130105 U RU 2019130105U RU 2019130105 U RU2019130105 U RU 2019130105U RU 199872 U1 RU199872 U1 RU 199872U1
- Authority
- RU
- Russia
- Prior art keywords
- hydraulic fracturing
- assembly
- barrel
- wells
- plug
- Prior art date
Links
- 238000007789 sealing Methods 0.000 claims description 3
- 230000009191 jumping Effects 0.000 claims description 2
- 230000004913 activation Effects 0.000 abstract description 4
- 230000000712 assembly Effects 0.000 abstract description 3
- 238000000429 assembly Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 238000002955 isolation Methods 0.000 abstract description 3
- 239000000203 mixture Substances 0.000 abstract description 3
- 238000005086 pumping Methods 0.000 abstract description 3
- 238000005553 drilling Methods 0.000 abstract description 2
- 238000002360 preparation method Methods 0.000 abstract description 2
- 238000000926 separation method Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 6
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 4
- 239000000725 suspension Substances 0.000 description 3
- 238000005303 weighing Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Pipe Accessories (AREA)
Abstract
Предлагаемая полезная модель относится к нефтегазодобывающей промышленности и предназначена для герметичного разобщения интервалов нефтяных и газовых скважин, с возможностью проведения закачки растворов и удержанием избыточного давления в обе стороны.Задачей предлагаемого технического решения является повышение надежности проведения многостадийного ГРП в скважинах с горизонтальным окончанием за счет герметичного разобщения отдельных интервалов, с возможностью проведения закачки растворов под компоновку и удержанием избыточного давления в обе стороны.Целью настоящей полезной модели является разработка устройства компоновки для проведения селективного гидроразрыва пласта в скважинах с горизонтальным окончанием, активация которой происходит после спуска на лифте НКТ пробки с помощью транспортного узла. Закачка ГРП производится через транспортное устройство, проходящее непосредственно через всё тело и обеспечивающее предохранение корпуса пробки от абразивного воздействия геле-пропантной смеси. После выполнения ГРП производится извлечение транспортного устройства из пробки, при этом происходит закрытие обратных отсекающих клапанов. После выхода адаптера из BittFrac повторный вход невозможен. Для следующего интервала рабочий цикл по СПО пробки, активации и ГРП повторяется с использованием нового транспортного узла. Каждый раз вновь простимулированный интервал остаётся изолированным до момента полного окончания работ по проведению ГРП и разбуривания всех спущенных пробок.Перед освоением производится разбуривание всех установленных пробок. На всех этапах проведения работ предполагается использование КРС, без использования комплекса ГНКТ.Новизна и новаторство состоит в технологическом решении доставки до целевого интервала и применения легко разбуриваемых пробок для гарантированного разобщения открытых интервалов и выполнения селективного ГРП. Потенциально кандидатами могут быть все скважины со спущенными компоновками Ø114 мм с муфтами ГРП однократного или многоразового действия по открытию-закрытию после выполнения работ по подготовке горизонтальной части скважины (требование «равнопроходного» сечения – с долотом диаметров 95 мм).The proposed utility model relates to the oil and gas industry and is intended for hermetic isolation of intervals of oil and gas wells, with the possibility of pumping solutions and maintaining excess pressure in both directions. The objective of the proposed technical solution is to increase the reliability of multistage hydraulic fracturing in wells with horizontal ends due to hermetic isolation separate intervals, with the possibility of injecting solutions for the assembly and maintaining the excess pressure in both directions. The purpose of this utility model is to develop an assembly device for selective hydraulic fracturing in wells with horizontal completion, the activation of which occurs after lowering the tubing on the tubing lift a plug using a transport hub ... Hydraulic fracturing is injected through a transport device that passes directly through the entire body and protects the plug body from the abrasive effect of the gel-proppant mixture. After hydraulic fracturing, the transport device is removed from the plug, and the check valves are closed. Once the adapter has exited BittFrac, re-login is not possible. For the next interval, the working cycle for the trip of the plug, activation and hydraulic fracturing is repeated using a new transport node. Each time the newly stimulated interval remains isolated until the completion of hydraulic fracturing and drilling out of all deflated plugs. Before development, all installed plugs are drilled out. At all stages of the work, it is assumed that workover is used, without the use of a coiled tubing complex. The novelty and innovation consists in the technological solution of delivery to the target interval and the use of easily drilled plugs to ensure the separation of open intervals and perform selective hydraulic fracturing. Potentially candidates can be all wells with lowered assemblies of Ø114 mm with single or multiple-action hydraulic fracturing collars for opening-closing after completing the preparation of the horizontal part of the well (the requirement for a "equal" section - with a 95 mm bit).
Description
Предлагаемая полезная модель относится к нефтегазодобывающей промышленности и предназначена для проведения гидравлического разрыва пласта в скважинах с горизонтальным окончанием. The proposed utility model relates to the oil and gas industry and is designed for hydraulic fracturing in wells with horizontal completion.
В процессе эксплуатации продуктивность скважины снижается, в частности, вследствие изменения проводящих характеристик трещин гидроразрыва пласта (ГРП) из-за засорения механическими примесями, поступающими из пласта, и деформации проппантной пачки («вмятие» пропанта в пластичные породы). Наиболее эффективным методом восстановления продуктивности скважин с многостадийным ГРП (МСГРП) представляется проведение повторного ГРП. Эффективность повторных операций ГРП через 3–5 лет после предыдущей стимуляции подтверждена в наклонно-направленных скважинах.During operation, the productivity of the well decreases, in particular, due to changes in the conductive characteristics of hydraulic fracturing (HF) fractures due to clogging with mechanical impurities coming from the formation and deformation of the proppant pack ("indentation" of the proppant into plastic rocks). The most effective method for restoring the productivity of wells with multi-stage hydraulic fracturing (MSHF) is re-fracturing. The effectiveness of re-fracturing operations 3-5 years after the previous stimulation has been confirmed in directional wells.
Известная компоновка малогабаритного хвостовика для проведения ГРП [1. Говзич А.Н., Билинчук А.В., Файзуллин И.Г. Опыт проведения многостадийных ГРП в горизонтальных скважинах ОАО "Газпром нефть"//Нефтяное хозяйство. — 2012. — № 12. — С. 59–61.;].The well-known layout of a small liner for hydraulic fracturing [1. Govzich A.N., Bilinchuk A.V., Faizullin I.G. Experience of multistage hydraulic fracturing in horizontal wells of JSC "Gazprom Neft" // Oil Industry. - 2012. - No. 12. - P. 59–61 .;].
Технология предусматривает спуск в горизонтальную часть ствола малогабаритной компоновки. Перед повторной операцией ГРП требуется разбурить все муфты ГРП и шары (на гибких насосно-компрессионных трубах (ГНКТ) или НКТ); диаметр фреза должен быть максимально возможным для использованных муфт ГРП и хвостовика горизонтальной части. Далее подвеска хвостовика диаметром 127 мм с присоединенным малогабаритным хвостовиком диаметром 73 мм с муфтами ГРП и набухающими пакерами спускаются в горизонтальную часть скважины, законченную хвостовиком диаметром 114 мм. Муфты ГРП могут активироваться как шарами, так и инструментом многоразового действия, спускаемым на ГНКТ. Затем проводятся посадка новой подвески и спуск стингера для ГРП на НКТ диаметром 89 мм.The technology provides for lowering a small-sized layout into the horizontal part of the wellbore. Before re-fracturing, it is required to drill out all the frac sleeves and balls (on coiled tubing (CT) or tubing); the cutter diameter should be as large as possible for the used frac sleeves and the horizontal liner. Then a liner hanger with a diameter of 127 mm with an attached small-size liner with a diameter of 73 mm with hydraulic fracturing sleeves and swellable packers is lowered into the horizontal part of the well, finished with a liner with a diameter of 114 mm. Fracturing sleeves can be activated both by balls and by a reusable coiled tubing tool. Then a new hanger is fitted and a stinger is run for hydraulic fracturing on 89 mm tubing.
К недостаткам следует отнести: высокая металлоемкость конструкции; возможность проведения только одной операции повторного МСГРП; отсутствие возможности проведения исследований в скважине после проведения операции; высокий риск получения сложной аварии. The disadvantages include: high metal consumption of the structure; the ability to carry out only one operation of repeated MSF; inability to conduct research in the well after the operation; high risk of getting a complex accident.
Известная конструкция компоновки для проведения ГРП с проппантной отсыпкой [1. Говзич А.Н., Билинчук А.В., Файзуллин И.Г. Опыт проведения многостадийных ГРП в горизонтальных скважинах ОАО "Газпром нефть"//Нефтяное хозяйство. — 2012. — № 12. — С. 59–61.].The known design of the assembly for hydraulic fracturing with proppant filling [1. Govzich A.N., Bilinchuk A.V., Faizullin I.G. Experience of multistage hydraulic fracturing in horizontal wells of JSC "Gazprom Neft" // Oil Industry. - 2012. - No. 12. - S. 59–61.].
Перед повторным ГРП разбуриваются все седла и шары (на ГНКТ или на НКТ). В скважину спускается малогабаритный пакер с использованием лифта НКТ диаметром 50 мм в горизонтальной части ствола и 89 мм в основной колонне. При проведении первой повторной операции ГРП пакер устанавливается между первой и второй муфтами ГРП. В конце закачки жидкости ГРП подается проппантная пачка высокой концентрации для отсыпки простимулированного интервала. Таким образом, перекрывается сечение хвостовика, и обработанный интервал изолируется от еще не обработанных. Затем пакер устанавливается в следующий интервал для проведения ГРП. Процесс повторяется.Before re-fracturing, all seats and balls are drilled (on coiled tubing or tubing). A small packer is run into the well using a tubing lift with a diameter of 50 mm in the horizontal part of the wellbore and 89 mm in the main string. During the first re-fracturing operation, the packer is installed between the first and second fracturing sleeves. At the end of the hydraulic fracturing fluid injection, a high concentration proppant pack is supplied to fill the stimulated interval. Thus, the shank section is overlapped, and the machined interval is isolated from those not yet machined. Then the packer is set in the next fracturing interval. The process is repeated.
К недостаткам следует отнести: риск возникновения заколонной циркуляции и попадания проппанта в пакерное оборудование; возможность прихвата компоновки после неуспешного ГРП на горизонтальном участке; риск негерметичности проппантной пробки; потеря контроля закачки проппанта в определенный интервал.The disadvantages include: the risk of annular circulation and proppant ingress into the packer equipment; the possibility of stuck assembly after unsuccessful hydraulic fracturing in the horizontal section; the risk of leakage of the proppant plug; loss of control of proppant injection in a certain interval.
Наиболее близким техническим решением, выбранным за прототип, является компоновка с двойным пакером для проведения ГРП в скважинах с горизонтальным окончанием [1. Говзич А.Н., Билинчук А.В., Файзуллин И.Г. Опыт проведения многостадийных ГРП в горизонтальных скважинах ОАО "Газпром нефть"//Нефтяное хозяйство. — 2012. — № 12. — С. 59–61.; 2. Economides M.J., Nolte K.G. Reservoir Stimulation. — USA: John Wiley Sons, 2006 . — 856 p].The closest technical solution, chosen for the prototype, is an assembly with a double packer for hydraulic fracturing in wells with horizontal completion [1. Govzich A.N., Bilinchuk A.V., Faizullin I.G. Experience of multistage hydraulic fracturing in horizontal wells of JSC "Gazprom Neft" // Oil Industry. - 2012. - No. 12. - P. 59–61 .; 2. Economides M.J., Nolte K.G. Reservoir Stimulation. - USA: John Wiley Sons, 2006. - 856 p].
Технология проведения ГРП с двойным пакером основана на использовании чашеобразных уплотнителей и пакера многократной установки. Устройство может переключаться с гидропескоструйной резки на режим ГРП и обратно. Необходимая зона изолируется между верхним чашеобразным уплотнителем и пакером многократной установки. Перед проведением повторного ГРП все седла и шары разбуриваются (на ГНКТ или на НКТ), компоновка устанавливается в требуемом интервале напротив открытой муфты ГРП. Затем выполняется ГРП. Double packer fracturing technology is based on the use of cup packers and a reusable packer. The device can be switched from water jet cutting to hydraulic fracturing and vice versa. The required area is isolated between the top cup and the reusable packer. Before re-fracturing, all seats and balls are drilled out (on coiled tubing or tubing), the assembly is installed in the required interval opposite the open frac sleeve. Then hydraulic fracturing is performed.
Конструкция компоновки позволяет создавать новые интервалы для осуществления ГРП. Для этого компоновку переводят в положение для проведения перфорации с последующей закачкой абразивной смеси. После выполнения ГПП компоновку переводят в положение для проведения ГРП в новом интервале.The assembly design allows creating new intervals for hydraulic fracturing. To do this, the assembly is moved to the position for perforation followed by pumping of the abrasive mixture. After the completion of the hydraulic fracturing, the assembly is moved to the position for hydraulic fracturing in the new interval.
К недостаткам следует отнести: продолжительность работ 25 суток и более; риск заколонной циркуляции и попадания проппанта в пакерное оборудование; прихват двухпакерной компоновки после успешного ГРП на горизонтальном участке; высокое давление закачки при ГРП из-за трения.The disadvantages include: duration of
Задачей предлагаемого технического решения является повышение надежности проведения многостадийного ГРП в скважинах с горизонтальным окончанием за счет герметичного разобщения отдельных интервалов с возможностью проведения закачки растворов под компоновку и удержанием избыточного давления в обе стороны.The objective of the proposed technical solution is to increase the reliability of multistage hydraulic fracturing in wells with horizontal ends due to hermetic separation of individual intervals with the possibility of pumping solutions for the assembly and maintaining excess pressure in both directions.
Достигаемый технический результат заключается в разработке компоновки ГРП, позволяющей проводить интервальный гидравлический разрыв пласта с применением системы тарельчатых обратных клапанов. The achieved technical result consists in the development of a hydraulic fracturing arrangement, which allows for interval hydraulic fracturing of the formation using a system of poppet check valves.
Поставленная задача и достигаемый технический результат достигаются тем, что компоновка для проведения гидроразрыва пласта в скважинах с горизонтальным окончанием включает ствол, на который установлены нижний клапанный узел, якорь нижний, антизатекатели, манжета уплотнительная, якорь верхний, гайка разрезная, гайка верхняя, верхний клапанный узел; нижний якорь образован из башмака, захватов с вставками и конуса; захваты соединяются с конусом посредством срезных винтов; башмак навинчен на ствол по резьбе; верхний якорь образован из конуса, захватов со вставками и верхней гайки; верхний якорь соединяется со стволом через разрезную гайку, которая навинчена на стволе по резьбе; гайка разрезная, упруго расширяясь, способна перескакивать по резьбе ствола под внешним осевым воздействием, исключительно в одном направлении – вниз; антизатекатели установлены с обеих сторон резиновой манжеты и предназначены для предотвращения затекания резины в зазор между компоновкой и обсадной колонны под действием избыточного давления; нижний клапанный узел соединяется со стволом снизу по резьбе и представляет собой тарельчатый обратный клапан; верхний клапанный узел соединяется со стволом сверху по резьбе и также представляет собой тарельчатый обратный клапан.The set task and the achieved technical result are achieved by the fact that the arrangement for hydraulic fracturing in wells with a horizontal end includes a wellbore with a lower valve assembly, an anchor lower, anti-deflectors, a sealing collar, an upper anchor, a split nut, an upper nut, an upper valve assembly ; the lower anchor is formed of a shoe, grips with inserts and a cone; the grippers are connected to the cone by means of shear screws; the shoe is threaded onto the barrel; the upper anchor is formed of a cone, grips with inserts and an upper nut; the upper anchor is connected to the barrel through a split nut, which is threaded onto the barrel; a split nut, elastically expanding, is capable of jumping along the barrel thread under an external axial force, only in one direction - down; anti-leakage devices are installed on both sides of the rubber cuff and are designed to prevent rubber from flowing into the gap between the assembly and the casing string under the influence of excessive pressure; the lower valve assembly is threaded from the bottom with the barrel and is a poppet check valve; the upper valve assembly is threaded from the top to the barrel and is also a poppet check valve.
Активация предлагаемой компоновки происходит после спуска на лифте НКТ пробки с помощью транспортного узла. Закачка ГРП производится через транспортное устройство, проходящее непосредственно через всё тело и обеспечивающее предохранение корпуса пробки от абразивного воздействия геле-пропантной смеси. После выполнения ГРП производится извлечение транспортного устройства из пробки, при этом происходит закрытие обратных отсекающих клапанов. После выхода адаптера из BittFrac повторный вход невозможен. Для следующего интервала рабочий цикл по СПО пробки, активации и ГРП повторяется с использованием нового транспортного узла. Каждый раз вновь простимулированный интервал остаётся изолированным до момента полного окончания работ по проведению ГРП и разбуривания всех спущенных пробок. The activation of the proposed layout occurs after the plug is lowered on the tubing elevator using the transport unit. Hydraulic fracturing is injected through a transport device that passes directly through the entire body and protects the plug body from the abrasive effect of the gel-proppant mixture. After hydraulic fracturing, the transport device is removed from the plug, and the check valves are closed. Once the adapter has exited BittFrac, re-login is not possible. For the next interval, the working cycle for the trip of the plug, activation and hydraulic fracturing is repeated using a new transport node. Each time, the newly stimulated interval remains isolated until the completion of hydraulic fracturing and drilling out of all deflated plugs.
Перед освоением производится разбуривание всех установленных пробок. На всех этапах проведения работ предполагается использование КРС, без использования комплекса ГНКТ. Before mastering, all installed plugs are drilled out. At all stages of the work, it is assumed to use workover, without using the coiled tubing complex.
Новизна и новаторство состоит в технологическом решении доставки до целевого интервала и применения легко разбуриваемых пробок для гарантированного разобщения открытых интервалов и выполнения гидроразрыва пласта. Потенциально кандидатами могут быть все скважины со спущенными компоновками Ø114 мм с муфтами ГРП однократного или многоразового действия по открытию-закрытию после выполнения работ по подготовке горизонтальной части скважины (требование «равнопроходного» сечения – с долотом диаметров 95 мм). The novelty and innovation lies in the technological solution of delivery to the target interval and the use of easily drillable plugs to ensure the isolation of open intervals and hydraulic fracturing. Potentially candidates can be all wells with lowered assemblies of Ø114 mm with single or multiple-action hydraulic fracturing collars for opening-closing after completing the preparation of the horizontal part of the well (the requirement for a "equal" section - with a 95 mm bit).
Сущность предлагаемой полезной модели представлена на чертежах (фиг. 1 и 2). На фиг. 1 представлен чертеж компоновки, на фиг. 2 – стволовая часть адаптера.The essence of the proposed utility model is shown in the drawings (Fig. 1 and 2). FIG. 1 is an arrangement drawing, FIG. 2 - barrel part of the adapter.
Компоновка (фиг. 1) включает ствол 1, на который установлены нижний клапанный узел 2, якорь нижний 3, антизатекатели 4, манжета уплотнительная 5, якорь верхний 6, гайка разрезная 7, гайка верхняя 8, верхний клапанный узел 9. The assembly (Fig. 1) includes a
Нижний якорь 3 образован из башмака, захватов с вставками и конуса. Захваты соединяются с конусом посредством срезных винтов М6. Башмак навинчен на ствол по резьбе. The
Верхний якорь 6 образован из конуса, захватов со вставками и верхней гайки 8. Верхний якорь соединяется со стволом 1 через разрезную гайку 7, которая навинчена на стволе по резьбе. Гайка разрезная 7, упруго расширяясь, способна перескакивать по резьбе ствола под внешним осевым воздействием, исключительно в одном направлении - вниз. Перемещение гайки разрезной вверх – исключено. The
Антизатекатели 4 установлены с обеих сторон резиновой манжеты 5 и предназначены для предотвращения затекания резины в зазор между компоновкой и обсадной колонны под действием избыточного давления. Anti-deflectors 4 are installed on both sides of the
Нижний клапанный узел 2 соединяется со стволом 1 снизу по резьбе и представляет собой тарельчатый обратный клапан. Он удерживает давление в одном направлении снизу вверх. The
Верхний клапанный узел 9 соединяется со стволом 1 сверху по резьбе и также представляет собой тарельчатый обратный клапан. Он удерживает давление в одном направлении сверху вниз. The
Адаптер предназначен для соединения компоновки с установочным модулем. В целом в адаптере можно выделить стволовую часть, которая соединяется со стволом компоновки и выходным штоком установочного модуля и наружной части, которая передают усилие установочного модуля на детали компоновки, установленные подвижно на стволе. The adapter is designed to connect the layout to the installation module. In general, a barrel part can be distinguished in the adapter, which is connected to the barrel of the assembly and the output rod of the installation module and the outer part, which transmit the force of the installation module to the assembly parts movably mounted on the barrel.
Стволовая часть адаптера (фиг. 2) состоит из муфты 10, в которую ввернут шток 16. На муфту 10 по наружной резьбе навернута обойма 11, имеющая радиальные отверстия, в количестве 4 шт. В обойму 11 ввернута опора цанги 14, на которую предварительно надета цанга 13. The stem part of the adapter (Fig. 2) consists of a
Цанга вставлена в обойму 11 и зафиксирована от перемещений срезными штифтами 12 в количестве 4 шт., вставленными в радиальные отверстия на обойме 11. Сверху на обойму надета крышка штифтов 15, которая предохраняет от выпадения срезные штифты 12. Крышка 15 фиксируется стопорным винтом 22. The collet is inserted into the
На нижней части штока 16 имеется сбивной клапан. Седло 18 с шариком 24 вставлено в шток 16. There is a knock-off valve on the bottom of the
Седло удерживается от выпадения цангой 18, которая в свою очередь зафиксирована на штоке 16 срезными винтами 21 в количестве 4 штук. Цанга 18 удерживается от раскрытия лепестков втулкой 20, которая зафиксирована от перемещений срезными винтами 21 в количестве 2-х штук. The saddle is kept from falling out by the
Сбивной клапан предназначен для перекрытия внутренней полости НКТ при создании внутри избыточного давления и приведение в действие установочного модуля. The knock-off valve is designed to shut off the inner cavity of the tubing when creating excess pressure inside and activating the setting module.
Наружная часть адаптера представлена толкателем 17, который наворачивается по резьбе на нижнюю втулку установочного модуля. Компоновка соединяется с адаптером посредством цанги 13, на лепестках которой имеется левая резьба. Для предотвращения самопроизвольного отворота компоновки фиксируется двумя срезными винта М6, завернутыми в на верхнем конце компоновки между лепестками цанги.The outer part of the adapter is represented by a
Также в компоновку входят цанга клапана 19, винт стопорный 23, кольца 25 и 26.The assembly also includes a
Компоновка работает следующим образом.The layout works as follows.
Компоновка посредством адаптера соединяют с установочным модулем. Затем данную компоновку на колонне насосно-компрессорных труб спускают в скважину. При достижении заданной глубины, в НКТ бросают шарик и создают в НКТ избыточное давление. Под действием гидравлического давления цилиндры установочного модуля перемещаются вниз относительно неподвижных стволов и оказывают силовое воздействие на подвижные части компоновки. The assembly is connected to the installation module by means of an adapter. Then this arrangement is lowered into the well on the tubing string. When a given depth is reached, a ball is thrown into the tubing and overpressure is created in the tubing. Under the action of hydraulic pressure, the cylinders of the installation module move downward relative to the stationary barrels and exert a force effect on the moving parts of the assembly.
Под действием толкателя происходит срез срезных винтов М6 на якорях и перемещение деталей на стволе компоновки. В результате осевого перемещения деталей компоновки захваты входят в зацепление с обсадной колонной, манжета расширяясь обжимает обсадную колонну, герметично разобщая интервалы до и после компоновки. Under the action of the pusher, the M6 shear screws on the anchors are sheared and the parts move on the assembly barrel. As a result of axial movement of the assembly details, the grippers engage with the casing, the collar expands and compresses the casing, hermetically separating the intervals before and after assembly.
При достижении давления в НКТ 18 МПА происходит срез штифтов на адаптере, о чем свидетельствуют колебания давления (но падения до нуля не происходит) и цанга выходит из зацепления с компоновки. В результате адаптер получает возможность перемещения вверх, в пределах хода штока (400 мм) адаптера до сбивного клапана. Затем сбрасывают давление в НКТ и производят натяжение подвески не более 2 тонн. В результате седло и шар выгадывают из штока, тем самым отрывают проходное отверстие. Далее проверяют, что проходное отверстие открыто разгрузившись на компоновки весом до 2 т и создав давление в НКТ. Если роста давления не происходит, и циркуляция по затрубу отсутсвует, значит компонвока установлена и проходное отверстие открыто. Производят закачку под компоновку. When the pressure in the tubing reaches 18 MPA, the pins on the adapter are sheared, as evidenced by pressure fluctuations (but does not fall to zero) and the collet disengages from the assembly. As a result, the adapter is able to move upward, within the stroke (400 mm) of the adapter to the knock-off valve. Then the pressure in the tubing is released and the suspension is tensioned to no more than 2 tons. As a result, the seat and ball are pushed out of the stem, thereby tearing off the bore. Further, it is checked that the through hole is open by unloading onto assemblies weighing up to 2 tons and creating pressure in the tubing. If the pressure does not increase and there is no circulation through the annulus, then the valve is installed and the orifice is open. Injection is performed for the assembly.
После проведения работ в под компоновкой производят натяжение подвески более 400 мм и весом более 3…4 тс. до резкого падения веса до собственного. В результате цанга 10 слетает со штока 7 и позволяет адаптеру After carrying out work under the assembly, the suspension is tensioned more than 400 mm and weighing more than 3 ... 4 tf. before a sharp drop in weight to its own. As a result, the
После проведения работ в под компоновкой производят натяжение подвески более 400 мм и весом более 3…4 тс. до резкого падения веса до собственного. В результате цанга слетает со штока и позволяет адаптеру выйти из компоновки. Нижний и верхний обратные клапаны закрываются. Появляется циркуляция по затрубу. Проводят работы над компоновкой.After carrying out work under the assembly, the suspension is tensioned more than 400 mm and weighing more than 3 ... 4 tf. before a sharp drop in weight to its own. As a result, the collet flies off the stem and allows the adapter to exit the assembly. The lower and upper check valves are closed. Circulation appears along the annulus. Work on the layout.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019130105U RU199872U1 (en) | 2019-09-25 | 2019-09-25 | Selective hydraulic fracturing assembly in horizontal wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019130105U RU199872U1 (en) | 2019-09-25 | 2019-09-25 | Selective hydraulic fracturing assembly in horizontal wells |
Publications (1)
Publication Number | Publication Date |
---|---|
RU199872U1 true RU199872U1 (en) | 2020-09-24 |
Family
ID=72601194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2019130105U RU199872U1 (en) | 2019-09-25 | 2019-09-25 | Selective hydraulic fracturing assembly in horizontal wells |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU199872U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2773125C1 (en) * | 2021-12-03 | 2022-05-30 | Акционерное общество "Новомет-Пермь" | Device for isolation of formations in a well |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU99104462A (en) * | 1999-03-02 | 2000-12-27 | Т.С. Левшин | DEVICE FOR HYDRAULIC IMPACT ON THE PLASTIC |
RU2183738C2 (en) * | 2000-06-20 | 2002-06-20 | Левшин Тимофей Сергеевич | Device for hydraulic stimulation of formation |
US20120111566A1 (en) * | 2009-06-22 | 2012-05-10 | Trican Well Service Ltd. | Apparatus and method for stimulating subterranean formations |
RU2513791C1 (en) * | 2012-10-22 | 2014-04-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of multilayer oil deposit using hydraulic fracturing of formation |
RU2682391C1 (en) * | 2018-01-09 | 2019-03-19 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ) | Formation in the well interval by interval multi-stage hydraulic fracturing performance method and a device for its implementation |
-
2019
- 2019-09-25 RU RU2019130105U patent/RU199872U1/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU99104462A (en) * | 1999-03-02 | 2000-12-27 | Т.С. Левшин | DEVICE FOR HYDRAULIC IMPACT ON THE PLASTIC |
RU2183738C2 (en) * | 2000-06-20 | 2002-06-20 | Левшин Тимофей Сергеевич | Device for hydraulic stimulation of formation |
US20120111566A1 (en) * | 2009-06-22 | 2012-05-10 | Trican Well Service Ltd. | Apparatus and method for stimulating subterranean formations |
RU2513791C1 (en) * | 2012-10-22 | 2014-04-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of multilayer oil deposit using hydraulic fracturing of formation |
RU2682391C1 (en) * | 2018-01-09 | 2019-03-19 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ) | Formation in the well interval by interval multi-stage hydraulic fracturing performance method and a device for its implementation |
Non-Patent Citations (1)
Title |
---|
ГОВЗИЧА.Н., Опыт проведения многостадийных ГРП в горизонтальных скважинах ОАО "Газпром нефть", Нефтяное хозяйство, N 12, 2012, c. 59-61. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2791008C1 (en) * | 2021-09-29 | 2023-03-01 | Иван Валериевич Лесь | Device for multi-stage hydraulic fracturing |
RU2773125C1 (en) * | 2021-12-03 | 2022-05-30 | Акционерное общество "Новомет-Пермь" | Device for isolation of formations in a well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7681645B2 (en) | System and method for stimulating multiple production zones in a wellbore | |
US8567501B2 (en) | System and method for stimulating multiple production zones in a wellbore with a tubing deployed ball seat | |
US8136584B2 (en) | Single trip tubing punch and setting tool | |
CA2465934C (en) | Hydraulic tools for setting liner top packers and for cementing liners | |
EP2620586B1 (en) | Resettable ball seat | |
US20180313182A1 (en) | Wellbore sleeve injector and method of use | |
NO337861B1 (en) | Multi-zone completion system | |
RU154511U1 (en) | PACKER DRILLING WITH A LANDING TOOL | |
RU2667171C1 (en) | Method of repair of oil and / or gas wells and device for its implementation (options) | |
CA3159589A1 (en) | Method for treating intervals of a producing formation | |
CA2279074A1 (en) | Hydraulic tubing punch and method of use | |
RU199872U1 (en) | Selective hydraulic fracturing assembly in horizontal wells | |
RU154295U1 (en) | PACKER DRILLED | |
RU162003U1 (en) | COUPLING CONTROL COUPLING | |
CN109339751B (en) | Easy-drilling type composite throttle and use method thereof | |
NO20200147A1 (en) | Combination bottom up and top down cementing with reduced time to set liner hanger/packer after top down cementing | |
RU2736078C1 (en) | Method of selective treatment of productive formation, device for its implementation and hydraulic fracturing unit | |
RU2533514C1 (en) | Slot perforator | |
RU2626108C2 (en) | Method of well casing by tail pipe with bottomhole screen | |
US20110186304A1 (en) | T-Frac Zone Test Tool and System | |
RU2483192C1 (en) | Drillable packer | |
RU2507375C1 (en) | Drillable packer | |
RU2480571C2 (en) | Device to install bridges in wells | |
CA2724499A1 (en) | T-frac zone test tool and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM9K | Utility model has become invalid (non-payment of fees) |
Effective date: 20200528 |