RU182155U1 - Tank filling control device - Google Patents

Tank filling control device Download PDF

Info

Publication number
RU182155U1
RU182155U1 RU2018118583U RU2018118583U RU182155U1 RU 182155 U1 RU182155 U1 RU 182155U1 RU 2018118583 U RU2018118583 U RU 2018118583U RU 2018118583 U RU2018118583 U RU 2018118583U RU 182155 U1 RU182155 U1 RU 182155U1
Authority
RU
Russia
Prior art keywords
tank
rod
holder
level
sleeve
Prior art date
Application number
RU2018118583U
Other languages
Russian (ru)
Inventor
Сергей Валентинович Андреев
Владимир Зиновьевич Лифшиц
Юрий Николаевич Мальцев
Original Assignee
Общество с ограниченной ответственностью "ПетроСибТранс"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "ПетроСибТранс" filed Critical Общество с ограниченной ответственностью "ПетроСибТранс"
Priority to RU2018118583U priority Critical patent/RU182155U1/en
Application granted granted Critical
Publication of RU182155U1 publication Critical patent/RU182155U1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/04Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by dip members, e.g. dip-sticks

Abstract

Полезная модель относится к области измерительной техники, используется для контроля уровня жидкости в цистерне непосредственно во время процесса налива. Устройство контроля заполнения цистерны, содержащее раму для установки на горловину цистерны, стержень с измерительной шкалой и пластиной на конце. Рама выполнена с осевым элементом и концевыми опорами. На осевом элементе подвижно установлена основная втулка с фиксатором её положения. На основной втулке под углом друг к другу на одном уровне закреплены держатель стержня и держатель упора. На конце держателя стержня закреплена втулка со стержнем и фиксатором его положения, на держателе упора посредством другой втулки, снабженной фиксатором, подвижно установлен упор. Технический результат заключается в повышении точности определения уровня наливаемой в цистерну жидкости. 2 ил.The utility model relates to the field of measurement technology, it is used to control the liquid level in the tank directly during the filling process. A control device for filling the tank, containing a frame for installation on the neck of the tank, a rod with a measuring scale and a plate at the end. The frame is made with an axial element and end supports. The main sleeve is movably mounted on the axial element with a lock of its position. The rod holder and the stop holder are fixed at the same level on the main sleeve at an angle to each other. At the end of the rod holder, a sleeve is fixed with the rod and its position lock, on the stop holder by means of another sleeve provided with a lock, the stop is movably mounted. The technical result consists in increasing the accuracy of determining the level of liquid poured into the tank. 2 ill.

Description

Полезная модель относится к области измерительной техники, в частности, к устройствам для определения уровня наливаемой в цистерну жидкости. Полезная модель используется для контроля непосредственно во время процесса налива жидкости в цистерну. Предназначена для предотвращения перелива, приводящего к необходимости слива излишней жидкости, и для предотвращения недолива, приводящего к неэффективному использованию транспорта. Может применяться для любых типов железнодорожных цистерн и любых химически не агрессивных жидкостей, таких как, например, мазут, бензин, дизельное топливо, иные нефтепродукты.The utility model relates to the field of measurement technology, in particular, to devices for determining the level of liquid poured into the tank. The utility model is used to control directly during the process of filling liquid into the tank. Designed to prevent overflow, leading to the need to drain excess fluid, and to prevent underfilling, leading to inefficient use of vehicles. It can be used for all types of railway tanks and any chemically non-aggressive liquids, such as, for example, fuel oil, gasoline, diesel fuel, and other petroleum products.

Известно устройство контроля загрузки железнодорожных цистерн в процессе налива нефтепродуктов по патенту РФ на полезную модель №132594, G08B 13/00, 2013. Устройство содержит основание, с помощью которого его устанавливают на штоке для открытия нижнего сливного клапана внутри цистерны, и штангу, снабженную измерительной линейкой. Штанга установлена в основании с возможностью вертикального перемещения, а основание снабжено фиксатором для фиксации штанги в заданном положении. На нижнем конце штанги закреплена горизонтальная планка. В верхней части штанги размещена верхняя планка. В процессе измерения верхнюю планку устанавливают на уровне верхней образующей котла цистерны. Недостатком является сложность установки и контроля положения верхней планки на необходимом уровне внутри цистерны. Кроме того, установка устройства на штоке сливного клапана не обеспечивает его жестко зафиксированного положения внутри цистерны из-за возможного свободного хода штока. Все это может привести к недостаточной точности определения уровня налива жидкости в цистерне.A device for monitoring the loading of railway tanks in the process of filling oil products according to the patent of the Russian Federation for utility model No. 132954, G08B 13/00, 2013. The device contains a base with which it is installed on the stem to open the lower drain valve inside the tank, and a rod equipped with a measuring a ruler. The rod is installed in the base with the possibility of vertical movement, and the base is equipped with a latch for fixing the rod in a predetermined position. A horizontal bar is fixed at the lower end of the bar. At the top of the bar is the upper bar. During the measurement, the upper bar is set at the level of the upper generatrix of the boiler tank. The disadvantage is the difficulty of installing and monitoring the position of the upper bar at the required level inside the tank. In addition, the installation of the device on the stem of the drain valve does not provide its rigidly fixed position inside the tank due to the possible free movement of the stem. All this can lead to insufficient accuracy in determining the level of liquid filling in the tank.

Известно устройство контроля загрузки железнодорожных цистерн в процессе налива нефтепродуктов по патенту РФ на полезную модель №160928, G01F 23/04, 2016. Устройство содержит штангу, снабженную измерительной линейкой, на нижнем конце которой закреплена горизонтальная нижняя предупреждающая планка. На расстоянии 4-8 см от нижней планки на штанге закреплена параллельная ей верхняя планка. Штанга снабжена передвижным фиксатором и ручкой. Фиксатор штанги крепят или к обечайке цистерны, или к крышке наливного наконечника. Уровень, на котором закрепляют штангу, выставляют по градуировочной шкале в соответствии с максимально допустимым уровнем налива. Недостатком является не точное определение уровня установки планок, т.к. при выставлении уровня сложно учесть точные размеры обечайки и наливного наконечника. A device for monitoring the loading of railway tanks in the process of filling oil products according to the patent of the Russian Federation for utility model No. 160928, G01F 23/04, 2016. The device comprises a bar equipped with a measuring ruler, at the lower end of which a horizontal lower warning strip is fixed. At a distance of 4-8 cm from the lower bar, a parallel upper bar is fixed to the bar. The bar is equipped with a movable latch and a handle. The rod clamp is attached either to the casing of the tank or to the lid of the filling tip. The level at which the bar is fixed is set on a calibration scale in accordance with the maximum permissible level of filling. The disadvantage is not an accurate determination of the level of installation of the strips, because when setting the level, it is difficult to take into account the exact dimensions of the shell and the filling tip.

В качестве ближайшего аналога заявляемому техническому решению выбрано устройство для контроля уровня заполнения цистерн по патенту РФ на полезную модель №176630, G01F 23/04, 2016. Устройство содержит штангу с измерительной шкалой, планку, фиксатор и раму, предназначенную для установки на верхнем крае горловины цистерны. С рамой связана муфта со сквозным отверстием для перемещения в нем штанги. Планка жестко связана с основанием штанги и установлена строго перпендикулярно основанию штанги. Уровень, на который необходимо заполнить цистерну продуктом вычисляют исходя из параметров жидкости и замеренной высоты цистерны от нижней образующей цистерны и верхнего края ее горловины. Уровень исчисляют от дна цистерны, а установку штанги осуществляют со стороны ее горловины, поэтому при практической установке планки внутри цистерны на предварительно рассчитанную высоту сложно точно учесть высоту горловины и толщину стенки цистерны. Погрешность в установке планки обуславливает недостаточную точность контроля уровня заполнения цистерны.As the closest analogue to the claimed technical solution, a device for monitoring the filling level of tanks according to the patent of the Russian Federation for utility model No. 176630, G01F 23/04, 2016 is selected. The device contains a rod with a measuring scale, a bar, a latch and a frame designed for installation on the upper edge of the neck tanks. A coupling is connected to the frame with a through hole for moving the rods therein. The bar is rigidly connected to the base of the rod and is installed strictly perpendicular to the base of the rod. The level at which it is necessary to fill the tank with the product is calculated based on the parameters of the liquid and the measured height of the tank from the lower generatrix of the tank and the upper edge of its neck. The level is calculated from the bottom of the tank, and the installation of the rod is carried out from the side of its neck, therefore, with the practical installation of the strap inside the tank at a pre-calculated height, it is difficult to accurately take into account the height of the neck and the wall thickness of the tank. An error in the installation of the strap causes insufficient accuracy in monitoring the level of filling the tank.

Техническим результатом заявляемой полезной модели является повышение точности определения уровня наливаемой в цистерну жидкости.The technical result of the claimed utility model is to increase the accuracy of determining the level of liquid poured into the tank.

Технический результат достигается тем, что в устройстве контроля заполнения цистерны, содержащем раму для установки на горловину цистерны, стержень с измерительной шкалой и пластиной на конце, согласно полезной модели, рама выполнена с осевым элементом и концевыми опорами, на осевом элементе подвижно установлена основная втулка с фиксатором её положения, на основной втулке под углом друг к другу, на одном уровне закреплены держатель стержня и держатель упора, на конце держателя стержня закреплена втулка со стержнем и фиксатором его положения, на держателе упора посредством другой втулки с фиксатором подвижно установлен упор.The technical result is achieved by the fact that in the device for monitoring the filling of the tank containing a frame for installation on the neck of the tank, a rod with a measuring scale and a plate at the end, according to a utility model, the frame is made with an axial element and end supports, the main sleeve is movably mounted on the axial element with with a clamp of its position, on the main sleeve at an angle to each other, the rod holder and the stop holder are fixed at the same level, at the end of the rod holder there is a sleeve with a rod and its locking tab On the holder of an emphasis by means of other plug with a clamp the emphasis is movably installed.

Технический результат обеспечивается за счет того, что устройство снабжено упором в наружную поверхность бочки цистерны и упор жестко соединен посредством держателей с измерительным стержнем. Держатель стержня и держатель упора закреплены на основной втулке на одном уровне. Устанавливая конец упора на верхнюю точку образующей криволинейной поверхности бочки цистерны автоматически получают начальное положение отсчета для стержня. Дальнейшее выставление пластины на расчетную высоту от дна цистерны осуществляют уже с учетом высоты горловины и толщины стенки цистерны. Выполнение рамы с осевым элементом и концевыми опорами позволяет точно устанавливать основную втулку с держателями в начальное положение. Концевые опоры фиксируют положение рамы на горловине и обеспечивают вертикальное положение осевого элемента, по которому передвигают основную втулку, устанавливая держатели на начальную высоту. Использование фиксаторов во втулке стержня, втулке упора и в основной втулке держателей позволяет зафиксировать положение данных элементов в нужном положении и предотвращает их смещение в процессе контроля, которое может привести к ошибке определения уровня жидкости. Таким образом, повышается точность определения уровня наливаемой в цистерну жидкости. The technical result is achieved due to the fact that the device is equipped with a stop in the outer surface of the barrel of the tank and the stop is rigidly connected by means of holders to the measuring rod. The rod holder and the stop holder are fixed on the main sleeve at the same level. By setting the stop end to the upper point of the generatrix of the curved surface of the tank barrel, the reference position for the rod is automatically obtained. Further exposure of the plate to the calculated height from the bottom of the tank is carried out taking into account the height of the neck and wall thickness of the tank. The implementation of the frame with an axial element and end supports allows you to accurately set the main sleeve with holders in the initial position. The end bearings fix the position of the frame on the neck and provide a vertical position of the axial element along which the main sleeve is moved, setting the holders to the initial height. The use of clamps in the core sleeve, the stop sleeve and in the main holder sleeve allows you to fix the position of these elements in the desired position and prevents their displacement in the control process, which can lead to an error in determining the liquid level. Thus, the accuracy of determining the level of liquid poured into the tank is increased.

На фиг. 1 представлен общий вид устройства контроля заполнения цистерны.In FIG. 1 shows a general view of a tank filling control device.

На фиг. 2 представлена схема расположения устройства в цистерне.In FIG. 2 shows the arrangement of the device in the tank.

Устройство контроля заполнения цистерны содержит раму 1, состоящую из планок различной длины, соединенных плоской перемычкой. На концах планок рамы 1 выполнены концевые опоры 2. На плоской перемычке рамы 1 закреплен осевой элемент 3, на котором установлена основная втулка 4 с фиксатором 5. На основной втулке 4 жестко, под углом друг к другу закреплены держатели – держатель 6 упора 10 и держатель 7 измерительного стержня 13. На держателе 6 установлена втулка 8 с фиксатором 9. На втулке 8 закреплен упор 10. На конце держателя 7 выполнена втулка 11 с фиксатором 12. В отверстии втулки 11 установлен измерительный стержень 13 с измерительной шкалой 14 и пластиной 15 на нижнем конце. Пластина 15 установлена перпендикулярно оси стержня 13. Фиксаторы 5, 9, 12 выполнены в виде резьбовых винтов. Устройство устанавливается на цистерну 16 с горловиной 17.The control device for filling the tank contains a frame 1, consisting of strips of various lengths connected by a flat jumper. End supports 2 are made at the ends of the frames of the frame 1. An axial element 3 is fixed on the flat bridge of the frame 1, on which the main sleeve 4 with a retainer 5 is mounted. On the main sleeve 4, the holders are fixed - holder 6 of stop 10 and holder 7 of the measuring rod 13. A sleeve 8 with a latch 9 is installed on the holder 6. A stop 10 is fixed on the sleeve 8. A sleeve 11 with a latch 12 is made at the end of the holder 7. A measuring rod 13 with a measuring scale 14 and a plate 15 is installed on the sleeve bore 11 the end. The plate 15 is installed perpendicular to the axis of the rod 13. The latches 5, 9, 12 are made in the form of threaded screws. The device is installed on the tank 16 with the neck 17.

Устройство контроля заполнения цистерны работает следующим образом.The control device filling the tank is as follows.

Перед началом налива рассчитывают уровень налива нефтепродукта в конкретную цистерну 16 по специальной компьютерной программе и калибровочным таблицам для различных видов ж/д цистерн. При расчете уровня учитывают характеристики наливаемого продукта, такие как плотность и температуру. Определяют максимально допустимый уровень загрузки исходя из типа данной цистерны. Для расчетной высоты налива вводят поправку на то, что при закрытии крана в емкости, из которой наливают жидкость, процесс налива не прекращается мгновенно. Часть продукта еще остается в трубе или шланге и поступает в ж/д цистерну. Раму 1 устанавливают на торец горловины 17 цистерны 16 с охватом концевыми опорами 2 боковой цилиндрической поверхности горловины 17. Перемещая основную втулку 4 по осевому элементу 3, устанавливают упор 10 так, чтобы его конец опирался на верхнюю точку образующей цилиндрической поверхности бочки цистерны 16. Закрепляют фиксатором 5 основную втулку 4 на осевом элементе 3, закрепляют фиксатором 9 упор 10 на держателе 6. Устанавливают измерительный стержень так, чтобы пластина 15 находилась на высоте от дна цистерны, соответствующей расчетному уровню налива. При установке пластины 15 учитывают ширину стенки цистерны α=9 мм, прибавляя ее к высоте горловины 17. Высоту горловины 17 фиксируют с помощью упора 10, при этом данное значение высоты откладывается на измерительном стержне 13. В результате получают точную высоту положения пластины 15 от замеченной начальной точки на измерительной шкале 14 измерительного стержня 13. Наливают нефтепродукт в цистерну 16. Во время налива оператор контролирует уровень налива через отверстие горловины 17 цистерны 16 с помощью света фонаря. При достижении уровня жидкости поверхности пластины 15 останавливают процесс налива. Для точного определения момента окончания налива пластина 15 может быть покрыта люминофорной краской. При прекращении свечения краски на пластине 15 останавливают налив. За счет использования упора 10 пластина 15 достаточно точно устанавливается на расчетном уровне налива. Уменьшение погрешности в высоте установки пластины 15 позволяет значительно повысить эффективность перевозок с учетом дополнительного объема жидкости, приходящегося на добавочную высоту и с учетом количества наполняемых с помощью заявляемого устройства цистерн.Before starting the loading, the level of loading the oil product into a specific tank 16 is calculated according to a special computer program and calibration tables for various types of railway tanks. When calculating the level, the characteristics of the product being poured, such as density and temperature, are taken into account. Determine the maximum allowable load level based on the type of tank. For the estimated filling height, a correction is introduced that when the valve is closed in the tank from which the liquid is poured, the filling process does not stop instantly. Part of the product still remains in the pipe or hose and enters the railway tank. The frame 1 is installed on the end of the neck 17 of the tank 16 with the end supports 2 covering the lateral cylindrical surface of the neck 17. Moving the main sleeve 4 along the axial element 3, set the stop 10 so that its end rests on the upper point of the cylindrical surface of the barrel of the tank 16. Fix it with a latch 5, the main sleeve 4 on the axial element 3, is fixed with a latch 9 stop 10 on the holder 6. Install the measuring rod so that the plate 15 is at a height from the bottom of the tank, corresponding to the calculated level filling. When installing the plate 15, take into account the width of the tank wall α = 9 mm, adding it to the height of the neck 17. The height of the neck 17 is fixed with a stop 10, and this height value is deposited on the measuring rod 13. As a result, the exact height of the position of the plate 15 from the observed the starting point on the measuring scale 14 of the measuring rod 13. Pour the oil into the tank 16. During loading, the operator controls the level of filling through the opening of the neck 17 of the tank 16 using the light of the lamp. When the liquid level reaches the surface of the plate 15 stop the filling process. To accurately determine the moment of completion of filling, the plate 15 may be coated with phosphor paint. When the luminescence of the paint on the plate 15 stops filling. Due to the use of the stop 10, the plate 15 is quite accurately set at the calculated level of filling. Reducing errors in the mounting height of the plate 15 can significantly increase the efficiency of transportation, taking into account the additional volume of liquid per additional height and taking into account the number of tanks filled using the inventive device.

Таким образом, полезная модель позволяет повысить точность определения уровня наливаемой в цистерну жидкости.Thus, the utility model allows to increase the accuracy of determining the level of liquid poured into the tank.

Claims (1)

Устройство контроля заполнения цистерны, содержащее раму для установки на горловину цистерны, стержень с измерительной шкалой и пластиной на конце, отличающееся тем, что рама выполнена с осевым элементом и концевыми опорами, на осевом элементе подвижно установлена основная втулка с фиксатором её положения, на основной втулке под углом друг к другу, на одном уровне закреплены держатель стержня и держатель упора, на конце держателя стержня закреплена втулка со стержнем и фиксатором его положения, на держателе упора посредством другой втулки, снабженной фиксатором, подвижно установлен упор. A control device for filling the tank, containing a frame for installation on the neck of the tank, a rod with a measuring scale and a plate at the end, characterized in that the frame is made with an axial element and end supports, the main sleeve is movably mounted on the axial element with a lock of its position, on the main sleeve at an angle to each other, the rod holder and the stop holder are fixed at the same level, a sleeve with the rod and its position lock is fixed at the end of the rod holder, on the stop holder by means of another sleeve Ki equipped with a latch, the emphasis is movably installed.
RU2018118583U 2018-05-21 2018-05-21 Tank filling control device RU182155U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018118583U RU182155U1 (en) 2018-05-21 2018-05-21 Tank filling control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018118583U RU182155U1 (en) 2018-05-21 2018-05-21 Tank filling control device

Publications (1)

Publication Number Publication Date
RU182155U1 true RU182155U1 (en) 2018-08-06

Family

ID=63141950

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018118583U RU182155U1 (en) 2018-05-21 2018-05-21 Tank filling control device

Country Status (1)

Country Link
RU (1) RU182155U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU210554U1 (en) * 2021-12-13 2022-04-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-ПЕРМЬ" Quick-release tank gauge hatch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2607122A (en) * 1950-07-31 1952-08-19 Elliott Paint & Varnish Co Liquid-measuring device
RU132594U1 (en) * 2013-02-20 2013-09-20 Закрытое акционерное общество "Петролеум Аналистс" RAILWAY TANK LOAD CONTROL DEVICE IN THE PROCESS OF FILLING OIL PRODUCTS
RU160928U1 (en) * 2015-06-16 2016-04-10 Общество с ограниченной ответственностью "ЛУКОЙЛ-Нижегороднефтеоргсинтез" (ООО "ЛУКОЙЛ-Нижегороднефтеоргсинтез") RAILWAY TANK LOAD CONTROL DEVICE IN THE PROCESS OF FILLING OIL PRODUCTS
RU176630U1 (en) * 2016-08-12 2018-01-24 Акционерное общество "СЖС Восток Лимитед" (Москва) Device for monitoring the level of filling tanks

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2607122A (en) * 1950-07-31 1952-08-19 Elliott Paint & Varnish Co Liquid-measuring device
RU132594U1 (en) * 2013-02-20 2013-09-20 Закрытое акционерное общество "Петролеум Аналистс" RAILWAY TANK LOAD CONTROL DEVICE IN THE PROCESS OF FILLING OIL PRODUCTS
RU160928U1 (en) * 2015-06-16 2016-04-10 Общество с ограниченной ответственностью "ЛУКОЙЛ-Нижегороднефтеоргсинтез" (ООО "ЛУКОЙЛ-Нижегороднефтеоргсинтез") RAILWAY TANK LOAD CONTROL DEVICE IN THE PROCESS OF FILLING OIL PRODUCTS
RU176630U1 (en) * 2016-08-12 2018-01-24 Акционерное общество "СЖС Восток Лимитед" (Москва) Device for monitoring the level of filling tanks

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU210554U1 (en) * 2021-12-13 2022-04-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-ПЕРМЬ" Quick-release tank gauge hatch

Similar Documents

Publication Publication Date Title
US4811601A (en) Method and apparatus for measuring the change in volume with change in temperature of liquid in tanks
RU182155U1 (en) Tank filling control device
US4155254A (en) Volume and density indicator system for liquids in tanks
RU2568981C2 (en) Measuring tank
RU132594U1 (en) RAILWAY TANK LOAD CONTROL DEVICE IN THE PROCESS OF FILLING OIL PRODUCTS
US2098963A (en) Surface contact gauge for liquids
US1646317A (en) Liquid gauge
RU2534377C1 (en) Fluid batchbox
US2676265A (en) Liquid level measuring device
CN216869717U (en) Automatic metering and calibrating device for liquid level meter
US1700659A (en) Measuring device
RU190040U1 (en) A device for determining the levels of produced water and oil in the tank
CN105203188A (en) Oil-water interface detector and oil tank liquid level meter calibrating device
US2189236A (en) Ullage rod
US1853813A (en) Liquid measuring device
US2040701A (en) Ullage rod
US2069793A (en) Ullage rod
RU2613259C1 (en) Liquid metering tank
RU170731U1 (en) DEVICE FOR DETERMINING THE OIL LEVEL IN THE ICE PALLET AT A TEST BENCH
RU2795843C1 (en) Measuring tool
RU2613261C1 (en) Liquid metering vessel
RU129554U1 (en) DEVICE FOR DETERMINING OIL AND GAS-WATER FLOW PARAMETERS
RU201521U1 (en) Device for determining the level of oil, water and ice in vertical above-ground tanks
US2006531A (en) Tank float gauge
RU2569065C1 (en) Method of volume measurements of oil product in tank

Legal Events

Date Code Title Description
MM9K Utility model has become invalid (non-payment of fees)

Effective date: 20190522