RU1818413C - Pile - Google Patents

Pile

Info

Publication number
RU1818413C
RU1818413C SU4856469A RU1818413C RU 1818413 C RU1818413 C RU 1818413C SU 4856469 A SU4856469 A SU 4856469A RU 1818413 C RU1818413 C RU 1818413C
Authority
RU
Russia
Prior art keywords
broadening
diameter
barrel
soil
level
Prior art date
Application number
Other languages
Russian (ru)
Inventor
Владимир Иванович Приходько
Original Assignee
В.И.Приходько
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.И.Приходько filed Critical В.И.Приходько
Priority to SU4856469 priority Critical patent/RU1818413C/en
Application granted granted Critical
Publication of RU1818413C publication Critical patent/RU1818413C/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Сущность изобретени : в свае, включающей ствол с уширением в верхней части и односторонним гнездом под опорный элемент , уширение выполнено ограниченным частью боковой поверхности по крайней мере одного цилиндра, образующа  которого расположена под углом к вертикали, равным 10-15°, при этом верхнее основание уширени  расположено горизонтально в уровне поверхности грунта, а нижнее - не менее чем на уровне границы сезонного промерзани  и оттаивани  грунта, под нисход щим углом к поверхности ствола и имеет диаметр, больший диаметра верхнего основани  и равный 0,5-1,0 диаметра ствола . Сва  может быть снабжена по крайней мере одним дополнительным уширением, расположенным асимметрично или симметрично основному уширению. Уширени  могут быть расположены в двух уровн х. 3 з.п. ф-лы, 9 ил.SUMMARY OF THE INVENTION: in a pile including a barrel with a broadening in the upper part and a one-sided socket for a supporting element, broadening is performed by a limited part of the side surface of at least one cylinder, the forming of which is located at an angle to the vertical equal to 10-15 °, the upper base of the broadening is located horizontally at the level of the soil surface, and the lower one is no less than at the level of the boundary of seasonal freezing and thawing of the soil, at a downward angle to the surface of the trunk and has a diameter larger than the diameter upper base and equal to 0.5-1.0 bore diameter. A piling may be provided with at least one additional broadening located asymmetrically or symmetrically to the main broadening. The broadening can be located at two levels. 3 s.p. f-ly, 9 ill.

Description

Изобретение относитс  к сва м, в частности к буронабивным, и может быть использовано при возведении на них распорных конструкций.The invention relates to piles, in particular to bored piles, and can be used in the construction of spacer structures on them.

Целью изобретени   вл етс  снижение материалоемкости при одновременном повышении эффективности работы на действие горизонтальных нагрузок и сил морозного пучени  грунта.The aim of the invention is to reduce the material consumption while increasing the operational efficiency on the effect of horizontal loads and frost heaving forces.

На фиг.1 изображена описываема  сва , вид сбоку; на фиг.2 - то же, с дополнительным уширением; на фиг.З - то же, с уширением в двух уровн х; на фиг.4 - разрез А-А на фиг.1; на фиг.5 - разрез Б-Б на фиг.2; на фиг.6 - разрез В-В на фиг.З; на фиг.7-9 - варианты расположени  ушире- ний, план.Figure 1 shows the described pile, side view; figure 2 is the same, with additional broadening; Fig. 3 is the same, with broadening in two levels; figure 4 is a section aa in figure 1; figure 5 is a section bB in figure 2; Fig.6 is a section bb In Fig.Z; Figures 7-9 show variations of the location of the enlargements;

Сва  включает ствол 1 с уширением 2 в верхней части и односторонним гнездом 3 под опорный элемент 4 распорной конструкции . Уширение 2 выполнено ограниченным частью боковой поверхности 5 .по крайней мере одного цилиндра, образующа  6 которого расположена под углом к вертикали, равным 10-15°, при этом верхнее основание 7 уширени  2 расположено горизонтально в уровне поверхности грунта , а нижнее основание 8 - не менее чем на уровне границы сезонного промерзани  и оттаивани  грунта, под нисход щим углом к поверхности 9 ствола и имеет диаметр, больший диаметра верхнего основани  7 и равный 0,5-1.0 диаметра ствола 1. При этом уширение 2 может быть выполнено ограниченным част ми боковой поверхности 5 рас00The pile includes a barrel 1 with a broadening 2 in the upper part and a one-sided socket 3 under the supporting element 4 of the spacer structure. The broadening 2 is made by a limited part of the side surface 5 of at least one cylinder, the forming 6 of which is located at an angle to the vertical equal to 10-15 °, while the upper base 7 of the broadening 2 is located horizontally at the level of the soil surface, and the lower base 8 is not less than at the level of the boundary of seasonal freezing and thawing of the soil, at a downward angle to the surface 9 of the trunk and has a diameter larger than the diameter of the upper base 7 and equal to 0.5-1.0 diameter of the trunk 1. At the same time, broadening 2 can be performed by a limited part Mi side surface 5 ras00

0000

сэ se

положенных в плане с равным интервалом цилиндров. Сва  может быть снабжена по крайней мере одним дополнительным уши- рением 10, расположенным асимметрично или симметрично основному уширению 2. Уширени  2 и 11 могут быть расположены в двух уровн х.laid in plan with equal cylinder spacing. The flange may be provided with at least one additional broadening 10 located asymmetrically or symmetrically to the main broadening 2. The broadening 2 and 11 may be located at two levels.

Сваю изготавливают следующим образом .Piles are made as follows.

Бур т вертикальную скважину (на чертежах не показана) под ствол 1, затем через то же устье бур т симметрично или асимметрично дополнительные скважины (на чертежах не показаны), причем оси будущих уширений 10, 11 ориентируют под углом 10-15° к вертикальной оси ствола 1. Затем в скважины помещают металлические арматурные каркасы (на чертежах не показаны), верхние части которых формируют арматурный каркас головы сваи. Устанавливают опалубку (не показана) и бетонируют сваю с глубинным вибрированием при одновременном формировании гнезда 3. После окончани  бетонных работ в одностороннее гнездо 3 сваи устанавливают опорный элемент 4 распорной конструкции и соедин ют его со сваей.A vertical well (not shown in the drawings) is drilled beneath the barrel 1, then additional wells (not shown) are symmetrically or asymmetrically drilled through the same wellhead, and the axes of future extensions 10, 11 are oriented at an angle of 10-15 ° to the vertical axis trunk 1. Then, metal reinforcing cages (not shown) are placed in the wells, the upper parts of which form the reinforcing cage of the pile head. The formwork (not shown) is installed and the pile is concreted with deep vibrating while forming socket 3. After the completion of concrete work, the support element 4 of the spacer structure is installed in the one-sided socket 3 of the piles and connected to the pile.

Claims (4)

1. Сва , включающа  ствол с уширени- ем в верхней части и односторонним гнез01. Pile, including a barrel with a broadening in the upper part and a one-sided socket 0 55 дом под опорный элемент распорной конструкции , отличающа с  тем, что, целью снижени  материалоемкости при од повременном повышении эффективности работы на действие горизонтальных нагрузок и сил морозного пучени  грунта, уширение выполнено ограниченным частью боковой поверхности по крайней мере одного цилиндра, образующа  которого расположена под углом к вертикали 10-15°, при этом верхнее основание уширени  расположено горизонтально в уровне поверхности грунта, а нижнее - не менее чем на уровне границы сезонного промерзани  и оттаивани  грунта - под нисход щим углом к поверхности ствола и имеет диэметр, больший диаметра верхнего основани  и равный 0,5- 1,0 диаметра ствола.house under the supporting element of the spacer structure, characterized in that, in order to reduce material consumption while increasing the working efficiency on the effect of horizontal loads and frost heaving forces, the broadening is performed by a limited part of the side surface of at least one cylinder, the forming of which is located at an angle to vertical 10-15 °, while the upper base of the broadening is located horizontally at the level of the surface of the soil, and the lower one is no less than at the level of the border of seasonal freezing and thawed and soil - at a downward angle to the surface of the barrel and has a diameter greater than the diameter of the upper base and equal to 0.5-1.0 diameter of the barrel. 2. Сва  по п.1, отл и ч а ю ща   с   тем, что уширение выполнено ограниченным част ми боковой поверхности, расположенных в плане с равным интервалом цилиндров.2. The pile according to claim 1, wherein the broadening is performed by limited parts of the side surface located in plan with equal cylinder spacing. 3. Сва  по пп. 1 и 2, о т л и ч а ю щ а  - 5 с   тем, что она снабжена по крайней мере одним дополнительным уширением, расположенным асимметрично или симметрично основному уширению.3. Swa on pp. 1 and 2, with the exception of 5 so that it is provided with at least one additional broadening located asymmetrically or symmetrically to the main broadening. 4. Сва  по п.З, отличающа с  тем, что уширени  расположены в двух уровн х.4. A pile according to claim 3, characterized in that the broadenings are located at two levels. 00 00 rfrf ЧH , 3, 3 .,. ..,. . W//7WW // 7W 1Л111L11 ЮYU Фиг. 2FIG. 2 А -АA-A Фиг. ЈFIG. Ј 55 Фиг.77 Фив. 8Thebes. 8 Составитель В.Гоник Техред М.МоргенталCompiled by V. Gonik Tehred M. Morgenthal Фиг.З 5-5Fig. 5-5 В-ВBb )) Фаг. 5Phage 5 Фиг. 6FIG. 6 Фив. 8Thebes. 8 Корректор Н.Ревска Proofreader N. Revska
SU4856469 1990-08-01 1990-08-01 Pile RU1818413C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4856469 RU1818413C (en) 1990-08-01 1990-08-01 Pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4856469 RU1818413C (en) 1990-08-01 1990-08-01 Pile

Publications (1)

Publication Number Publication Date
RU1818413C true RU1818413C (en) 1993-05-30

Family

ID=21530596

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4856469 RU1818413C (en) 1990-08-01 1990-08-01 Pile

Country Status (1)

Country Link
RU (1) RU1818413C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 962455, кл. Е 02 D 5/48. 1979. Обзорна информаци Фундаменты одноэтажных сельскохоз йственных зданий с каркасом из трех шарнирных рам. М.: ЦНИИЭПсельстрой, 1976, с.14, 15, 38, 39. *

Similar Documents

Publication Publication Date Title
US2429952A (en) Underwater foundation and method of erecting the same
US4911583A (en) Structure and method for shoring a face of an excavation
US5433557A (en) Method for underpinning an existing footing
CN110847047B (en) Open sea bare rock trestle construction method
RU1818413C (en) Pile
CN106545018B (en) Excavation slope excavation construction process and excavation slope
JPS6145022B2 (en)
US4355927A (en) Piling structure and methods
GB2091313A (en) Methods of underpinning
MY131012A (en) Installing pre-founded columns
RU188967U1 (en) REINFORCED STRUCTURE OF THE SUPPORTING WALL
CN215669660U (en) But reuse's retaining wall
CN208965573U (en) A kind of soft band civil engineering pile foundation construction structure
SU740901A1 (en) Foundation
SU1116120A1 (en) Counter-landslide arrangement
RU1790643C (en) Pile
SU1110851A1 (en) Support structure
JPH04128471A (en) Steel foundation mold for underground structure
SU1052628A1 (en) Foundation on sagging soil
SU1036844A1 (en) Foundation
RU56416U1 (en) BOARD WALL IN SOIL
CN110258574A (en) Foundation ditch construction method
SU1735490A1 (en) Method of erecting pile foundation
KR950018960A (en) Apparatus and construction method for constructing temporary wall for permanent wall (building base wall)
CN115748787A (en) Split type open caisson deviation prevention device and open caisson deviation prevention construction method