Prior art keywords
drying chamber
spray booth
opening
wall
adjacent
Prior art date
Application number
Other languages
Russian (ru)
Inventor
Борис Васильевич Алексеев
Original Assignee
Б.В. Алексеев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Б.В. Алексеев filed Critical Б.В. Алексеев
Priority to SU4720163 priority Critical patent/RU1808402C/en
Application granted granted Critical
Publication of RU1808402C publication Critical patent/RU1808402C/en

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

Использование: изобретение относитс  к машиностроению и может быть использовано при нанесении лакокрасочных покрытий на крупногабаритные издели  дл  снижени  эксплуатационных расходов и уменьшени  габаритов. Сущность изобретени : поперечное сечение сушильной камеры меньше по площади смежного с ней поперечного сечени  окрасочной камеры. Поперечна  стенка окрасочной камеры, смежна  с сушилкой, перекрыта П-образной стационарной стенкой и размещенными в проеме между камерами распашными воротами. Боковой проем окрасочной камеры перекрыт продольной стенкой, установленной с возможностью перемещени  в направлении сушильной камеры и снабженной поддерживающим роликом дл  взаимодействи  с направл ющей, прикрепленной к площадке дл  тепловентил ционных агрегатов . При этом площадка дл  тепловентил ционных агрегатов размещена над сушильной камерой. 3 ил.Usage: the invention relates to mechanical engineering and can be used in the application of coatings on large-sized products to reduce operating costs and reduce overall dimensions. SUMMARY OF THE INVENTION: The cross section of the drying chamber is smaller in area than the adjacent cross section of the spray booth. The transverse wall of the spray booth, adjacent to the dryer, is covered by a U-shaped stationary wall and swing gates placed in the opening between the chambers. The side opening of the spray booth is covered by a longitudinal wall mounted for movement in the direction of the drying chamber and provided with a supporting roller for engaging with a guide attached to the area for the heat ventilation units. At the same time, a platform for heat ventilation units is placed above the drying chamber. 3 ill.

Description

(L

СWITH

Изобретение относитс  к машиностроению может быть использовано при нанесе- нии лакокрасочных . покрытий на крупногабаритные издели .The invention relates to mechanical engineering can be used in the application of paints and varnishes. coatings for bulky products.

Целью изобретени   вл етс  снижение эксплуатационных расходов, уменьшени  габаритов.The aim of the invention is to reduce operating costs, downsizing.

На фиг.1 изображен окрасочно-сушиль- ный комплекс, вид сбоку; на фиг.2 - разрез А-А на фиг, 1,-на фиг.З-разрез Б-Б на фиг.1.Figure 1 shows a painting and drying complex, side view; in Fig.2 is a section aa in Fig.1, Fig. 3-section bB in Fig.1.

Устройство содержит корпус 1 сушильной камеры со створками 2 распашных ворот . Над корпусом камеры расположена площадка 3 дл  размещени  и обслуживани  тепловентил ционных агрегатов (не по- казаны)сушильной камеры. Площадка 3 опираетс  на стойки 4 и снабжена ограждением , выполненным со стороны ворот 2 в виде сплошного листа 5.The device comprises a housing 1 of a drying chamber with wings 2 swing gates. A platform 3 is located above the chamber body for accommodating and servicing the heat ventilation units (not shown) of the drying chamber. The platform 3 rests on the posts 4 and is provided with a guard made on the side of the gate 2 in the form of a continuous sheet 5.

Устройство содержит также напольную решетку 6, размещенную в окрасочной камере , под решеткой расположена сборна  ванна 7 дл  циркулирующей воды, переливна  ванна 8 и лоток 9. С задней продольной стороны напольной решетки размещены гидрофильтры 10 с переливной ванной 11, полуцилиндрами 12 и отбойными щитками 13. Зазоры между гидрофильтрами защиты листами 14. С правого торца решетки размещена стационарна  стенка 15, котора  состыкована с листом 14 задней продольной стенки. С левого торца напольной решетки размещены створки распашных ворот сушильной камеры, а пространство сбоку иThe device also contains a floor grate 6 located in the spray booth, a collection bath 7 for circulating water, an overflow bath 8 and a tray 9 located under the grate. Hydraulic filters 10 with an overflow bath 11, half cylinders 12 and baffle plates 13 are placed on the rear longitudinal side of the floor grate. The gaps between the protection filters are by the sheets 14. A stationary wall 15 is placed at the right end of the grating, which is joined to the sheet 14 of the rear longitudinal wall. The leaves of the swinging doors of the drying chamber are placed on the left end of the floor grill, and the space on the side and

0000

оabout

0000

о to about to

ад корпусом камеры зашито сплошным Pi- бразным листом 16. С ближней продольой стороны решетки 6 комплекс снабжен плошной передвижной стенкой 17, котора  ерез ходовые колеса 18 опираетс  на рельс 19 и перемещаетс  с помощью привода 20. В верхней части стенки 17 установлен ролик 1, который заключен в направл ющую 22, приваренную к площадке 3 сушильной каеры . Дл  фиксации закрытого положени  подвижной стенки 17 к торцевой стенке 15 прикреплен упор 23.hell with the camera body is sewn up with a continuous P-sheet 16. From the near longitudinal side of the grating 6, the complex is equipped with a flat movable wall 17, which is supported by the drive 19 through the wheels 18 and moved by the drive 20. A roller 1 is installed in the upper part of the wall 17, which enclosed in a guide 22 welded to the drying kiln site 3. A stop 23 is attached to the end wall 15 to fix the closed position of the movable wall 17.

Изделие 24 размещаетс  на тележке 25, котора  опираетс  через ходовые колеса 26 на рельсовый путь 27 и перемещаетс  с помощью канатного привода 28.The product 24 is placed on a trolley 25, which is supported through the running wheels 26 on a rail track 27 and is moved by a cable drive 28.

Окрасочно-сушильный комплекс работает следующим образом. Исходное положение: тележка 25 находитс  на напольной решетке 6, ворота 2 сушильной камеры закрыты , подвижна  стенка 17 находитс  в закрытом (правом) положении.Painting and drying complex works as follows. Starting position: trolley 25 is located on floor grate 6, gate 2 of the drying chamber is closed, movable wall 17 is in the closed (right) position.

Включаетс  привод 20 и откатна  стенка 17 перемещаетс  в крайнее левое положение . Изделие 24 цеховым краном устанавливаетс  на тележку 25. Включаетс  привод 20 и стенка 17 перемещаетс  в крайнее правое положение, изолиру  изделие от помещени  цеха.The actuator 20 is turned on and the sliding wall 17 is moved to the leftmost position. The product 24 is installed by the workshop crane on the trolley 25. The drive 20 is turned on and the wall 17 moves to the extreme right position, isolating the product from the workshop room.

Включаютс  насосы (не показаны), которые подают зоду из ванны 7 в переливные ванны 8 и 11. Включаютс  также вентил торы (не показаны), которые подсоединены к верхним фланцам гидрофильтров 10 и отсасывают воздух из при мка ванны 7. При этом воздух из цеха двигаетс  сверху вниз в ограниченном стенками 14,15,16,17 пространстве и через напольную решетку 6 поступает в гидрофильтры 10. Проход  через вод ные завесы, образованные водой, стекающей с лотка 9 переливных ванн 8 и 11, загр зненный воздух очищаетс  от лакокрасочных материалов, осушаетс  отбойными щитками 13 и удал етс  в атмосферу. Через двери (не показаны) окрасочник входит на напольную решетку и осуществл ет окраску издели .Pumps (not shown) are turned on, which feed the zod from bath 7 to overflow baths 8 and 11. Fans (not shown) are also turned on, which are connected to the upper flanges of the hydrofilters 10 and sucked air out of the bath tub 7. In this case, the air from the workshop moves from top to bottom in the space bounded by the walls 14,15,16,17 and through the floor grate 6 it enters the hydraulic filters 10. Passing through the water curtains formed by the water flowing from the tray 9 of the overflow baths 8 and 11, the polluted air is cleaned of paints and varnishes is drained by fenders shields 13 and is removed to the atmosphere. Through doors (not shown), the sprayer enters the floor grill and paints the product.

По окончании окраски открываютс  ворота 2 и тележка 25 вместе с изделием перемещаетс  внутрь корпуса 1, сушильной камеры, после чего ворота 2 закрываютс . Отключаютс  насосы и вентил торы напольной решетки и включаютс  тепловентил ци- онные агрегаты (не показаны), которые подают циркулирующий нагретый .воздух внутрь корпуса 1 сушильной камеры. Осуществл етс  сушка издели .At the end of the painting, the gates 2 are opened and the carriage 25 together with the product moves inside the housing 1, the drying chamber, after which the gates 2 are closed. The pumps and fans of the floor grille are turned off and the fan heaters (not shown) are turned on, which supply the circulating heated air to the inside of the casing 1 of the drying chamber. The product is dried.

По окончании сушки тепловентил цион- ные агрегаты отключаютс , открываютс  ворота 2 сушильной камеры, а тележка 25 сAt the end of drying, the fan heaters are switched off, the doors 2 of the drying chamber open, and the trolley 25 s

высушенным изделием 24 выкатываетс  на напольную решетку 6.dried product 24 is rolled out onto floor grate 6.

Ворота 2 закрываютс , включаетс  привод 20 и стенка 17 перемещаетс  в крайнееThe gate 2 closes, the drive 20 is turned on, and the wall 17 moves to the extreme

левое положение, после чего изделие 24 цеховым краном снимаетс  с тележки 25. Затем цикл может повтор тьс .left position, after which the product 24 is removed by the workshop crane from the cart 25. Then, the cycle can be repeated.

В за вленном устройстве напольна  решетка примыкает непосредственно к сушильной камере, а откатна  стенка в открытом положении размещаетс  в пределах длины сушильной камеры, что позвол ет снизить требуемую дл  размещени  комплекса площадь цеха.In the claimed device, the floor grate adjoins directly to the drying chamber, and the sliding wall in the open position is placed within the length of the drying chamber, which allows reducing the workshop area required for the complex to be installed.

5 Ограждение зоны .окраски осуществл -. етс  простыми средствами: стационарными стенками 15, 16 и корпусом сушильной камеры , а также откатной стенкой 17, котора  требует незначительной мощности на ее пе0 редвижение, повышает надежность и безопасность работы.5 Fencing of the .kras zone by -. simple means: stationary walls 15, 16 and the housing of the drying chamber, as well as a sliding wall 17, which requires little power to move it, increases the reliability and safety of work.

Надежна , благодар  простоте средств, изол ци  зоны окраски позвол ет снизить количество отсасываемого вентил торамиReliable, due to the simplicity of the means, isolation of the paint zone allows to reduce the amount of suction fans

5 через гидрофильтры воздуха, улучшить услови  труда в цехе.5 through air hydrofilters, improve the working conditions in the workshop.

Комплекс не требует глубоких при мков , что снижает затраты на строительство, изготовление и эксплуатацию, и также сни0 жает габариты устройства.The complex does not require deep marks, which reduces the cost of construction, manufacturing and operation, and also reduces the dimensions of the device.

Claims (1)

Формула изобретени  Окрасочно-сушильный комплекс, содержащий окрасочную и смежную с ней сушильную камеру с проемом между ними дл SUMMARY OF THE INVENTION A paint-drying complex comprising a paint and adjacent drying chamber with an opening between them for 5 прохода изделий, тепловентил ционные агрегаты , размещенные на площадке, окрасочна  камера выполнена с проемом в боковой стенке дл  прохода изделий и снабжена системой очистки воздуха, напольной5 passage of products, heat ventilation units located on the site, the spray booth is made with an opening in the side wall for passage of products and is equipped with an air purification system, floor 0 решеткой и ванной, размещенной под напольной решеткой,отличающийс  тем, что, с целью снижени  эксплуатационных расходов, уменьшени  габаритов, поперечное сечение сушильной камеры меньше по0 grid and a bath placed under the floor grill, characterized in that, in order to reduce operating costs, reduce overall dimensions, the cross section of the drying chamber is smaller 5 площади смежного с ней поперечного сечени  окрасочной камеры, поперечна  стенка окрасочной камеры, смежна  с сушильной, перекрыта П-образной стационарной стенкой и размещенными в проеме между хаме0 рами распашными воротами, а боковой проем окрасочной камеры перекрыт продольной стенкой, установленной с возможностью перемещени  в направлении сушильной камеры и снабженной поддер5 живающим роликом дл  взаимодействи  с направл ющей, прикрепленной к площадке д Л  тепловентил ционных агрегатов, при этом площадка дл  тепловентил ционных агрегатов размещена над сушильной камерой .5 areas of the cross section of the spray booth adjacent to it, the transverse wall of the spray booth, adjacent to the drying chamber, is blocked by a U-shaped stationary wall and swing gates placed in the opening between the chambers, and the side opening of the spray booth is blocked by a longitudinal wall mounted for movement in the direction drying chamber and provided with a supporting roller for interacting with a guide attached to the site for the heat ventilation units, while the site for heat ventilation units placed above the drying chamber.
SU4720163 1989-07-14 1989-07-14 Painting and drying complex RU1808402C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4720163 RU1808402C (en) 1989-07-14 1989-07-14 Painting and drying complex

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4720163 RU1808402C (en) 1989-07-14 1989-07-14 Painting and drying complex

Publications (1)

Publication Number Publication Date
RU1808402C true RU1808402C (en) 1993-04-15

Family

ID=21461464

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4720163 RU1808402C (en) 1989-07-14 1989-07-14 Painting and drying complex

Country Status (1)

Country Link
RU (1) RU1808402C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Лакокрасочные материалы и их применение. № 4, 1988, с. .51. фиг. 1. Сточик Г.Ф. Защитные покрыти в машиностроении. М.; Машгиз, 1963, с. 130- 131,фиг.81. *

Similar Documents

Publication Publication Date Title
US9643203B2 (en) Spray booths
JPS62502479A (en) industrial exhaust ventilation system
EA000935B1 (en) Spraying booth and circulation system for a working chamber
CN111330793A (en) Paint spraying circulation line for civil air defense door
CN109622286A (en) A kind of elevator car door spray-painting plant
CN210207338U (en) Panel paint spraying apparatus is used to building engineering fitment
RU1808402C (en) Painting and drying complex
CN113522610B (en) Motor housing paint spraying system
RU2011429C1 (en) Lacquer coating applying and drying device
CN104117454A (en) Primer paint spraying chamber
CN114289225B (en) Engineering construction equipment for building construction
SU1741921A1 (en) Apparatus for painting and drying large-size articles
KR100632131B1 (en) Combination spray booth for water based paint of auto refinish
CN216025810U (en) Spray and dry by fire flexible spray booth of integral type
CN214390763U (en) Steel plate longitudinal spraying production line
CN208984544U (en) Fluorescence detection line
CN218251787U (en) Circulating type cleaning, drying and cooling machine
CN215310823U (en) Air filtering equipment for coating room
CN218133050U (en) Anticorrosive finish spraying rapid-curing cutback equipment
SU1437100A1 (en) Unit for painting and drying articles
CN215429881U (en) Aluminum plate paint spray booth
SU1595577A1 (en) Installation for painting articles of complex configuration
CN215197840U (en) Spraying device is used in processing of environment-friendly water pump case
CN216738450U (en) Electromagnetic valve inner cavity surface quenching device
CN210729987U (en) Curing barn with infrared baking device