CN104117454A - Primer paint spraying chamber - Google Patents

Primer paint spraying chamber Download PDF

Info

Publication number
CN104117454A
CN104117454A CN201410381905.8A CN201410381905A CN104117454A CN 104117454 A CN104117454 A CN 104117454A CN 201410381905 A CN201410381905 A CN 201410381905A CN 104117454 A CN104117454 A CN 104117454A
Authority
CN
China
Prior art keywords
chamber body
door
purging
water fender
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410381905.8A
Other languages
Chinese (zh)
Inventor
高建飞
高涌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Shunda Intelligent Automation Engineering Co Ltd
Original Assignee
Wuxi Shunda Intelligent Automation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Shunda Intelligent Automation Engineering Co Ltd filed Critical Wuxi Shunda Intelligent Automation Engineering Co Ltd
Priority to CN201410381905.8A priority Critical patent/CN104117454A/en
Publication of CN104117454A publication Critical patent/CN104117454A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/43Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by filtering the air charged with excess material
    • B05B14/435Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by filtering the air charged with excess material with means for cleaning the filters by gas flow, e.g. blasts of air
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/46Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material
    • B05B14/465Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material using substantially vertical liquid curtains or wetted walls behind the object to be sprayed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/60Ventilation arrangements specially adapted therefor

Abstract

The invention relates to a primer paint spraying chamber. A rail in the left-right direction is arranged in a chamber body, the upper end of a mechanical lift machine is connected to the rail in a hung mode, and one end of the chamber body is provided with an electric hinged door. The bottom of the chamber body is provided with a grating plate. A paint mist treatment system is arranged below the grating plate and comprises a water pool, water rotating cylinders and circulation pipelines. The water pool is located under the grating plate, the center of the water pool is provided with a plurality of water rotating cylinders, and the front sides and the rear sides of the water rotating cylinders are respectively provided with a set of circulation pipelines. A blowing and sweeping system is arranged outside the chamber body, a blowing pipe of the blowing and sweeping system penetrates through one side of the upper portion of the chamber body and enters the chamber body, a plurality of blowing and sweeping air openings are evenly distributed in the blowing pipe in the length direction of the blowing pipe, and the end, located outside the chamber body, of the blowing pipe is connected with an air outlet of a blowing and sweeping fan. The primer paint spraying chamber is ingenious in structure, reasonable in design, capable of effectively guaranteeing body health of operating personnel and guaranteeing product paint spraying quality as well, and low in production cost and operation cost.

Description

Priming paint paint spray booth
Technical field
The present invention relates to a kind of application paint spray booth, specifically the priming paint paint spray booth on agricultural machinery and implement structure coating line.
Background technology
Mostly domestic application paint spray booth is for meeting the spraying process of super large, overweight workpiece at present, paint spray booth floor space often very large, for less agricultural machinery and implement structural member, the purchase cost of this type of paint spray booth is very high, and the operating cost of this type of paint spray booth is also higher.Therefore the producer of some production agricultural machinery and implement has adopted simple paint spray booth.But because the coating using in lacquer spraying technique process all contains organic solvent, it is harmful to health, if paint spray booth's structure is too simple, to operating personnel's protection degree just not.In addition, the paint spray booth that structure is simple and crude also affects the effect of spraying paint.Particularly for priming paint, spray, because priming paint is the ground floor of paint system, its for improving the adhesive force of finish paint, increase finish paint richness, alkali resistance is provided, anti-corrosion function etc. is provided, can guarantee the even absorption of finish paint simultaneously, make paint system performance optimum efficiency.Priming paint spraying effect is not good will have a strong impact on product quality.Therefore, be necessary to research and develop a kind of priming paint paint spray booth being applicable on agricultural machinery and implement structure coating line.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of priming paint paint spray booth is provided, its structure is ingenious, reasonable in design, health that can either effective guarantee operating personnel, can guarantee again the product quality of spraying paint, and production cost and operating cost cheap.
According to technical scheme provided by the invention: priming paint paint spray booth, it is characterized in that: comprise chamber body, mechanical elevator, coating cloud treatment system and purging system, the track of left and right trend is installed in the body of described chamber, the hanging of mechanical elevator upper end connects in orbit and can be along track travel, body one end, chamber is provided with electronic clamshell doors, and workpiece to be sprayed enters and packs mechanical elevator into from electronic clamshell doors; The bottom of described chamber body is flase floor; Described coating cloud treatment system is arranged on flase floor below, coating cloud treatment system comprises that pond, water revolve cylinder and circulation line, pond is positioned under flase floor, and the center in pond is provided with a plurality of water and revolves cylinder, and the both sides, front and back of revolving cylinder at a plurality of water are respectively provided with a set of circulation line; It is external that described purging system is arranged on chamber, the blower of purging system runs through and enters in the body of chamber from body top, chamber one side, blower is provided with several equally distributed purging air ports in its length, and blower is positioned at the air outlet that external one end, chamber connects purging motor.
As a further improvement on the present invention, described chamber body comprises upper chamber body, chamber, middle level body and lower chamber body, described upper chamber body top is provided with two air ports, the blower of described purging system penetrates and is arranged in upper chamber body from upper chamber body sidewall, and upper chamber body sidewall is provided with upper strata access door; Chamber, described middle level body is communicated with upper chamber body, the middle level cell of three parallel left and right trends before, during and after body inside, chamber, middle level is divided into, the track of left and right trend is installed in middle middle level cell, the hanging of mechanical elevator upper end connects in orbit, and two forward and backward middle level cell sidewalls are provided with middle level access door; Also lower floor's cell of three parallel left and right trends before, during and after being divided in described lower chamber body, middle lower floor's cell one end is provided with electronic clamshell doors, and forward and backward Liang Ge lower floor cell is as operation room, and operation room is provided with safety door; The bottom of described lower chamber body is flase floor.
As a further improvement on the present invention, between the forward and backward middle level cell of described upper chamber body and chamber, middle level body, by porous plate, be separated by, between the middle middle level cell of upper chamber body and chamber, middle level body, by flap, be separated by, between middle middle level cell and middle lower floor cell, by steel plate, be separated by, between this steel plate, be provided with the short slot passing for mechanical elevator together; The upper and lower of described lower chamber body is provided with lamp box, and middle part is provided with windowpane; Described chamber body adopts splicing structure, and the skeleton of chamber body mainly consists of C shaped steel, and the wallboard of chamber body adopts galvanized steel plain sheet, and with bolts between wallboard and wallboard, wallboard and skeleton, seam crossing does not contain silicone sealant.
As a further improvement on the present invention, described electronic clamshell doors comprises door-plate, upper directive wheel, upper guiding channel-section steel, lower support wheel, lower guideway assembly and driving mechanism for opening or closing, and described door-plate has two, and two door-plates are opposite opened setting; Door-plate is installed directive wheel below, and upper directive wheel is embedded in guiding channel-section steel, and guiding guide groove is fixed on the external wall in chamber; Described door-plate is installed lower support wheel below, and door-plate is taken turns to support by lower support and is placed on lower guideway assembly; Two door-plates drive by driving mechanism for opening or closing, can locking phase near or oppositely away from.
As a further improvement on the present invention, described driving mechanism for opening or closing comprises motor reducer, turns to sprocket wheel, motor reducer is arranged on one end of door-plate folding direction, the output of motor reducer is installed drive sprocket, turn to sprocket wheel to be arranged on the other end of door-plate folding direction, turn between sprocket wheel and drive sprocket by chain connection for transmission; A door-plate in two door-plates connects the top of chain by the first connecting plate, another door-plate by the second connecting plate connect chain below, the forward and reverse rotation of motor drive two door-plate locking phases near or oppositely away from.
As a further improvement on the present invention, described lower guideway assembly comprises guide rail base, guide supporting platform and guide rail body, described guide rail base adopts rectangular tube, guide supporting platform adopts channel-section steel, guide rail base and guide supporting platform are welded to connect, and described guide rail body adopts angle steel, and the right angle rim of guide rail body vertically upward, described lower support wheel is provided with right angle race, and lower support wheel coordinates with the right angle rim of guide rail body by its right angle race; Described lower guideway assembly is also provided with chain bracket, chain bracket comprises vertical supporting rod and cross girders, vertical supporting rod adopts angle steel, vertical supporting rod lower end and guide rail base are welded to connect, described cross girders has two, two cross girders be arranged in parallel one on the other, are separately fixed on vertical supporting rod, and hold by two cross girders respectively on the upper and lower limit of described chain.
As a further improvement on the present invention, described purging system is arranged on chamber body upper outside, purging system comprises blower, connecting pipe component, purging motor, fan platform and blast pipe assembly, described blower is arranged in the body of chamber, blower is provided with several equally distributed purging air ports in its length, and blower is positioned at external one end, chamber and is connected with the air outlet of purging motor by connecting pipe component; Described purging motor is arranged on fan platform, and the air inlet of purging motor connects blast pipe assembly.
As a further improvement on the present invention, described connecting pipe component comprises that tube connector and the first canvas are flexible coupling, described tube connector is hard tube, tube connector one end is directly connected with blower, the tube connector other end is fixed on and supports on angle steel, and tube connector is flexible coupling and is connected with the air outlet of purging motor by the first canvas; Described blast pipe assembly comprises that blast pipe, the second canvas are flexible coupling and bag filter, and bag filter is arranged on the entrance point of blast pipe, and the port of export of blast pipe is flexible coupling and is connected with the air inlet of purging motor by the second canvas; Described purging air port place is provided with deep bead, and deep bead is arranged on blower in mode that can turn, by turn, regulates deep bead can partly or entirely cover purging air port.
As a further improvement on the present invention, a plurality of water at center, described pond revolve cylinder and form a line, described circulation line comprises pipeline, support of pipelines, flange end cap, butterfly valve, bend pipe, the first water fender and the second water fender, pipe arrangement is in the both sides, front and back in pond and by support of pipelines, install fixingly, and support of pipelines scene manufactures; Pipe end is stifled by flange end cap seal, on pipeline, near import position, butterfly valve is installed, pipeline bottom is provided with a plurality of bend pipes that are communicated with pipe interior uniform in pipe lengths, the lower end outlet of bend pipe is towards pond, in the dead ahead of winding pipe exit, be provided with the first water fender, described the first water fender is short slab, and corresponding first water fender of each bend pipe, leaves spacing between adjacent the first water fender; After the first water fender, be provided with the second water fender, described the second water fender is a long slab, and all bend pipe correspondences second water fender.
As a further improvement on the present invention, the height of described the first water fender is higher than the second water fender; The upper end of described the first water fender is to the bending of bend pipe direction, and its bending angle is 120 degree.
compared with prior art, tool has the following advantages in the present invention:structure of the present invention is ingenious, reasonable in design, and health that can either effective guarantee operating personnel can guarantee again the product quality of spraying paint, and production cost and operating cost cheap.
Accompanying drawing explanation
Fig. 1 is the structural front view of the embodiment of the present invention.
Fig. 2 is the structure top view of the embodiment of the present invention.
Fig. 3 is the structure left view of the embodiment of the present invention.
Fig. 4 .1 is the structural front view of the chamber body in the embodiment of the present invention.
Fig. 4 .2 is the left view of Fig. 4 .1.
Fig. 4 .3 is the right view of Fig. 4 .1.
Fig. 4 .4 is the top view of Fig. 4 .1.
Fig. 4 .5 is that A-A in Fig. 4 .1 is to cutaway view.
Fig. 4 .6 is that B-B in Fig. 4 .1 is to cutaway view.
Fig. 5 .1 is the structural front view of the electronic clamshell doors in the embodiment of the present invention.
Fig. 5 .2 is the left view of Fig. 5 .1.
Fig. 5 .3 is the I portion enlarged diagram in Fig. 5 .1.
Fig. 5 .4 is the II portion enlarged diagram in Fig. 5 .1.
Fig. 5 .5 is that A-A in Fig. 5 .1 is to cutaway view.
Fig. 6 .1 is the structural front view of the purging system in the embodiment of the present invention.
Fig. 6 .2 is the top view of Fig. 6 .1.
Fig. 6 .3 is the left view of Fig. 6 .1.
Fig. 6 .4 is the structural representation of blower in Fig. 6 .1.
Fig. 6 .5 is the I portion enlarged diagram in Fig. 6 .4.
Fig. 7 .1 is the structural front view of the coating cloud treatment system in the embodiment of the present invention.
Fig. 7 .2 is the left view of Fig. 7 .1.
Fig. 7 .3 is the top view of Fig. 7 .1.
Fig. 7 .4 is the I portion enlarged diagram in Fig. 7 .3.
The specific embodiment
Below in conjunction with concrete drawings and Examples, the invention will be further described.
As shown in the figure: the priming paint paint spray booth in embodiment is mainly comprised of chamber body 1, mechanical elevator 6, coating cloud treatment system 2 and purging system 4 etc., the track 5 of left and right trend is installed in described chamber body 1, mechanical elevator 6 upper end hangings are connected on track 5 and can walk along track 5, body 1 one end in chamber is provided with electronic clamshell doors 3, and workpiece to be sprayed enters and packs mechanical elevator 6 into from electronic clamshell doors 3; The bottom of described chamber body 1 is flase floor 7; Described coating cloud treatment system 2 is arranged on flase floor 7 belows, coating cloud treatment system 2 comprises that pond 2.1, water revolve cylinder 2.2 and circulation line, pond 2.1 is positioned under flase floor 7,2.1 center, pond is provided with a plurality of water and revolves cylinder 2.2, and the both sides, front and back of revolving cylinder 2.2 at a plurality of water are respectively provided with a set of circulation line; Described purging system 4 is arranged on outside chamber body 1, the blower 4.1 of purging system 4 runs through and enters in chamber body 1 from chamber body 1 top one side, blower 4.1 is provided with several equally distributed purging air port 4.1a in its length, and blower 4.1 is positioned at the air outlet of one end connection purging motor 4.4 outside chamber body 1.
In the embodiment of the present invention, the structure of described chamber body 1 is in detail as shown in Fig. 4 .1 ~ Fig. 4 .6, it mainly comprises upper chamber body 1.1, chamber, middle level body 1.2 and lower chamber body 1.3, described upper chamber body 1.1 tops are provided with two air ports 1.4, the blower 4.1 of described purging system 4 penetrates and is arranged in upper chamber body 1.1 from upper chamber body 1.1 sidewalls, and upper chamber body 1.1 sidewalls are provided with upper strata access door 1.5; Chamber, described middle level body 1.2 is communicated with upper chamber body 1.1, the middle level cell of three parallel left and right trends before, during and after body 1.2 inside, chamber, middle level are divided into, the track 5 of left and right trend is installed in middle middle level cell, mechanical elevator 6 upper end hangings are connected on track 5 and can walk along track 5, and two forward and backward middle level cell sidewalls are provided with middle level access door 1.6; Also lower floor's cell of three parallel left and right trends before, during and after being divided in described lower chamber body 1.3, middle lower floor's cell one end is provided with electronic clamshell doors 3, workpiece to be sprayed enters and packs mechanical elevator 6 into from electronic clamshell doors 3, forward and backward Liang Ge lower floor cell is as operation room, and operation room is provided with safety door 1.7; The bottom of described lower chamber body 1.3 is flase floor 7.
As shown in Fig. 4 .5, Fig. 4 .6, between the forward and backward middle level cell of described upper chamber body 1.1 and chamber, middle level body 1.2, by porous plate 1.8, be separated by, between the middle middle level cell of upper chamber body 1.1 and chamber, middle level body 1.2, by flap 1.9, be separated by, between middle middle level cell and middle lower floor cell, by steel plate 1.10, be separated by, between this steel plate 1.10, be provided with the short slot passing for mechanical elevator 6 together.
As shown in Fig. 4 .1, the upper and lower of described lower chamber body 1.3 is provided with lamp box 1.11, and middle part is provided with windowpane 1.12.In the embodiment of the present invention, described chamber body 1 adopts splicing structure, and the skeleton of chamber body 1 mainly consists of C shaped steel, and the wallboard of chamber body 1 adopts galvanized steel plain sheet, and with bolts between wallboard and wallboard, wallboard and skeleton, seam crossing does not contain silicone sealant.
In addition, as shown in Fig. 4 .3, for convenience of operation, in described operation room, be provided with movable portable control tower 1.13.
In the embodiment of the present invention, the structure of described electronic clamshell doors 3 is in detail as shown in Fig. 5 .1 ~ Fig. 5 .5, it is mainly comprised of door-plate 3.4, upper directive wheel 3.8, upper guiding channel-section steel 3.7, lower support wheel 3.5, lower guideway assembly and driving mechanism for opening or closing, described door-plate 3.4 has two, and two door-plates 3.4 are opposite opened setting; Door-plate 3.4 is installed directive wheel 3.8 below, and upper directive wheel 3.8 is embedded in guiding channel-section steel 3.7, and guiding guide groove is fixed on chamber body 1 outer wall; Described door-plate 3.4 is installed lower support wheel 3.5 below, and door-plate 3.4 is taken turns 3.5 supports by lower support and is placed on lower guideway assembly; Two door-plates 3.4 drive by driving mechanism for opening or closing, can locking phase near or oppositely away from.
As shown in Fig. 5 .1 ~ Fig. 5 .5, described driving mechanism for opening or closing mainly comprises motor reducer 3.1, turns to sprocket wheel 3.6, motor reducer 3.1 is arranged on one end of door-plate 3.4 folding directions, the output of motor reducer 3.1 is installed drive sprocket 3.10, turn to sprocket wheel 3.6 to be arranged on the other end of door-plate 3.4 folding directions, turn between sprocket wheel 3.6 and drive sprocket 3.10 by chain 3.9 connection for transmissions; A door-plate 3.4 in two door-plates 3.4 connects the top of chain 3.9 by the first connecting plate 3.2, another door-plate 3.4 by the second connecting plate 3.3 connect chains 3.9 below, the forward and reverse rotation of motor drive two door-plate 3.4 locking phases near or oppositely away from.
As shown in Fig. 5 .5, described lower guideway assembly comprises guide rail base 3.11, guide supporting platform 3.12 and guide rail body 3.13, described guide rail base 3.11 adopts rectangular tube, guide supporting platform 3.12 adopts channel-section steel, guide rail base 3.11 is welded to connect with guide supporting platform 3.12, described guide rail body 3.13 adopts angle steel, the right angle rim of guide rail body 3.13 vertically upward, described lower support wheel 3.5 is provided with right angle race, and lower support wheel 3.5 coordinates with the right angle rim of guide rail body 3.13 by its right angle race.In addition, described lower guideway assembly is also provided with chain bracket, chain bracket comprises vertical supporting rod 3.14 and cross girders 3.15, vertical supporting rod 3.14 adopts angle steel, vertical supporting rod 3.14 lower ends and guide rail base 3.11 are welded to connect, and described cross girders 3.15 has two, and two cross girders 3.15 be arranged in parallel one on the other, be separately fixed on vertical supporting rod 3.14, hold by two cross girders 3.15 respectively on the upper and lower limit of described chain 3.9.
As shown in Fig. 5 .4, in the embodiment of the present invention, described drive sprocket 3.10 is mainly comprised of sprocket body 3.10a, chain gear transmission cover 3.10b, sprocket wheel back-up ring 3.10c and safety pin 3.10d, chain gear transmission cover 3.10b is arranged on the output shaft of motor reducer 3.1, sprocket body 3.10a is arranged on chain gear transmission cover 3.10b and goes up and use sprocket wheel back-up ring 3.10c to block spacing, sprocket wheel back-up ring 3.10c is screwed and is connected to motor reducer 3.1 output shaft ends, and sprocket body 3.10a overlaps between 3.10b and is connected with driving torque by safety pin 3.10d with chain gear transmission.Security when such drive sprocket structure can improve electronic clamshell doors 3 closure, if operating personnel are jammed, electronic clamshell doors 3 can be subject to resistance and can not close, now safety pin 3.10d can disconnect, and avoids casualty accident to occur.
As shown in Fig. 1 ~ Fig. 3, in the embodiment of the present invention, described purging system 4 is arranged on chamber body 1 upper outside, the structure of purging system 4 is in detail as shown in Fig. 6 .1 ~ Fig. 6 .5, it is mainly comprised of blower 4.1, connecting pipe component, purging motor 4.4, fan platform 4.5 and blast pipe assembly, described blower 4.1 is arranged in chamber body 1, blower 4.1 is provided with several equally distributed purging air port 4.1a in its length, and one end that blower 4.1 is positioned at outside chamber body 1 is connected with the air outlet of purging motor 4.4 by connecting pipe component; Described purging motor 4.4 is arranged on fan platform 4.5, and the air inlet of purging motor 4.4 connects blast pipe assembly.
As shown in Fig. 6 .2, described connecting pipe component comprises that tube connector 4.2 and the first canvas are flexible coupling 4.3, described tube connector 4.2 is hard tube, tube connector 4.2 one end are directly connected with blower 4.1, tube connector 4.2 other ends are fixed on and support on angle steel, and tube connector 4.2 is flexible coupling and 4.3 is connected with the air outlet of purging motor 4.4 by the first canvas.Described blast pipe assembly comprises that blast pipe 4.7, the second canvas are flexible coupling 4.6 and bag filter 4.8, bag filter 4.8 is arranged on the entrance point of blast pipe 4.7, and the port of export of blast pipe 4.7 is flexible coupling and 4.6 is connected with the air inlet of purging motor 4.4 by the second canvas.
As shown in Fig. 6 .4, Fig. 6 .5,4.1a place, described purging air port is provided with deep bead 4.9, and deep bead 4.9 is arranged on blower 4.1 in mode that can turn, regulates deep bead 4.9 partly or entirely to cover purge air port 4.1a by turn.
In the embodiment of the present invention, the structure of described coating cloud treatment system 2 is concrete as shown in Fig. 7 .1 ~ Fig. 7 .3, a plurality of water at 2.1 centers, described pond revolve cylinder 2.2 and form a line, described circulation line is mainly comprised of pipeline 2.3, support of pipelines, flange end cap 2.5, butterfly valve 2.4, bend pipe 2.8, the first water fender 2.6 and the second water fender 2.7, pipeline 2.3 is arranged in the both sides, front and back in pond 2.1 and is installed and fixed by support of pipelines, and support of pipelines scene manufactures; Pipeline 2.3 ends are by 2.5 shutoff of flange end cap, on pipeline 2.3, near import position, butterfly valve 2.4 is installed, pipeline 2.3 bottoms be provided with a plurality of on pipeline 2.3 length directions uniform and bend pipes 2.8 pipeline 2.3 internal communication, the lower end outlet of bend pipe 2.8 is towards pond 2.1, dead ahead in bend pipe 2.8 outlets is provided with the first water fender 2.6, described the first water fender 2.6 is short slab, and corresponding first water fender 2.6 of each bend pipe 2.8, leaves spacing between adjacent the first water fender 2.6; After the first water fender 2.6, be provided with the second water fender 2.7, described the second water fender 2.7 is a long slab, and all bend pipe 2.8 correspondences second water fender 2.7.
As shown in Fig. 7 .4, the height of described the first water fender 2.6 is higher than the second water fender 2.7; The upper end of described the first water fender 2.6 is to bend pipe 2.8 direction bendings, and its bending angle is 120 degree.In addition, the pipeline 2.3 in the embodiment of the present invention is mainly comprised of at least one section of stainless steel tube, between adjacent stainless steel tube, by flange, connects.
The course of work of the present invention and operation principle are as follows:
The electronic clamshell doors 3 of chamber body 1 is opened, and needs the workpiece of spraying to send into and be contained on mechanical elevator 6, then starts spraying operation.Meanwhile, purging system 4 starts, and by blast pipe 4.7 air amounts, the bag filter 4.8 that air arranges through blast pipe 4.7 import departments filters, and guarantees to enter air cleaning; Purging system 4 blows out clean air to the upper chamber body 1.1 of chamber body 1 from the purging air port 4.1a of blower 4.1, and upper chamber body 1.1 is herein as dynamic pressure chamber; The gas that blower 4.1 blows out enters chamber, middle level body 1.2 downwards, chamber, middle level body 1.2 is herein as plenum chamber, air port 1.4 and 1.8 effects of the porous plate between upper chamber body 1.1 and chamber, middle level body 1.2 by upper chamber body 1.1 tops, be uniformly distributed the air-flow and the air pressure that enter chamber, middle level body 1.2; Then this air-flow enters lower chamber body 1.3 downwards, and spraying workpiece is to containing state, and the air that contains coating cloud and solvent that air-flow produces operation room presses down, and the flase floor 7 by bottom enters coating cloud treatment system 2.
The air that contains coating cloud and solvent is pressed down and enters after coating cloud treatment system 2 by the air-flow of purging system 4, in the circulating line 2.3 of coating cloud treatment system 2, water enters from pipeline 2.3, through butterfly valve 2.4, from each bend pipe 2.8, flow out, first the water flowing out stopped by the first water fender 2.6, then from the gap between the first water fender 2.6, flow to the second water fender 2.7, by the second water fender 2.7, form cascade, part coating cloud and solvent are entered in water by band when touching cascade, and water can filter airborne coating cloud.Another part coating cloud and solvent flow to water with air and revolve cylinder 2.2, then at water, revolve with water that cylinder 2.2 is interior fully to be mixed, and spread rapidly subsequently and impact, and coating cloud is caught by cascade again, jointly enters 2.1 bottoms, pond, then flows to follow-up treatment system.

Claims (10)

1. priming paint paint spray booth, it is characterized in that: comprise chamber body (1), mechanical elevator (6), coating cloud treatment system (2) and purging system (4), the track (5) of left and right trend is installed in described chamber body (1), the hanging of mechanical elevator (6) upper end is connected to track (5) above and can walks along track (5), chamber body (1) one end is provided with electronic clamshell doors (3), and workpiece to be sprayed enters and packs mechanical elevator (6) into from electronic clamshell doors (3); The bottom of described lower chamber body (1.3) is flase floor (7); Described coating cloud treatment system (2) is arranged on flase floor (7) below, coating cloud treatment system (2) comprises that pond (2.1), water revolve cylinder (2.2) and circulation line, pond (2.1) is positioned under flase floor (7), the center in pond (2.1) is provided with a plurality of water and revolves cylinder (2.2), and the both sides, front and back of revolving cylinder (2.2) at a plurality of water are respectively provided with a set of circulation line; Described purging system (4) is arranged on outside chamber body (1), the blower (4.1) of purging system (4) runs through and enters in chamber body (1) from chamber body (1) top one side, blower (4.1) is provided with several equally distributed purging air ports (4.1a) in its length, and blower (4.1) is positioned at the air outlet that the outer one end of chamber body (1) connects purging motor (4.4).
2. priming paint as claimed in claim 1 paint spray booth, it is characterized in that: described chamber body (1) comprises upper chamber body (1.1), chamber, middle level body (1.2) and lower chamber body (1.3), described upper chamber body (1.1) top is provided with two air ports (1.4), the blower (4.1) of described purging system (4) penetrates and is arranged in upper chamber body (1.1) from upper chamber body (1.1) sidewall, and upper chamber body (1.1) sidewall is provided with upper strata access door (1.5); Chamber, described middle level body (1.2) is communicated with upper chamber body (1.1), the middle level cell of three parallel left and right trends before, during and after chamber, middle level body (1.2) inside is divided into, the track (5) of left and right trend is installed in middle middle level cell, it is upper that the hanging of mechanical elevator (6) upper end is connected to track (5), and two forward and backward middle level cell sidewalls are provided with middle level access door (1.6); Also lower floor's cell of three parallel left and right trends before, during and after being divided in described lower chamber body (1.3), middle lower floor's cell one end is provided with electronic clamshell doors (3), forward and backward Liang Ge lower floor cell is as operation room, and operation room is provided with safety door (1.7); The bottom of described lower chamber body (1.3) is flase floor (7).
3. priming paint as claimed in claim 2 paint spray booth, it is characterized in that: between described upper chamber body (1.1) and the forward and backward middle level cell of chamber, middle level body (1.2), by porous plate (1.8), be separated by, between the middle middle level cell of upper chamber body (1.1) and chamber, middle level body (1.2), by flap (1.9), be separated by, between middle middle level cell and middle lower floor cell, by steel plate (1.10), be separated by, between this steel plate (1.10), be provided with the short slot passing for mechanical elevator (6) together; The upper and lower of described lower chamber body (1.3) is provided with lamp box (1.11), and middle part is provided with windowpane (1.12); Described chamber body (1) adopts splicing structure, and the skeleton of chamber body (1) mainly consists of C shaped steel, and the wallboard of chamber body (1) adopts galvanized steel plain sheet, and with bolts between wallboard and wallboard, wallboard and skeleton, seam crossing does not contain silicone sealant.
4. priming paint as claimed in claim 1 paint spray booth, it is characterized in that: described electronic clamshell doors (3) comprises door-plate (3.4), upper directive wheel (3.8), upper guiding channel-section steel (3.7), lower support wheel (3.5), lower guideway assembly and driving mechanism for opening or closing, described door-plate (3.4) has two, and two door-plates (3.4) are opposite opened setting; Door-plate (3.4) is installed directive wheel (3.8) below, and upper directive wheel (3.8) is embedded in guiding channel-section steel (3.7), and guiding guide groove is fixed on chamber body (1) outer wall; Described door-plate (3.4) is installed lower support wheel (3.5) below, and door-plate (3.4) is taken turns (3.5) support by lower support and is placed on lower guideway assembly; Two door-plates (3.4) drive by driving mechanism for opening or closing, can locking phase near or oppositely away from.
5. priming paint as claimed in claim 4 paint spray booth, it is characterized in that: described driving mechanism for opening or closing comprises motor reducer (3.1), turns to sprocket wheel (3.6), motor reducer (3.1) is arranged on one end of door-plate (3.4) folding direction, the output of motor reducer (3.1) is installed drive sprocket (3.10), turn to sprocket wheel (3.6) to be arranged on the other end of door-plate (3.4) folding direction, turn between sprocket wheel (3.6) and drive sprocket (3.10) by chain (3.9) connection for transmission; A door-plate (3.4) in two door-plates (3.4) connects the top of chain (3.9) by the first connecting plate (3.2), another door-plate (3.4) by the second connecting plate (3.3) connect chain (3.9) below, the forward and reverse rotation of motor drive two door-plates (3.4) locking phase near or oppositely away from.
6. priming paint as claimed in claim 4 paint spray booth, it is characterized in that: described lower guideway assembly comprises guide rail base (3.11), guide supporting platform (3.12) and guide rail body (3.13), described guide rail base (3.11) adopts rectangular tube, guide supporting platform (3.12) adopts channel-section steel, guide rail base (3.11) is welded to connect with guide supporting platform (3.12), described guide rail body (3.13) adopts angle steel, the right angle rim of guide rail body (3.13) vertically upward, described lower support wheel (3.5) is provided with right angle race, lower support wheel (3.5) coordinates with the right angle rim of guide rail body (3.13) by its right angle race, described lower guideway assembly is also provided with chain bracket, chain bracket comprises vertical supporting rod (3.14) and cross girders (3.15), vertical supporting rod (3.14) adopts angle steel, vertical supporting rod (3.14) lower end and guide rail base (3.11) are welded to connect, described cross girders (3.15) has two, two cross girders (3.15) be arranged in parallel one on the other, are separately fixed at vertical supporting rod (3.14) upper, and hold by two cross girders (3.15) respectively on the upper and lower limit of described chain (3.9).
7. priming paint as claimed in claim 1 paint spray booth, it is characterized in that: described purging system (4) is arranged on chamber body (1) upper outside, purging system (4) comprises blower (4.1), connecting pipe component, purging motor (4.4), fan platform (4.5) and blast pipe assembly, described blower (4.1) is arranged in chamber body (1), blower (4.1) is provided with several equally distributed purging air ports (4.1a) in its length, blower (4.1) is positioned at the outer one end of chamber body (1) and is connected with the air outlet of purging motor (4.4) by connecting pipe component, it is upper that described purging motor (4.4) is arranged on fan platform (4.5), and the air inlet of purging motor (4.4) connects blast pipe assembly.
8. priming paint as claimed in claim 7 paint spray booth, it is characterized in that: described connecting pipe component comprises tube connector (4.2) and the first canvas be flexible coupling (4.3), described tube connector (4.2) is hard tube, tube connector (4.2) one end is directly connected with blower (4.1), tube connector (4.2) other end is fixed on and supports on angle steel, tube connector (4.2) by the first canvas be flexible coupling (4.3) be connected with the air outlet of purging motor (4.4); Described blast pipe assembly comprises that blast pipe (4.7), the second canvas are flexible coupling (4.6) and bag filter (4.8), bag filter (4.8) is arranged on the entrance point of blast pipe (4.7), the port of export of blast pipe (4.7) by the second canvas be flexible coupling (4.6) be connected with the air inlet of purging motor (4.4); Deep bead (4.9) is located to be provided with in described purging air port (4.1a), and it is upper that deep bead (4.9) is arranged on blower (4.1) in mode that can turn, by turn, regulates deep bead (4.9) can partly or entirely cover purging air port (4.1a).
9. priming paint as claimed in claim 1 paint spray booth, it is characterized in that: a plurality of water at center, described pond (2.1) revolve cylinder (2.2) and form a line, described circulation line comprises pipeline (2.3), support of pipelines, flange end cap (2.5), butterfly valve (2.4), bend pipe (2.8), the first water fender (2.6) and the second water fender (2.7), pipeline (2.3) is arranged in the both sides, front and back in pond (2.1) and is installed and fixed by support of pipelines, and support of pipelines scene manufactures, pipeline (2.3) end is by flange end cap (2.5) shutoff, pipeline (2.3) is upper is provided with butterfly valve (2.4) near import position, pipeline (2.3) bottom be provided with a plurality of on pipeline (2.3) length direction uniform and bend pipe (2.8) pipeline (2.3) internal communication, the lower end outlet of bend pipe (2.8) is towards pond (2.1), dead ahead in bend pipe (2.8) outlet is provided with the first water fender (2.6), described the first water fender (2.6) is short slab, corresponding first water fender (2.6) of each bend pipe (2.8), between adjacent the first water fender (2.6), leave spacing, at the first water fender (2.6), be provided with afterwards the second water fender (2.7), described the second water fender (2.7) is a long slab, all bend pipes (2.8) corresponding second water fender (2.7).
10. priming paint as claimed in claim 9 paint spray booth, is characterized in that: the height of described the first water fender (2.6) is higher than the second water fender (2.7); The upper end of described the first water fender (2.6) is to the bending of bend pipe (2.8) direction, and its bending angle is 120 degree.
CN201410381905.8A 2014-08-06 2014-08-06 Primer paint spraying chamber Pending CN104117454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410381905.8A CN104117454A (en) 2014-08-06 2014-08-06 Primer paint spraying chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410381905.8A CN104117454A (en) 2014-08-06 2014-08-06 Primer paint spraying chamber

Publications (1)

Publication Number Publication Date
CN104117454A true CN104117454A (en) 2014-10-29

Family

ID=51763220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410381905.8A Pending CN104117454A (en) 2014-08-06 2014-08-06 Primer paint spraying chamber

Country Status (1)

Country Link
CN (1) CN104117454A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104826766A (en) * 2015-04-21 2015-08-12 北京京诚之星科技开发有限公司 Powder room used for electrostatic powder spraying
CN107776465A (en) * 2016-08-31 2018-03-09 车急修汽车科技有限公司 Side with two-way integrated cabinet it is extending go out operation room mobile quick repairing vehicle
CN108187961A (en) * 2017-12-30 2018-06-22 湖南三五二环保科技有限公司 A kind of quick colour changing equipment spray equipment
CN113399188A (en) * 2021-05-31 2021-09-17 中国联合工程有限公司 Movable paint spray booth

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104826766A (en) * 2015-04-21 2015-08-12 北京京诚之星科技开发有限公司 Powder room used for electrostatic powder spraying
CN104826766B (en) * 2015-04-21 2020-06-12 中冶京诚工程技术有限公司 Powder room for electrostatic powder spraying
CN107776465A (en) * 2016-08-31 2018-03-09 车急修汽车科技有限公司 Side with two-way integrated cabinet it is extending go out operation room mobile quick repairing vehicle
CN108187961A (en) * 2017-12-30 2018-06-22 湖南三五二环保科技有限公司 A kind of quick colour changing equipment spray equipment
CN113399188A (en) * 2021-05-31 2021-09-17 中国联合工程有限公司 Movable paint spray booth

Similar Documents

Publication Publication Date Title
CN104117454A (en) Primer paint spraying chamber
CN101062497B (en) Paint booth
CN204074368U (en) Priming paint paint spray booth
CN201676796U (en) High-voltage cable asphalt coating machine
CN206661788U (en) The cleaning device of intermediate of brake valve
CN107237484B (en) A kind of house decoration spray-painting plant
CN201120354Y (en) Combined water rotating spray booth moving as a whole
CN101623681A (en) Multi-station pull-cover type water-spinning spray chamber
CN206676621U (en) A kind of air zoning moves dry spray booth
CN105903625B (en) Oily leaching formula multifunction surface processing equipment
CN107983560A (en) Color steel tile face automatic paint-spraying machine
CN101728033B (en) High-voltage cable asphalt coating machine
CN208660200U (en) A kind of construction place spraying ventilating device easy to remove
CN208878905U (en) A kind of environment-friendly high-efficiency paint spray booth
CN106423688A (en) Spraying device for paint without organic solvents
CN110841824A (en) Efficient garden operation device based on tree whitening
CN101143355B (en) Combination type integrated moving water rotary spraying paint room
CN205587229U (en) Self -propelled spray booth
CN205002919U (en) Portable rain leakage test device of railway freight car
CN213315838U (en) Fluorocarbon spraying equipment used in aluminum veneer machining process
CN102989623B (en) Suspension type automatic lifting type spraying and baking integrated house
CN212237932U (en) Panel paint spraying apparatus for construction
CN106040509A (en) Waterborne inorganic zinc-rich primer spraying equipment
CN206716566U (en) A kind of color steel tile alkali cleaning degreasing equipment
CN104107775A (en) Electric oppositely-opening type door for prime paint spraying chamber body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141029