Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
Cofrajul glisant este utilizat pentru realizarea de constructii din beton armat cu sectiune dreptunghiulara, avînd sectiunei variabile în trepte ti care este actionat de verine hidraulice prin intermediul unor traverse drepte pentru cîmp si alte traverse de colt si intersectia zidului interior, executate în consecinta si de care sunt legati montatii ce antreneaza panourile de cofraj realizate cu posibilitatea de a reduce sectiunea peretilor în trepte.The sliding formwork is used for the construction of reinforced concrete with rectangular section having a variable section in steps which is driven by hydraulic verniers by means of straight crossings for the field and other corner traverses and the intersection of the inner wall executed accordingly are mounted the mountings that make the shuttering panels made with the possibility to reduce the section of the stairs.
REINFORCEMENT FOR CONSTRUCTION IN REINFORCED CONGLOMERATE, SUCH AS REINFORCED CONCRETE, PARTICULARLY FOR BUILDING, AND CONSTRUCTION METHOD USING SUCH REINFORCEMENT.
Installations for the production of large hollow monolithic building structures of reinforced concrete, preferably prefabricated reinforced concrete garages.
PREFABRICATED BUILDING PANELS FOR EXTERNAL WALLS IN BRICK AND REINFORCED CONCRETE WITH STEEL TRUSS RIBS, SUITABLE FOR THE INFILLING OF CIVIL AND INDUSTRIAL BUILDINGS
Construction process allowing the construction of reinforced concrete structures made up of slabs and concrete walls using prefabricated elements without creating visible recoveries and clear recovery faces at the connections
FORMWORK LOST FOR REALIZATION OF WALLS OR SLABS, FOR TRADITIONAL BUILDING OR PREFABRICATED IN THE CONSTRUCTION SITE OR IN THE FACTORY AND PROCEDURE FOR INSTALLATION