PL89729B1 - - Google Patents
Download PDFInfo
- Publication number
- PL89729B1 PL89729B1 PL17535374A PL17535374A PL89729B1 PL 89729 B1 PL89729 B1 PL 89729B1 PL 17535374 A PL17535374 A PL 17535374A PL 17535374 A PL17535374 A PL 17535374A PL 89729 B1 PL89729 B1 PL 89729B1
- Authority
- PL
- Poland
- Prior art keywords
- backfilling
- outlets
- filling
- fact
- excavation
- Prior art date
Links
- 238000009412 basement excavation Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 5
- 238000005065 mining Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000011800 void material Substances 0.000 claims description 2
Landscapes
- Revetment (AREA)
Description
Przedmiotem wynalazku jest sposób podsadzania wyrobisk górniczych szczególnie pod obiektami chronio¬ nymi, w których czynnikiem transportujacym jest woda.Obecnie znany sposób podsadzania wyrobisk poeksploatacyjnych przy scianowym systemie wybierania polega na tym, ze na rurociagu podsadzkowym znajdujacym sie w wyrobisku scianowym, zabudowuje sie kilka wylotów, które stanowia trójniki, z zastawka oraz dolaczone do wylotu kawalki rur skierowane do podsadzanej przestrzeni. Samo podsadzanie odbywa sie w ten sposób, ze w kolejnych wylotach otwiera sie zastawki, podsadzajac stopniowo na dlugosci sciany. Zasadnicza wada takiego sposobu podsadzania jest fakt, ze po odsaczeniu wody material podsadzkowy osiada, tworzac tzw. zero podsadzkowe. Okazalo sie, ze material podsadzkowy uklada sie róznie na dlugosci sciany w zaleznosci od odleglosci pomiedzy wylotami rurociagu podsadzkowego. Okazalo sie równiez, ze na wprost wylotów rurociagu podsadzkowego deponowany material posiada mniejsza scisliwosc anizeli pomiedzy wylotami.Celem wynalazku jest wykorzystanie odkrycia wyze} omówionej zaleznosci. Cel ten osiagnieto w ten sposób, ze opracowano sposób podsadzania, którego istota jest równoczesne podsadzanie pustki poeksploatacyj¬ nej na calej jej dlugosci.W przykladzie stosowania, sposób wedlug wynalazku realizuje sie zabudowujac na scianowym rurociagu podsadzkowym maksymalna ilosc wylotów tak, aby wzajemne odleglosci pomiedzy wierzcholkami stozków naplywowych byly jak najmniejsze. PL
Claims (1)
1. Zastrzezenie patentowe Sposób podsadzania wyrobisk górniczych szczególnie pod obiektami chronionymi, w których czynnikiem transportujacym material podsadzkowy jest woda, znamienny tym, ze material deponuje sie do pustki poeksploatacyjnej szczególnie wyrobiska scianowego równoczesnie na calej jego dlugosci. PL
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL17535374A PL89729B1 (pl) | 1974-11-05 | 1974-11-05 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL17535374A PL89729B1 (pl) | 1974-11-05 | 1974-11-05 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL89729B1 true PL89729B1 (pl) | 1976-12-31 |
Family
ID=19969520
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL17535374A PL89729B1 (pl) | 1974-11-05 | 1974-11-05 |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL89729B1 (pl) |
-
1974
- 1974-11-05 PL PL17535374A patent/PL89729B1/pl unknown
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB1337923A (en) | Method of operating a gas turbine air storage installation | |
| PL89729B1 (pl) | ||
| GB1293521A (en) | Floating breakwater | |
| Ozis | Historical water schemes in Turkey | |
| US2447937A (en) | Method of laying submerged pipe | |
| ES478369A1 (es) | Procedimiento para la construccion bajo el suelo de obras con paredes verticales partiendo de conductos subterraneos. | |
| SU76959A1 (ru) | Обделка гидротехнических туннелей | |
| JPS54136745A (en) | Manhole installing structure for sewer pipe passage | |
| CN209636744U (zh) | 利用开挖料的经济型泄洪闸导墙结构 | |
| Mahajan | Practical Application of Steel Fibre Reinforced Shotcrete in Desilting Chambers of Nathpa Jhakri Hydroelectric Project | |
| US2965248A (en) | Apparatus for preventing voids in free-standing piles | |
| SU1206366A1 (ru) | Труба под высокой насыпью | |
| JPS5712713A (en) | Method for constructing rubber weir | |
| SU599100A1 (ru) | Установка гидротранспорта к рассредоточенным потребител м | |
| SU1032191A1 (ru) | Ограждающа крепь | |
| RU2259479C1 (ru) | Способ сооружения тоннелей | |
| PL126695B2 (en) | Loading chamber disposed above an output surge bin | |
| PL170267B1 (pl) | Sposób wypełniania pustych przestrzeni górotworu | |
| Latella et al. | Aspects of the Evolution of an Important Geo-Ecosystem in the Lessinian Mountain (Venetian Prealps, Italy) | |
| CN119686347A (zh) | 用于泥石流地质灾害防治的斜坡面防护装置 | |
| JPS56105023A (en) | Preventing method for frost heaving of pile | |
| PL40681B1 (pl) | ||
| SU972779A1 (ru) | Способ М.Е.журжи транспортировани гидросмеси из шахты | |
| RU35323U1 (ru) | Подземное хранилище для газа, нефти и продуктов их переработки | |
| SU1142581A1 (ru) | Способ возведени плотины с водотоком в ущелье,сложенном скальными породами |