PL76140B2 - - Google Patents

Download PDF

Info

Publication number
PL76140B2
PL76140B2 PL15793672A PL15793672A PL76140B2 PL 76140 B2 PL76140 B2 PL 76140B2 PL 15793672 A PL15793672 A PL 15793672A PL 15793672 A PL15793672 A PL 15793672A PL 76140 B2 PL76140 B2 PL 76140B2
Authority
PL
Poland
Prior art keywords
shot
cushion
exploitation
explosive
crushing
Prior art date
Application number
PL15793672A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15793672A priority Critical patent/PL76140B2/pl
Publication of PL76140B2 publication Critical patent/PL76140B2/pl

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

Pierwszenstwo Zgloszenie oglofczono: 01.06.1973 Opis patentowy opublikowar;o: 30.09.1975 76140 KI. 5b,4106 MKP E21c 41/06 CiTlCLNfA Twórca wynalazku: Wieslaw Trzak Uprawniony z patentu tymczasowego: Kombinat Górniczo-Hutniczy Mie¬ dzi, Lubin (Polska) Sposób eksploatacji zloza Przedmiotem wynalazku jest sposób eksploatacji zloza systemem scian poprzecznych przy zastoso¬ waniu równoleglych do nich otworów strzalowych.Dotychczas znane i stosowane sposoby eksploa¬ tacji zlóz systemem scian poprzecznych przy zasto¬ sowaniu dlugich równoleglych do nich otworów strzalowych, polegaja na oddzialywaniu energii odpalanego materialu wybuchowego zarówno na ca¬ lizne w celu jej kruszenia jak i na sam urobek powodujac jego odrzut w kierunku wyrobiska.Takie sposoby eksploatacji zlóz wymagaja szcze¬ gólnie w górnictwie rud, zachowania miedzy calizna a sciana podsadzki lub zawalu odpowiednio duzej przestrzeni roboczej, zabudowywanej obudowa pod¬ porowa zabezpieczajaca strop, a której stosowanie uniemozliwia wprowadzenie w miejsce tradycyjnych odstawczych przenosników przesuwnych, nowo¬ czesnych wysokowydajnych maszyn ladujaco-od- stawczych.Celem wynalazku jest usuniecie wyzej opisanych niedogodnosci przez opracowanie prostego sposobu eksploatacji, pozwalajacego na wykorzystanie ener¬ gii odpalanego materialu wybuchowego glównie do kruszenia skal przy ograniczeniu do minimum strat energii na rozrzut urobku, co umozliwi bezpieczna eksploatacje sciany z zastosowaniem ciezkiego sprzetu ladujaco-odstawczego.Wedlug wynalazku osiaga sie to w ten sposób, ze urobek z odstrzelonego uprzednio zabioru two¬ rzy poduszke odzialywujaca na wykorzystanie ener- 15 25 30 gii odpalanego w nastepnej kolejnosci materialu wybuchowego, glównie dla kruszenia nowego za¬ bioru.Sposób wedlug wynalazku jest eksploatacyjnie prosty i nie wymaga zastosowania zadnych dodat¬ kowych urzadzen. Jego wprowadzenie w zaleznosci od ukladu odwierconych równolegle do calizny scia¬ ny otworów strzalowych, ilosci stosowanego mate¬ rialu wybuchowego i grubosci stosowanej z urobku poduszki, daje bardzo duze rozdrobnienie i zagesz¬ czenie odstrzelonego urobku, umozliwiajac podpar¬ cie stropu wzmiankowana poduszka nad przestrze¬ nia odstrzelona, co eliminuje koniecznosc stosowa¬ nia obudowy podporowej i pozwala na wprowadze¬ nie do eksploatacji zloza wysokowydajnego ciez¬ kiego sprzetu laduj aco-odstawczego. Dodatkowa za¬ leta sposobu wedlug wynalazku jest wzrost efek¬ tywnosci robót strzalowych dzieki zwiekszeniu stop¬ nia wykorzystania otworów strzalowych przy ob¬ nizonym wskazniku okreslajacym liosc mb. otwo¬ rów strzalowych przypadajacych na m8 calizny.Przedmiot wynalazku jest pomocniczo przedsta¬ wiony w przykladzie wykonania na rysunku, na którym fig. 1 ukazuje poziomy przekrój wyrobiska, a fig. 2 przekrój wzdluzny calizny wyrobiska i pod¬ sadzki lub zawalu.Eksploatacje zloza prowadzi sie z komory wyro¬ biska 1, do której sa po bokach calizny 2 i dopro¬ wadzone dwa równolegle chodniki przewozowe 3 i 4. 76 14076 140 3 Równolegle do sciany przedniej 5 calizny 2, wzdluz której pozostawiono w formie poduszki 6 odstrzelony uprzednio zabiór nie wybranego urob¬ ku, wierci sie na wylot przez cala jej szerokosc od¬ powiednio usytuowane otwory strzalowe 7. Odwier¬ cone przy zastosowaniu ciezkich wiertnic samojezd¬ nych otwory strzalowe 7, po ich wycofaniu do chodników 3 i 4 wypelnia sie materialem wybu¬ chowym, a nastepnie po odpowiednim zabezpiecze¬ niu obslugujacych, zdalnie odpala. Energia wytwo¬ rzona przez odpalenie materialu wybuchowego dzie¬ ki zastosowanej z poprzedniego urobku poduszce 6 zostaje wykorzystana glównie na kruszenie ska¬ ly, ^z£j:zj£m dodatkowym efektem jest rozdrob¬ nienie , postrzelonego urobku. Po dokonanym od¬ strzale i przewietrzeniu wyrobiska 1 oraz chodni¬ ków 3 i 4 wprowadza sie do wyrobiska 1 wysoko- wydajrte samojezdne wozy ladujaco-odstawcze, przy pomocy, któr^cl?jujsuwa sie rozdrobniona warstwe urobku stanowiacego uprzednio poduszke 6 oraz czesc swiezego urobku pozostawiajac wzdluz no- 10' wopowstalej na skutek odstrzalu sciany przedniej 8 calizny 2 pozostala czesc swiezego urobku jako nowa poduszke 9.Czynnosci eksploatacyjne prowadzi sie az do kompletnego wybrania pola wypelniajac stopnio¬ wo wybrana przestrzen podsadzka 10. Jako do¬ datkowy efekt wynikajacy bezposrednio z zastoso¬ wania przy odpalaniu materialu wybuchowego po¬ duszki pozostalej z uprzednio odstrzelonego zabio¬ ru, otrzymuje sie znikomy rozrzut calosci urobku. PL PLPriority Application was canceled: June 1, 1973 Patent description published by: September 30, 1975 76 140 KI. 5b, 4106 MKP E21c 41/06 CiTlCLNfA Inventor: Wieslaw Trzak Authorized under the provisional patent: Kombinat Górniczo-Hutniczy Miedzi, Lubin (Poland) Method of exploitation of the deposit The subject of the invention is the method of exploitation of the deposit by the system of transverse walls applying parallel to them Previously known and used methods of exploitation of deposits with the system of transverse walls with the use of long, parallel to them, rely on the effect of the energy of the fired explosive both on the entire purpose of its crushing and on the material itself, causing its recoil Such methods of exploitation of deposits require, especially in the mining of ores, the preservation of a sufficiently large working space between the debris and the wall of the backfill or collapsing, a supporting casing to be built in to protect the roof, and the use of which makes it impossible to replace traditional sliding conveyors, ¬ tuition high The aim of the invention is to eliminate the above-described inconveniences by developing a simple method of operation, allowing the use of the energy of the fired explosive, mainly for crushing rocks, while minimizing energy losses on the spreading of the spoil, which will enable safe operation of the wall with According to the invention, this is achieved in that the debris from the previously blown away haulage forms a cushion that influences the use of energy and the consecutively fired explosive, mainly for crushing the new haul. The method according to the invention is operationally simple and does not require any additional equipment. Its introduction, depending on the arrangement of the shot holes drilled parallel to the entire wall, the amount of explosive material used and the thickness of the cushion used from the excavated material, gives a very large fragmentation and compaction of the shot material, enabling the ceiling to be supported by the above-mentioned cushion over the space it has been shot off, which eliminates the need to use a support casing and allows the commissioning of a bed of highly efficient heavy loading and holding equipment. An additional advantage of the method according to the invention is the increase in the efficiency of the shots due to the increased utilization of the shot holes with a lowered index determining the number of meters. The subject of the invention is illustrated as an example in the drawing, in which Fig. 1 shows the horizontal cross-section of the excavation, and Fig. 2 the longitudinal cross-section of the excavation and the bedding or the fall. from the excavation chamber 1, to which there are whole 2 on the sides and two parallel roadways 3 and 4. 76 14076 140 3 Parallel to the front wall 5 of the whole 2, along which there was left in the form of a pillow 6 previously shot the selected excavated material is drilled right through its entire width with appropriately positioned shot holes 7. The shot holes 7 drilled with the use of heavy mobile drilling rigs, after their retraction into the galleries 3 and 4, are filled with explosive material, and then, after properly securing the operating personnel, it fires remotely. The energy generated by the firing of the explosive due to the cushion 6 used from the previous excavation is mainly used for rock crushing, with an additional effect of grinding the shot material. After the completed shooting and ventilation of the excavation 1 and the galleries 3 and 4, high-performance self-propelled loading-hauling trucks are introduced into the excavation, with the help of which the fragmented layer of excavated material, which previously constituted the pillow 6, and a part of the fresh excavated material, is moved. leaving along the new-10 'shot-off front wall 8 whole 2 the remaining part of the fresh spoil as a new cushion 9. Operating activities are carried out until the field is completely selected, gradually filling the selected space with the filling 10. As an additional effect resulting directly from When used in the firing of the explosive, the airbag remaining from the previously blown off strip, a negligible dispersion of the total output is obtained. PL PL

Claims (2)

1. Zastrzezenia patentowe Sposób eksploatacji zloza, zwlaszcza w górnictwie rud, systemem scian poprzecznych przy zastosowa¬ niu dlugich równoleglych do nich otworów strzalo¬ wych, znamienny tym, ze urobek z odstrzelonego uprzednio zabioru tworzy poduszke (6) oddzialywa- jaca na wykorzystanie energii odpalanego w nastep¬ nej kolejnosci materialu wybuchowego glównie dla kruszenia nowego zabioru. Fig.1. Patent claims The method of exploitation of the deposit, especially in the mining of ores, with the system of transverse walls with the use of long parallel arrows, characterized by the fact that the material from the previously blown out web forms a cushion (6) influencing the use of the fired energy then the explosives are mainly used for crushing the new collection. Fig. 2. Bltk 360/75 120 egz. A4 Cena zl 10 PL PL2. Bltk 360/75 120 copies A4 Price PLN 10 PL PL
PL15793672A 1972-09-27 1972-09-27 PL76140B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15793672A PL76140B2 (en) 1972-09-27 1972-09-27

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15793672A PL76140B2 (en) 1972-09-27 1972-09-27

Publications (1)

Publication Number Publication Date
PL76140B2 true PL76140B2 (en) 1975-02-28

Family

ID=19960051

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15793672A PL76140B2 (en) 1972-09-27 1972-09-27

Country Status (1)

Country Link
PL (1) PL76140B2 (en)

Similar Documents

Publication Publication Date Title
CN106761745B (en) Out-of-vein segmented open-field mining method
US3650564A (en) Mining method for methane drainage and rock conditioning
PL76140B2 (en)
RU2279546C1 (en) Development method for rock or half-rock deposit with different block structures
Reddy et al. Influence of stemming material on performance of blasting
RU2638995C1 (en) Method for mining inclined ore bodies
RU2095570C1 (en) Method for development of steep ore bodies
Yeryomenko et al. Effect of geological disturbances on the danger of rock bursts in a rock mass
SU1506109A1 (en) Method of protecting development workings
SU1415854A1 (en) Method of breaking rock
SU699183A1 (en) Method of working inclined ore bodies
PL152254B1 (en) Deposit mining method
RU2004138621A (en) METHOD FOR DEVELOPMENT OF LAYERS OF SMALL AND MEDIUM POWER OF THE SYSTEM OF DEVELOPMENT BY LONG POSTS FOR EQUIPMENT WITH LEAVING OF BREED IN THE MINES
PL243265B1 (en) Method for improving the stability of a bundle of dog headings in the area of intensive horizontal stresses
PL158092B1 (en) A chamber and pillar system of mining deposition
Rak et al. Extraction of Coal from Steeply Inclined Coal Seams, Using a Fully Mechanised Sublevel Caving Mining System in the Kazimierz-Juliusz Coal Mine
PL199120B1 (en) Method of mining of compact beds
Mosenthal Presidential Address: Stoping in Witwatersrand gold mines during the past forty years
Murthy et al. Productivity optimisation in weak sedimentary formations for improved coal production and roof stability—an approach
PL237248B1 (en) Method for mining rocks by means of explosive material
Loofbourow et al. Construction Of Underground Storage Chambers
Yancik Jr Development of large hole burn cut drift rounds
Paithankar A critical appraisal of double spiral cut in tunnel blasting
Ramulu¹ et al. Rock excavation by controlled blasting at sensitive urban areas for Bangalore metro rail construction
RU2331769C2 (en) Open-cut method of mining of mineral deposits