PL72075B2 - - Google Patents

Download PDF

Info

Publication number
PL72075B2
PL72075B2 PL14661271A PL14661271A PL72075B2 PL 72075 B2 PL72075 B2 PL 72075B2 PL 14661271 A PL14661271 A PL 14661271A PL 14661271 A PL14661271 A PL 14661271A PL 72075 B2 PL72075 B2 PL 72075B2
Authority
PL
Poland
Prior art keywords
stand
stands
canopy
built
canopies
Prior art date
Application number
PL14661271A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL14661271A priority Critical patent/PL72075B2/pl
Publication of PL72075B2 publication Critical patent/PL72075B2/pl

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.05.1973 Opis patentowy opublikowano: 30.09.1974 72075 KI. 5c,23/02 MKP E21d 23/02 ilSLIOTEKA Urzekl P«*»nlcir«i* Twórca wynalazku: Wojciech Muszynski Uprawniony z patentu tymczasowego: Glówny Instytut Górnictwa, Katowice (Polska) Sposób prowadzenia obudowy kroczacej Przedmiotem wynalazku jest sposób prowadzenia górniczej obudowy kroczacej, skladajacy sie ze sto¬ jaków indywidualnych polaczonych ze soba parami, w podziemnych wyrobiskach scianowych.Znany dotychczas sposób prowadzenia obudowy zlozonej ze stojaków indywidualnych polega na tym, ze po urobieniu kolejnego zabioru zawiesza sie na strzemionach stropnice, które po przesunie¬ ciu przenosnika zgrzeblowego pod ocios sciany pod¬ piera sie stojakami indywidualnymi. W tym celu kazdy stojak nalezy uniesc ze spagu, ustawic w od¬ powiednim miejscu oraz rozeprzec .pomiedzy stro¬ pem i spagiem wyrobiska. Na koniec cyklu, od stro¬ ny przestrzeni wybranej rabuje sie ostatni rzad stojaków, które po wyrabowaniu przenosi sie recz¬ nie w kierunku czola sciany celem wykorzystania ich do obudowy w nastepnym cyklu. Zasadnicza wada takiego sposobu prowadzenia obudowy jest miedzy innymi to, ze przy wysokosci sciany prze¬ kraczajacej 2 m ciezar stojaka indywidualnego jest tak duzy, ze czesto przekracza mozliwosci przeno¬ szenia go przez jedna osobe. Z koniecznosci wiec stojak taki rzuca sie na spag przez co szybciej ule¬ ga on zniszczeniu, a przy tym stwarza duze zagro¬ zenie dla ludzi zatrudnionych przy obudowie. Inna niedogodnoscia takiego sposobu prowadzenia obudo¬ wy indywidualnej jest to, ze aby zabudowac stojak nalezy dzwignac go ze spagu i przeniesc w odpo¬ wiednie miejsce. Wszystkie wiec czynnosci wyko¬ nywane sa tu kosztem wysilku fizycznego przy jed- 2 noczesnym stalym zagrozeniu niebezpieczenstwem dla osób bedacych w zasiegu stojaka.Wymienionych wad i niedogodnosci nie ma spo¬ sób bedacy przedmiotem niniejszego wynalazku. 5 Istota tego sposobu polega na tym, ze po wybraniu kolejnego zabioru, przesunieciu przenosnika i za¬ wieszeniu stropnicy na strzemieniu najpierw obok stojaka przedniego, pod stropnica podpierana przez ten stojak, ustawia sie stojak dodatkowy. Nastep- io nie rabuje sie stojak przedni i ruchem obrotowym, wokól sprzegnietego z nim stojaka zabudowanego w rzedzie sasiednim, przemieszcza sie do przodu oraz rozpiera pod stropnica zawieszona na strze- mienu. Potem rabuje se stojak tylny tego samego 15 rzedu i stropnice podparta tym stojakiem, który to stojak w podobny sposób przemieszcza sie ruchem obrotowym do przodu i rozpiera go w miejscu, gdzie dotychczas byl zabudowany stojak przedni. Na ko¬ niec zas usuwa sie stojak dodatkowy przenoszac 20 go do nastepnego rzedu, który ma byc przemiesz¬ czany do przodu. W przypadku istnienia mocnego stropu mozna jednoczesnie rabowac przedni i tyl¬ ny stojak, a nastepnie wraz ze stropnicami oba stojaki przemiescic do przodu ruchem obrotowym 25 wokól zabudowanych stojaków rzedu sasiedniego.Glówna tzaleta prowadzenia obudowy indywidual¬ nej sposobem wedlug wynalazku jest calkowite wy¬ eliminowanie ciezkiej pracy fizycznej oraz wytoitne podniesienie stopnia bezpieczenstwa, poniewaz w 30 czasie wykonywania obudowy ludzie znajduja sie 7207572075 3 w miejscu zabezpieczonym od opadajacych ze stro¬ pu odlamków skal. Wazna równiez zaleta tego spo¬ sobu jest krótkotrwale pozbawienie stropu podpar¬ cia, poniewaz stojaki po wyrabowaniu przemiesz- . cza sie na stosunkowo niewielkim luku. Tak krót- 5 kiego otwarcia stropu dotychczas nie mozna bylo osiagnac zadnym ze znanych sposobów prowadzenia obudowy indywidualnej. Dodatkowa zaleta sposo¬ bu wedlug wynalazku jest to, ze nadaje sie on do stosowania w kazdych warunkach górniczo-geolo- io gicznych.Sposób wedlug wynalazku jest dokladniej wy¬ jasniony na rysunku, na lrtórym fig. 1 przedstawia schematycznie fragment obudowy sciany w widoku z góry, a fiig. 2—4 — poszczególne fazy przestawia- 15 nia stojaków do przodu.Jak uwidoczniono na rysunku sciana obudowana jest stojakami indywidualnymi i stropnicami czlo¬ nowymi zabudowanymi w ukladzie trójkatnym.Przednie stojaki 1 i 2 zabudowane pod przednimi 20 stropnicami 3 oraz tylne stojaki 4 i 5 zabudowane pod tylnymi stropnicami 6 dwóch sasiednich rze¬ dów sa polaczone ze soba za pomoca urzadzen sprzegajacych. Po urobieniu kolejnego zabioru i za¬ wieszeniu na strzemieniu nowej stropnicy 7 oraz :5 przesunieciu przenosnika pod ocios sciany, pod przednia stropnica 3 ustawia sie dodatkowy stojak 8. Nastepnie rabuje sie stojak 1 i ruchem obroto¬ wym, wokól stojaka 2, przemieszcza sie go do przo¬ du oraz rozpiera pod stropnica 7. Potem rabuje sie so tylny .stojak 4 wraz z stropnica 6 i przemieszcza sie go ruchem obrotowym wokól stojaka 5 do przodu oraz rozpiera w miejscu, gdzie uprzednio byl za¬ budowany przedni stojak 1. Na koniec usuwa sie dodatkowy stojak 8 spod stropnicy 3, który przeno¬ si sie do nastepnego rzedu stojaków przemieszcza¬ nych do przodu. PLPriority: Application announced: May 30, 1973 Patent description was published: September 30, 1974 72075 KI. 5c, 23/02 MKP E21d 23/02 IlSLIOTEKA Urzekl P «*» nlcir «i * Inventor: Wojciech Muszynski Authorized by the provisional patent: Central Mining Institute, Katowice (Poland) The method of running the crawling casing The subject of the invention is the method of running the crawling casing , consisting of individual tables connected in pairs, in underground wall workings. The hitherto known method of guiding the casing consisting of individual stands consists in the fact that after making another riser, the rails are hung on the stirrups, which after moving the belt conveyor under the side walls are supported by individual stands. For this purpose, each stand should be lifted from the foot, set in a suitable place and spread between the foot and the foot of the excavation. At the end of the cycle, the last row of stands is robbed from the side of the selected space and, after being robbed, it is moved manually towards the face of the wall to be used for the casing in the next cycle. The main disadvantage of this method of guiding the casing is, inter alia, that with a wall height of more than 2 m, the weight of the individual stand is so great that it often exceeds the capacity to be carried by one person. As a necessity, such a stand is thrown onto the spag, which makes it quickly damaged, and at the same time poses a great risk to people working at the casing. Another disadvantage of this method of guiding the individual casing is that in order to install the rack it has to be lifted from the foot and moved to the appropriate place. Thus, all activities are performed here at the expense of physical effort with the simultaneous constant risk of danger to persons within the range of the stand. The above-mentioned disadvantages and inconveniences are not found in the methods which are the subject of the present invention. The essence of this method consists in the fact that after selecting the next haul-out, moving the conveyor and hanging the canopy on the stirrup, first next to the front stand, an additional stand is placed under the canopy supported by this stand. Then, the front stand is robbed and with a rotating movement, around the connected stand built in the adjacent row, it moves forward and spreads under the canopy suspended on the bow. Then he robs the back stand of the same row and the canopies supported by this stand, which in a similar manner rotates forward and spreads it in the place where the front stand was previously installed. Finally, the auxiliary rack is removed and carried to the next row to be moved forward. In the case of a strong ceiling, the front and rear racks can be robbed at the same time, and then, together with the canopies, both racks can be moved forward by a rotary motion around the built-up racks of the adjacent row. The main advantage of guiding the individual lining in the method according to the invention is the complete elimination of heavy physical work and a remarkable increase in the degree of safety, because during the execution of the casing, people are located 720 7572075 3 in a place protected from rock fragments falling from the top. Another important advantage of this method is the short-term deprivation of the support of the ceiling, because the racks are displaced after being robbed. hides in a relatively small gap. Such a short opening of the ceiling has hitherto not been possible to achieve with any of the known methods of guiding the individual cladding. An additional advantage of the method according to the invention is that it is suitable for use in all mining and geological conditions. The method according to the invention is more precisely illustrated in the drawing, in which Fig. 1 schematically shows a fragment of the wall casing in a view from top and fiig. 2 - 4 - individual stages of moving the stands forward. As shown in the figure, the wall is enclosed with individual stands and canopy canopies built in a triangular system. built under the rear canopies 6 of two neighboring rows are connected to each other by means of coupling devices. After making another grab and hanging the new canopy 7 on the stirrup and: 5 shifting the conveyor under the side of the wall, an additional stand 8 is placed under the front canopy 3. Then the stand 1 is robbed and rotating around the stand 2, it is moved to the front and expands under the canopy 7. Then the rear stand 4 with the canopy 6 is robbed and it is moved in a rotary motion around the stand 5 forwards and it is expanded in the place where the front stand 1 was previously built. the additional stand 8 from under the canopy 3 is removed, which is transferred to the next row of stands to be moved forward. PL

Claims (2)

Zastrzezenia patentowe 1. Sposób prowadzenia obudowy kroczacej zlozo¬ nej ze stojaków indywidualnych, które w dwóch kolejnych rzedach sa polaczone ze soba parami za pomoca urzadzen sprzegajacych tak, aby podpiera¬ ne tymi stojakami stropnice czlonowe tworzyly uklad trójkatny po wybraniu kazdego kolejnego za¬ bioru, przesunieciu przenosnika i zawieszeniu strop¬ nicy na strzemieniu, znamienny tym, ze najpierw obok przedniego stojaka (1), zabudowanego od czola sciany, pod stropnica (3) ustawia sie dodatkowy stojak (8)t po czym wyirabowuje sie przedni stojak i ruchem obrotowym, wokól stojaka (2) zabudowa¬ nego w rzedzie sasiednim, przemieszcza sie go do przodu oraz rozpiera pod stropnica (7) zawieszona na strzemieniu, a nastepnie rabuje sie tylny sto¬ jak (4) tego samego rzedu, znajdujacy sie od strony przestrzeni wybranej i w podobny sposób przemie¬ szcza sie go i rozpiera w miejscu, w którym byl dotychczas zabudowany przedni stojak (1), przy czym jednoczesnie z tylnym stojakiem (4) rabuje sie stropnice (6), na koniec zas usuwa sie spod stropnicy (3) dodatkowy stojak (8).Claims 1. The method of guiding the rolling casing consisting of individual stands, which are connected in pairs in two consecutive rows by means of coupling devices, so that the member canopies supported by these stands form a triangular system after selecting each successive job, moving the conveyor and suspending the roof on the stirrup, characterized by the fact that, first, next to the front stand (1), built from the face of the wall, an additional stand (8) is placed under the canopy (3), then the front stand is kneaded and rotated, around the stand (2) built into the adjacent row, it is moved forward and stretched under the canopy (7) suspended on the stirrup, and then the rear table (4) of the same row is robbed, located on the side of the chosen space and in a similar way, it is moved and expanded in the place where the front stand (1) was previously installed, while simultaneously with the rear stand (4) rob that the canopies (6) are attached, and finally the additional stand (8) is removed from under the canopy (3). 2. Odmiana sposobu wedlug zastrz. 1, znamienna tym, ze jednoczesnie rabuje sie stojaki przedni i tylny, a nastepnie wraz ze stropnicami przemie¬ szcza sie je do przodu ruchem obrotowym wokól zabudowanych stojaków rzedu sasiedniego.KI. 5c,23/02 72075 MKP E21d 23/02 Fig. T 4 6 5 18 2 3 7 A-A fig.2 y///<$ PL2. A variant of the method according to claim The method of claim 1, characterized in that the front and rear stands are simultaneously robbed, and then, together with the canopies, they are moved forward in a rotary motion around the built-up stands of the adjacent row. 5c, 23/02 72075 MKP E21d 23/02 Fig. T 4 6 5 18 2 3 7 A-A fig. 2 y /// <$ PL
PL14661271A 1971-03-03 1971-03-03 PL72075B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14661271A PL72075B2 (en) 1971-03-03 1971-03-03

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL14661271A PL72075B2 (en) 1971-03-03 1971-03-03

Publications (1)

Publication Number Publication Date
PL72075B2 true PL72075B2 (en) 1974-06-29

Family

ID=19953643

Family Applications (1)

Application Number Title Priority Date Filing Date
PL14661271A PL72075B2 (en) 1971-03-03 1971-03-03

Country Status (1)

Country Link
PL (1) PL72075B2 (en)

Similar Documents

Publication Publication Date Title
PL72075B2 (en)
SU112972A1 (en) Mobile metal lining for steeply dipping seams
SU825973A1 (en) Apparatus for mechanical sinking of vertical shafts
US2408967A (en) Coal mining apparatus
JPS5253349A (en) Rock preventing apparatus for hung device from crane
SU881329A1 (en) Mine shaft muck-loading device
SU1133409A1 (en) Suspension multilevel sinking platform
SU620615A1 (en) Temporary safety support for development workings
US715590A (en) Scaffold-support.
SU95495A1 (en) Shield support
SU141841A1 (en) Installation for stripping ore fines
SU78725A1 (en) Walking support for fastening underground workings
FR2224635A1 (en) Building evacuation sliding safety ladder - has multiple sections extending between balconies of different floors
SU756017A1 (en) Suspended cradle
RU2020238C1 (en) Installation for enlarging vertical chambers, mine workings and other structures
SU74055A1 (en) Metal Mobile Mount
SU471456A1 (en) Crepe Spreader
SU635244A1 (en) Temporary safety roof support for horizontal workings
PL63724B1 (en)
SU855212A1 (en) Tunnelling ladder
SU152223A1 (en) Safety top to
SU66770A1 (en) Scraper for transporting rock when laying workings in mines
SU537185A1 (en) Scrapero-plow for expanding the well into a split furnace
PL74544B2 (en)
PL63391B1 (en)