PL4535107T3 - System i sposób monitorowania procesu wytwarzania akumulatora - Google Patents

System i sposób monitorowania procesu wytwarzania akumulatora

Info

Publication number
PL4535107T3
PL4535107T3 PL24202803.3T PL24202803T PL4535107T3 PL 4535107 T3 PL4535107 T3 PL 4535107T3 PL 24202803 T PL24202803 T PL 24202803T PL 4535107 T3 PL4535107 T3 PL 4535107T3
Authority
PL
Poland
Prior art keywords
monitoring
manufacturing process
battery manufacturing
battery
manufacturing
Prior art date
Application number
PL24202803.3T
Other languages
English (en)
Inventor
Seol Hee Kim
Min Kyu Sim
Wi Dae Park
Jung Youn JUNG
In Bong BAE
Min Su Kim
Jong Seok Park
Original Assignee
Lg Energy Solution, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lg Energy Solution, Ltd. filed Critical Lg Energy Solution, Ltd.
Publication of PL4535107T3 publication Critical patent/PL4535107T3/pl

Links

Classifications

    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00—Program-control systems
    • G05B19/02—Program-control systems electric
    • G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by quality surveillance of production
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M4/00—Electrodes
    • H01M4/02—Electrodes composed of, or comprising, active material
    • H01M4/04—Processes of manufacture in general
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4285—Testing apparatus
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00—Measuring arrangements characterised by the use of optical techniques
    • G01B11/002—Measuring arrangements characterised by the use of optical techniques for measuring two or more coordinates
    • G01B11/005—Measuring arrangements characterised by the use of optical techniques for measuring two or more coordinates coordinate measuring machines
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00—Program-control systems
    • G05B19/02—Program-control systems electric
    • G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4183—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04—Manufacturing
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10—Services
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/04—Construction or manufacture in general
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/45—Nc applications
    • G05B2219/45224—Electrode making
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10—Energy storage using batteries
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50—Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • Secondary Cells (AREA)
  • Battery Electrode And Active Subsutance (AREA)
PL24202803.3T 2023-09-27 2024-09-26 System i sposób monitorowania procesu wytwarzania akumulatora PL4535107T3 (pl)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20230130493 2023-09-27

Publications (1)

Publication Number Publication Date
PL4535107T3 true PL4535107T3 (pl) 2026-06-15

Family

ID=92925980

Family Applications (1)

Application Number Title Priority Date Filing Date
PL24202803.3T PL4535107T3 (pl) 2023-09-27 2024-09-26 System i sposób monitorowania procesu wytwarzania akumulatora

Country Status (8)

Country Link
US (2) US20250105380A1 (pl)
EP (2) EP4723270A3 (pl)
JP (1) JP2026504789A (pl)
KR (1) KR102839383B1 (pl)
CN (1) CN120418965A (pl)
ES (1) ES3070657T3 (pl)
PL (1) PL4535107T3 (pl)
WO (1) WO2025071217A1 (pl)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20250098495A (ko) * 2023-12-22 2025-07-01 삼성에스디아이 주식회사 제조 공정 데이터 분석 장치 및 그 방법

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5415017B2 (ja) * 2008-04-28 2014-02-12 日立ビークルエナジー株式会社 二次電池、二次電池の製造方法、及び製造システム
JP5851965B2 (ja) * 2012-10-02 2016-02-03 株式会社日立製作所 放電容量予測装置、プログラム、および電池の製造方法
KR102216308B1 (ko) * 2018-12-31 2021-02-16 주식회사 포스코아이씨티 스마트팩토리 플랫폼을 위한 클러스터링 구조의 인터페이스 미들웨어 시스템
KR102261757B1 (ko) * 2020-06-22 2021-06-08 (주) 인텍플러스 배터리 전극 검사 시스템
KR102627519B1 (ko) * 2020-09-22 2024-01-23 엘지전자 주식회사 배터리 셀 추적 시스템 및 배터리
CN114490698B (zh) * 2020-10-28 2025-03-18 北京中祥英科技有限公司 产品履历查询方法、装置、设备及介质
KR102593244B1 (ko) * 2021-08-13 2023-10-25 주식회사 엘지에너지솔루션 전극 위치 추적시스템
KR102798823B1 (ko) * 2021-08-18 2025-04-22 주식회사 엘지에너지솔루션 전극 파단시의 롤맵 좌표 보정시스템 및 롤맵 좌표 보정방법
KR102923060B1 (ko) * 2021-09-06 2026-02-04 현대자동차 주식회사 배터리 셀 전극 정렬도 검사 방법
CN119008844A (zh) * 2021-09-13 2024-11-22 宁德新能源科技有限公司 电化学装置
KR102661396B1 (ko) * 2021-11-08 2024-04-29 주식회사 엘지에너지솔루션 합권취 전극의 롤맵 생성장치
US12597593B2 (en) * 2022-02-07 2026-04-07 Honeywell International Inc. Manufacturing method for traceability of battery electrodes with fiducial markers
CN116503079A (zh) * 2023-04-21 2023-07-28 合肥国轩高科动力能源有限公司 锂电池电芯追溯方法及系统

Also Published As

Publication number Publication date
WO2025071217A1 (ko) 2025-04-03
EP4723270A3 (en) 2026-06-24
US20260058230A1 (en) 2026-02-26
CN120418965A (zh) 2025-08-01
EP4535107A1 (en) 2025-04-09
ES3070657T3 (en) 2026-06-16
JP2026504789A (ja) 2026-02-10
EP4723270A2 (en) 2026-04-08
KR102839383B1 (ko) 2025-07-28
KR20250047177A (ko) 2025-04-03
US20250105380A1 (en) 2025-03-27
EP4535107B1 (en) 2026-04-08

Similar Documents

Publication Publication Date Title
HUE068052T2 (hu) Eljárás és berendezés egy akkumulátor-cella elõállítására
GB202317289D0 (en) A method of and system for monitoring a building
PL4113691T3 (pl) W pełni stały akumulator oraz sposób wytwarzania w pełni stałego akumulatora
EP4249293A4 (en) TIRE CONDITION MONITORING SYSTEM AND METHOD FOR MONITORING TIRE CONDITION
GB202003599D0 (en) A method for monitoring a network
HUE069838T2 (hu) Hegesztési eljárás és hegesztõberendezés másodlagos akkumulátorhoz, valamint ellenõrzõ eljárás és ellenõrzõ berendezés másodlagos akkumulátor hegesztési folyamathoz
PL4525131T3 (pl) Układ baterii i sposób monitorowania układu baterii
GB202004674D0 (en) Method for monitoring a computational system
GB202015557D0 (en) System and method for manufacturing a component
GB202416496D0 (en) Method and system for monitoring a well treatment
PL3896774T3 (pl) Układ i sposób do komunikacji między modułami układu akumulatora
GB2619305B (en) System and method for monitoring environmental events
GB2628450B (en) Method and system for monitoring a building
EP4123858C0 (en) BATTERY MANAGEMENT SYSTEM AND METHOD FOR MONITORING OVERCURRENT IN A BATTERY MANAGEMENT SYSTEM
GB202213272D0 (en) A system and method for identifying a cutscene
GB202404704D0 (en) Method and system for monitoring a well treatment
GB202401649D0 (en) A produce monitoring system and method
GB202308396D0 (en) A method and system for monitoring bioaerosols
HUE068458T2 (hu) Eszköz és eljárás egy termelõgép folyamatainak csatlakoztatására és felügyeletére
GB2603502B (en) System and method for monitoring a spare wheel
GB202411651D0 (en) System and method for monitoring a sensor network
EP4200529A4 (en) METHOD AND SYSTEM FOR MONITORING SCALE FORMATION
GB202213905D0 (en) A method for monitoring production lines
GB202313477D0 (en) Battery cell, and method for manufacturing a battery cell
GB2639567B (en) A tire monitoring system