PL427550A1 - Method and device for driving rods into the ground - Google Patents

Method and device for driving rods into the ground

Info

Publication number
PL427550A1
PL427550A1 PL427550A PL42755018A PL427550A1 PL 427550 A1 PL427550 A1 PL 427550A1 PL 427550 A PL427550 A PL 427550A PL 42755018 A PL42755018 A PL 42755018A PL 427550 A1 PL427550 A1 PL 427550A1
Authority
PL
Poland
Prior art keywords
anvil
ground
rod
bars
driving
Prior art date
Application number
PL427550A
Other languages
Polish (pl)
Other versions
PL237075B1 (en
Inventor
Wojciech Józef Rogowski
Original Assignee
Wojciech Józef Rogowski
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wojciech Józef Rogowski filed Critical Wojciech Józef Rogowski
Priority to PL427550A priority Critical patent/PL237075B1/en
Publication of PL427550A1 publication Critical patent/PL427550A1/en
Publication of PL237075B1 publication Critical patent/PL237075B1/en

Links

Landscapes

  • Manufacturing Of Electrical Connectors (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Sposób wbijania prętów w grunt polega na tym, że po założeniu na pręt (1) młota (2) i kowadła (3) w miejscu zapewniającym sztywność odcinka wbijanego (4) prowadzi się proces osadzania w gruncie. Urządzenie do wbijania prętów w grunt polega na tym, że ma przelotowy lub obejmujący młot (2) i kowadło (3). Korzystnie, gdy powierzchnia boczna pręta (1) i powierzchnia wewnętrzna kowadła (3) mają odpowiadające sobie ukształtowanie. Korzystnie, gdy tuleja zewnętrzna kowadła (3) ma ukośną powierzchnię wewnętrzną umożliwiającą dociśnięcie klinów kowadła (3) do zewnętrznej powierzchni pręta (1). Korzystnie, gdy powierzchnia wewnętrzna kowadła (3) jest gwintowana jak powierzchnia zewnętrzna pręta (1). Korzystnie, gdy powierzchnia wewnętrzna dzielonej tulei wewnętrznej utrzymywanej przez tuleję zewnętrzną kowadła (3) jest żebrowana jak powierzchnia zewnętrzna pręta (1). Rozwiązanie ma zastosowanie w budownictwie do wbijania długich i wiotkich elementów korzystnie prętów stalowych w grunt w celu wykonania posadowienia konstrukcji na mikropalach przekazujących obciążenia na grunt nośny za pomocą tarcia o powierzchnię boczną. Pręty mogą być także wbijane w zsuwające się skarpy przez powierzchnie poślizgu w celu ich stabilizacji (tzw. gwoździowanie). Rozwiązanie można także stosować do osadzania w gruncie prętów uziomów elektrycznych.The method of driving the bars into the ground is based on the fact that after the hammer (2) and the anvil (3) are placed on the bar (1) in the place ensuring the stiffness of the driven section (4), the process of embedding in the ground is carried out. The device for driving the bars into the ground is based on the fact that it has a through or encompassing hammer (2) and an anvil (3). Preferably, the side surface of the rod (1) and the inner surface of the anvil (3) have a corresponding configuration. Preferably, the outer anvil sleeve (3) has an inclined inner surface enabling the anvil wedges (3) to be pressed against the outer surface of the rod (1). Preferably, the inner surface of the anvil (3) is threaded like the outer surface of the rod (1). Preferably, the inner surface of the split inner sleeve held by the outer sleeve of the anvil (3) is ribbed like the outer surface of the rod (1). The solution is applicable in the construction industry for driving long and slender elements, preferably steel bars, into the ground in order to make the foundation of the structure on micropiles transferring loads to the load-bearing soil by friction against the side surface. Bars can also be driven into sliding slopes through the slip surfaces in order to stabilize them (the so-called nailing). The solution can also be used for embedding electric earth electrodes in the ground.

PL427550A 2018-10-26 2018-10-26 Method and device for driving rods into the ground PL237075B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL427550A PL237075B1 (en) 2018-10-26 2018-10-26 Method and device for driving rods into the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL427550A PL237075B1 (en) 2018-10-26 2018-10-26 Method and device for driving rods into the ground

Publications (2)

Publication Number Publication Date
PL427550A1 true PL427550A1 (en) 2020-05-04
PL237075B1 PL237075B1 (en) 2021-03-08

Family

ID=70466977

Family Applications (1)

Application Number Title Priority Date Filing Date
PL427550A PL237075B1 (en) 2018-10-26 2018-10-26 Method and device for driving rods into the ground

Country Status (1)

Country Link
PL (1) PL237075B1 (en)

Also Published As

Publication number Publication date
PL237075B1 (en) 2021-03-08

Similar Documents

Publication Publication Date Title
Karamlooa et al. An efficient algorithm for scaling problem of notched beam specimens with various notch to depth ratios
CN104358422B (en) Prestressing working device and method for reinforcing wall cracks
US20180010314A1 (en) A foundation pile, a grouting method for the said pile and a manufacturing method therefor
ATE19679T1 (en) PROCEDURE FOR ANCHORING ANCHORING BARS OD. DGL. IN CONCRETE.
PL427550A1 (en) Method and device for driving rods into the ground
NZ716390A (en) Method and apparatus for stabilizing slopes and embankments with soil load transfer plates
Kim et al. Effect of bending angle and embedment length on the bond characteristics of V-shaped tie reinforcement
CN103924590B (en) A kind of method for designing of pressure anchor wire
RU2462557C1 (en) Pile
Farouk et al. Soil, foundation, and superstructure interaction (I): advanced analyses of shallow foundations
ATE552385T1 (en) METHOD FOR CONSOLIDATING SOILS AND STABILIZING FOUNDATIONS
CN207047835U (en) A kind of structure improved prefabricated tubular pile
Anamali et al. Axial Load Capacity of Cast in Place Piles from SPT and CPTU Data
Walkup et al. Repair of partially embedded metal connector plates
Dewey et al. Behaviour of round notched timber sections
Savvides Uncertainty quantification in Geotechnical Engineering
JP1707289S (en) Temporary piles for construction
Marcinowski et al. Stress distribution in column-plate foundations of Monument of Christ The King erected in Świebodzin
CN104265338A (en) Efficiency determination method for roadway support unit
CN205101009U (en) Strut anchor rope for physical simulation experiments
RU2620127C2 (en) E.n. khrustalev's method of determining pressure of surface and internal cracking
Zhang et al. Theoretical research on roof damage of the fully mechanized top-caving mining coal seam with deep dip angle
Cuenca Recommendations for Future Research
CN203730030U (en) Deep well high-ground-pressure solid coal wall flexible yielding wood tray
JP2014109189A (en) Slope reinforcement method