PL410259A1 - Sposób oddziaływania na formację geologiczną - Google Patents
Sposób oddziaływania na formację geologicznąInfo
- Publication number
- PL410259A1 PL410259A1 PL410259A PL41025913A PL410259A1 PL 410259 A1 PL410259 A1 PL 410259A1 PL 410259 A PL410259 A PL 410259A PL 41025913 A PL41025913 A PL 41025913A PL 410259 A1 PL410259 A1 PL 410259A1
- Authority
- PL
- Poland
- Prior art keywords
- formation
- underground
- flow path
- impacting
- casing column
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 7
- 238000000034 method Methods 0.000 title abstract 2
- 230000003116 impacting effect Effects 0.000 title 1
- 238000005755 formation reaction Methods 0.000 abstract 6
- 239000012530 fluid Substances 0.000 abstract 3
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B29/08—Cutting or deforming pipes to control fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/114—Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/162—Injecting fluid from longitudinally spaced locations in injection well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
- Processing Of Solid Wastes (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Sposób oddziaływania na formacje podziemne, obejmuje zapewnienie odwiertu penetrującego formację podziemną i umieszczenie w nim kolumny rur okładzinowych, która to kolumna rur okładzinowych zawiera pewną liczbę obszarów wejściowych, przy czym każdy z tych obszarów wejściowych zapewnia drogę do przekazywania płynu z kolumny rur okładzinowych do tej formacji podziemnej, wprowadzanie płynu roboczego obrabiającego do tej formacji podziemnej przez pierwszą drogę przepływu i kierowanie płynu roboczego obrabiającego z pierwszej drogi przepływu do formacji do drugiej drogi przepływu do formacji.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/442,411 US8887803B2 (en) | 2012-04-09 | 2012-04-09 | Multi-interval wellbore treatment method |
Publications (1)
Publication Number | Publication Date |
---|---|
PL410259A1 true PL410259A1 (pl) | 2015-11-09 |
Family
ID=48096173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PL410259A PL410259A1 (pl) | 2012-04-09 | 2013-03-13 | Sposób oddziaływania na formację geologiczną |
Country Status (9)
Country | Link |
---|---|
US (2) | US8887803B2 (pl) |
AR (1) | AR090627A1 (pl) |
AU (1) | AU2013246411B2 (pl) |
CA (1) | CA2868337C (pl) |
GB (1) | GB2520585B (pl) |
IN (1) | IN2014DN07327A (pl) |
MX (1) | MX2014009981A (pl) |
PL (1) | PL410259A1 (pl) |
WO (1) | WO2013154727A2 (pl) |
Families Citing this family (69)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US10808497B2 (en) | 2011-05-11 | 2020-10-20 | Schlumberger Technology Corporation | Methods of zonal isolation and treatment diversion |
WO2014036742A1 (en) * | 2012-09-10 | 2014-03-13 | Schlumberger Canada Limited | Method for transverse fracturing of a subterranean formation |
US9546534B2 (en) * | 2013-08-15 | 2017-01-17 | Schlumberger Technology Corporation | Technique and apparatus to form a downhole fluid barrier |
US9366124B2 (en) * | 2013-11-27 | 2016-06-14 | Baker Hughes Incorporated | System and method for re-fracturing multizone horizontal wellbores |
WO2015089458A1 (en) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Creating radial slots in a wellbore |
US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
US9719339B2 (en) * | 2014-06-06 | 2017-08-01 | Baker Hughes Incorporated | Refracturing an already fractured borehole |
MX2016015593A (es) | 2014-07-07 | 2017-06-26 | Halliburton Energy Services Inc | Herramientas del interior del pozo que comprenden elementos de cierre hermetico degradables en fluido acuoso. |
WO2016011327A2 (en) * | 2014-07-17 | 2016-01-21 | Schlumberger Canada Limited | Heel to toe fracturing and re-fracturing method |
US10001613B2 (en) | 2014-07-22 | 2018-06-19 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
US10738577B2 (en) | 2014-07-22 | 2020-08-11 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
WO2016022146A1 (en) | 2014-08-08 | 2016-02-11 | Halliburton Energy Services, Inc. | Flow conditioning openings |
EP3212884B1 (en) | 2014-10-30 | 2021-03-03 | Services Petroliers Schlumberger | Method of creating radial slots in a subterranean formation |
US9810051B2 (en) | 2014-11-20 | 2017-11-07 | Thru Tubing Solutions, Inc. | Well completion |
AU2015378635B2 (en) | 2015-01-23 | 2018-04-05 | Halliburton Energy Services, Inc. | Establishing control of oil and gas producing wellbore through application of self-degrading particulates |
US10082012B2 (en) | 2015-04-10 | 2018-09-25 | Baker Hughes, A Ge Company, Llc | Refracturing method using spaced shaped charges straddled with isolators on a liner string |
US10119351B2 (en) * | 2015-04-16 | 2018-11-06 | Baker Hughes, A Ge Company, Llc | Perforator with a mechanical diversion tool and related methods |
US10641069B2 (en) | 2015-04-28 | 2020-05-05 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US10233719B2 (en) | 2015-04-28 | 2019-03-19 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US10774612B2 (en) | 2015-04-28 | 2020-09-15 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US10851615B2 (en) | 2015-04-28 | 2020-12-01 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US9708883B2 (en) | 2015-04-28 | 2017-07-18 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US10655427B2 (en) | 2015-04-28 | 2020-05-19 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US9567826B2 (en) | 2015-04-28 | 2017-02-14 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US9567825B2 (en) | 2015-04-28 | 2017-02-14 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US9523267B2 (en) | 2015-04-28 | 2016-12-20 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US10513653B2 (en) | 2015-04-28 | 2019-12-24 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US9816341B2 (en) | 2015-04-28 | 2017-11-14 | Thru Tubing Solutions, Inc. | Plugging devices and deployment in subterranean wells |
US9745820B2 (en) | 2015-04-28 | 2017-08-29 | Thru Tubing Solutions, Inc. | Plugging device deployment in subterranean wells |
US9567824B2 (en) | 2015-04-28 | 2017-02-14 | Thru Tubing Solutions, Inc. | Fibrous barriers and deployment in subterranean wells |
US11851611B2 (en) | 2015-04-28 | 2023-12-26 | Thru Tubing Solutions, Inc. | Flow control in subterranean wells |
US20160333680A1 (en) * | 2015-05-12 | 2016-11-17 | Schlumberger Technology Corporation | Well re-fracturing method |
WO2016182784A1 (en) * | 2015-05-12 | 2016-11-17 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
WO2016195623A1 (en) * | 2015-05-29 | 2016-12-08 | Halliburton Energy Services, Inc. | Methods and systems for characterizing and/or monitoring wormhole regimes in matrix acidizing |
US10612354B2 (en) | 2015-06-23 | 2020-04-07 | Halliburton Energy Services, Inc. | Jetting apparatus for fracturing applications |
WO2017014820A1 (en) | 2015-07-21 | 2017-01-26 | Thru Tubing Solutions, Inc. | Plugging device deployment |
US10590758B2 (en) | 2015-11-12 | 2020-03-17 | Schlumberger Technology Corporation | Noise reduction for tubewave measurements |
US20170138169A1 (en) * | 2015-11-12 | 2017-05-18 | Schlumberger Technology Corporation | Monitoring diversion degradation in a well |
US20170159402A1 (en) * | 2015-12-02 | 2017-06-08 | Baker Hughes Incorporated | Method of enhancing circulation during drill-out of a wellbore barrier using dissovable solid particulates |
CA2999197C (en) * | 2015-12-09 | 2020-08-11 | Halliburton Energy Services, Inc. | Method of well completion |
US9920589B2 (en) | 2016-04-06 | 2018-03-20 | Thru Tubing Solutions, Inc. | Methods of completing a well and apparatus therefor |
US10301903B2 (en) | 2016-05-16 | 2019-05-28 | Schlumberger Technology Corporation | Well treatment |
WO2017213624A1 (en) * | 2016-06-06 | 2017-12-14 | Halliburton Energy Services, Inc. | Fracturing a subterranean formation |
US10920132B2 (en) | 2016-06-09 | 2021-02-16 | Halliburton Energy Services, Inc. | Pressure dependent leak-off mitigation in unconventional formations |
US11041111B2 (en) | 2016-06-23 | 2021-06-22 | Halliburton Energy Services, Inc. | Enhanced propped fracture conductivity in subterranean wells |
CN109564296B (zh) | 2016-07-01 | 2021-03-05 | 斯伦贝谢技术有限公司 | 用于检测反射液压信号的井中对象的方法和系统 |
CA3027356C (en) | 2016-07-27 | 2020-12-29 | Halliburton Energy Services, Inc. | Real-time monitoring and control of diverter placement for multistage stimulation treatments |
WO2018022044A1 (en) * | 2016-07-27 | 2018-02-01 | Halliburton Energy Services, Inc. | Real-time monitoring and control of diverter placement for multistage stimulation treatments |
CN106337673A (zh) * | 2016-09-18 | 2017-01-18 | 中国石油天然气股份有限公司 | 一种多层段压裂工艺管柱及其施工方法 |
US9725993B1 (en) | 2016-10-13 | 2017-08-08 | Geodynamics, Inc. | Constant entrance hole perforating gun system and method |
US10753183B2 (en) | 2016-10-13 | 2020-08-25 | Geodynamics, Inc. | Refracturing in a multistring casing with constant entrance hole perforating gun system and method |
US10280698B2 (en) | 2016-10-24 | 2019-05-07 | General Electric Company | Well restimulation downhole assembly |
US10481243B2 (en) * | 2016-10-31 | 2019-11-19 | Aptiv Technologies Limited | Automated vehicle radar system with self-calibration |
WO2018111749A1 (en) | 2016-12-13 | 2018-06-21 | Thru Tubing Solutions, Inc. | Methods of completing a well and apparatus therefor |
RU175464U1 (ru) * | 2017-01-17 | 2017-12-06 | Общество с ограниченной ответственностью "Газпром добыча Уренгой" | Хвостовик для проведения многоэтапного гидроразрыва продуктивного пласта в скважине |
US20180245439A1 (en) * | 2017-02-24 | 2018-08-30 | Pavlin B. Entchev | Methods for Refracturing a Subterranean Formation Using Shearable Ball Seats for Zone Isolation |
US20180245440A1 (en) * | 2017-02-24 | 2018-08-30 | Pavlin B. Entchev | Methods for Refracturing a Subterranean Formation |
CN110382662B (zh) * | 2017-03-03 | 2022-04-08 | 轨迹石油Ip有限责任公司 | 用于在压裂井中对聚合物进行微生物增强消化的组合物和方法 |
CN106948795B (zh) * | 2017-03-30 | 2019-09-06 | 中国石油大学(北京) | 一种多分支水平井闭式循环开发水热型地热的方法 |
CA3058512C (en) | 2017-04-25 | 2022-06-21 | Thru Tubing Solutions, Inc. | Plugging undesired openings in fluid conduits |
CA3058511C (en) | 2017-04-25 | 2022-08-23 | Thru Tubing Solutions, Inc. | Plugging undesired openings in fluid vessels |
US10590748B2 (en) * | 2017-09-22 | 2020-03-17 | Statoil Gulf Services LLC | Reservoir stimulation method and apparatus |
WO2019074731A1 (en) * | 2017-10-11 | 2019-04-18 | Geodynamics, Inc. | RE-FRACTURING IN A MULTI-TRAIN TUBING WITH A CONSTANT INHIBITION HOLE SYSTEM AND METHOD |
WO2019195478A1 (en) | 2018-04-03 | 2019-10-10 | Schlumberger Technology Corporation | Proppant-fiber schedule for far field diversion |
US11530595B2 (en) * | 2018-08-24 | 2022-12-20 | Schlumberger Technology Corporation | Systems and methods for horizontal well completions |
US10326203B1 (en) * | 2018-09-19 | 2019-06-18 | Pivotal Commware, Inc. | Surface scattering antenna systems with reflector or lens |
CN111255427A (zh) * | 2020-01-16 | 2020-06-09 | 中国石油天然气股份有限公司 | 油井机械分层压裂的方法 |
CN111441751B (zh) * | 2020-04-15 | 2022-01-25 | 王皓 | 连续油管多层注聚洗井一体装置 |
Family Cites Families (146)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2312018A (en) | 1939-08-19 | 1943-02-23 | Fred G Beckman | Method of and means for cleaning wells |
US2703316A (en) | 1951-06-05 | 1955-03-01 | Du Pont | Polymers of high melting lactide |
US2753940A (en) | 1953-05-11 | 1956-07-10 | Exxon Research Engineering Co | Method and apparatus for fracturing a subsurface formation |
US3912692A (en) | 1973-05-03 | 1975-10-14 | American Cyanamid Co | Process for polymerizing a substantially pure glycolide composition |
US4005750A (en) | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
US4312406A (en) | 1980-02-20 | 1982-01-26 | The Dow Chemical Company | Device and method for shifting a port collar sleeve |
US4387769A (en) | 1981-08-10 | 1983-06-14 | Exxon Production Research Co. | Method for reducing the permeability of subterranean formations |
US4509598A (en) | 1983-03-25 | 1985-04-09 | The Dow Chemical Company | Fracturing fluids containing bouyant inorganic diverting agent and method of use in hydraulic fracturing of subterranean formations |
US4515214A (en) | 1983-09-09 | 1985-05-07 | Mobil Oil Corporation | Method for controlling the vertical growth of hydraulic fractures |
US4590995A (en) | 1985-03-26 | 1986-05-27 | Halliburton Company | Retrievable straddle packer |
US4687061A (en) | 1986-12-08 | 1987-08-18 | Mobil Oil Corporation | Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing |
US6323307B1 (en) | 1988-08-08 | 2001-11-27 | Cargill Dow Polymers, Llc | Degradation control of environmentally degradable disposable materials |
US5216050A (en) | 1988-08-08 | 1993-06-01 | Biopak Technology, Ltd. | Blends of polyactic acid |
US4869322A (en) | 1988-10-07 | 1989-09-26 | Mobil Oil Corporation | Sequential hydraulic fracturing of a subsurface formation |
US4887670A (en) | 1989-04-05 | 1989-12-19 | Halliburton Company | Controlling fracture growth |
US4949788A (en) * | 1989-11-08 | 1990-08-21 | Halliburton Company | Well completions using casing valves |
US5074360A (en) | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
US5111881A (en) | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5241475A (en) | 1990-10-26 | 1993-08-31 | Halliburton Company | Method of evaluating fluid loss in subsurface fracturing operations |
US5318123A (en) | 1992-06-11 | 1994-06-07 | Halliburton Company | Method for optimizing hydraulic fracturing through control of perforation orientation |
US5361856A (en) | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5482116A (en) | 1993-12-10 | 1996-01-09 | Mobil Oil Corporation | Wellbore guided hydraulic fracturing |
US5533571A (en) | 1994-05-27 | 1996-07-09 | Halliburton Company | Surface switchable down-jet/side-jet apparatus |
US5499678A (en) | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5431225A (en) | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5595245A (en) | 1995-08-04 | 1997-01-21 | Scott, Iii; George L. | Systems of injecting phenolic resin activator during subsurface fracture stimulation for enhanced oil recovery |
US6047773A (en) | 1996-08-09 | 2000-04-11 | Halliburton Energy Services, Inc. | Apparatus and methods for stimulating a subterranean well |
US5765642A (en) | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US6283210B1 (en) | 1999-09-01 | 2001-09-04 | Halliburton Energy Services, Inc. | Proactive conformance for oil or gas wells |
US6474419B2 (en) | 1999-10-04 | 2002-11-05 | Halliburton Energy Services, Inc. | Packer with equalizing valve and method of use |
US6394184B2 (en) | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US6401815B1 (en) | 2000-03-10 | 2002-06-11 | Halliburton Energy Services, Inc. | Apparatus and method for connecting casing to lateral casing using thermoset plastic molding |
DZ3387A1 (fr) | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
US6439310B1 (en) | 2000-09-15 | 2002-08-27 | Scott, Iii George L. | Real-time reservoir fracturing process |
GB2382610B (en) * | 2000-09-20 | 2004-12-15 | Schlumberger Holdings | Method for gravel packing open holes above fracturing pressure |
US20020177955A1 (en) | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US6565129B2 (en) | 2001-06-21 | 2003-05-20 | Halliburton Energy Services, Inc. | Quick connect system and method for fluid devices |
US6938690B2 (en) | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
US6725933B2 (en) | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6719054B2 (en) | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US6662874B2 (en) | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6907936B2 (en) * | 2001-11-19 | 2005-06-21 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7096954B2 (en) | 2001-12-31 | 2006-08-29 | Schlumberger Technology Corporation | Method and apparatus for placement of multiple fractures in open hole wells |
US20030205376A1 (en) * | 2002-04-19 | 2003-11-06 | Schlumberger Technology Corporation | Means and Method for Assessing the Geometry of a Subterranean Fracture During or After a Hydraulic Fracturing Treatment |
US7108067B2 (en) | 2002-08-21 | 2006-09-19 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7100688B2 (en) | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US7108064B2 (en) | 2002-10-10 | 2006-09-19 | Weatherford/Lamb, Inc. | Milling tool insert and method of use |
US6805199B2 (en) | 2002-10-17 | 2004-10-19 | Halliburton Energy Services, Inc. | Process and system for effective and accurate foam cement generation and placement |
US6837523B2 (en) | 2002-12-05 | 2005-01-04 | Halliburton Energy Services, Inc. | Piping with integral force absorbing restraining system |
US7032671B2 (en) | 2002-12-12 | 2006-04-25 | Integrated Petroleum Technologies, Inc. | Method for increasing fracture penetration into target formation |
US20040231845A1 (en) | 2003-05-15 | 2004-11-25 | Cooke Claude E. | Applications of degradable polymers in wells |
US7044220B2 (en) | 2003-06-27 | 2006-05-16 | Halliburton Energy Services, Inc. | Compositions and methods for improving proppant pack permeability and fracture conductivity in a subterranean well |
US7066265B2 (en) | 2003-09-24 | 2006-06-27 | Halliburton Energy Services, Inc. | System and method of production enhancement and completion of a well |
US20050087336A1 (en) | 2003-10-24 | 2005-04-28 | Surjaatmadja Jim B. | Orbital downhole separator |
US8126689B2 (en) | 2003-12-04 | 2012-02-28 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7445045B2 (en) | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US7225869B2 (en) * | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7150327B2 (en) | 2004-04-07 | 2006-12-19 | Halliburton Energy Services, Inc. | Workover unit and method of utilizing same |
US7234529B2 (en) | 2004-04-07 | 2007-06-26 | Halliburton Energy Services, Inc. | Flow switchable check valve and method |
US7503404B2 (en) | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US20080060810A9 (en) | 2004-05-25 | 2008-03-13 | Halliburton Energy Services, Inc. | Methods for treating a subterranean formation with a curable composition using a jetting tool |
US7159660B2 (en) | 2004-05-28 | 2007-01-09 | Halliburton Energy Services, Inc. | Hydrajet perforation and fracturing tool |
US7287592B2 (en) | 2004-06-11 | 2007-10-30 | Halliburton Energy Services, Inc. | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool |
US7273313B2 (en) | 2004-06-17 | 2007-09-25 | Halliburton Energy Services, Inc. | Mixing device for mixing bulk and liquid material |
US7243723B2 (en) | 2004-06-18 | 2007-07-17 | Halliburton Energy Services, Inc. | System and method for fracturing and gravel packing a borehole |
US7429332B2 (en) | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7370701B2 (en) | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7090153B2 (en) | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7775278B2 (en) | 2004-09-01 | 2010-08-17 | Schlumberger Technology Corporation | Degradable material assisted diversion or isolation |
US7281580B2 (en) | 2004-09-09 | 2007-10-16 | Halliburton Energy Services, Inc. | High porosity fractures and methods of creating high porosity fractures |
US20060070740A1 (en) | 2004-10-05 | 2006-04-06 | Surjaatmadja Jim B | System and method for fracturing a hydrocarbon producing formation |
US20060086507A1 (en) | 2004-10-26 | 2006-04-27 | Halliburton Energy Services, Inc. | Wellbore cleanout tool and method |
US7543635B2 (en) | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US7237612B2 (en) | 2004-11-17 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods of initiating a fracture tip screenout |
US7325608B2 (en) | 2004-12-01 | 2008-02-05 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7281581B2 (en) | 2004-12-01 | 2007-10-16 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7228908B2 (en) | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7398825B2 (en) | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US7273099B2 (en) | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
US7322417B2 (en) | 2004-12-14 | 2008-01-29 | Schlumberger Technology Corporation | Technique and apparatus for completing multiple zones |
US7387165B2 (en) * | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US7506689B2 (en) | 2005-02-22 | 2009-03-24 | Halliburton Energy Services, Inc. | Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations |
US7278486B2 (en) | 2005-03-04 | 2007-10-09 | Halliburton Energy Services, Inc. | Fracturing method providing simultaneous flow back |
US7478020B2 (en) | 2005-03-07 | 2009-01-13 | M-I Llc | Apparatus for slurry and operation design in cuttings re-injection |
US7318473B2 (en) | 2005-03-07 | 2008-01-15 | Halliburton Energy Services, Inc. | Methods relating to maintaining the structural integrity of deviated well bores |
US7926571B2 (en) * | 2005-03-15 | 2011-04-19 | Raymond A. Hofman | Cemented open hole selective fracing system |
US7595281B2 (en) | 2005-05-18 | 2009-09-29 | Halliburton Energy Services, Inc. | Methods to increase recovery of treatment fluid following stimulation of a subterranean formation comprising in situ fluorocarbon coated particles |
US7431090B2 (en) | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7296625B2 (en) | 2005-08-02 | 2007-11-20 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US7343975B2 (en) | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US7905284B2 (en) | 2005-09-07 | 2011-03-15 | Halliburton Energy Services, Inc. | Fracturing/gravel packing tool system with dual flow capabilities |
WO2007035745A2 (en) | 2005-09-19 | 2007-03-29 | Pioneer Natural Resources Usa Inc | Well treatment device, method, and system |
US7946340B2 (en) | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
US7711487B2 (en) | 2006-10-10 | 2010-05-04 | Halliburton Energy Services, Inc. | Methods for maximizing second fracture length |
US7740072B2 (en) | 2006-10-10 | 2010-06-22 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
US7647964B2 (en) | 2005-12-19 | 2010-01-19 | Fairmount Minerals, Ltd. | Degradable ball sealers and methods for use in well treatment |
US7472746B2 (en) | 2006-03-31 | 2009-01-06 | Halliburton Energy Services, Inc. | Packer apparatus with annular check valve |
US7337844B2 (en) | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US20070261851A1 (en) | 2006-05-09 | 2007-11-15 | Halliburton Energy Services, Inc. | Window casing |
US7478676B2 (en) | 2006-06-09 | 2009-01-20 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US7575062B2 (en) | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US20070284106A1 (en) | 2006-06-12 | 2007-12-13 | Kalman Mark D | Method and apparatus for well drilling and completion |
US20080000637A1 (en) | 2006-06-29 | 2008-01-03 | Halliburton Energy Services, Inc. | Downhole flow-back control for oil and gas wells by controlling fluid entry |
US7520327B2 (en) | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
US8540027B2 (en) | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
US7571766B2 (en) | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7581590B2 (en) | 2006-12-08 | 2009-09-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20080135248A1 (en) | 2006-12-11 | 2008-06-12 | Halliburton Energy Service, Inc. | Method and apparatus for completing and fluid treating a wellbore |
DK2189622T3 (en) | 2007-01-25 | 2019-02-04 | Welldynamics Inc | Casing valve system for selective borehole stimulation and control |
US7617871B2 (en) | 2007-01-29 | 2009-11-17 | Halliburton Energy Services, Inc. | Hydrajet bottomhole completion tool and process |
US20080202764A1 (en) | 2007-02-22 | 2008-08-28 | Halliburton Energy Services, Inc. | Consumable downhole tools |
US7681645B2 (en) | 2007-03-01 | 2010-03-23 | Bj Services Company | System and method for stimulating multiple production zones in a wellbore |
US7870907B2 (en) | 2007-03-08 | 2011-01-18 | Weatherford/Lamb, Inc. | Debris protection for sliding sleeve |
US7841396B2 (en) | 2007-05-14 | 2010-11-30 | Halliburton Energy Services Inc. | Hydrajet tool for ultra high erosive environment |
US7580796B2 (en) | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US7673673B2 (en) | 2007-08-03 | 2010-03-09 | Halliburton Energy Services, Inc. | Apparatus for isolating a jet forming aperture in a well bore servicing tool |
US7971646B2 (en) | 2007-08-16 | 2011-07-05 | Baker Hughes Incorporated | Multi-position valve for fracturing and sand control and associated completion methods |
US7703510B2 (en) | 2007-08-27 | 2010-04-27 | Baker Hughes Incorporated | Interventionless multi-position frac tool |
US20090062157A1 (en) | 2007-08-30 | 2009-03-05 | Halliburton Energy Services, Inc. | Methods and compositions related to the degradation of degradable polymers involving dehydrated salts and other associated methods |
US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
US7726403B2 (en) | 2007-10-26 | 2010-06-01 | Halliburton Energy Services, Inc. | Apparatus and method for ratcheting stimulation tool |
US8079933B2 (en) | 2007-11-04 | 2011-12-20 | GM Global Technology Operations LLC | Method and apparatus to control engine torque to peak main pressure for a hybrid powertrain system |
US20090125280A1 (en) | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7849924B2 (en) | 2007-11-27 | 2010-12-14 | Halliburton Energy Services Inc. | Method and apparatus for moving a high pressure fluid aperture in a well bore servicing tool |
US7690427B2 (en) | 2008-03-07 | 2010-04-06 | Halliburton Energy Services, Inc. | Sand plugs and placing sand plugs in highly deviated wells |
US8096358B2 (en) | 2008-03-27 | 2012-01-17 | Halliburton Energy Services, Inc. | Method of perforating for effective sand plug placement in horizontal wells |
US7730951B2 (en) | 2008-05-15 | 2010-06-08 | Halliburton Energy Services, Inc. | Methods of initiating intersecting fractures using explosive and cryogenic means |
US9260921B2 (en) | 2008-05-20 | 2016-02-16 | Halliburton Energy Services, Inc. | System and methods for constructing and fracture stimulating multiple ultra-short radius laterals from a parent well |
US20090308588A1 (en) | 2008-06-16 | 2009-12-17 | Halliburton Energy Services, Inc. | Method and Apparatus for Exposing a Servicing Apparatus to Multiple Formation Zones |
US20100000727A1 (en) | 2008-07-01 | 2010-01-07 | Halliburton Energy Services, Inc. | Apparatus and method for inflow control |
US8424617B2 (en) * | 2008-08-20 | 2013-04-23 | Foro Energy Inc. | Methods and apparatus for delivering high power laser energy to a surface |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US7775285B2 (en) | 2008-11-19 | 2010-08-17 | Halliburton Energy Services, Inc. | Apparatus and method for servicing a wellbore |
US8074715B2 (en) | 2009-01-15 | 2011-12-13 | Halliburton Energy Services, Inc. | Methods of setting particulate plugs in horizontal well bores using low-rate slurries |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US7882894B2 (en) | 2009-02-20 | 2011-02-08 | Halliburton Energy Services, Inc. | Methods for completing and stimulating a well bore |
US20110028358A1 (en) | 2009-07-30 | 2011-02-03 | Welton Thomas D | Methods of Fluid Loss Control and Fluid Diversion in Subterranean Formations |
US8104535B2 (en) | 2009-08-20 | 2012-01-31 | Halliburton Energy Services, Inc. | Method of improving waterflood performance using barrier fractures and inflow control devices |
US8104539B2 (en) | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8061426B2 (en) | 2009-12-16 | 2011-11-22 | Halliburton Energy Services Inc. | System and method for lateral wellbore entry, debris removal, and wellbore cleaning |
US8267172B2 (en) | 2010-02-10 | 2012-09-18 | Halliburton Energy Services Inc. | System and method for determining position within a wellbore |
US8210257B2 (en) | 2010-03-01 | 2012-07-03 | Halliburton Energy Services Inc. | Fracturing a stress-altered subterranean formation |
US8307904B2 (en) | 2010-05-04 | 2012-11-13 | Halliburton Energy Services, Inc. | System and method for maintaining position of a wellbore servicing device within a wellbore |
US20110284214A1 (en) | 2010-05-19 | 2011-11-24 | Ayoub Joseph A | Methods and tools for multiple fracture placement along a wellbore |
US9022115B2 (en) | 2010-11-11 | 2015-05-05 | Gas Technology Institute | Method and apparatus for wellbore perforation |
-
2012
- 2012-04-09 US US13/442,411 patent/US8887803B2/en active Active
-
2013
- 2013-03-13 MX MX2014009981A patent/MX2014009981A/es active IP Right Grant
- 2013-03-13 PL PL410259A patent/PL410259A1/pl unknown
- 2013-03-13 WO PCT/US2013/030784 patent/WO2013154727A2/en active Application Filing
- 2013-03-13 AU AU2013246411A patent/AU2013246411B2/en active Active
- 2013-03-13 GB GB1414390.3A patent/GB2520585B/en not_active Expired - Fee Related
- 2013-03-13 IN IN7327DEN2014 patent/IN2014DN07327A/en unknown
- 2013-03-13 CA CA2868337A patent/CA2868337C/en active Active
- 2013-04-08 AR ARP130101135A patent/AR090627A1/es active IP Right Grant
-
2014
- 2014-10-15 US US14/515,183 patent/US9725998B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
MX2014009981A (es) | 2014-10-24 |
AU2013246411A1 (en) | 2014-09-04 |
GB2520585A (en) | 2015-05-27 |
GB201414390D0 (en) | 2014-09-24 |
CA2868337A1 (en) | 2013-10-17 |
GB2520585B (en) | 2016-01-20 |
AR090627A1 (es) | 2014-11-26 |
US20150027692A1 (en) | 2015-01-29 |
WO2013154727A2 (en) | 2013-10-17 |
IN2014DN07327A (pl) | 2015-04-24 |
AU2013246411B2 (en) | 2016-02-25 |
CA2868337C (en) | 2017-03-14 |
US8887803B2 (en) | 2014-11-18 |
US20130264054A1 (en) | 2013-10-10 |
WO2013154727A3 (en) | 2014-06-26 |
US9725998B2 (en) | 2017-08-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PL410259A1 (pl) | Sposób oddziaływania na formację geologiczną | |
HK1210567A1 (en) | A system and method for stimulating wells, deposits and boreholes using the plasma source | |
BR112015009095A2 (pt) | fluido de furo de poço, método, e método para perfilagem elétrica de subseção de um poço subterrâneo. | |
MX2017004995A (es) | Sistema y metodo para tratar una formacion subterranea. | |
MX2014000080A (es) | Sistema engranable de anillos operables sin torre de perforacion compatible con un cable para usar y abandonar un pozo subterraneo. | |
EA201490168A1 (ru) | Способ разработки газоносных и низкопроницаемых угольных пластов | |
MY156971A (en) | High strength dissolvable structures for use in a subterranean well | |
CO6761342A2 (es) | Un metodo para manatener individualmente una pluralidad de zonas de una formación subterranea | |
GB2533730B (en) | Drill-in fluids comprising nanoparticulates for consolidating subterranean formations while drilling | |
BR112014015589A8 (pt) | métodos para formação subterrânea, de perfuração, e para cimentar um poço | |
HK1214849A1 (zh) | 用來勘測鑽孔的方法,鑽削設備,和鑽孔勘測組件 | |
CL2014001907A1 (es) | Sistema de perforación de suelo, tal como para exploración o producción, comprende una sarta de perforación para formar una trayectoria de flujo de fluido de lavado y de flujo de fluido de trabajo que están fluidamente aisladas una de la otra, un martillo de agua, y una salida de fluido de lavado; método. | |
GB2548248A (en) | Cationic multiple quaternary ammonium-based surfactants for enhancing production in subterranean formations | |
AR093936A1 (es) | Sistema, metodo y producto de programa informatico para determinar la ubicacion de intervalos de perforacion utilizando facies, limites de fluidos, geocuerpos y propiedades dinamicas de los fluidos | |
AR091232A1 (es) | Sistemas y metodos para el emplazamiento optimo de plataformas de perforacion | |
MX2014003307A (es) | Limpieza de muestras fluidas. | |
DK201470499A (da) | Fremgangsmåde og indretning til behandling af et underjordisk område | |
EP2933306A4 (en) | FLUID DISPERSION FOR DRILLING AND EXTRACTION METHOD FOR UNDERGROUND RESOURCES USING THE SAME | |
MX363284B (es) | Metodo y dispositivo para limpiar las particulas de control de un pozo. | |
BR112014028756A2 (pt) | método e fluido de manutenção de furo de poço. | |
GB2554209A (en) | Providing communication between wellbores through directional hydraulic fracturing | |
BR112013011703A8 (pt) | método para controlar fluxo de fluido através de um ou mais caminhos em uma ou mais formações rochosas penetradas por um poço em um poço subterrâneo | |
MX2016003818A (es) | Metodo para sellar un pozo. | |
MX2015014009A (es) | Turbocompresor accionado mediante una velocidad reducida. | |
UA74195U (ru) | Устройство для бурения скважин |