PL1964978T3 - Method for erecting a wharfage and wharfage - Google Patents
Method for erecting a wharfage and wharfageInfo
- Publication number
- PL1964978T3 PL1964978T3 PL07001953T PL07001953T PL1964978T3 PL 1964978 T3 PL1964978 T3 PL 1964978T3 PL 07001953 T PL07001953 T PL 07001953T PL 07001953 T PL07001953 T PL 07001953T PL 1964978 T3 PL1964978 T3 PL 1964978T3
- Authority
- PL
- Poland
- Prior art keywords
- wharfage
- anchor
- erecting
- bottom material
- anchor rods
- Prior art date
Links
- 239000000463 material Substances 0.000 abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/06—Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Composite Materials (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Revetment (AREA)
- Machines For Manufacturing Corrugated Board In Mechanical Paper-Making Processes (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The erection process for a quay involves producing a wall (10) which during the final back-filling with bottom material is anchored with the aid of anchor rods (22) to a rear anchor table (24) over the bottom (14). The bottom material is filled in layers to the top level (16), and the anchor rods are at a horizontal spacing from each other under the water, where they are connected at their ends to the anchor table.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP07001953A EP1964978B1 (en) | 2007-01-30 | 2007-01-30 | Method for erecting a wharfage and wharfage |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL1964978T3 true PL1964978T3 (en) | 2009-04-30 |
Family
ID=38180586
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL07001953T PL1964978T3 (en) | 2007-01-30 | 2007-01-30 | Method for erecting a wharfage and wharfage |
Country Status (7)
| Country | Link |
|---|---|
| EP (1) | EP1964978B1 (en) |
| AT (1) | ATE412086T1 (en) |
| DE (1) | DE502007000191D1 (en) |
| DK (1) | DK1964978T3 (en) |
| ES (1) | ES2317594T3 (en) |
| PL (1) | PL1964978T3 (en) |
| PT (1) | PT1964978E (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102016118896A1 (en) | 2016-10-05 | 2018-04-05 | Bilfinger Marine & Offshore Systems Gmbh | Sheet pile wall with at least one support pile and method for producing a sheet pile wall |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE604250C (en) * | 1934-10-17 | Kurt Schroeder Dipl Ing | Anchoring for iron sheet piling | |
| US4690588A (en) * | 1984-05-04 | 1987-09-01 | C-Lock Retention Systems, Inc. | Seawall |
| FR2889215B1 (en) * | 2005-07-26 | 2009-03-06 | Filtaro Sarl | WALL WALL, INTENDED IN PARTICULAR TO PROTECT THE SHORES OF A COASTAL EDGE |
-
2007
- 2007-01-30 EP EP07001953A patent/EP1964978B1/en active Active
- 2007-01-30 DE DE502007000191T patent/DE502007000191D1/en active Active
- 2007-01-30 PT PT07001953T patent/PT1964978E/en unknown
- 2007-01-30 DK DK07001953T patent/DK1964978T3/en active
- 2007-01-30 PL PL07001953T patent/PL1964978T3/en unknown
- 2007-01-30 AT AT07001953T patent/ATE412086T1/en not_active IP Right Cessation
- 2007-01-30 ES ES07001953T patent/ES2317594T3/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| EP1964978B1 (en) | 2008-10-22 |
| DE502007000191D1 (en) | 2008-12-04 |
| EP1964978A1 (en) | 2008-09-03 |
| PT1964978E (en) | 2009-01-30 |
| DK1964978T3 (en) | 2009-03-02 |
| ATE412086T1 (en) | 2008-11-15 |
| ES2317594T3 (en) | 2009-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| PH12017500191A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
| CN107866180A (en) | A kind of special mixing apparatus of construction | |
| EP3052752A2 (en) | Apparatus and method for producing oil and gas using buoyancy effect | |
| CN106499070A (en) | The construction method of connecting sewing between assembled architecture component and component | |
| CN106437164A (en) | Buffer device for downward ultra-deep composite pumping of concrete | |
| CN102704493A (en) | Force-transferring device for shallow pit base plate and deep pit strut and construction method | |
| CN102535525B (en) | Structure and method utilizing anti-floating anchor rods to support underground raft plates | |
| PL1964978T3 (en) | Method for erecting a wharfage and wharfage | |
| CN204491905U (en) | With the frame construction infilled wall of tension rib | |
| CN204983762U (en) | Standing level view water scenery device | |
| WO2006003320A3 (en) | Method of constructing a wall using hemp and lime, blocks used for same and device for moulding said blocks | |
| RU2008139006A (en) | METHOD FOR STRENGTHENING THE SOIL | |
| CN204491906U (en) | With the cracking-proof frame construction infilled wall of tension rib | |
| CN109518710A (en) | A kind of polygonal jacket basis and its construction method for ocean engineering | |
| CN103790147B (en) | A kind of prefabricated fixed offshore platform and mounting method thereof | |
| RU2009125513A (en) | SUPPORT-REGULATING STRUCTURE ON SOIL-FILLED FLYBETET AND METHOD FOR ITS IMPLEMENTATION | |
| CN202359579U (en) | Structure for supporting underground raft plate by use of anti-floating anchor rods | |
| MA34561B1 (en) | IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH | |
| CN203821353U (en) | Prefabricated fixed offshore platform | |
| PL1936039T3 (en) | Method of strengthening foundations comprising a slab buried in the ground, in particular foundations for pylons, and structure obtained | |
| PT2141287E (en) | Method of constructing a retaining wall | |
| CN204266207U (en) | Compound bamboo box arch for foundation pit support | |
| CN204738287U (en) | Be applied to weak soil regional light weight, high strength degree foam concrete structure of soaking | |
| CN206568311U (en) | Steam-curing chamber | |
| RU2009118027A (en) | METHOD FOR CREATING GROUND-ARMED BASES AND FOUNDATIONS OF BUILDINGS AND STRUCTURES AND DEVICE FOR ITS IMPLEMENTATION |