PL123778B2 - Ventilation dam for mine workings of high formation pressure - Google Patents

Ventilation dam for mine workings of high formation pressure Download PDF

Info

Publication number
PL123778B2
PL123778B2 PL22533480A PL22533480A PL123778B2 PL 123778 B2 PL123778 B2 PL 123778B2 PL 22533480 A PL22533480 A PL 22533480A PL 22533480 A PL22533480 A PL 22533480A PL 123778 B2 PL123778 B2 PL 123778B2
Authority
PL
Poland
Prior art keywords
dam
ventilation
frame
formation pressure
mine workings
Prior art date
Application number
PL22533480A
Other languages
Polish (pl)
Other versions
PL225334A2 (en
Inventor
Andrzej Naczynski
Marian Szewczyk
Jozef Kostrz
Antoni Nimpsch
Original Assignee
Kopalnia Wegla Kamiennego Poko
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kopalnia Wegla Kamiennego Poko filed Critical Kopalnia Wegla Kamiennego Poko
Priority to PL22533480A priority Critical patent/PL123778B2/en
Publication of PL225334A2 publication Critical patent/PL225334A2/xx
Publication of PL123778B2 publication Critical patent/PL123778B2/en

Links

Landscapes

  • Building Environments (AREA)

Description

Przedmiotem wynalazku jest wentylacyjna tama bezpieczenstwa przeznaczona dla podzie¬ mnych wyrobisk górniczych narazonych na duze cisnienie górotworu.Tamy wentylacyjne stosowane powszechnie w podziemiach kopaln o dlugotrwalym przezna¬ czeniu, budowane sa z reguly z cegly lub z betonitów. Natomiast w miejscach, w których wystepuje wzmozone cisnienie górotworu warstwy poziome muru przeklada sie warstwami materialu elasty¬ cznego. Taka konstrukcja tamy dobrze spelnia swoje zadanie tylko w przypadku wystepowania cisnienia górotworu o umiarkowanej wielkosci. Niestety wraz ze wzrostem glebokosci eksploatacji wzrasta równiez cisnienie górotworu i konstrukcje tam wentylacyjnych zlokalizowanych zwlaszcza w sasiedztwie dyslokacji lub miejsc sasiadujacych z polami eksploatacyjnymi badz starymi zrobami narazona jest na deformacje powodujace zwiekszenie nacisku górotworu. W takich warunkach nawet tama wyposazona we wkladki elastyczne szybko ulega zniszczeniu i przestaje spelniac swoje zadanie. Dotychczas zniszczona lub zdeformowana tame rozbierano i na jej miejscu budowano nowa tame, która po pewnym czasie trzeba bylo znowu przebudowywac.Niedogodnosci te usuwa calkowicie tama wentylacyjna bedaca przedmiotem niniejszego wynalazku. Istota tej tamy polega na zastosowaniu prostokatnej ramy zlozonej ze stalowych ksztaltowników polaczonych ze soba rozlacznie oraz elastycznych wykladzin o duzej wytrzyma¬ losci na zgniatanie. Wykladzinami tymi wylozona jest cala przestrzen pomiedzy rama a ociosami, spagiem i stropem wyrobiska. Ponadto wszystkie plaszczyzny zewnetrzne tamy sa pokryte meta¬ lowa siatka i warstwa ochronnego tynku. Tama wentylacyjna o takiej konstrukcji jest bardzo odporna na cisnienie górotworu, a zwlaszcza na jego dynamiczne uderzenia zwane tapaniami.Dzieki zastosowaniu ramy ze stalowych ksztaltowników uzyskano staly przekrój tamy nawet przy bardzo duzym cisnieniu górotworu otaczajacego tame.Przedmiot wynalazku jest uwidoczniony w przykladowym wykonaniu na rysunku, na którym fig. 1 przedstawia tame w wyrobisku z obudowa lukowa w widoku z przodu, fig. 2 — taka sama tame w wyrobisku o przekroju prostokatnym, a fig. 3 — tame w pionowym przekroju poprzecznym wzdluz linii A-A zaznaczonej na fig. 2 Jak uwidoczniono na rysunku tama wentylacyjna wedlug wynalazku sklada sie ze stalowej ramy 1 i z elastycznych wykladzin 2 obejmujacych te rame ze wszystkich stron. Rama 1 zlozonajest2 123778 ze stalowych ksztaltowników polaczonych ze soba rozlacznie za pomoca lubków 3 i sciagajacych srub 4. Ponadto wszystkie powierzchnie zewnetrzne tamy sa pokryte metalowa siatka 5 i ochron¬ nym tynkiem 6. Tamewedlug wynalazku wykonuje sie w nastepujacy sposób. Po wykonaniu wrebu najpierw na spagu wyrobiska uklada sie warstwe elastycznych wykladzin 2 najkorzystniej z impregnowanego drewna w postaci podkladów kolejowych. Nastepnie na tej warstwie ustawia sie rame 1, po czym wszystkie wolne przestrzenie pomiedzy rama i ociosami oraz stropem wyrobiska wypelnia-sie wykladzinami 2. Wykladziny te uklada warstwami przekladanymi zaprawa wapienna lui z gliny.Na koniec zas wszystkie powierzchnie zewnetrzne tamy pokrywa sie siatka metalowa 5 i warstwa tynku 6 izolujacego drewno od atmosfery kopalnianej.Ze wzgledu na bardzo duza odpornosc na cisnienie górotworu tama wentylacyjna wedlug wynalazku nadaje sie do stosowania wszedzie tam, gdzie wystepuja znaczne deformacje wyrobisk korytarzowych.Zastrzezenie patentowe Tama wentylacyjna dla podziemnych wyrobisk korytarzowych narazonych na duze cisnienie górotworu, znamienna tym, ze ma prostokatna rame (1) zlozona z metalowych ksztaltowników polaczonych ze soba srubami sciagajacymi (4) oraz elastyczne wykladziny (2) obejmujace te rame ze wszystkich stron, które to wykladziny maja powierzchnie zewnetrzne pokryte metalowa siatka (5) i ochronnym tynkiem (6).Rg.1123 778 ¦¦'I ¦!'¦ivl.-1 I I-I l-;ll iw-U ki-istttj O! PLThe subject of the invention is a safety ventilation dam intended for common mining excavations exposed to high rock mass pressure. Ventilation dams commonly used in mining undergrounds for long-term use are usually built of brick or concreteite. On the other hand, in places where there is an increased pressure of the rock mass, the horizontal layers of the wall are translated with layers of elastic material. Such a structure of the dam fulfills its task well only in the presence of moderate mass rock pressure. Unfortunately, along with the increase in the depth of exploitation, the pressure of the rock mass and the structures of ventilation dams located, especially in the vicinity of dislocations or places adjacent to mining fields or old goafs, are exposed to deformations resulting in an increase in the rock mass pressure. In such conditions, even a dam with elastic inlays quickly deteriorates and ceases to fulfill its task. Until now, the damaged or deformed dam was dismantled and in its place a new dam was built, which after some time had to be rebuilt again. These inconveniences are completely removed by the ventilation dam, which is the subject of the present invention. The essence of this dam is based on the use of a rectangular frame made of steel sections joined together in a detachable manner and flexible linings with high crushing strength. These carpets cover the entire space between the frame and the side walls, spag and the roof of the excavation. Moreover, all external surfaces of the dam are covered with a metal mesh and a layer of protective plaster. A ventilation dam with such a structure is very resistant to the pressure of the rock mass, and especially to its dynamic impacts called tapania. Thanks to the use of a frame made of steel sections, a constant cross-section of the dam was obtained even with very high pressure of the rock mass surrounding the dam. in which fig. 1 shows the tame in the excavation with a hatch casing in a front view, fig. 2 - the same tame in the working with a rectangular cross-section, and fig. 3 - the same in a vertical cross section along the line AA marked in fig. 2 as shown in the drawing, the ventilation dam according to the invention consists of a steel frame 1 and flexible linings 2 surrounding the frame on all sides. The frame 1 is composed of 123778 steel profiles connected to each other by means of loves 3 and tightening screws 4. Moreover, all external surfaces of the dam are covered with a metal mesh 5 and a protective plaster 6. The invention is carried out in the following manner. After making the notch, first on the bottom of the excavation a layer of elastic coverings 2 is laid, preferably made of impregnated wood in the form of railway sleepers. Then, on this layer, frame 1 is set, and then all free spaces between the frame and the side walls and the roof of the excavation are filled with carpets 2. These carpets are laid with layers of lime mortar or clay. Finally, all external surfaces of the dam are covered with a metal mesh 5 and a layer of plaster 6 isolating the wood from the mine atmosphere. Due to the very high pressure resistance of the rock mass, the ventilation dam according to the invention is suitable for use wherever there are significant deformations of the corridor workings. characterized in that it has a rectangular frame (1) composed of metal profiles joined together by tightening screws (4) and flexible linings (2) covering the frame on all sides, the linings having outer surfaces covered with a metal mesh (5) and a protective with plaster (6) .Rg. 1123 778 ¦¦ ' I ¦! '¦ivl.-1 I I-I l-; ll iw-U ki-istttj O! PL

Claims (1)

1. Zastrzezenie patentowe Tama wentylacyjna dla podziemnych wyrobisk korytarzowych narazonych na duze cisnienie górotworu, znamienna tym, ze ma prostokatna rame (1) zlozona z metalowych ksztaltowników polaczonych ze soba srubami sciagajacymi (4) oraz elastyczne wykladziny (2) obejmujace te rame ze wszystkich stron, które to wykladziny maja powierzchnie zewnetrzne pokryte metalowa siatka (5) i ochronnym tynkiem (6). Rg.1123 778 ¦¦'I ¦!'¦ivl.-1 I I-I l-;ll iw-U ki-istttj O! PL1. Patent claim Ventilation dam for underground corridors exposed to high rock mass pressure, characterized by the fact that it has a rectangular frame (1) composed of metal profiles connected with each other by tightening screws (4) and flexible linings (2) covering the frame from all sides which coverings have outer surfaces covered with a metal mesh (5) and a protective plaster (6). Rg. 1123 778 ¦¦'I ¦! '¦ivl.-1 I I-I l-; ll iw-U ki-istttj O! PL
PL22533480A 1980-06-30 1980-06-30 Ventilation dam for mine workings of high formation pressure PL123778B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL22533480A PL123778B2 (en) 1980-06-30 1980-06-30 Ventilation dam for mine workings of high formation pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL22533480A PL123778B2 (en) 1980-06-30 1980-06-30 Ventilation dam for mine workings of high formation pressure

Publications (2)

Publication Number Publication Date
PL225334A2 PL225334A2 (en) 1981-05-22
PL123778B2 true PL123778B2 (en) 1982-11-30

Family

ID=20003965

Family Applications (1)

Application Number Title Priority Date Filing Date
PL22533480A PL123778B2 (en) 1980-06-30 1980-06-30 Ventilation dam for mine workings of high formation pressure

Country Status (1)

Country Link
PL (1) PL123778B2 (en)

Also Published As

Publication number Publication date
PL225334A2 (en) 1981-05-22

Similar Documents

Publication Publication Date Title
PL123778B2 (en) Ventilation dam for mine workings of high formation pressure
US3469405A (en) Mine water barrier
US1646113A (en) Construction of buildings
SU842137A1 (en) Method of making a counter-filtration curtain
RU2166591C2 (en) Facing of building walls
JPS56159419A (en) Continuous underground wall and construction thereof
RU1800037C (en) Method for formation of large underground room
SU896196A1 (en) Large-panel building constructed on poor soil
‘Adawi Jerusalem, el-‘Isawiya
JPS57116835A (en) Construction of structure with basement
SU787593A1 (en) Bridge for openings in external walls of brick buildings
SU958594A1 (en) Prefabricated-monolythic wall in soil
PL170528B1 (en) Method of making a mining insulating dam
PL203590B1 (en) Method of stiffening flexible hatches of the lining of corridor workings
SU541952A1 (en) Building element
SU1382964A1 (en) Tunnel lining
US1891724A (en) Masonry joint
PL61509B1 (en)
GB191415801A (en) Improvements in or relating to the Building of Waterproof Tunnels.
SU1483015A1 (en) Lining of shallow hydraulic engineering tunnel
PL187614B1 (en) Method of and material for providing fire-proofing insulation of mine workings
Dallasheh Bet Shemesh, Ramat Bet Shemesh M3
JPS5625522A (en) Construction of prefabricated underground room
SU1113465A1 (en) Underground structure finishing
PL136951B1 (en) Yeldable water-tight shaft lining of prefabricated members