PL112221B1 PL20016377A PL20016377A PL112221B1 PL 112221 B1 PL112221 B1 PL 112221B1 PL 20016377 A PL20016377 A PL 20016377A PL 20016377 A PL20016377 A PL 20016377A PL 112221 B1 PL112221 B1 PL 112221B1
Authority
PL
Poland
Prior art keywords
transformers
current
windings
phase
secondary windings
Prior art date
Application number
PL20016377A
Other languages
Polish (pl)
Other versions
PL200163A1 (en
Inventor
Aleksy Kurbiel
Jacek Senkowski
Maciej Mickowski
Jozef Cegla
Original Assignee
Akad Gorniczo Hutnicza
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Akad Gorniczo Hutnicza filed Critical Akad Gorniczo Hutnicza
Priority to PL20016377A priority Critical patent/PL112221B1/en
Publication of PL200163A1 publication Critical patent/PL200163A1/en
Publication of PL112221B1 publication Critical patent/PL112221B1/en

Links

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Description

Przedmiotem wynalazku jest uklad do pomiaru pradów pieca lukowego.Stan techniki. Dotychczas prady luków, malych pieców lukowych mierzy sie najczesciej za pomoca przekladników pradowych zainstalowanych na torze wielkopradowym. Pomiar taki jest obarczony du¬ zym bledem, wynikajacym z silnych pól magnety¬ cznych, wywolanych przez prady w torze wielko¬ pradowym. Przy piecach o duzych pradach znamio¬ nowych, nie stosuje sie przekladników pradowych na torze wielkopradowym. Na takich piecach prady luków mierzy sie za pomoca przekladników zain¬ stalowanych po stronie pierwotnej transformatora piecowego. W czasie pracy pieca uzwojenie pier¬ wotne transformatora piecowego jest przelaczone z trójkata w gwiazde, natomiast uzwojenia wtórne sa polaczone na stale w trójkat lub w gwiazde.Z tego powodu przy pomiarze pradu luku za po¬ moca przekladników pradowych, zainstalowanych po stronie pierwotnej transformatora, nalezy zmie¬ nic uklad polaczen tych przekladników przy zmia¬ nie ukladu polaczen transformatora.Istota wynalazku. Uklad do pomiaru pradów pie¬ ca lukowego zawiera przekladniki pradowe zain¬ stalowane po stronie pierwotnej transformatora pie¬ cowego o ukladzie polaczen D—Y/d. Uzwojenia wtó¬ rne pradowych przekladników sieciowych zlaczone szeregowo z uzwojeniami pierwotnymi pradowych przekladników fazowych, sa polaczone w trójkat.Wierzcholki trójkata sa polaczone z poczatkami 10 15 20 25 30 pierwotnych uzwojen pradowych przekladników przewodowych, których konce sa zlaczone w gwiaz¬ de. Uzwojenia wtórne pradowych przekladników fa¬ zowych i pradowych przekladników przewodowych sa polaczone z wejsciami prostowników i ze sty¬ kami trójfazowego przelacznika. Wyjscia skojarzo¬ nych par prostowników sa zlaczone z rezystorami.Inny uklad do pomiaru pradów pieca lukowego, zawiera przekladniki pradowe zainstalowane po stronie pierwotnej transformatora piecowego o u- kladzie polaczen D—Y/y. Do polaczonych w gwia¬ zde uzwojen wtórnych pradowych przekladników sieciowych sa przylaczone poczatki uzwojen pier¬ wotnych pradowych przeksztaltników przewodo¬ wych, zas konce tych uzwojen sa polaczone z wie¬ rzcholkami trójkata utworzonego przez uzwojenia pierwotne pradowych przekladników fazowych.Uzwojenia wtórne pradowych przekladników prze¬ wodowych i pradowych przekladników fazowych sa polaczone z wejsciami prostowników i ze stykami trójfazowego przelacznika. Wyjscia skojarzonych par prostowników sa zlaczone rezystorami. Styki trójfazowego przelacznika w jednym polozeniu zwie¬ raja uzwojenia wtórne pradowych przekladników fazowych, a w drugim polozeniu przelacznika, styki zwieraja uzwojenia wtórne pradowych przekladni¬ ków przewodowych.Objasnienie rysunku. Przedmiot wynalazku jest uwidoczniony w przykladowym wykonaniu na ry¬ sunku, na którym fig. 1 przedstawia schemat ukla- U2 221112 221 3 4 du stosowanego przy transformatorze piecowym o uzwojeniu pierwotnym przelaczalnym z trójkata w gwiazda i uzwojeniu wtórnym polaczonym w trój¬ kat, fig. 2 — schemat ukladu stosowanego przy transformatorze piecowym o uzwojeniu pierwotnym przelaczalnym z trójkata w gwiazde i uzwojeniu wtórnym polaczonym w gwiazde.Przyklad wykonania. Uklad zawiera trzy prado¬ we przekladniki sieciowe Pi, P2, Pa zainstalowane po stronie pierwotnej transformatora piecowego o ukladzie polaczen D—Y/d. Uzwojenia wtórne pra¬ dowych przekladników sieciowych Pi, P2 i P3, zla¬ czone szeregowo z uzwojeniami pierwotnymi pra¬ dowych przekladników fazowych Pfi, Pf2, Pf3, sa polaczone w trójkat. Wierzcholki utworzonego trój¬ kata sa polaczone i poczatkami pierwotnych uzwo¬ jen pradowych przekladników przewodowych Ppi, Pp2, Pp3, których konce uzwojen pierwotnych sa polaczone w gwiazde. Uzwojenia wtórne pradowych przekladników fazowych Pfi, Pf2, Pf3 sa polaczone z wejsciami prostowników Mfi, Mf2, Mf3, a wtórne uzwojenia pradowych przekladników przewodo¬ wych Ppi, Pp2, Pp3 sa polaczone z wejsciami pro¬ stowników Mpi, Mp2, Mp8. Zlaczone wyjscia pro¬ stowników Mpi—Mfi, MP2—Mf2 i MP3—Mf3 sa po¬ laczone z rezystorami Ri, R2, R3, zwierajacymi ich wyjscia. Uzwojenia wtórne pradowych przekladni¬ ków fazowych Pfi, Pf2, Pf3 i uzwojenia wtórne pra¬ dowych przekladników przewodowych Ppi, Pp2, Pp3 sa polaczone ze stykami przelacznika S.Inny uklad zawiera trzy pradowe przekladniki sieciowe Pi, P2, P3 zainstalowane po stronie pier¬ wotnej transformatora piecowego o ukladzie pola¬ czen D—Y/y, Uzwojenia wtórne pradowych prze¬ kladników sieciowych Pi, P2, P3 sa zlaczone w gwia¬ zde, a ich poczatki sa polaczone, poprzez uzwoje¬ nia pierwotne pradowych przekladników przewo¬ dowych Ppi, Pp2, Pp3 z wierzcholkami trójkata, utworzonego przez uzwojenia pierwotne pradowych przeksztaltników fazowych Pfi, Pf2, Pf3. Uzwojenia wtórne pradowych przekladników przewodowych Ppi, PP2, PPs sa polaczone z wejsciami prostowni¬ ków Mpi, Mp2, Mp3 i ze stykami przelacznika S.Uzwojenia wtórne pradowych przekladników fazo¬ wych Pfi, Pf2, Pf8 sa polaczone z prostownikami Mpi, Mp2, Mp3 i ze stykami przelacznika S. Wyjscia skojarzonych par prostowników Mpi, Mfi, Mp2, Mf2, Mp3, Mf8 sa polaczone z rezystorami Ri, R2, R3.Styki trójfazowego przelacznika S w jednym po¬ lozeniu zawieraja uzwojenia wtórne pradowych przekladników fazowych Pfi, Pf2, Pf3 a w drugim polozeniu styki przelacznika S zwieraja uzwojenia wtórne pradowych przekladników przewodowych PPt, Pp2, Pp8.Dzialanie ukladu do pomiaru pradów pieca luko¬ wego, polega na tym, ze mierzy sie prady po stronie pierwotnej transformatora piecowego i przetwarza sie je na sygnaly napiec wyprostowanych. Gdy tran¬ sformator jest polaczony w ukladzie D/d, to prady luków mierzy sie przekladnikami fazowymi Pfi, Pf2, Pf8, zas uzwojenia wtórne przekladników Ppi, Pp* PPs sa zwarte stykami przelacznika S. Po prze¬ laczeniu transformatora do ukladu Y/d, prady lu¬ ków mierzy sie przekladnikami przewodowymi Ppi, Pp2, Pps gdyz przelacznikiem S zwiera sie prze¬ kladniki fazowe Pfi, Pf2, Pf8. Na rezystorach Ri, R2, R3 wlaczonych na wyjscia skojarzonych prosto- 5 wników Mpi, Mfi, Mp2, IVtf2, Mp3, Mf3 wywoluje sie napiecie wyprostowane, proporcjonalne do pradów pieca, niezaleznie od ukladu polaczen transformato¬ ra piecowego. Poza tym wartosci tych. napiec zmie¬ niaja sie wraz ze zmiana zaczepów transformatora piecowego i stalym pradzie pieca w takim samym stopniu, w jakim zmieniaja sie napiecia wtórne transformatora. Wlasciwosc ta jest korzystna ze wzgledu na automatyke przesuwu elektrod pieca, w której nastepuje porównanie sygnalów napiec proporcjonalnych do pradu i do napiecia pieca.Zastrzezenia patentowe 1. Uklad do pomiaru pradów pieca lukowego, za¬ wierajacy przekladniki pradowe zainstalowane po stronie pierwotnej transformatora piecowego o ukladzie polaczen D—Y/d, znamienny tym, ze uzwojenia wtórne pradowych przekladników sie¬ ciowych (Pi, P2, P3), zlaczone szeregowo z uzwoje¬ niami pierwotnymi pradowych przekladników fazo¬ wych (Pfi, Pf2, Pf8), sa polaczone w trójkat, którego wierzcholki sa polaczone z poczatkami pierwotnych uzwojen pradowych przekladników przewodowych (Ppi, Pp2, Pp3), których konce sa zlaczone w gwiaz¬ de, zas uzwojenia wtórne pradowych przekladni¬ ków fazowych (Pfi, Pf2, Pf3) i uzwojenia wtórne pradowych przekladników przewodowych (Ppi, Pp2, PPa) sa polaczone z wejsciami prostowników (Mpi, Mp2, Mp3, Mfi, Mf2, Mf3) i ze stykami trójfazowego przelacznika (S), przy czym wyjscia skojarzonych par prostowników (Mpi, Mfi) (Mp2, Mf2) (Mp8, Mf3) sa zlaczone rezystorami (Ri, R2, R3). 2. Uklad do pomiaru pradów pieca lukowego, za¬ wierajacy przekladniki pradowe zainstalowane po stronie pierwotnej transformatora piecowego o ukladzie polaczen D—Y/y, znamienny tym, ze do po¬ laczonych w gwiazde uzwojen wtórnych pradowych przekladników sieciowych (Pi, P2, P3) sa przyla¬ czone poczatki uzwojen pierwotnych pradowych przeksztaltników przewodowych (Ppi, Pp2, Pp3), zas konce tych uzwojen sa polaczone z wierzcholkami trójkata, utworzonego przez uzwojenia pierwotne pradowych przekladników fazowych (Pfi, Pf2, Pf8), przy czym uzwojenia wtórne pradowych przekla¬ dników przewodowych (Ppi, Pp2, Pp3) i pradowych przekladników fazowych (Pfi, Pf2, Pf3) sa polaczo- ne z wejsciami prostowników (Mfx Mf2 Mf8 Mpi Mp2 Mp3) i ze stykami trójfazowego przelacznika (S), ponadto wyjscia skojarzonych par prostowników (Mpi—Mfj) (Mp2—Mf2) (Mpj—Mf8) sa zlaczone re¬ zystorami (Ri, R2, R8). 3. Uklad wedlug zastrz. 1 albo 2, znamienny tym, ze styki trójfazowego przelacznika (s) w jed¬ nym polozeniu zawieraja wtórne uzwojenia prado¬ wych przekladników fazowych (Pfi, Pf2, Pf8) a w drugim polozeniu przelacznika (S) jego styki zwieraja wtórne uzwojenia pradowych przeklad¬ ników przewodowych (Ppi, Pp2, Pp8). 15 20 25 30 30 40 45 50 55112 221 , "£i s\ / h 51 /vj /r^J K F,g. / =d wm nK *£- * 5/ ll M o ro 52 3 i /* nn ftft fffz Fig. 2. tipi PLThe subject of the invention is a system for measuring the currents of an arc furnace. State of the art. Until now, the currents of hatching and small arc furnaces are usually measured using current transformers installed on a high-beam track. Such a measurement is very error-prone, resulting from strong magnetic fields caused by currents in the high-current path. With furnaces with high rated currents, current transformers on the high-voltage track are not used. In such furnaces, the arc currents are measured by means of transformers installed on the primary side of the furnace transformer. During operation of the furnace, the primary winding of the furnace transformer is switched from a triangle to a star, while the secondary windings are permanently connected in a triangle or a star. For this reason, when measuring the arc current by means of the current transformers installed on the primary side of the transformer, the connection arrangement of these transformers should be changed when the transformer connection arrangement is changed. Summary of the invention. The circuit for measuring the arc furnace currents includes the current transformers installed on the primary side of the furnace transformer with the D-Y / d connection system. The secondary windings of the line current transformers, connected in series with the primary windings of the phase transformers, are connected in a triangle. The vertices of the triangle are connected to the beginnings of 10 15 20 25 30 primary current windings of line transformers, the ends of which are joined in a star. The secondary windings of the phase and line current transformers are connected to the rectifier inputs and to the contacts of the three-phase switch. The outputs of the associated pairs of rectifiers are connected to resistors. Another system for measuring the currents of the arc furnace includes the current transformers installed on the primary side of the furnace transformer with the D-Y / y connection pattern. The beginnings of the primary windings of the line transformers are connected to the star-connected secondary windings of the current line transformers, and the ends of these windings are connected to the circles of the triangle formed by the primary windings of the current phase transformers. and current phase transformers are connected to the rectifier inputs and to the contacts of the three-phase switch. The outputs of the associated rectifier pairs are connected by resistors. The contacts of the three-phase switch in one position close the secondary windings of the phase current transformers, and in the other position of the switch, the contacts close the secondary windings of the line current transformers. The subject matter of the invention is illustrated in an exemplary embodiment in the drawing, in which Fig. 1 shows a diagram of a U2 221112 221 3 4 duo used for a furnace transformer with a star-delta-switched primary winding and a triple-connected secondary winding, Fig. 2 - diagram of a circuit used for a furnace transformer with a star triangle switching primary winding and a star-connected secondary winding. The system includes three current network transformers Pi, P2, Pa installed on the primary side of a furnace transformer with the D-Y / d connection system. The secondary windings of the current line transformers Pi, P2 and P3, connected in series with the primary windings of the Pfi, Pf2, and Pf3 phase transformers, are connected in a triangle. The vertices of the formed triangle are connected and with the beginnings of the primary windings of the line transformers Ppi, Pp2, Pp3, the ends of the primary windings of which are connected in a star. The secondary windings of the Pfi, Pf2, Pf3 phase transformers are connected to the inputs of the rectifiers Mfi, Mf2, Mf3, and the secondary windings of the line current transformers Ppi, Pp2, Pp3 are connected to the inputs of the rectifiers Mpi, Mp2, Mp8. The combined outputs of the rectifiers Mpi-Mfi, MP2-Mf2 and MP3-Mf3 are connected to the resistors Ri, R2, R3, shorting their outputs. The secondary windings of the Pfi, Pf2, Pf3 phase transformers and the secondary windings of the line current transformers Ppi, Pp2, Pp3 are connected with the contacts of the switch S. Another system includes three network current transformers Pi, P2, P3 installed on the primary side a furnace transformer with a D-Y / y connection system, the secondary windings of the current line transformers Pi, P2, P3 are connected into stars, and their beginnings are connected through the primary windings of the Ppi line current transformers, Pp2, Pp3 with the tops of a triangle formed by the primary windings of the current phase transformers Pfi, Pf2, Pf3. The secondary windings of the line current transformers Ppi, PP2, PPs are connected to the inputs of the rectifiers Mpi, Mp2, Mp3 and the contacts of the switch S. Secondary windings of the phase current transformers Pfi, Pf2, Pf8 are connected to the rectifiers Mpi, Mp2, Mp3 and with the contacts of switch S. The outputs of the associated pairs of rectifiers Mpi, Mfi, Mp2, Mf2, Mp3, Mf8 are connected with the resistors Ri, R2, R3. The contacts of the three-phase switch S in one position contain the secondary windings of the current phase transformers Pfi, Pf2, Pf3 In the second position, the contacts of the switch S short-circuit the secondary windings of the line current transformers PPt, Pp2, Pp8. The operation of the circuit for measuring the arc furnace currents is based on the fact that the currents on the primary side of the furnace transformer are measured and converted into rectified voltage signals. When the transformer is connected in the D / d system, the arc currents are measured with the phase transformers Pfi, Pf2, Pf8, while the secondary windings of Ppi, Pp * PPs are shorted with the contacts of the switch S. After switching the transformer to the Y / d system , the arcing currents are measured with the line transformers Ppi, Pp2, Pps, because the switch S includes the phase transformers Pfi, Pf2, Pf8. On the resistors Ri, R2, R3 connected to the outputs of the associated rectifiers Mpi, Mfi, Mp2, IVtf2, Mp3, Mf3 a rectified voltage is generated, proportional to the furnace currents, irrespective of the connection system of the furnace transformer. Besides the value of these. The voltages change with the change of the taps of the furnace transformer and the constant current of the furnace to the same extent as the secondary voltages of the transformer. This property is advantageous due to the automatic movement of the furnace electrodes, in which the comparison of voltage signals proportional to the current and to the furnace voltage is carried out. Patent claims 1. System for measuring the arc furnace currents, containing the current transformers installed on the primary side of the furnace transformer with the D-Y / d connection, characterized in that the secondary windings of network current transformers (Pi, P2, P3), connected in series with the primary windings of phase current transformers (Pfi, Pf2, Pf8), are connected in a triangle whose tops are connected to the beginnings of the primary windings of line transformers (Ppi, Pp2, Pp3), the ends of which are joined into a star, and the secondary windings of the current phase transformers (Pfi, Pf2, Pf3) and the secondary windings of the line current transformers (Ppi, Pp2, PPa) are connected to the rectifier inputs (Mpi, Mp2, Mp3, Mfi, Mf2, Mf3) and to the contacts of the three-phase switch (S), the outputs and aa of the associated rectifier pairs (Mpi, Mfi) (Mp2, Mf2) (Mp8, Mf3) are connected by resistors (Ri, R2, R3). 2. A circuit for measuring the arc furnace currents containing the current transformers installed on the primary side of the furnace transformer with the D-Y / y connection system, characterized in that for star-connected secondary windings of current network transformers (Pi, P2, P3 ) are connected to the beginnings of the primary windings of line current transformers (Ppi, Pp2, Pp3), while the ends of these windings are connected to the tips of the triangle formed by the primary windings of the phase current transformers (Pfi, Pf2, Pf8), while the secondary windings of the current transformers are The conductors (Ppi, Pp2, Pp3) and the current phase transformers (Pfi, Pf2, Pf3) are connected to the rectifier inputs (Mfx Mf2 Mf8 Mpi Mp2 Mp3) and to the contacts of the three-phase switch (S), in addition to the outputs of the associated rectifier pairs (Mpi — Mfj) (Mp2 — Mf2) (Mpj — Mf8) are connected by resistors (Ri, R2, R8). 3. System according to claim A method according to claim 1 or 2, characterized in that the contacts of the three-phase switch (s) in one position contain the secondary windings of the phase current transformers (Pfi, Pf2, Pf8) and in the other position of the switch (S) its contacts close the secondary windings of the current transformers wired (Ppi, Pp2, Pp8). 15 20 25 30 30 40 45 50 55 112 221, "£ is \ / h 51 / vj / r ^ JKF, g. / = D wm nK * £ - * 5 / ll M o ro 52 3 i / * nn ftft fffz Fig. 2. tipi PL

Claims (2)

Zastrzezenia patentowe 1. Uklad do pomiaru pradów pieca lukowego, za¬ wierajacy przekladniki pradowe zainstalowane po stronie pierwotnej transformatora piecowego o ukladzie polaczen D—Y/d, znamienny tym, ze uzwojenia wtórne pradowych przekladników sie¬ ciowych (Pi, P2, P3), zlaczone szeregowo z uzwoje¬ niami pierwotnymi pradowych przekladników fazo¬ wych (Pfi, Pf2, Pf8), sa polaczone w trójkat, którego wierzcholki sa polaczone z poczatkami pierwotnych uzwojen pradowych przekladników przewodowych (Ppi, Pp2, Pp3), których konce sa zlaczone w gwiaz¬ de, zas uzwojenia wtórne pradowych przekladni¬ ków fazowych (Pfi, Pf2, Pf3) i uzwojenia wtórne pradowych przekladników przewodowych (Ppi, Pp2, PPa) sa polaczone z wejsciami prostowników (Mpi, Mp2, Mp3, Mfi, Mf2, Mf3) i ze stykami trójfazowego przelacznika (S), przy czym wyjscia skojarzonych par prostowników (Mpi, Mfi) (Mp2, Mf2) (Mp8, Mf3) sa zlaczone rezystorami (Ri, R2, R3). 2. Uklad do pomiaru pradów pieca lukowego, za¬ wierajacy przekladniki pradowe zainstalowane po stronie pierwotnej transformatora piecowego o ukladzie polaczen D—Y/y, znamienny tym, ze do po¬ laczonych w gwiazde uzwojen wtórnych pradowych przekladników sieciowych (Pi, P2, P3) sa przyla¬ czone poczatki uzwojen pierwotnych pradowych przeksztaltników przewodowych (Ppi, Pp2, Pp3), zas konce tych uzwojen sa polaczone z wierzcholkami trójkata, utworzonego przez uzwojenia pierwotne pradowych przekladników fazowych (Pfi, Pf2, Pf8), przy czym uzwojenia wtórne pradowych przekla¬ dników przewodowych (Ppi, Pp2, Pp3) i pradowych przekladników fazowych (Pfi, Pf2, Pf3) sa polaczo- ne z wejsciami prostowników (Mfx Mf2 Mf8 Mpi Mp2 Mp3) i ze stykami trójfazowego przelacznika (S), ponadto wyjscia skojarzonych par prostowników (Mpi—Mfj) (Mp2—Mf2) (Mpj—Mf8) sa zlaczone re¬ zystorami (Ri, R2, R8). 3. Uklad wedlug zastrz. 1 albo 2, znamienny tym, ze styki trójfazowego przelacznika (s) w jed¬ nym polozeniu zawieraja wtórne uzwojenia prado¬ wych przekladników fazowych (Pfi, Pf2, Pf8) a w drugim polozeniu przelacznika (S) jego styki zwieraja wtórne uzwojenia pradowych przeklad¬ ników przewodowych (Ppi, Pp2, Pp8). 15 20 25 30 30 40 45 50 55112 221 , "£i s\ / h 51 /vj /r^J K F,g. / =d wm nK *£- * 5/ ll M o ro 52 3 i /* nn ftft fffz Fig.Claims 1. A system for measuring the arc furnace currents, containing the current transformers installed on the primary side of the furnace transformer with the D-Y / d connection system, characterized by the fact that the secondary windings of current mains transformers (Pi, P2, P3), connected in series with the primary windings of phase current transformers (Pfi, Pf2, Pf8), they are connected in a triangle whose vertices are connected to the beginnings of the primary current windings of line transformers (Ppi, Pp2, Pp3), the ends of which are joined in a star While the secondary windings of the phase current transformers (Pfi, Pf2, Pf3) and the secondary windings of the line current transformers (Ppi, Pp2, PPa) are connected to the rectifier inputs (Mpi, Mp2, Mp3, Mfi, Mf2, Mf3) and with the contacts of a three-phase switch (S), the outputs of the associated rectifier pairs (Mpi, Mfi) (Mp2, Mf2) (Mp8, Mf3) are connected by resistors (Ri, R2, R3). 2. A circuit for measuring the arc furnace currents containing the current transformers installed on the primary side of the furnace transformer with the D-Y / y connection system, characterized in that for star-connected secondary windings of current network transformers (Pi, P2, P3 ) are connected to the beginnings of the primary windings of line current transformers (Ppi, Pp2, Pp3), while the ends of these windings are connected to the tips of the triangle formed by the primary windings of the phase current transformers (Pfi, Pf2, Pf8), while the secondary windings of the current transformers are The conductors (Ppi, Pp2, Pp3) and the current phase transformers (Pfi, Pf2, Pf3) are connected to the rectifier inputs (Mfx Mf2 Mf8 Mpi Mp2 Mp3) and to the contacts of the three-phase switch (S), in addition to the outputs of the associated rectifier pairs (Mpi — Mfj) (Mp2 — Mf2) (Mpj — Mf8) are connected by resistors (Ri, R2, R8). 3. System according to claim A method according to claim 1 or 2, characterized in that the contacts of the three-phase switch (s) in one position contain the secondary windings of the phase current transformers (Pfi, Pf2, Pf8) and in the other position of the switch (S) its contacts close the secondary windings of the current transformers wired (Ppi, Pp2, Pp8). 15 20 25 30 30 40 45 50 55 112 221, "£ is \ / h 51 / vj / r ^ JKF, g. / = D wm nK * £ - * 5 / ll M o ro 52 3 i / * nn ftft fffz Fig. 2. tipi PL2. tipi PL
PL20016377A 1977-08-09 1977-08-09 System for current measurement in arc furnace PL112221B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL20016377A PL112221B1 (en) 1977-08-09 1977-08-09 System for current measurement in arc furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL20016377A PL112221B1 (en) 1977-08-09 1977-08-09 System for current measurement in arc furnace

Publications (2)

Publication Number Publication Date
PL200163A1 PL200163A1 (en) 1979-03-12
PL112221B1 true PL112221B1 (en) 1980-10-31

Family

ID=19984028

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20016377A PL112221B1 (en) 1977-08-09 1977-08-09 System for current measurement in arc furnace

Country Status (1)

Country Link
PL (1) PL112221B1 (en)

Also Published As

Publication number Publication date
PL200163A1 (en) 1979-03-12

Similar Documents

Publication Publication Date Title
BR112017008629B1 (en) TRANSFORMER TESTING DEVICE, SYSTEM AND METHOD FOR TESTING A TRANSFORMER
BR112016025925B1 (en) PROCESS AND DEVICE FOR TESTING A TRANSFORMER TAP SWITCH
CN106461737B (en) Transformer testing method, electrical testing system, short circuit and anode assembly
PL112221B1 (en) System for current measurement in arc furnace
CN107422247A (en) A kind of signal amplifier automatic test circuit
CN113791344B (en) Switching test loop and method for switching current of high-voltage isolating switch
US20170138994A1 (en) Checking a multi-pole electrical circuit breaker
Bosneaga et al. The peculiarities of the steady state modes of medium voltage cables grid at various neutral grounding and single-phase to ground failure
Zubić et al. Managing post-fault oscillation phenomenon in compensated MV-networks
Czapp et al. A new method of fault loop resistance measurement in low voltage systems with residual current devices
US3398357A (en) Circuit breaker testing circuits in which a normally closed pair of contacts in a high current path short circuits a high recovery voltage source and another pair of normally closed contacts forms a low impedance shunt circuit across the high voltage source until both pairs of contacts are opened
CN105092956B (en) Power Systems factor measurement apparatus, method and its system
CN205178317U (en) Take simple and easy power distribution box of phase sequence error indication
SU788032A1 (en) Method of measuring resistance of three-phase transformer windings
KR20160147966A (en) Method and device for testing a tap changer of a transformer
CN205038309U (en) Cooperation thyristor selects load circuit of looks controller use
Gosland Restriking-voltage characteristics under various fault conditions at typical points on the network of a large city supply authority
SU570118A1 (en) Device for testing contactors
RU1812507C (en) Method for determining single phase fault-to-ground current in insulated neutral network
US2989696A (en) Watt-hour meter testing circuit
US3178642A (en) Electrical testers having means for supplying three-phase voltage of adjustable magnitude and polarity for testing polyphase electrical apparatus
SU864408A1 (en) Method of single-phase automatic reconnection of power transmission line
US800538A (en) Apparatus for use in the distribution of alternating electric currents.
RU2640036C1 (en) Method of adjusting current protection on hermetic contacts
SU118917A1 (en) Device for reproducing characteristics of electric modes of three-phase arc steel-smelting furnaces