Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Antonio Honki S CofiledCriticalAntonio Honki S Co
Priority to PH22018050366UpriorityCriticalpatent/PH22018050366U1/en
Publication of PH22018050366Y1publicationCriticalpatent/PH22018050366Y1/en
Publication of PH22018050366U1publicationCriticalpatent/PH22018050366U1/en
The present utility model relates to a method of post-tensioning building structures comprising the steps of forming a building structure by interconnecting at least pairs of first structural members and second structural members; installing provisional support elements on the at least pairs of interconnected first structural members and second structural members; post-tensioning the at least pairs of interconnected first structural members and second structural members; and dismantling the provisional steel support elements from the post-tensioned at least pairs of interconnected first structural members and second structural members to form a post tensioned structure.
PH22018050366U2018-08-212018-08-21A method of post-tensioning building structures
PH22018050366U1
(en)