NO990344L - FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske - Google Patents
FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæskeInfo
- Publication number
- NO990344L NO990344L NO990344A NO990344A NO990344L NO 990344 L NO990344 L NO 990344L NO 990344 A NO990344 A NO 990344A NO 990344 A NO990344 A NO 990344A NO 990344 L NO990344 L NO 990344L
- Authority
- NO
- Norway
- Prior art keywords
- sampling
- reservoir fluid
- well
- drilling
- analyzes
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 7
- 238000005259 measurement Methods 0.000 title abstract 6
- 238000005070 sampling Methods 0.000 title abstract 6
- 238000000034 method Methods 0.000 title abstract 2
- 238000005553 drilling Methods 0.000 abstract 4
- 229930195733 hydrocarbon Natural products 0.000 abstract 4
- 150000002430 hydrocarbons Chemical class 0.000 abstract 4
- 239000004215 Carbon black (E152) Substances 0.000 abstract 3
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B47/14—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves
- E21B47/16—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves through the drill string or casing, e.g. by torsional acoustic waves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/081—Obtaining fluid samples or testing fluids, in boreholes or wells with down-hole means for trapping a fluid sample
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Acoustics & Sound (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Sampling And Sample Adjustment (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Oppfinnelsen gjelder en fremgangsmåte for bruk ved prøveta- king og/eller strømnings-, mengdemåling, eventuelt annen ana- lyse, i reservoarvæske som påtreffes i en grunnformasj.on. (1) , f.eks. under boring av en letebrønn (3) for hydrokarboner. Formål med oppfinnelsen er bl.a. at prøvetakingen, strømning- og mengdemålingene eller de øvrige analyser skal utføres i reservoarvæske som befinner seg nede i det hydrokarbonførende sjikt (2), er mest mulig stabilisert og uten nevneverdig inn- hold av borevæske etter boringen. Dette er realisert på den måte at brønnen (3) avtettes i et område ved det hydrokarbon- førende sjikt (2) ved hjelp av pakninger (5, 6), at reservo- arvæske fra nevnte sjikt (2) tilføres i en borerørstreng (4) som anvendes under boringen og er ført gjennom det-avtettede område av brønnen (3), at prøvetakingen og de respektive må- linger eller analyser utføres i det avtettede område av brøn- nen (3) mens reservoarvæsken strømmer kontrollert inn i bore- rørstrengen (4), og at reservoarvæsken tilbakeføres fra boré- rørstrengen (4) til det hydrokarbonførende sjikt (2) etter avsluttet prøvetaking og respektive måling eller analyse. Prøvetakingen og de respektive målinger og analyser gjøres ved hjelp av utstyr (9, 10, 11, 12) som er anordnet i en hus- del (7) på borerørstrengen (4).
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO990344A NO990344L (no) | 1999-01-26 | 1999-01-26 | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
PCT/NO2000/000020 WO2000047870A1 (en) | 1999-01-26 | 2000-01-26 | A method for use in sampling and/or measuring in reservoir fluid |
AU25812/00A AU761645B2 (en) | 1999-01-26 | 2000-01-26 | A method for use in sampling and/or measuring in reservoir fluid |
GB0115689A GB2362221B (en) | 1999-01-26 | 2000-01-26 | A method for use in sampling and/or measuring in reservoir fluid |
US09/890,117 US6655457B1 (en) | 1999-01-26 | 2000-01-26 | Method for use in sampling and/or measuring in reservoir fluid |
US10/257,486 US20030155152A1 (en) | 1999-01-26 | 2001-04-09 | Method of conducting in situ measurements of properties of a reservoir fluid |
AU2001252774A AU2001252774A1 (en) | 1999-01-26 | 2001-04-09 | A method of conducting in situ measurements of properties of a reservoir fluid |
PCT/NO2001/000154 WO2001077489A1 (en) | 1999-01-26 | 2001-04-09 | A method of conducting in situ measurements of properties of a reservoir fluid |
NO20013120A NO326628B1 (no) | 1999-01-26 | 2001-06-22 | Fremgangsmate for nedihulls stromningsmaling og provetaking av reservoarfluid, |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO990344A NO990344L (no) | 1999-01-26 | 1999-01-26 | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
Publications (2)
Publication Number | Publication Date |
---|---|
NO990344D0 NO990344D0 (no) | 1999-01-26 |
NO990344L true NO990344L (no) | 2000-07-27 |
Family
ID=19902865
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO990344A NO990344L (no) | 1999-01-26 | 1999-01-26 | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
Country Status (5)
Country | Link |
---|---|
US (2) | US6655457B1 (no) |
AU (1) | AU761645B2 (no) |
GB (1) | GB2362221B (no) |
NO (1) | NO990344L (no) |
WO (1) | WO2000047870A1 (no) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO990344L (no) * | 1999-01-26 | 2000-07-27 | Bjoern Dybdahl | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
US7246664B2 (en) * | 2001-09-19 | 2007-07-24 | Baker Hughes Incorporated | Dual piston, single phase sampling mechanism and procedure |
GB2403488B (en) * | 2003-07-04 | 2005-10-05 | Flight Refueling Ltd | Downhole data communication |
GB2431010C (en) | 2003-09-29 | 2008-06-25 | Schlumberger Holdings | Method and system for conditioning a multiphase fluid stream. |
GB2410550B8 (en) * | 2003-12-04 | 2008-10-01 | Schlumberger Holdings | Fluids chain-of-custody |
US7379819B2 (en) * | 2003-12-04 | 2008-05-27 | Schlumberger Technology Corporation | Reservoir sample chain-of-custody |
US20050205301A1 (en) * | 2004-03-19 | 2005-09-22 | Halliburton Energy Services, Inc. | Testing of bottomhole samplers using acoustics |
US7834312B2 (en) | 2005-02-24 | 2010-11-16 | Weatherford/Lamb, Inc. | Water detection and 3-phase fraction measurement systems |
GB2432425B (en) | 2005-11-22 | 2008-01-09 | Schlumberger Holdings | Isokinetic sampling method and system for multiphase flow from subterranean wells |
US7367394B2 (en) | 2005-12-19 | 2008-05-06 | Schlumberger Technology Corporation | Formation evaluation while drilling |
NO20070851L (no) * | 2007-02-14 | 2008-08-15 | Statoil Asa | Formasjonstesting |
GB2447908B (en) | 2007-03-27 | 2009-06-03 | Schlumberger Holdings | System and method for spot check analysis or spot sampling of a multiphase mixture flowing in a pipeline |
WO2013105864A1 (en) | 2012-01-09 | 2013-07-18 | Sinvent As | Method and system for wireless in-situ sampling of a reservoir fluid |
CN103982176B (zh) * | 2014-06-04 | 2015-08-19 | 东北石油大学 | 一种电控存储式油井分层测压仪 |
WO2018075075A1 (en) * | 2016-10-21 | 2018-04-26 | Halliburton Energy Services, Inc. | Methods and systems for determining fluid density by distributed acoustic sensing |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3422672A (en) * | 1966-12-27 | 1969-01-21 | Exxon Production Research Co | Measurement of earth formation pressures |
CA1054911A (en) * | 1976-01-07 | 1979-05-22 | Exxon Production Research Company | Method for determining gas saturation in reservoirs |
US4392376A (en) * | 1981-03-31 | 1983-07-12 | S-Cubed | Method and apparatus for monitoring borehole conditions |
US4535843A (en) * | 1982-05-21 | 1985-08-20 | Standard Oil Company (Indiana) | Method and apparatus for obtaining selected samples of formation fluids |
US5095745A (en) * | 1990-06-15 | 1992-03-17 | Louisiana State University | Method and apparatus for testing subsurface formations |
US5201220A (en) * | 1990-08-28 | 1993-04-13 | Schlumberger Technology Corp. | Apparatus and method for detecting the presence of gas in a borehole flow stream |
CA2034444C (en) | 1991-01-17 | 1995-10-10 | Gregg Peterson | Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability |
DE69636665T2 (de) * | 1995-12-26 | 2007-10-04 | Halliburton Co., Dallas | Vorrichtung und Verfahren zur Frühbewertung und Unterhalt einer Bohrung |
NO305259B1 (no) * | 1997-04-23 | 1999-04-26 | Shore Tec As | FremgangsmÕte og apparat til bruk ved produksjonstest av en forventet permeabel formasjon |
NO990344L (no) * | 1999-01-26 | 2000-07-27 | Bjoern Dybdahl | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
US6330913B1 (en) * | 1999-04-22 | 2001-12-18 | Schlumberger Technology Corporation | Method and apparatus for testing a well |
US6347666B1 (en) * | 1999-04-22 | 2002-02-19 | Schlumberger Technology Corporation | Method and apparatus for continuously testing a well |
US6328103B1 (en) * | 1999-08-19 | 2001-12-11 | Halliburton Energy Services, Inc. | Methods and apparatus for downhole completion cleanup |
-
1999
- 1999-01-26 NO NO990344A patent/NO990344L/no not_active Application Discontinuation
-
2000
- 2000-01-26 GB GB0115689A patent/GB2362221B/en not_active Expired - Lifetime
- 2000-01-26 WO PCT/NO2000/000020 patent/WO2000047870A1/en active Application Filing
- 2000-01-26 US US09/890,117 patent/US6655457B1/en not_active Expired - Lifetime
- 2000-01-26 AU AU25812/00A patent/AU761645B2/en not_active Expired
-
2001
- 2001-04-09 US US10/257,486 patent/US20030155152A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
GB0115689D0 (en) | 2001-08-22 |
US20030155152A1 (en) | 2003-08-21 |
US6655457B1 (en) | 2003-12-02 |
WO2000047870A1 (en) | 2000-08-17 |
GB2362221B (en) | 2002-09-11 |
AU2581200A (en) | 2000-08-29 |
NO990344D0 (no) | 1999-01-26 |
GB2362221A (en) | 2001-11-14 |
AU761645B2 (en) | 2003-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO990344L (no) | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske | |
US7822554B2 (en) | Methods and apparatus for analysis of downhole compositional gradients and applications thereof | |
US4833915A (en) | Method and apparatus for detecting formation hydrocarbons in mud returns, and the like | |
US9696193B2 (en) | Real-time measurement of reservoir fluid properties | |
US7392697B2 (en) | Apparatus for downhole fluids analysis utilizing micro electro mechanical system (MEMS) or other sensors | |
US20100018287A1 (en) | Wirleline downhole gas chromatograph and downhole gas chromatography method | |
US20100132449A1 (en) | System and method for analysis of well fluid samples | |
AU2012231384B2 (en) | Measuring gas losses at a rig surface circulation system | |
US7438128B2 (en) | Identifying zones of origin of annular gas pressure | |
NO20063888L (no) | Fremgangsmate og apparat for fluidanalyse | |
NO20170795A1 (no) | Brønnhull-sondeanordning og en fremgangsmåte ved prøvetaking | |
NO20075868L (no) | "Chain-of-custody"-fremgangsmate for reservoarprover | |
GB2404403A (en) | Fluid sampling methods and apparatus for use in boreholes | |
EP1855109A3 (en) | Method and apparatus for simulating PVT parameters | |
CA2195794A1 (en) | Device for measuring the permeability of rock fragments | |
US8360143B2 (en) | Method of determining end member concentrations | |
US20040014223A1 (en) | Method intended for chemical and isotopic analysis and measurement on constituents carried by a drilling fluid | |
Meisingset | Uncertainties in reservoir fluid description for reservoir modeling | |
Al-Eid et al. | Investigation of H2S migration in the Marjan complex | |
EP0095837A3 (en) | Well testing apparatus and method | |
NO20120163A1 (no) | Anordning og framgangsmate for bronntesting | |
Al-Mohsin et al. | Application of Wireline Formation Tester (Openhole and Cased-Hole) Sampling Techniques for Estimation of Nonhydrocarbon Gas Content of Khuff Reservoir Fluids in the North Field, Qatar | |
Estublier et al. | Gas Monitoring in Wells in CCS Context: Application of a Mobile Cabin for Detecting Low Content of Gas Dissolved in Water | |
Ghaniputra et al. | Dynamic Baseline on Chromatographic Gas Ratios Analysis: A New Practical Approach for Fluid Characterization and Enhanced Fluid Interpretation in Bekapai Field | |
Dria et al. | Membrane-based gas sensing for robust pay identification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |