NO2748650T3 - - Google Patents

Info

Publication number
NO2748650T3
NO2748650T3 NO12838857A NO12838857A NO2748650T3 NO 2748650 T3 NO2748650 T3 NO 2748650T3 NO 12838857 A NO12838857 A NO 12838857A NO 12838857 A NO12838857 A NO 12838857A NO 2748650 T3 NO2748650 T3 NO 2748650T3
Authority
NO
Norway
Application number
NO12838857A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Publication of NO2748650T3 publication Critical patent/NO2748650T3/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R3/00Arrangements of steps or ladders facilitating access to or on the vehicle, e.g. running-boards
    • B60R3/007Removable steps or ladders, e.g. foldable
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F3/00Vehicles particularly adapted for collecting refuse
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L21/00Joints with sleeve or socket
    • F16L21/002Sleeves or nipples for pipes of the same diameter; Reduction pieces
    • F16L21/005Sleeves or nipples for pipes of the same diameter; Reduction pieces made of elastic material, e.g. partly or completely surrounded by clamping devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/17Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of rings, bands or sleeves pressed against the outside surface of the pipe or hose
    • G01V20/00
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F3/00Vehicles particularly adapted for collecting refuse
    • B65F3/001Vehicles particularly adapted for collecting refuse for segregated refuse collecting, e.g. vehicles with several compartments
    • B65F2003/003Footboards
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/02Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness
    • G01B7/023Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness for measuring distance between sensor and object
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
NO12838857A 2011-10-06 2012-10-05 NO2748650T3 (no)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161544202P 2011-10-06 2011-10-06
PCT/US2012/058851 WO2013052731A1 (en) 2011-10-06 2012-10-05 Systems and methods for subsurface oil recovery optimization

Publications (1)

Publication Number Publication Date
NO2748650T3 true NO2748650T3 (no) 2018-02-10

Family

ID=48044172

Family Applications (1)

Application Number Title Priority Date Filing Date
NO12838857A NO2748650T3 (no) 2011-10-06 2012-10-05

Country Status (10)

Country Link
US (4) US10370940B2 (no)
EP (3) EP2764201B1 (no)
CN (2) CN104541184A (no)
AR (3) AR088270A1 (no)
AU (6) AU2012318531B2 (no)
BR (3) BR112014007853A2 (no)
CA (3) CA2852953C (no)
MX (4) MX2014003947A (no)
NO (1) NO2748650T3 (no)
WO (3) WO2013052731A1 (no)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2852953C (en) 2011-10-06 2018-04-03 Landmark Graphics Corporation Systems and methods for subsurface oil recovery optimization
US9085958B2 (en) 2013-09-19 2015-07-21 Sas Institute Inc. Control variable determination to maximize a drilling rate of penetration
US9163497B2 (en) 2013-10-22 2015-10-20 Sas Institute Inc. Fluid flow back prediction
WO2015126423A1 (en) 2014-02-24 2015-08-27 Landmark Graphics Corporation Total asset modeling with integrated asset models and persistent asset models
US9957781B2 (en) 2014-03-31 2018-05-01 Hitachi, Ltd. Oil and gas rig data aggregation and modeling system
GB2538466B (en) * 2014-04-01 2020-07-22 Landmark Graphics Corp Optimizing oil recovery and reducing water production in smart wells
US10934811B2 (en) 2014-08-22 2021-03-02 Chevron U.S.A. Inc. Flooding analysis tool and method thereof
US9650876B2 (en) * 2014-12-30 2017-05-16 Baker Hughes Incorporated Method of balancing resource recovery from a resource bearing formation
BR112017026203A2 (pt) * 2015-06-05 2018-08-14 Repsol Sa método de geração de uma estratégia de produção para a explotação de um reservatório de hidrocarbonetos em um ambiente natural
EP3323092B1 (en) * 2015-07-13 2022-11-23 ConocoPhillips Company Ensemble based decision making
CA3002330C (en) * 2015-10-22 2023-07-11 Statoil Petroleum As Method and system for the optimisation of the addition of diluent to an oil well comprising a downhole pump
NO341053B1 (en) * 2016-01-26 2017-08-14 Exebenus AS A method for planning and executing real time automated decision support in oil and gas wells
US10450511B2 (en) 2016-02-23 2019-10-22 Suncor Energy Inc. Production of hydrocarbon product and selective rejection of low quality hydrocarbons from bitumen material
US11326443B2 (en) 2017-04-28 2022-05-10 Schlumberger Technology Corporation Method and system for generating a completion design using a streamline model
WO2019055653A1 (en) * 2017-09-13 2019-03-21 Schlumberger Technology Corporation PROBABILISTIC PREDICTION OF OIL PRODUCTION
WO2019067213A1 (en) 2017-09-28 2019-04-04 Chevron U.S.A. Inc. SYSTEMS AND METHODS FOR ESTIMATING THE PRODUCTIVITY OF A TANK BASED ON DEPTH IN A UNDERGROUND VOLUME OF INTEREST
CA3076523C (en) * 2017-09-28 2023-04-04 Chevron, U.S.A. Systems and methods for estimating a likelihood of reservoir productivity as a function of position in a subsurface volume of interest
US10975668B2 (en) 2018-03-29 2021-04-13 Ge Inspection Technologies, Lp Rapid steam allocation management and optimization for oil sands
US11287788B2 (en) 2019-06-27 2022-03-29 Halliburton Energy Services, Inc. Field development optimization through direct rig equipment control
US11371336B2 (en) * 2019-09-19 2022-06-28 Chevron U.S.A. Inc. Systems and methods for estimating refined reservoir productivity values as a function of position in a subsurface volume of interest
US11481413B2 (en) 2020-04-07 2022-10-25 Saudi Arabian Oil Company Systems and methods for evaluating petroleum data for automated processes
US11867054B2 (en) 2020-05-11 2024-01-09 Saudi Arabian Oil Company Systems and methods for estimating well parameters and drilling wells
CN114059990A (zh) * 2020-08-04 2022-02-18 中国石油天然气股份有限公司 油水井注采联动交互调配方法及装置
US11480035B1 (en) 2020-09-04 2022-10-25 Oswaldo Jose Sanchez Torrealba Pressure assisted oil recovery system and apparatus
CA3214959A1 (en) * 2021-03-25 2022-09-29 Schlumberger Canada Limited Well intervention performance system
WO2022232689A1 (en) * 2021-04-30 2022-11-03 Conocophillips Company Systems and methods for predictive reservoir development

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US6775578B2 (en) 2000-09-01 2004-08-10 Schlumberger Technology Corporation Optimization of oil well production with deference to reservoir and financial uncertainty
WO2003018958A1 (en) * 2001-08-31 2003-03-06 Statoil Asa Method and plant for enhanced oil recovery and simultaneous synthesis of hydrocarbons from natural gas
US8463616B2 (en) 2002-10-15 2013-06-11 Invensys Systems, Inc. Scheduling a process according to time-varying input prices
CA2514516C (en) 2003-03-26 2012-11-20 Exxonmobil Upstream Research Company Performance prediction method for hydrocarbon recovery processes
CN1262850C (zh) * 2003-07-04 2006-07-05 中国原子能科学研究院 用氟代苯甲酸作示踪剂的油田示踪分析检测方法
GB2429796B (en) 2004-06-25 2008-08-06 Shell Int Research Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
US20080120954A1 (en) * 2006-05-16 2008-05-29 Duello Leonard E Tackified And Non-Tackified Nonwovens Of Controlled Stiffness And Retained Foldability
US7953587B2 (en) 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US7774184B2 (en) * 2006-10-17 2010-08-10 Schlumberger Technology Corporation Brownfield workflow and production forecast tool
US7721802B2 (en) 2007-02-23 2010-05-25 Warren Michael Levy Fluid level sensing device and methods of using same
US8170801B2 (en) * 2007-02-26 2012-05-01 Bp Exploration Operating Company Limited Determining fluid rate and phase information for a hydrocarbon well using predictive models
US8005658B2 (en) * 2007-05-31 2011-08-23 Schlumberger Technology Corporation Automated field development planning of well and drainage locations
JP5024789B2 (ja) * 2007-07-06 2012-09-12 Nltテクノロジー株式会社 発光制御回路、発光制御方法、面照明装置及び該面照明装置を備えた液晶表示装置
US20090076873A1 (en) 2007-09-19 2009-03-19 General Electric Company Method and system to improve engineered system decisions and transfer risk
US7890264B2 (en) 2007-10-25 2011-02-15 Schlumberger Technology Corporation Waterflooding analysis in a subterranean formation
US8396826B2 (en) * 2007-12-17 2013-03-12 Landmark Graphics Corporation Systems and methods for optimization of real time production operations
US8744817B2 (en) * 2007-12-21 2014-06-03 Schlumberger Technology Corporation Method for upscaling a reservoir model using deep reading measurements
US7963327B1 (en) 2008-02-25 2011-06-21 QRI Group, LLC Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics
US7966166B2 (en) 2008-04-18 2011-06-21 Schlumberger Technology Corp. Method for determining a set of net present values to influence the drilling of a wellbore and increase production
US8793111B2 (en) * 2009-01-20 2014-07-29 Schlumberger Technology Corporation Automated field development planning
CA2731784C (en) * 2008-08-19 2016-08-09 Exxonmobil Upstream Research Company Fluid injection completion techniques
US20110106723A1 (en) 2009-11-03 2011-05-05 Michael Ryan Chipley Computer-Implemented Systems And Methods For Scenario Analysis
US8646525B2 (en) * 2010-05-26 2014-02-11 Chevron U.S.A. Inc. System and method for enhancing oil recovery from a subterranean reservoir
CA2852953C (en) 2011-10-06 2018-04-03 Landmark Graphics Corporation Systems and methods for subsurface oil recovery optimization

Also Published As

Publication number Publication date
CA2852953A1 (en) 2013-04-11
BR112014007853A2 (pt) 2017-04-18
CA2850501A1 (en) 2013-04-11
MX2014003949A (es) 2014-08-01
AU2012318527B2 (en) 2014-08-14
EP2748650A4 (en) 2016-01-13
US10415349B2 (en) 2019-09-17
US10370940B2 (en) 2019-08-06
WO2013052731A1 (en) 2013-04-11
CA2850782C (en) 2018-05-15
AU2012318531A1 (en) 2014-04-10
AU2015218424A1 (en) 2015-09-17
AR088269A1 (es) 2014-05-21
AU2012318531B2 (en) 2015-06-11
WO2013052725A1 (en) 2013-04-11
AU2017218931A1 (en) 2017-09-07
CA2852953C (en) 2018-04-03
EP2764201A1 (en) 2014-08-13
EP2764201A4 (en) 2016-01-13
AU2012318521A1 (en) 2014-04-10
AU2019201852A1 (en) 2019-04-11
MX337098B (es) 2016-02-11
AR088270A1 (es) 2014-05-21
EP2764201B1 (en) 2017-08-30
US20140006111A1 (en) 2014-01-02
AU2012318527A1 (en) 2014-04-10
US20140229151A1 (en) 2014-08-14
MX344827B (es) 2017-01-05
WO2013052735A1 (en) 2013-04-11
AR088268A1 (es) 2014-05-21
EP2748756B1 (en) 2017-08-09
US9031823B2 (en) 2015-05-12
CA2850501C (en) 2017-06-06
EP2748650B1 (en) 2017-09-13
EP2748756A4 (en) 2016-01-13
EP2748756A1 (en) 2014-07-02
US20140236681A1 (en) 2014-08-21
CN103958825A (zh) 2014-07-30
US10100619B2 (en) 2018-10-16
BR112014007867A2 (pt) 2017-04-18
MX2014003948A (es) 2015-05-11
EP2748650A1 (en) 2014-07-02
AU2012318521B2 (en) 2015-12-03
CA2850782A1 (en) 2013-04-11
CN104025111A (zh) 2014-09-03
MX2014003947A (es) 2014-08-21
CN104541184A (zh) 2015-04-22
BR112014007854A2 (pt) 2017-04-18
US20140297245A1 (en) 2014-10-02

Similar Documents

Publication Publication Date Title
BR112013022641A2 (no)
AP3853A (no)
BR112013031251A2 (no)
BR112013027245A2 (no)
BR112013024383A2 (no)
BR112013026905A2 (no)
BR112013023185A2 (no)
BR112013022995A2 (no)
BR112013017670A2 (no)
BR112013026744A2 (no)
BR112013023927A2 (no)
BR112013027830A2 (no)
BR112013024365A2 (no)
BR112013028733A2 (no)
BR112013027121A2 (no)
BR112013027452A2 (no)
AP2016009466A0 (no)
BR112013031556A2 (no)
BR112013024588A2 (no)
BR112013032377A2 (no)
BR112013032380A2 (no)
BR112013026790A2 (no)
BR112013032366A2 (no)
BR112013018949A2 (no)
BR112013026895A2 (no)