NO20092963L - Sammenstilling og fremgangsmate for transient og kontinuerlig testing av en apen del av et borehull - Google Patents
Sammenstilling og fremgangsmate for transient og kontinuerlig testing av en apen del av et borehullInfo
- Publication number
- NO20092963L NO20092963L NO20092963A NO20092963A NO20092963L NO 20092963 L NO20092963 L NO 20092963L NO 20092963 A NO20092963 A NO 20092963A NO 20092963 A NO20092963 A NO 20092963A NO 20092963 L NO20092963 L NO 20092963L
- Authority
- NO
- Norway
- Prior art keywords
- annulus
- reservoir interval
- gaskets
- assembly
- downhole pump
- Prior art date
Links
- 230000001052 transient effect Effects 0.000 title abstract 2
- 239000012530 fluid Substances 0.000 abstract 7
- 230000015572 biosynthetic process Effects 0.000 abstract 4
- 239000010802 sludge Substances 0.000 abstract 2
- 230000005540 biological transmission Effects 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
- 238000005086 pumping Methods 0.000 abstract 1
- 238000005070 sampling Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Analytical Chemistry (AREA)
- Chemical & Material Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Sampling And Sample Adjustment (AREA)
- Geophysics And Detection Of Objects (AREA)
- Examining Or Testing Airtightness (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Sammenstilling for transient og kontinuerlig testing av en åpen del av et borehull, idet sammenstillingen er anordnet i nedre del av en borestreng, og omfatter: minimum to pakninger festet på utsiden av borestrengen, hvilke pakninger kan ekspanderes for 'a isolere et reservoarintervall; en nedihullspumpe for pumping av formasjonsfluid fra reservoarintervallet; et prøvetakingskammer; sensorer for måling av fluidegenskaper; en innstengningsventil, for å stenge fluidstrømmen fra reservoarintervallet, kjennetegnet ved at sammenstillingen videre omfatter: sensorer og telemetri for måling og sanntid overføring av strømningsrnengde, trykk og temperatur i fluidstrømmen fra reservoarintervallet, fra nedihullspumpen, i borestrengen og i et ringrom ovenfor pakningene; en slammedrevet turbin eller elektrisk kabel for energitilførsel til nedihullspumpen; og en sirkulasjons-enhet for slamsirkulasjon fra et borerør til ringrommet ovenfor pakningene og mating av formasjons-fluid fra nedihullspumpen til nevnte ringrom, hvilken sirkulasjonsenhet uavhengig av sirkulasjonsraten for boreslam til ringrommet kan lede formasjonsfluid fra reservoarintervallet til nevnte ringrom, slik at en brønn til enhver tid kan holdes i overbalanse og slik at boreslam i ringrommet til enhver tid kan løse formasjonsfluidet fra reservoarintervallet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20092963A NO344231B1 (no) | 2007-02-14 | 2009-09-06 | Sammenstilling og fremgangsmåte for transient og kontinuerlig testing av en åpen del av et borehull |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20070851A NO20070851L (no) | 2007-02-14 | 2007-02-14 | Formasjonstesting |
PCT/NO2008/000058 WO2008100156A1 (en) | 2007-02-14 | 2008-02-14 | Assembly and method for transient and continuous testing of an open portion of a well bore |
NO20092963A NO344231B1 (no) | 2007-02-14 | 2009-09-06 | Sammenstilling og fremgangsmåte for transient og kontinuerlig testing av en åpen del av et borehull |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20092963L true NO20092963L (no) | 2009-09-14 |
NO344231B1 NO344231B1 (no) | 2019-10-14 |
Family
ID=39690304
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20070851A NO20070851L (no) | 2007-02-14 | 2007-02-14 | Formasjonstesting |
NO20092963A NO344231B1 (no) | 2007-02-14 | 2009-09-06 | Sammenstilling og fremgangsmåte for transient og kontinuerlig testing av en åpen del av et borehull |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20070851A NO20070851L (no) | 2007-02-14 | 2007-02-14 | Formasjonstesting |
Country Status (6)
Country | Link |
---|---|
US (1) | US8528394B2 (no) |
BR (1) | BRPI0807471A2 (no) |
CA (1) | CA2677603C (no) |
GB (1) | GB2459414B8 (no) |
NO (2) | NO20070851L (no) |
WO (1) | WO2008100156A1 (no) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8506262B2 (en) | 2007-05-11 | 2013-08-13 | Schlumberger Technology Corporation | Methods of use for a positive displacement pump having an externally assisted valve |
US8757254B2 (en) | 2009-08-18 | 2014-06-24 | Schlumberger Technology Corporation | Adjustment of mud circulation when evaluating a formation |
EP2486237A4 (en) * | 2009-10-05 | 2017-04-26 | Schlumberger Technology B.V. | Formation testing |
US9238961B2 (en) | 2009-10-05 | 2016-01-19 | Schlumberger Technology Corporation | Oilfield operation using a drill string |
US8567500B2 (en) | 2009-10-06 | 2013-10-29 | Schlumberger Technology Corporation | Cooling apparatus and methods for use with downhole tools |
MX2012004168A (es) | 2009-10-06 | 2012-05-08 | Schlumberger Technology Bv | Planificacion y monitoreo de pruebas de formaciones. |
US8763696B2 (en) * | 2010-04-27 | 2014-07-01 | Sylvain Bedouet | Formation testing |
CN102003177B (zh) * | 2010-09-13 | 2013-01-02 | 许进鹏 | 用于井下单个钻孔的水文地质参数观测仪器 |
US9249660B2 (en) * | 2011-11-28 | 2016-02-02 | Schlumberger Technology Corporation | Formation fluid sampling |
US9714570B2 (en) | 2013-07-03 | 2017-07-25 | Schlumberger Technology Corporation | Packer-packer vertical interference testing |
WO2015038100A1 (en) * | 2013-09-10 | 2015-03-19 | Halliburton Energy Services. Inc. | Realtime downhole sample volume collection |
US9347299B2 (en) * | 2013-12-20 | 2016-05-24 | Schlumberger Technology Corporation | Packer tool including multiple ports |
CN108801342A (zh) * | 2018-05-08 | 2018-11-13 | 中山大学 | 一种嵌入式多参数传感量测装置 |
US10605077B2 (en) | 2018-05-14 | 2020-03-31 | Alfred T Aird | Drill stem module for downhole analysis |
WO2020190298A1 (en) * | 2019-03-21 | 2020-09-24 | Halliburton Energy Services, Inc. | Siphon pump chimney for formation tester |
US11466567B2 (en) | 2020-07-16 | 2022-10-11 | Halliburton Energy Services, Inc. | High flowrate formation tester |
US11624279B2 (en) | 2021-02-04 | 2023-04-11 | Halliburton Energy Services, Inc. | Reverse drill stem testing |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1153288A (en) | 1980-08-27 | 1983-09-06 | Alfred H. Jageler | Method and apparatus for obtaining selected samples of formation fluids |
CA2034444C (en) * | 1991-01-17 | 1995-10-10 | Gregg Peterson | Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability |
GB9501846D0 (en) | 1995-01-21 | 1995-03-22 | Phoenix Petroleum Services | Well-logging and control system |
DE69636665T2 (de) * | 1995-12-26 | 2007-10-04 | Halliburton Co., Dallas | Vorrichtung und Verfahren zur Frühbewertung und Unterhalt einer Bohrung |
NO990344L (no) | 1999-01-26 | 2000-07-27 | Bjoern Dybdahl | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
US6347666B1 (en) | 1999-04-22 | 2002-02-19 | Schlumberger Technology Corporation | Method and apparatus for continuously testing a well |
GB2355033B (en) | 1999-10-09 | 2003-11-19 | Schlumberger Ltd | Methods and apparatus for making measurements on fluids produced from underground formations |
US6622554B2 (en) | 2001-06-04 | 2003-09-23 | Halliburton Energy Services, Inc. | Open hole formation testing |
-
2007
- 2007-02-14 NO NO20070851A patent/NO20070851L/no not_active Application Discontinuation
-
2008
- 2008-02-14 WO PCT/NO2008/000058 patent/WO2008100156A1/en active Application Filing
- 2008-02-14 CA CA2677603A patent/CA2677603C/en active Active
- 2008-02-14 BR BRPI0807471-2A2A patent/BRPI0807471A2/pt active IP Right Grant
- 2008-02-14 GB GB0914920A patent/GB2459414B8/en active Active
- 2008-02-14 US US12/526,352 patent/US8528394B2/en active Active
-
2009
- 2009-09-06 NO NO20092963A patent/NO344231B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
US8528394B2 (en) | 2013-09-10 |
NO344231B1 (no) | 2019-10-14 |
WO2008100156A1 (en) | 2008-08-21 |
GB2459414B (en) | 2011-11-02 |
NO20070851L (no) | 2008-08-15 |
GB2459414B8 (en) | 2014-02-19 |
US20100294033A1 (en) | 2010-11-25 |
GB2459414A (en) | 2009-10-28 |
BRPI0807471A2 (pt) | 2014-05-13 |
GB0914920D0 (en) | 2009-09-30 |
CA2677603C (en) | 2015-05-05 |
CA2677603A1 (en) | 2008-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20092963L (no) | Sammenstilling og fremgangsmate for transient og kontinuerlig testing av en apen del av et borehull | |
RU2313659C1 (ru) | Способ одновременно-раздельной эксплуатации многопластовых скважин | |
NZ607028A (en) | Apparatus and method for downhole steam generation and enhanced oil recovery | |
NO20074526L (no) | Boresystem omfattende ringromstrykkstyring | |
NO20072761A (no) | Anordning ved toppdrevet boremaskin for kontinuerlig sirkulasjon av borevæske | |
NO20090179L (no) | Bronnslipeverktoy med et hydrostatisk kammer og anvendelser av dette | |
BR0108877A (pt) | Poço de petróleo com injeção de gás para a produção de produtos de petróleo, obturador controlável localizado em um fundo de poço e métodos de produzir produtos de petróleo a partir de um poço com injeção de gás e de operar um poço de petróleo | |
NO20092450L (no) | Fremgangsmater og anordninger for fluidanalyse i bronnhull | |
CA2594015A1 (en) | Apparatus and methods to remove impurities at a sensor in a downhole tool | |
MY168844A (en) | Method of drilling a subterranean borehole | |
NO20061709L (no) | Fremgangsmate for boring gjennom et lukket stigeror med en trykksatt slamplugg og retursirkulasjon. | |
MX2010006142A (es) | Metodo y sistema para fracturar formaciones subsuperficiales durante la perforacion de estas. | |
CN103089199A (zh) | 枯竭式油气藏地下储气库注采管柱及其作业方法 | |
NO325521B1 (no) | Sammenstilling for trykkontroll ved boring og fremgangsmate for trykkontroll ved boring i en formasjon med uforutsett hoyt formasjonstrykk | |
NO20120735A1 (no) | Forbedret plassering av en stromningsmodul mellom et undervannstre og en rorhengerspole | |
NO333727B1 (no) | Anordninger og fremgangsmater for formasjonstesting ved trykkmaling i et isolert, variabelt volum | |
RU2262586C2 (ru) | Скважинная установка для одновременно-раздельной и поочередной эксплуатации нескольких пластов одной скважиной | |
Li et al. | A prevention and control method for natural gas hydrate in pipe strings during deepwater gas well production tests | |
NO20050617L (no) | Havbunnsbrønn-produksjonssystem | |
BRPI0905957A2 (pt) | Ferramenta e método para direcionar fluidos de um conjunto de elevação e de uma perfuração de uma tubulação de fundo de poço, conjunto de válvula para direcionar fluidos de um conjunto de elevação e uma tubulação de fundo de poço e método para seletivamente conectar uma fonte de fluido a uma tubulação de fundo de poço ou uma tubulação de fundo de poço a uma saída | |
RU2309246C1 (ru) | Скважинная установка гарипова | |
NO20014701L (no) | Fremgangsmåte og anordning for åpenhulls-testing av undergrunnsbrönner | |
CN202900175U (zh) | 储气库悬挂压力计测压完井管柱 | |
US20150041126A1 (en) | Bypass steam injection and production completion system | |
NO20084782L (no) | Dispersiv borefluid uten stigeror |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
CHAD | Change of the owner's name or address (par. 44 patent law, par. patentforskriften) |
Owner name: STATOIL ASA, NO |