NO20091723L - Fremgangsmate for maling av formasjonsegenskaper med tidsbegrenset formasjonstest - Google Patents
Fremgangsmate for maling av formasjonsegenskaper med tidsbegrenset formasjonstestInfo
- Publication number
- NO20091723L NO20091723L NO20091723A NO20091723A NO20091723L NO 20091723 L NO20091723 L NO 20091723L NO 20091723 A NO20091723 A NO 20091723A NO 20091723 A NO20091723 A NO 20091723A NO 20091723 L NO20091723 L NO 20091723L
- Authority
- NO
- Norway
- Prior art keywords
- formation
- time
- painting
- properties
- limited
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 8
- 238000000034 method Methods 0.000 title abstract 3
- 238000010422 painting Methods 0.000 title 1
- 239000012530 fluid Substances 0.000 abstract 2
- 239000010802 sludge Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/10—Obtaining fluid samples or testing fluids, in boreholes or wells using side-wall fluid samplers or testers
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Treatment Of Sludge (AREA)
- Investigating Or Analyzing Non-Biological Materials By The Use Of Chemical Means (AREA)
- Investigating Or Analysing Materials By The Use Of Chemical Reactions (AREA)
- Treatments Of Macromolecular Shaped Articles (AREA)
- Geophysics And Detection Of Objects (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Et apparat og en fremgangsmåte for å bestemme minst én egenskap ved en undergrunnsformasjon er beskrevet. Apparatet innbefatter et forteststempel som kan posisjoneres i fluidkommunikasjon med formasjonen, og en rekke strømningslinje-trykkmålere og ventiler utformet for selektivt å trekke inn i apparatet for måling enten formasjonsfluid eller slam. Fremgangsmåten innbefatter å utføre en første fortest for å bestemme en estimert formasjonsparameter; å bruke den første fortest til å utforme en annen fortest og generere forfinede formasjonsparametere slik at formasjonsegenkaper kan estimeres.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/237,394 US6832515B2 (en) | 2002-09-09 | 2002-09-09 | Method for measuring formation properties with a time-limited formation test |
US10/434,923 US7263880B2 (en) | 2002-09-09 | 2003-05-09 | Method for measuring formation properties with a time-limited formation test |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20091723L true NO20091723L (no) | 2004-03-10 |
NO340077B1 NO340077B1 (no) | 2017-03-06 |
Family
ID=31990797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20091723A NO340077B1 (no) | 2002-09-09 | 2009-04-30 | Fremgangsmåte for måling av formasjonsegenskaper med tidsbegrenset formasjonstest |
Country Status (4)
Country | Link |
---|---|
US (7) | US6832515B2 (no) |
EP (2) | EP1553260A3 (no) |
CN (1) | CN101092874B (no) |
NO (1) | NO340077B1 (no) |
Families Citing this family (71)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7011155B2 (en) * | 2001-07-20 | 2006-03-14 | Baker Hughes Incorporated | Formation testing apparatus and method for optimizing draw down |
GB2400871B (en) * | 2001-12-03 | 2005-09-14 | Shell Int Research | Method for formation pressure control while drilling |
US7805247B2 (en) * | 2002-09-09 | 2010-09-28 | Schlumberger Technology Corporation | System and methods for well data compression |
US6832515B2 (en) * | 2002-09-09 | 2004-12-21 | Schlumberger Technology Corporation | Method for measuring formation properties with a time-limited formation test |
US7266983B2 (en) * | 2002-09-12 | 2007-09-11 | Baker Hughes Incorporated | Methods to detect formation pressure |
US6923052B2 (en) * | 2002-09-12 | 2005-08-02 | Baker Hughes Incorporated | Methods to detect formation pressure |
WO2005038409A2 (en) * | 2003-10-17 | 2005-04-28 | Invensys Systems, Inc. | Flow assurance monitoring |
WO2005084332A2 (en) * | 2004-03-01 | 2005-09-15 | Halliburton Energy Services, Inc. | Methods for measuring a formation supercharge pressure |
US7216533B2 (en) * | 2004-05-21 | 2007-05-15 | Halliburton Energy Services, Inc. | Methods for using a formation tester |
WO2005113935A2 (en) * | 2004-05-21 | 2005-12-01 | Halliburton Energy Services, Inc. | Methods and apparatus for using formation property data |
WO2005113937A2 (en) * | 2004-05-21 | 2005-12-01 | Halliburton Energy Services, Inc. | Methods and apparatus for measuring formation properties |
US7260985B2 (en) * | 2004-05-21 | 2007-08-28 | Halliburton Energy Services, Inc | Formation tester tool assembly and methods of use |
US7603897B2 (en) * | 2004-05-21 | 2009-10-20 | Halliburton Energy Services, Inc. | Downhole probe assembly |
US7380599B2 (en) * | 2004-06-30 | 2008-06-03 | Schlumberger Technology Corporation | Apparatus and method for characterizing a reservoir |
DE602005013483D1 (de) * | 2005-02-28 | 2009-05-07 | Schlumberger Technology Bv | Verfahren zur Messung von Formationseigenschaften mit einem Formationstester |
US7278480B2 (en) * | 2005-03-31 | 2007-10-09 | Schlumberger Technology Corporation | Apparatus and method for sensing downhole parameters |
US7461547B2 (en) * | 2005-04-29 | 2008-12-09 | Schlumberger Technology Corporation | Methods and apparatus of downhole fluid analysis |
US7458252B2 (en) * | 2005-04-29 | 2008-12-02 | Schlumberger Technology Corporation | Fluid analysis method and apparatus |
WO2008008424A2 (en) * | 2006-07-12 | 2008-01-17 | Baker Hughes Incorporated | Method and apparatus for formation testing |
US7996153B2 (en) * | 2006-07-12 | 2011-08-09 | Baker Hughes Incorporated | Method and apparatus for formation testing |
US7594541B2 (en) | 2006-12-27 | 2009-09-29 | Schlumberger Technology Corporation | Pump control for formation testing |
US7957946B2 (en) | 2007-06-29 | 2011-06-07 | Schlumberger Technology Corporation | Method of automatically controlling the trajectory of a drilled well |
US7788972B2 (en) * | 2007-09-20 | 2010-09-07 | Schlumberger Technology Corporation | Method of downhole characterization of formation fluids, measurement controller for downhole characterization of formation fluids, and apparatus for downhole characterization of formation fluids |
US7707878B2 (en) * | 2007-09-20 | 2010-05-04 | Schlumberger Technology Corporation | Circulation pump for circulating downhole fluids, and characterization apparatus of downhole fluids |
US8230916B2 (en) * | 2007-11-16 | 2012-07-31 | Schlumberger Technology Corporation | Apparatus and methods to analyze downhole fluids using ionized fluid samples |
US7733490B2 (en) * | 2007-11-16 | 2010-06-08 | Schlumberger Technology Corporation | Apparatus and methods to analyze downhole fluids using ionized fluid samples |
US7765862B2 (en) * | 2007-11-30 | 2010-08-03 | Schlumberger Technology Corporation | Determination of formation pressure during a drilling operation |
US20090143991A1 (en) * | 2007-11-30 | 2009-06-04 | Schlumberger Technology Corporation | Measurements in a fluid-containing earth borehole having a mudcake |
US8136395B2 (en) | 2007-12-31 | 2012-03-20 | Schlumberger Technology Corporation | Systems and methods for well data analysis |
US8555966B2 (en) * | 2008-05-13 | 2013-10-15 | Baker Hughes Incorporated | Formation testing apparatus and methods |
US8042387B2 (en) | 2008-05-16 | 2011-10-25 | Schlumberger Technology Corporation | Methods and apparatus to control a formation testing operation based on a mudcake leakage |
US8581591B2 (en) * | 2008-06-11 | 2013-11-12 | Halliburton Energy Services, Inc. | Method and system of determining an electrical property of a formation fluid |
US8434357B2 (en) * | 2009-08-18 | 2013-05-07 | Schlumberger Technology Corporation | Clean fluid sample for downhole measurements |
US8434356B2 (en) | 2009-08-18 | 2013-05-07 | Schlumberger Technology Corporation | Fluid density from downhole optical measurements |
US7913556B2 (en) * | 2008-06-11 | 2011-03-29 | Schlumberger Technology Corporation | Methods and apparatus to determine the compressibility of a fluid |
US8991245B2 (en) * | 2008-07-15 | 2015-03-31 | Schlumberger Technology Corporation | Apparatus and methods for characterizing a reservoir |
US20100076740A1 (en) * | 2008-09-08 | 2010-03-25 | Schlumberger Technology Corporation | System and method for well test design and interpretation |
US8596384B2 (en) | 2009-02-06 | 2013-12-03 | Schlumberger Technology Corporation | Reducing differential sticking during sampling |
US8473214B2 (en) * | 2009-04-24 | 2013-06-25 | Schlumberger Technology Corporation | Thickness-independent computation of horizontal and vertical permeability |
US9297255B2 (en) | 2010-06-17 | 2016-03-29 | Halliburton Energy Services, Inc. | Non-invasive compressibility and in situ density testing of a fluid sample in a sealed chamber |
KR20110140010A (ko) * | 2010-06-24 | 2011-12-30 | 삼성전자주식회사 | 근적외광 신호를 이용한 이미지 센서 |
FR2968348B1 (fr) | 2010-12-03 | 2015-01-16 | Total Sa | Procede de mesure de pression dans une formation souterraine |
US20140033816A1 (en) * | 2011-02-23 | 2014-02-06 | Schlumberger Technology Corporation | Multi-Phase Region Analysis Method And Apparatus |
US8726725B2 (en) | 2011-03-08 | 2014-05-20 | Schlumberger Technology Corporation | Apparatus, system and method for determining at least one downhole parameter of a wellsite |
US8997861B2 (en) | 2011-03-09 | 2015-04-07 | Baker Hughes Incorporated | Methods and devices for filling tanks with no backflow from the borehole exit |
US9581019B2 (en) * | 2011-03-23 | 2017-02-28 | Schlumberger Technology Corporation | Measurement pretest drawdown methods and apparatus |
US9051798B2 (en) * | 2011-06-17 | 2015-06-09 | David L. Abney, Inc. | Subterranean tool with sealed electronic passage across multiple sections |
US8839668B2 (en) * | 2011-07-22 | 2014-09-23 | Precision Energy Services, Inc. | Autonomous formation pressure test process for formation evaluation tool |
WO2013016359A2 (en) * | 2011-07-25 | 2013-01-31 | Halliburton Energy Services, Inc. | Automatic optimizing methods for reservoir testing |
US8965703B2 (en) | 2011-10-03 | 2015-02-24 | Schlumberger Technology Corporation | Applications based on fluid properties measured downhole |
US10088454B2 (en) | 2011-10-18 | 2018-10-02 | Cidra Corporate Services, Inc. | Speed of sound and/or density measurement using acoustic impedance |
WO2013152302A1 (en) * | 2012-04-05 | 2013-10-10 | Cidra Corporate Services Inc. | Speed of sound and/or density measurement using acoustic impedance |
EP2607622B1 (en) * | 2011-12-23 | 2015-10-07 | Services Pétroliers Schlumberger | System and method for measuring formation properties |
EP2810106B8 (en) * | 2012-02-20 | 2019-08-21 | Halliburton Energy Services Inc. | Downhole formation testing with automation and optimization |
BR112014031182B1 (pt) | 2012-06-13 | 2021-03-16 | Halliburton Energy Services, Inc | método para testar uma formação e sistema para testar a pressão de uma formação |
US10550687B2 (en) * | 2013-01-31 | 2020-02-04 | Schlumberger Technology Corporation | Methods for analyzing formation tester pretest data |
CA2916067C (en) * | 2013-06-19 | 2021-06-08 | National Oilwell Varco Norway As | Method and apparatus for real-time fluid compressibility measurements |
US9399913B2 (en) | 2013-07-09 | 2016-07-26 | Schlumberger Technology Corporation | Pump control for auxiliary fluid movement |
US20150057935A1 (en) * | 2013-08-22 | 2015-02-26 | Baker Hughes Incorporated | Modified flow rate analysis |
US9557312B2 (en) | 2014-02-11 | 2017-01-31 | Schlumberger Technology Corporation | Determining properties of OBM filtrates |
US10731460B2 (en) | 2014-04-28 | 2020-08-04 | Schlumberger Technology Corporation | Determining formation fluid variation with pressure |
US10125558B2 (en) * | 2014-05-13 | 2018-11-13 | Schlumberger Technology Corporation | Pumps-off annular pressure while drilling system |
US10419018B2 (en) | 2015-05-08 | 2019-09-17 | Schlumberger Technology Corporation | Real-time annulus pressure while drilling for formation integrity test |
WO2017015340A1 (en) | 2015-07-20 | 2017-01-26 | Pietro Fiorentini Spa | Systems and methods for monitoring changes in a formation while dynamically flowing fluids |
US11889245B2 (en) * | 2015-09-17 | 2024-01-30 | Mindspark Technologies Pty Ltd | Sensing device, systems and methods for monitoring movement of ground and other structures |
NL2017006B1 (en) * | 2016-06-20 | 2018-01-04 | Fugro N V | a method, a system, and a computer program product for determining soil properties |
CN108825211B (zh) * | 2017-04-27 | 2021-08-13 | 中国石油化工股份有限公司 | 地层压力测量平衡装置及其测量方法 |
US10704369B2 (en) | 2017-06-22 | 2020-07-07 | Saudi Arabian Oil Company | Simultaneous injection and fracturing interference testing |
WO2020096603A1 (en) * | 2018-11-08 | 2020-05-14 | Halliburton Energy Services, Inc. | Method for estimating wellbore compressibility |
US20240003251A1 (en) * | 2022-06-30 | 2024-01-04 | Halliburton Energy Services, Inc. | Determining Spatial Permeability From A Formation Tester |
US11913329B1 (en) | 2022-09-21 | 2024-02-27 | Saudi Arabian Oil Company | Untethered logging devices and related methods of logging a wellbore |
Family Cites Families (87)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3321965A (en) * | 1964-10-08 | 1967-05-30 | Exxon Production Research Co | Method for testing wells |
US3352361A (en) * | 1965-03-08 | 1967-11-14 | Schlumberger Technology Corp | Formation fluid-sampling apparatus |
US3448611A (en) * | 1966-09-29 | 1969-06-10 | Schlumberger Technology Corp | Method and apparatus for formation testing |
US3898877A (en) * | 1971-12-20 | 1975-08-12 | Sperry Sun Well Surveying Co | Method and apparatus for measuring pressure related parameters |
US3811321A (en) * | 1972-12-08 | 1974-05-21 | Schlumberger Technology Corp | Methods and apparatus for testing earth formations |
US3859851A (en) * | 1973-12-12 | 1975-01-14 | Schlumberger Technology Corp | Methods and apparatus for testing earth formations |
US3934468A (en) | 1975-01-22 | 1976-01-27 | Schlumberger Technology Corporation | Formation-testing apparatus |
US4416152A (en) * | 1981-10-09 | 1983-11-22 | Dresser Industries, Inc. | Formation fluid testing and sampling apparatus |
US4953399A (en) * | 1982-09-13 | 1990-09-04 | Western Atlas International, Inc. | Method and apparatus for determining characteristics of clay-bearing formations |
FR2544790B1 (fr) | 1983-04-22 | 1985-08-23 | Flopetrol | Methode de determination des caracteristiques d'une formation souterraine produisant un fluide |
US4507957A (en) * | 1983-05-16 | 1985-04-02 | Dresser Industries, Inc. | Apparatus for testing earth formations |
US4513612A (en) * | 1983-06-27 | 1985-04-30 | Halliburton Company | Multiple flow rate formation testing device and method |
FI70651C (fi) * | 1984-10-05 | 1986-09-24 | Kone Oy | Foerfarande och anordning foer oevervakning av omraodet framfoer en hissdoerr |
SE453014B (sv) | 1985-03-06 | 1988-01-04 | Systemteknik Ab | Vetskenivagivare |
CA1277157C (en) * | 1985-07-23 | 1990-12-04 | Christine Ehlig-Economides | Process for measuring flow and determining the parameters of multilayer hydrocarbon-producing formations |
US4745802A (en) * | 1986-09-18 | 1988-05-24 | Halliburton Company | Formation testing tool and method of obtaining post-test drawdown and pressure readings |
US4742459A (en) * | 1986-09-29 | 1988-05-03 | Schlumber Technology Corp. | Method and apparatus for determining hydraulic properties of formations surrounding a borehole |
US4890487A (en) * | 1987-04-07 | 1990-01-02 | Schlumberger Technology Corporation | Method for determining horizontal and/or vertical permeability of a subsurface earth formation |
US4949575A (en) * | 1988-04-29 | 1990-08-21 | Anadrill, Inc. | Formation volumetric evaluation while drilling |
US4879900A (en) * | 1988-07-05 | 1989-11-14 | Halliburton Logging Services, Inc. | Hydraulic system in formation test tools having a hydraulic pad pressure priority system and high speed extension of the setting pistons |
US4843878A (en) * | 1988-09-22 | 1989-07-04 | Halliburton Logging Services, Inc. | Method and apparatus for instantaneously indicating permeability and horner plot slope relating to formation testing |
US4936139A (en) * | 1988-09-23 | 1990-06-26 | Schlumberger Technology Corporation | Down hole method for determination of formation properties |
US4860581A (en) * | 1988-09-23 | 1989-08-29 | Schlumberger Technology Corporation | Down hole tool for determination of formation properties |
US5184508A (en) * | 1990-06-15 | 1993-02-09 | Louisiana State University And Agricultural And Mechanical College | Method for determining formation pressure |
US5095745A (en) * | 1990-06-15 | 1992-03-17 | Louisiana State University | Method and apparatus for testing subsurface formations |
US5230244A (en) * | 1990-06-28 | 1993-07-27 | Halliburton Logging Services, Inc. | Formation flush pump system for use in a wireline formation test tool |
GB9026703D0 (en) | 1990-12-07 | 1991-01-23 | Schlumberger Ltd | Downhole measurement using very short fractures |
US5144589A (en) * | 1991-01-22 | 1992-09-01 | Western Atlas International, Inc. | Method for predicting formation pore-pressure while drilling |
US5233866A (en) * | 1991-04-22 | 1993-08-10 | Gulf Research Institute | Apparatus and method for accurately measuring formation pressures |
US5265015A (en) * | 1991-06-27 | 1993-11-23 | Schlumberger Technology Corporation | Determining horizontal and/or vertical permeability of an earth formation |
US5247830A (en) * | 1991-09-17 | 1993-09-28 | Schlumberger Technology Corporation | Method for determining hydraulic properties of formations surrounding a borehole |
US5335542A (en) * | 1991-09-17 | 1994-08-09 | Schlumberger Technology Corporation | Integrated permeability measurement and resistivity imaging tool |
US5269180A (en) * | 1991-09-17 | 1993-12-14 | Schlumberger Technology Corp. | Borehole tool, procedures, and interpretation for making permeability measurements of subsurface formations |
US5233868A (en) | 1992-04-13 | 1993-08-10 | Coats Montgomery R | Non-intrusive mass flow measuring apparatus and method |
US5353637A (en) * | 1992-06-09 | 1994-10-11 | Plumb Richard A | Methods and apparatus for borehole measurement of formation stress |
US5708204A (en) * | 1992-06-19 | 1998-01-13 | Western Atlas International, Inc. | Fluid flow rate analysis method for wireline formation testing tools |
US5473939A (en) * | 1992-06-19 | 1995-12-12 | Western Atlas International, Inc. | Method and apparatus for pressure, volume, and temperature measurement and characterization of subsurface formations |
US5635631A (en) * | 1992-06-19 | 1997-06-03 | Western Atlas International, Inc. | Determining fluid properties from pressure, volume and temperature measurements made by electric wireline formation testing tools |
US5303582A (en) * | 1992-10-30 | 1994-04-19 | New Mexico Tech Research Foundation | Pressure-transient testing while drilling |
US5329811A (en) | 1993-02-04 | 1994-07-19 | Halliburton Company | Downhole fluid property measurement tool |
US5602334A (en) | 1994-06-17 | 1997-02-11 | Halliburton Company | Wireline formation testing for low permeability formations utilizing pressure transients |
US5555945A (en) * | 1994-08-15 | 1996-09-17 | Halliburton Company | Early evaluation by fall-off testing |
CA2155918C (en) * | 1994-08-15 | 2001-10-09 | Roger Lynn Schultz | Integrated well drilling and evaluation |
US6047239A (en) * | 1995-03-31 | 2000-04-04 | Baker Hughes Incorporated | Formation testing apparatus and method |
US6157893A (en) * | 1995-03-31 | 2000-12-05 | Baker Hughes Incorporated | Modified formation testing apparatus and method |
AU5379196A (en) * | 1995-03-31 | 1996-10-16 | Baker Hughes Incorporated | Formation isolation and testing apparatus and method |
US5703286A (en) * | 1995-10-20 | 1997-12-30 | Halliburton Energy Services, Inc. | Method of formation testing |
DE69636665T2 (de) * | 1995-12-26 | 2007-10-04 | Halliburton Co., Dallas | Vorrichtung und Verfahren zur Frühbewertung und Unterhalt einer Bohrung |
US5770798A (en) * | 1996-02-09 | 1998-06-23 | Western Atlas International, Inc. | Variable diameter probe for detecting formation damage |
US5644076A (en) * | 1996-03-14 | 1997-07-01 | Halliburton Energy Services, Inc. | Wireline formation tester supercharge correction method |
US5741962A (en) * | 1996-04-05 | 1998-04-21 | Halliburton Energy Services, Inc. | Apparatus and method for analyzing a retrieving formation fluid utilizing acoustic measurements |
US5969241A (en) * | 1996-04-10 | 1999-10-19 | Schlumberger Technology Corporation | Method and apparatus for measuring formation pressure |
FR2747729B1 (fr) * | 1996-04-23 | 1998-07-03 | Elf Aquitaine | Methode d'identification automatique de la nature d'un puits de production d'hydrocarbures |
US5796342A (en) * | 1996-05-10 | 1998-08-18 | Panov; Yuri S. | Diagnosing flame characteristics in the time domain |
US5934374A (en) * | 1996-08-01 | 1999-08-10 | Halliburton Energy Services, Inc. | Formation tester with improved sample collection system |
US6058773A (en) * | 1997-05-16 | 2000-05-09 | Schlumberger Technology Corporation | Apparatus and method for sampling formation fluids above the bubble point in a low permeability, high pressure formation |
US6176323B1 (en) * | 1997-06-27 | 2001-01-23 | Baker Hughes Incorporated | Drilling systems with sensors for determining properties of drilling fluid downhole |
US5789669A (en) * | 1997-08-13 | 1998-08-04 | Flaum; Charles | Method and apparatus for determining formation pressure |
US6026915A (en) * | 1997-10-14 | 2000-02-22 | Halliburton Energy Services, Inc. | Early evaluation system with drilling capability |
US6006834A (en) * | 1997-10-22 | 1999-12-28 | Halliburton Energy Services, Inc. | Formation evaluation testing apparatus and associated methods |
US6758090B2 (en) * | 1998-06-15 | 2004-07-06 | Schlumberger Technology Corporation | Method and apparatus for the detection of bubble point pressure |
US6178815B1 (en) * | 1998-07-30 | 2001-01-30 | Schlumberger Technology Corporation | Method to improve the quality of a formation fluid sample |
US6343507B1 (en) * | 1998-07-30 | 2002-02-05 | Schlumberger Technology Corporation | Method to improve the quality of a formation fluid sample |
US6230557B1 (en) * | 1998-08-04 | 2001-05-15 | Schlumberger Technology Corporation | Formation pressure measurement while drilling utilizing a non-rotating sleeve |
US6157032A (en) * | 1998-11-04 | 2000-12-05 | Schlumberger Technologies, Inc. | Sample shape determination by measurement of surface slope with a scanning electron microscope |
US6325146B1 (en) * | 1999-03-31 | 2001-12-04 | Halliburton Energy Services, Inc. | Methods of downhole testing subterranean formations and associated apparatus therefor |
US6334489B1 (en) * | 1999-07-19 | 2002-01-01 | Wood Group Logging Services Holding Inc. | Determining subsurface fluid properties using a downhole device |
US6147437A (en) * | 1999-08-11 | 2000-11-14 | Schlumberger Technology Corporation | Pressure and temperature transducer |
US6343650B1 (en) * | 1999-10-26 | 2002-02-05 | Halliburton Energy Services, Inc. | Test, drill and pull system and method of testing and drilling a well |
WO2001033044A1 (en) | 1999-11-05 | 2001-05-10 | Halliburton Energy Services, Inc. | Drilling formation tester, apparatus and methods of testing and monitoring status of tester |
US6340062B1 (en) * | 2000-01-24 | 2002-01-22 | Halliburton Energy Services, Inc. | Early formation evaluation tool |
WO2002006634A1 (en) * | 2000-07-19 | 2002-01-24 | Schlumberger Technology B.V. | A method of determining properties relating to an underbalanced well |
US6568487B2 (en) * | 2000-07-20 | 2003-05-27 | Baker Hughes Incorporated | Method for fast and extensive formation evaluation using minimum system volume |
EP1381755B1 (en) | 2000-07-20 | 2007-12-26 | Baker Hughes Incorporated | Drawdown apparatus and method for in-situ analysis of formation fluids |
US6427530B1 (en) * | 2000-10-27 | 2002-08-06 | Baker Hughes Incorporated | Apparatus and method for formation testing while drilling using combined absolute and differential pressure measurement |
US6474152B1 (en) * | 2000-11-02 | 2002-11-05 | Schlumberger Technology Corporation | Methods and apparatus for optically measuring fluid compressibility downhole |
US6761062B2 (en) * | 2000-12-06 | 2004-07-13 | Allen M. Shapiro | Borehole testing system |
CN1256578C (zh) * | 2001-06-07 | 2006-05-17 | 西安石油大学 | 全储层取样测试器 |
US7011155B2 (en) | 2001-07-20 | 2006-03-14 | Baker Hughes Incorporated | Formation testing apparatus and method for optimizing draw down |
US7059179B2 (en) * | 2001-09-28 | 2006-06-13 | Halliburton Energy Services, Inc. | Multi-probe pressure transient analysis for determination of horizontal permeability, anisotropy and skin in an earth formation |
US6843118B2 (en) * | 2002-03-08 | 2005-01-18 | Halliburton Energy Services, Inc. | Formation tester pretest using pulsed flow rate control |
US6932167B2 (en) * | 2002-05-17 | 2005-08-23 | Halliburton Energy Services, Inc. | Formation testing while drilling data compression |
US6672386B2 (en) * | 2002-06-06 | 2004-01-06 | Baker Hughes Incorporated | Method for in-situ analysis of formation parameters |
US6832515B2 (en) * | 2002-09-09 | 2004-12-21 | Schlumberger Technology Corporation | Method for measuring formation properties with a time-limited formation test |
US6986282B2 (en) | 2003-02-18 | 2006-01-17 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
CN1759229B (zh) * | 2003-03-10 | 2010-05-05 | 贝克休斯公司 | 通过岩层速率分析技术进行泵送质量控制的方法和装置 |
US7181960B2 (en) * | 2004-08-26 | 2007-02-27 | Baker Hughes Incorporated | Determination of correct horizontal and vertical permeabilities in a deviated well |
-
2002
- 2002-09-09 US US10/237,394 patent/US6832515B2/en not_active Expired - Lifetime
-
2003
- 2003-05-09 US US10/434,923 patent/US7263880B2/en not_active Expired - Fee Related
- 2003-09-02 EP EP05006754A patent/EP1553260A3/en not_active Withdrawn
- 2003-09-02 EP EP07023533.8A patent/EP1898046B1/en not_active Expired - Lifetime
- 2003-09-09 CN CN2007101379439A patent/CN101092874B/zh not_active Expired - Fee Related
-
2004
- 2004-11-15 US US10/989,185 patent/US7290443B2/en not_active Expired - Lifetime
- 2004-11-15 US US10/989,190 patent/US7210344B2/en not_active Expired - Lifetime
- 2004-11-15 US US10/989,158 patent/US7024930B2/en not_active Expired - Lifetime
- 2004-11-15 US US10/989,224 patent/US7117734B2/en not_active Expired - Lifetime
- 2004-11-15 US US10/989,165 patent/US7036579B2/en not_active Expired - Lifetime
-
2009
- 2009-04-30 NO NO20091723A patent/NO340077B1/no not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
CN101092874A (zh) | 2007-12-26 |
US20040045706A1 (en) | 2004-03-11 |
US20050173113A1 (en) | 2005-08-11 |
EP1553260A3 (en) | 2005-07-20 |
EP1553260A2 (en) | 2005-07-13 |
US7290443B2 (en) | 2007-11-06 |
EP1898046A2 (en) | 2008-03-12 |
US7036579B2 (en) | 2006-05-02 |
US6832515B2 (en) | 2004-12-21 |
NO340077B1 (no) | 2017-03-06 |
US7263880B2 (en) | 2007-09-04 |
US20050187715A1 (en) | 2005-08-25 |
US7117734B2 (en) | 2006-10-10 |
US20050098312A1 (en) | 2005-05-12 |
US20070175273A1 (en) | 2007-08-02 |
US20040050588A1 (en) | 2004-03-18 |
EP1898046A3 (en) | 2008-12-17 |
US7210344B2 (en) | 2007-05-01 |
US20050087009A1 (en) | 2005-04-28 |
EP1898046B1 (en) | 2013-11-13 |
CN101092874B (zh) | 2011-07-06 |
US7024930B2 (en) | 2006-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20091723L (no) | Fremgangsmate for maling av formasjonsegenskaper med tidsbegrenset formasjonstest | |
NO20065932L (no) | Fremgangsmater for anvendelse av en formasjonstester | |
NO20064018L (no) | Fremgangsmater for maling av en formasjons overtrykk | |
NO20064386L (no) | Fremgangsmate og anordning for a pavise sprekker fra tidligere frakturering i underjordiske formasjoner | |
WO2007069201A3 (en) | System and method for treatment of a well | |
WO2008106376A3 (en) | Logging method for determining characteristic of fluid in a downhole measurement region | |
NO20063888L (no) | Fremgangsmate og apparat for fluidanalyse | |
NO20054033L (no) | Fremgangsmate og apparat for pumpekvalitetskontroll ved formasjonsrateanalyseteknikker | |
EP1710575A3 (fr) | Procédé de détermination de la teneur en au mois un gaz donné dans une boue de forage, dispositif et installation associes | |
MY151387A (en) | Circulation control valve and associated method | |
CA2546080A1 (en) | Technique and apparatus for use in well testing | |
GB2383600A (en) | Method and apparatus for formation damage removal | |
WO2009139992A3 (en) | Methods and apparatus to control a formation testing operation based on a mudcake leakage | |
WO2009138911A3 (en) | Methods and apparatus for characterization of petroleum fluids contaminated with drilling mud | |
NO20061444L (no) | Apparat og fremgangsmate for avfoling av nedihullsparametere | |
NO20091546L (no) | Fremgangsmate og apparat for a styre bunnhullstrykk i en underjordisk formasjon under borepumpeoperasjon | |
NO20100152L (no) | Bronn-fluidfilter | |
WO2003065037A3 (en) | Method and apparatus for measuring membrane permeability | |
NO20084535L (no) | Borevaeske og fremgangsmate for a redusere tapt sirkulasjon | |
WO2008087478A3 (en) | Methods and apparatus for multi dimension fluorescence spectrum measurement and correlations downhole | |
EP1445587A4 (en) | METHOD FOR MEASURING THE FLOW OF A FLUID MOVING INTO A TUBE OR A ROLE-DISTINCT FLOW | |
EP2045437A3 (en) | Wellbore fluid treatment tubular and method | |
CA2539015C (en) | Method for designing formation tester for a well | |
WO2014150722A3 (en) | Method and apparatus for measuring drilling fluid properties | |
NO20055641L (no) | Fremgangsmate for a behandle en underjordisk formasjon og vannbasert behandlingsvaeske til bruk ved utforelsen av fremgangsmaten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK1K | Patent expired |