US7213037B2
(en)
|
2003-01-13 |
2007-05-01 |
I2 Technologies Us, Inc. |
Master data management system for centrally managing cached data representing core enterprise reference data maintained as locked in true state read only access until completion of manipulation process
|
US7539625B2
(en)
*
|
2004-03-17 |
2009-05-26 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
|
US7876705B2
(en)
*
|
2003-06-25 |
2011-01-25 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product
|
US7725302B2
(en)
*
|
2003-12-02 |
2010-05-25 |
Schlumberger Technology Corporation |
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
|
US7636671B2
(en)
*
|
2004-08-30 |
2009-12-22 |
Halliburton Energy Services, Inc. |
Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
|
US8868440B1
(en)
*
|
2005-01-07 |
2014-10-21 |
Sprint Communications Company L.P. |
Forecasting and analysis tool
|
FR2886742B1
(fr)
*
|
2005-06-02 |
2007-07-27 |
Inst Francais Du Petrole |
Methode de changement d'echelle des permeabilites absolues pour construire un modele de simulation d'ecoulement
|
US20070016389A1
(en)
*
|
2005-06-24 |
2007-01-18 |
Cetin Ozgen |
Method and system for accelerating and improving the history matching of a reservoir simulation model
|
US20070032994A1
(en)
*
|
2005-08-02 |
2007-02-08 |
Kimminau Stephen J |
System and method of flow assurance in a well
|
US8145463B2
(en)
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
US8504341B2
(en)
*
|
2006-01-31 |
2013-08-06 |
Landmark Graphics Corporation |
Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
|
US9043188B2
(en)
*
|
2006-09-01 |
2015-05-26 |
Chevron U.S.A. Inc. |
System and method for forecasting production from a hydrocarbon reservoir
|
US8335677B2
(en)
*
|
2006-09-01 |
2012-12-18 |
Chevron U.S.A. Inc. |
Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies
|
US7877246B2
(en)
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8626557B2
(en)
*
|
2006-09-26 |
2014-01-07 |
International Business Machines Corporation |
System and method of providing snapshot to support approval of workflow changes
|
US7895241B2
(en)
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
CA2665116C
(en)
|
2006-10-30 |
2011-07-19 |
Schlumberger Canada Limited |
System and method for performing oilfield simulation operations
|
US20080126168A1
(en)
*
|
2006-11-15 |
2008-05-29 |
Schlumberger Technology Corporation |
Oilfield management system
|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
US9175547B2
(en)
*
|
2007-06-05 |
2015-11-03 |
Schlumberger Technology Corporation |
System and method for performing oilfield production operations
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8020437B2
(en)
*
|
2007-06-26 |
2011-09-20 |
Schlumberger Technology Corporation |
Method and apparatus to quantify fluid sample quality
|
US8914267B2
(en)
*
|
2007-07-18 |
2014-12-16 |
Chevron U.S.A. Inc. |
Systems and methods for diagnosing production problems in oil field operations
|
US8046314B2
(en)
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US8244509B2
(en)
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
US7900700B2
(en)
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
FR2919932B1
(fr)
*
|
2007-08-06 |
2009-12-04 |
Inst Francais Du Petrole |
Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes
|
US8156131B2
(en)
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
US9070172B2
(en)
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
WO2009061903A2
(en)
*
|
2007-11-10 |
2009-05-14 |
Landmark Graphics Corporation |
Systems and methods for workflow automation, adaptation and integration
|
US8437996B2
(en)
|
2007-12-13 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
WO2009075946A1
(en)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Iterative reservior surveillance
|
US8396826B2
(en)
|
2007-12-17 |
2013-03-12 |
Landmark Graphics Corporation |
Systems and methods for optimization of real time production operations
|
US8073665B2
(en)
|
2008-03-07 |
2011-12-06 |
Schlumberger Technology Corporation |
Analyzing an oilfield network for oilfield production
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
US7966166B2
(en)
*
|
2008-04-18 |
2011-06-21 |
Schlumberger Technology Corp. |
Method for determining a set of net present values to influence the drilling of a wellbore and increase production
|
US8527248B2
(en)
*
|
2008-04-18 |
2013-09-03 |
Westerngeco L.L.C. |
System and method for performing an adaptive drilling operation
|
US8793111B2
(en)
*
|
2009-01-20 |
2014-07-29 |
Schlumberger Technology Corporation |
Automated field development planning
|
AU2009238481B2
(en)
|
2008-04-22 |
2014-01-30 |
Exxonmobil Upstream Research Company |
Functional-based knowledge analysis in a 2D and 3D visual environment
|
US8095349B2
(en)
*
|
2008-05-30 |
2012-01-10 |
Kelkar And Associates, Inc. |
Dynamic updating of simulation models
|
US8499829B2
(en)
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
US8892407B2
(en)
*
|
2008-10-01 |
2014-11-18 |
Exxonmobil Upstream Research Company |
Robust well trajectory planning
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
WO2010053618A1
(en)
*
|
2008-11-06 |
2010-05-14 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
US8301426B2
(en)
*
|
2008-11-17 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
BRPI0923412A2
(pt)
*
|
2008-12-16 |
2016-05-24 |
Exxonmobil Upstream Res Co |
método, e, produto de programa de computador.
|
EA201170931A1
(ru)
*
|
2009-01-13 |
2012-01-30 |
Эксонмобил Апстрим Рисерч Компани |
Оптимизация планов эксплуатации скважины
|
GB2471139A
(en)
*
|
2009-06-19 |
2010-12-22 |
Kongsberg Maritime As Oil And Gas |
Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility
|
WO2011096964A1
(en)
|
2010-02-03 |
2011-08-11 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
CN102754105B
(zh)
|
2010-02-12 |
2016-05-25 |
埃克森美孚上游研究公司 |
用于创建历史匹配模拟模型的方法和系统
|
CN102741855B
(zh)
|
2010-02-12 |
2016-10-26 |
埃克森美孚上游研究公司 |
用于将并行模拟模型分区的方法和系统
|
US8731872B2
(en)
*
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
WO2011112221A1
(en)
|
2010-03-12 |
2011-09-15 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
US8484610B2
(en)
*
|
2010-03-17 |
2013-07-09 |
Microsoft Corporation |
Workflow execution model
|
US8731887B2
(en)
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8700371B2
(en)
*
|
2010-07-16 |
2014-04-15 |
Schlumberger Technology Corporation |
System and method for controlling an advancing fluid front of a reservoir
|
RU2573746C2
(ru)
*
|
2010-07-30 |
2016-01-27 |
Эксонмобил Апстрим Рисерч Компани |
Система и способы для прогнозирования поведения скважины
|
EP2601642B1
(de)
|
2010-08-04 |
2018-06-13 |
Exxonmobil Upstream Research Company |
System und verfahren zur zusammenfassung von daten auf einem unstrukturierten gitter
|
US8731875B2
(en)
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
WO2012027020A1
(en)
|
2010-08-24 |
2012-03-01 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
CN102073772A
(zh)
*
|
2011-01-18 |
2011-05-25 |
大庆油田有限责任公司 |
一种mdt压力数值测试模拟方法
|
CA2823017A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
AU2011360212B2
(en)
|
2011-02-21 |
2017-02-02 |
Exxonmobil Upstream Research Company |
Reservoir connectivity analysis in a 3D earth model
|
WO2012115630A1
(en)
*
|
2011-02-23 |
2012-08-30 |
Landmark Graphics Corporation |
Method and systems of determining viable hydraulic fracture scenarios
|
US9223594B2
(en)
|
2011-07-01 |
2015-12-29 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
US8731892B2
(en)
|
2011-08-02 |
2014-05-20 |
Saudi Arabian Oil Company |
Systems and program product for performing a fully automated workflow for well performance model creation and calibration
|
US8688426B2
(en)
|
2011-08-02 |
2014-04-01 |
Saudi Arabian Oil Company |
Methods for performing a fully automated workflow for well performance model creation and calibration
|
CA2843733C
(en)
*
|
2011-08-02 |
2017-03-21 |
Saudi Arabian Oil Comapny |
Systems and program product for performing a fully automated workflow for well performance model creation and calibration
|
US9372827B2
(en)
*
|
2011-09-30 |
2016-06-21 |
Commvault Systems, Inc. |
Migration of an existing computing system to new hardware
|
CN102402184B
(zh)
*
|
2011-10-28 |
2013-09-11 |
中国石油集团川庆钻探工程有限公司 |
井筒压力模型预测系统控制方法
|
WO2013169429A1
(en)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Canvas control for 3d data volume processing
|
RU2594405C2
(ru)
*
|
2012-05-30 |
2016-08-20 |
Лэндмарк Графикс Корпорейшн |
Способ добычи нефти или газа с применением компьютерного моделирования нефтяного или газового месторождения и эксплуатационного оборудования
|
CA2877479A1
(en)
*
|
2012-06-21 |
2013-12-27 |
Halliburton Energy Services, Inc. |
Method and apparatus for formation tester data interpretation with diverse flow models
|
US20140172306A1
(en)
*
|
2012-12-18 |
2014-06-19 |
Schlumberger Technology Corporation |
Integrated oilfield decision making system and method
|
US20140214476A1
(en)
*
|
2013-01-31 |
2014-07-31 |
Halliburton Energy Services, Inc. |
Data initialization for a subterranean operation
|
WO2014200685A2
(en)
|
2013-06-10 |
2014-12-18 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
AU2014306491B2
(en)
*
|
2013-08-16 |
2016-03-03 |
Landmark Graphics Corporation |
Creating a thickness grid for determining reserve estimates for a reservoir
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
US10605797B2
(en)
*
|
2014-02-12 |
2020-03-31 |
Schlumberger Technology Corporation |
Fluid analysis methods and apparatus for determining gas-oil ratio
|
US10861110B2
(en)
*
|
2014-08-04 |
2020-12-08 |
Schlumberger Technology Corporation |
Collaborative system and method for performing wellsite tasks
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
BR112017006134B1
(pt)
*
|
2014-09-25 |
2021-07-13 |
Total S.A. |
Produção de hidrocarbonetos com separador de teste
|
US20160108706A1
(en)
*
|
2014-10-17 |
2016-04-21 |
Schlumberger Technology Corporation |
Reservoir simulation system and method
|
WO2016073319A1
(en)
*
|
2014-11-05 |
2016-05-12 |
Schlumberger Canada Limited |
Integrated oilfield decision making system and method
|
US10280731B2
(en)
*
|
2014-12-03 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
Energy industry operation characterization and/or optimization
|
US10401808B2
(en)
|
2015-01-28 |
2019-09-03 |
Schlumberger Technology Corporation |
Methods and computing systems for processing and transforming collected data to improve drilling productivity
|
GB2558423B
(en)
*
|
2015-08-27 |
2021-04-28 |
Halliburton Energy Services Inc |
Tuning predictions of wellbore operation parameters
|
GB2555743B
(en)
|
2015-08-27 |
2021-07-14 |
Halliburton Energy Services Inc |
Predicting wellbore operation parameters
|
GB2557054B
(en)
*
|
2015-08-27 |
2021-07-14 |
Halliburton Energy Services Inc |
Determining sources of erroneous downhole predictions
|
US10191108B2
(en)
*
|
2015-11-19 |
2019-01-29 |
Globalfoundries Inc. |
On-chip sensor for monitoring active circuits on integrated circuit (IC) chips
|
US11230924B2
(en)
|
2016-12-19 |
2022-01-25 |
Schlumberger Technology Corporation |
Interpretation of pressure test data
|
CA3047723C
(en)
*
|
2016-12-19 |
2024-06-18 |
Conocophillips Company |
Subsurface modeler workflow and tool
|
CA3043756C
(en)
|
2016-12-29 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Method and system for regression and classification in subsurface models to support decision making for hydrocarbon operations
|
WO2018144687A1
(en)
*
|
2017-02-03 |
2018-08-09 |
The Curators Of The University Of Missouri |
Physical resource optimization system and associated method of use
|
US10508521B2
(en)
|
2017-06-05 |
2019-12-17 |
Saudi Arabian Oil Company |
Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions
|
RU2658422C1
(ru)
*
|
2017-06-06 |
2018-06-21 |
Общество с ограниченной ответственностью "Конкорд" |
Способ назначения нагнетательных и добывающих скважин и изменения их интервалов перфораций
|
US11126762B2
(en)
|
2018-02-28 |
2021-09-21 |
Saudi Arabian Oil Company |
Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
|
CN110359903A
(zh)
*
|
2018-04-09 |
2019-10-22 |
中国石油天然气股份有限公司 |
一种封闭气藏不规则几何边界的确定方法
|
US11719842B2
(en)
*
|
2018-11-14 |
2023-08-08 |
International Business Machines Corporation |
Machine learning platform for processing data maps
|
WO2020142257A1
(en)
|
2018-12-31 |
2020-07-09 |
Exxonmobil Upstream Research Company |
Method and system for evaluating variability in subsurface models to support decision making for hydrocarbon operations
|
US20200240259A1
(en)
*
|
2019-01-25 |
2020-07-30 |
Ge Inspection Technologies, Lp |
Flow network model analysis
|
US11429670B2
(en)
*
|
2019-07-16 |
2022-08-30 |
Schlumberger Technology Corporation |
Geologic formation operations framework control
|
US11488068B2
(en)
*
|
2020-04-10 |
2022-11-01 |
Microsoft Technology Licensing, Llc |
Machine-learned predictive models and systems for data preparation recommendations
|
US11493654B2
(en)
*
|
2020-05-11 |
2022-11-08 |
Saudi Arabian Oil Company |
Construction of a high-resolution advanced 3D transient model with multiple wells by integrating pressure transient data into static geological model
|