NO20045471L - Fremgangsmate for a bestemme trykk i jordformasjoner - Google Patents
Fremgangsmate for a bestemme trykk i jordformasjonerInfo
- Publication number
- NO20045471L NO20045471L NO20045471A NO20045471A NO20045471L NO 20045471 L NO20045471 L NO 20045471L NO 20045471 A NO20045471 A NO 20045471A NO 20045471 A NO20045471 A NO 20045471A NO 20045471 L NO20045471 L NO 20045471L
- Authority
- NO
- Norway
- Prior art keywords
- depth range
- pressure
- determining
- permeability
- time
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000004181 pedogenesis Methods 0.000 title 1
- 230000015572 biosynthetic process Effects 0.000 abstract 7
- 238000005755 formation reaction Methods 0.000 abstract 7
- 230000000737 periodic effect Effects 0.000 abstract 4
- 230000035699 permeability Effects 0.000 abstract 4
- 238000005553 drilling Methods 0.000 abstract 1
- 239000010802 sludge Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics And Detection Of Objects (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Examining Or Testing Airtightness (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/769,014 US7031841B2 (en) | 2004-01-30 | 2004-01-30 | Method for determining pressure of earth formations |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20045471D0 NO20045471D0 (no) | 2004-12-15 |
NO20045471L true NO20045471L (no) | 2005-08-01 |
Family
ID=34080911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20045471A NO20045471L (no) | 2004-01-30 | 2004-12-15 | Fremgangsmate for a bestemme trykk i jordformasjoner |
Country Status (9)
Country | Link |
---|---|
US (1) | US7031841B2 (zh) |
CN (1) | CN100432372C (zh) |
AU (1) | AU2004237814B2 (zh) |
CA (1) | CA2491192C (zh) |
FR (1) | FR2865762B1 (zh) |
GB (1) | GB2410511B (zh) |
MX (1) | MXPA05000490A (zh) |
NO (1) | NO20045471L (zh) |
RU (1) | RU2362875C2 (zh) |
Families Citing this family (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8210260B2 (en) * | 2002-06-28 | 2012-07-03 | Schlumberger Technology Corporation | Single pump focused sampling |
US8555968B2 (en) * | 2002-06-28 | 2013-10-15 | Schlumberger Technology Corporation | Formation evaluation system and method |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
US8899323B2 (en) | 2002-06-28 | 2014-12-02 | Schlumberger Technology Corporation | Modular pumpouts and flowline architecture |
US7805247B2 (en) * | 2002-09-09 | 2010-09-28 | Schlumberger Technology Corporation | System and methods for well data compression |
GB2419424B (en) * | 2004-10-22 | 2007-03-28 | Schlumberger Holdings | Method and system for estimating the amount of supercharging in a formation |
US8132453B2 (en) * | 2005-05-10 | 2012-03-13 | Schlumberger Technology Corporation | Method for analysis of pressure response in underground formations |
US7361887B2 (en) * | 2005-07-26 | 2008-04-22 | Baker Hughes Incorporated | Measurement of formation gas pressure in cased wellbores using pulsed neutron instrumentation |
WO2007124041A2 (en) * | 2006-04-20 | 2007-11-01 | Baker Hughes Incorporated | A system and method for estimating supercharge pressure and initial pressure of a formation |
EP2057577A4 (en) * | 2006-08-14 | 2009-07-22 | Exxonmobil Upstream Res Co | ENHANCED MULTIPORT FLOW APPROXIMATION |
US7594541B2 (en) | 2006-12-27 | 2009-09-29 | Schlumberger Technology Corporation | Pump control for formation testing |
US20080230221A1 (en) * | 2007-03-21 | 2008-09-25 | Schlumberger Technology Corporation | Methods and systems for monitoring near-wellbore and far-field reservoir properties using formation-embedded pressure sensors |
US7577023B2 (en) * | 2007-05-04 | 2009-08-18 | Qimonda North America Corp. | Memory including write circuit for providing multiple reset pulses |
US7542853B2 (en) * | 2007-06-18 | 2009-06-02 | Conocophillips Company | Method and apparatus for geobaric analysis |
US8397809B2 (en) | 2007-10-23 | 2013-03-19 | Schlumberger Technology Corporation | Technique and apparatus to perform a leak off test in a well |
US7765862B2 (en) * | 2007-11-30 | 2010-08-03 | Schlumberger Technology Corporation | Determination of formation pressure during a drilling operation |
US8042387B2 (en) * | 2008-05-16 | 2011-10-25 | Schlumberger Technology Corporation | Methods and apparatus to control a formation testing operation based on a mudcake leakage |
WO2009142868A2 (en) | 2008-05-23 | 2009-11-26 | Schlumberger Canada Limited | Drilling wells in compartmentalized reservoirs |
US8120357B2 (en) * | 2008-05-30 | 2012-02-21 | Schlumberger Technology Corporation | Method and system for fluid characterization of a reservoir |
US8015869B2 (en) * | 2008-09-02 | 2011-09-13 | Schlumberger Technology Corporation | Methods and apparatus to perform pressure testing of geological formations |
CN101403294B (zh) * | 2008-11-06 | 2012-05-23 | 中国石化集团胜利石油管理局地质录井公司 | 一种pdc钻头与牙轮钻头互换时的地层压力检测方法 |
US8473214B2 (en) * | 2009-04-24 | 2013-06-25 | Schlumberger Technology Corporation | Thickness-independent computation of horizontal and vertical permeability |
GB2515411B (en) * | 2009-10-09 | 2015-06-10 | Senergy Holdings Ltd | Well simulation |
IT1402183B1 (it) * | 2010-09-14 | 2013-08-28 | Torino Politecnico | Procedimento di prova di pozzo, in particolare per idrocarburi, a interferenza armonica |
RU2449122C9 (ru) * | 2010-11-18 | 2012-07-20 | Государственное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" | Способ определения упругих характеристик горной породы по данным измерений в скважине |
US20120179379A1 (en) * | 2011-01-10 | 2012-07-12 | Saudi Arabian Oil Company | Flow Profile Modeling for Wells |
US9581019B2 (en) * | 2011-03-23 | 2017-02-28 | Schlumberger Technology Corporation | Measurement pretest drawdown methods and apparatus |
PL408174A1 (pl) | 2011-07-11 | 2014-12-22 | Schlumberger Technology B.V. | Układ i sposób przeprowadzania operacji stymulacji odwiertu |
MX351081B (es) | 2012-06-13 | 2017-09-29 | Halliburton Energy Services Inc | Aparato y método para pruebas de pulso de un yacimiento. |
CN102720487B (zh) * | 2012-06-29 | 2015-10-14 | 中国石油天然气股份有限公司 | 一种获取气藏地层压力系统及其方法 |
CN103015996B (zh) * | 2012-12-31 | 2014-03-19 | 中国石油大学(华东) | 钻前预测高陡构造地层漏失速率的方法 |
CN103244108B (zh) * | 2013-06-05 | 2014-06-25 | 中国石油大学(华东) | 井喷无法关井情况下的地层压力确定方法 |
US20150057935A1 (en) * | 2013-08-22 | 2015-02-26 | Baker Hughes Incorporated | Modified flow rate analysis |
GB2533847B (en) * | 2014-11-06 | 2017-04-05 | Logined Bv | Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory |
CA2986777C (en) * | 2015-07-06 | 2021-03-09 | The Regents Of The University Of California | Determination of the optimal fluid pulses for enhancement of reservoir permeability and productivity |
WO2017015340A1 (en) | 2015-07-20 | 2017-01-26 | Pietro Fiorentini Spa | Systems and methods for monitoring changes in a formation while dynamically flowing fluids |
CN105484722B (zh) * | 2015-11-25 | 2018-06-05 | 中国石油大学(华东) | 一种模拟通道压裂泵注方式及测量通道率的装置和工作方法 |
WO2017099796A1 (en) * | 2015-12-11 | 2017-06-15 | Halliburton Energy Services, Inc. | Mud cake correction of formation measurement data |
CN106194164B (zh) * | 2016-08-10 | 2019-04-12 | 中国石油天然气股份有限公司 | 边底水油藏开发岩心实验模拟方法 |
EA034881B1 (ru) * | 2017-01-11 | 2020-04-01 | Общество С Ограниченной Ответственностью "Сонограм" | Способ определения гидродинамических параметров многопластовых скважин |
US11156082B2 (en) * | 2017-06-21 | 2021-10-26 | Schlumberger Technology Corporation | Downhole characterization of formation pressure |
US10704369B2 (en) * | 2017-06-22 | 2020-07-07 | Saudi Arabian Oil Company | Simultaneous injection and fracturing interference testing |
CN109577969B (zh) * | 2018-12-07 | 2021-10-22 | 中国地质大学(武汉) | 一种基于岩石压缩系数计算碳酸盐岩地层孔隙压力的方法 |
CN111608647B (zh) * | 2020-04-14 | 2023-07-21 | 中国石油化工股份有限公司 | 一种注水注聚井区地层压力预测方法 |
US11649724B2 (en) * | 2020-06-25 | 2023-05-16 | Halliburton Energy Services, Inc. | Formation testing and sampling tool for stimulation of tight and ultra-tight formations |
CN111963149B (zh) * | 2020-08-26 | 2024-03-01 | 中国石油天然气集团有限公司 | 一种考虑滞地液量增压的压裂后地层压力求取方法 |
US11501623B1 (en) * | 2021-05-14 | 2022-11-15 | China University Of Geosciences (Wuhan) | Arrangement apparatus for multiple integrated sensors in deep position of sliding mass and arrangement method |
CN113605879B (zh) * | 2021-08-02 | 2023-03-21 | 中国石油大学(北京) | 煤储层原始地层压力的计算方法及装置 |
US11913329B1 (en) | 2022-09-21 | 2024-02-27 | Saudi Arabian Oil Company | Untethered logging devices and related methods of logging a wellbore |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3934468A (en) | 1975-01-22 | 1976-01-27 | Schlumberger Technology Corporation | Formation-testing apparatus |
FR2544790B1 (fr) | 1983-04-22 | 1985-08-23 | Flopetrol | Methode de determination des caracteristiques d'une formation souterraine produisant un fluide |
US4833914A (en) | 1988-04-29 | 1989-05-30 | Anadrill, Inc. | Pore pressure formation evaluation while drilling |
US4860581A (en) | 1988-09-23 | 1989-08-29 | Schlumberger Technology Corporation | Down hole tool for determination of formation properties |
US5138877A (en) * | 1990-06-25 | 1992-08-18 | Louisiana State University And Agricultural And Mechanical College | Method and apparatus for intersecting a blowout well from a relief well |
US5226310A (en) | 1990-08-31 | 1993-07-13 | Exxon Production Research Company | Methods and apparatuses for measurement of the strengths, pore pressures, and mechanical properties of low permeability geologic materials |
US5205164A (en) * | 1990-08-31 | 1993-04-27 | Exxon Production Research Company | Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters |
US5144589A (en) | 1991-01-22 | 1992-09-01 | Western Atlas International, Inc. | Method for predicting formation pore-pressure while drilling |
US5233866A (en) * | 1991-04-22 | 1993-08-10 | Gulf Research Institute | Apparatus and method for accurately measuring formation pressures |
NO930044L (no) | 1992-01-09 | 1993-07-12 | Baker Hughes Inc | Fremgangsmaate til vurdering av formasjoner og borkronetilstander |
US5282384A (en) | 1992-10-05 | 1994-02-01 | Baroid Technology, Inc. | Method for calculating sedimentary rock pore pressure |
US5602334A (en) | 1994-06-17 | 1997-02-11 | Halliburton Company | Wireline formation testing for low permeability formations utilizing pressure transients |
CA2155918C (en) | 1994-08-15 | 2001-10-09 | Roger Lynn Schultz | Integrated well drilling and evaluation |
US6157893A (en) | 1995-03-31 | 2000-12-05 | Baker Hughes Incorporated | Modified formation testing apparatus and method |
US5672819A (en) | 1996-03-13 | 1997-09-30 | Halliburton Energy Services, Inc. | Formation evaluation using phase shift periodic pressure pulse testing |
US5644076A (en) | 1996-03-14 | 1997-07-01 | Halliburton Energy Services, Inc. | Wireline formation tester supercharge correction method |
US6148912A (en) * | 1997-03-25 | 2000-11-21 | Dresser Industries, Inc. | Subsurface measurement apparatus, system, and process for improved well drilling control and production |
US5789669A (en) | 1997-08-13 | 1998-08-04 | Flaum; Charles | Method and apparatus for determining formation pressure |
DE60136661D1 (de) * | 2000-07-20 | 2009-01-02 | Baker Hughes Inc | Vorrichtung zur Absaugung von Flüssigkeitsproben und Verfahren zur Vorortsanalyse der Formationsflüssigkeiten |
US6544076B2 (en) * | 2001-07-10 | 2003-04-08 | Alan L. Pocrass | Dual function RJ connector |
US6907797B2 (en) | 2002-11-12 | 2005-06-21 | Baker Hughes Incorporated | Method and apparatus for supercharging downhole sample tanks |
US7331223B2 (en) | 2003-01-27 | 2008-02-19 | Schlumberger Technology Corporation | Method and apparatus for fast pore pressure measurement during drilling operations |
US6904365B2 (en) * | 2003-03-06 | 2005-06-07 | Schlumberger Technology Corporation | Methods and systems for determining formation properties and in-situ stresses |
-
2004
- 2004-01-30 US US10/769,014 patent/US7031841B2/en not_active Expired - Lifetime
- 2004-12-08 AU AU2004237814A patent/AU2004237814B2/en not_active Ceased
- 2004-12-09 GB GB0426945A patent/GB2410511B/en not_active Expired - Fee Related
- 2004-12-15 NO NO20045471A patent/NO20045471L/no not_active Application Discontinuation
- 2004-12-30 CA CA002491192A patent/CA2491192C/en not_active Expired - Fee Related
-
2005
- 2005-01-11 MX MXPA05000490A patent/MXPA05000490A/es active IP Right Grant
- 2005-01-28 RU RU2005102137/03A patent/RU2362875C2/ru not_active IP Right Cessation
- 2005-01-28 FR FR0550246A patent/FR2865762B1/fr not_active Expired - Fee Related
- 2005-01-28 CN CNB2005100063590A patent/CN100432372C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
RU2362875C2 (ru) | 2009-07-27 |
GB0426945D0 (en) | 2005-01-12 |
GB2410511A (en) | 2005-08-03 |
FR2865762B1 (fr) | 2007-03-30 |
NO20045471D0 (no) | 2004-12-15 |
FR2865762A1 (fr) | 2005-08-05 |
MXPA05000490A (es) | 2005-08-16 |
CN100432372C (zh) | 2008-11-12 |
GB2410511B (en) | 2006-10-18 |
RU2005102137A (ru) | 2006-07-10 |
AU2004237814A1 (en) | 2005-08-18 |
CA2491192A1 (en) | 2005-07-30 |
CA2491192C (en) | 2008-06-17 |
US7031841B2 (en) | 2006-04-18 |
CN1648410A (zh) | 2005-08-03 |
AU2004237814B2 (en) | 2006-11-30 |
US20050171699A1 (en) | 2005-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20045471L (no) | Fremgangsmate for a bestemme trykk i jordformasjoner | |
MX356660B (es) | Aparato y método de comunicación de fluido en el fondo de la perforación. | |
NO20041034L (no) | Anordning og framgangsmate for regulering av bunnhullstrykk under boring av offshorebronner pa dypt vann. | |
ATE538285T1 (de) | Bohrsystem und -verfahren mit kontinuierlichem durchfluss | |
GB2490451A (en) | Reverse circulation apparatus and methods for using same | |
MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
NO20074526L (no) | Boresystem omfattende ringromstrykkstyring | |
GB2574132A (en) | Chemically tagged drilling fluid additives | |
EA200870156A1 (ru) | Способ обнаружения входа пластовой текучей среды в ствол скважины или потери бурового раствора в стволе скважины с использованием системы управления динамическим давлением в кольцевом пространстве | |
MXPA05008715A (es) | Aparato y metodo para la evaluacion de formaciones. | |
NO20073534L (no) | Fremgangsmate for a ansla begrenset kompressiv styrke for bergformasjoner ved bruk av skemptonteori | |
MX2010006142A (es) | Metodo y sistema para fracturar formaciones subsuperficiales durante la perforacion de estas. | |
EA200501346A1 (ru) | Способ бурения и заканчивания скважин | |
EA201000363A1 (ru) | Бурение с использованием хвостовика обсадной трубы с пескозащитным фильтром | |
NO341575B1 (no) | Fremgangsmåte for måling av overtrykk i et undergrunnsreservoar krysset av et borehull | |
WO2006101606A3 (en) | Method for running tubulars in wellbores | |
MXPA05009285A (es) | Metodo y aparato para detectar, la presencia y profundidad de agua producida de la formacion mientras se perfora en subequilibrio. | |
MY154155A (en) | Method for determining formation integrity and optimum drilling parameters during drilling | |
GB2467488A (en) | Wellbore drilling system | |
WO2007143384A3 (en) | System and method for reducing the borehole gap for downhole formation testing sensors | |
NO20074146L (no) | Tid- og dybdekorreksjon for signaloverforing via borestreng og vaierlinemalinger som anvender korrelasjon av overflate- og bronnmalinger | |
GB2434606B (en) | Method of drilling and completing multiple wellbores inside a single caisson | |
DK1702135T3 (da) | Fremgangsmåde og indretning til styring af borefluidtryk | |
NO20055658D0 (no) | Anordning og fremgangsmate for formasjonsundersokelse | |
NO20082625L (no) | Brønnboresystem |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |