US7036594B2
(en)
*
|
2000-03-02 |
2006-05-02 |
Schlumberger Technology Corporation |
Controlling a pressure transient in a well
|
BR0203994B1
(pt)
*
|
2001-02-05 |
2011-10-04 |
|
método e aparelho adaptado para continuamente otimizar sistemas de rede de reservatório, poço e superfìcie.
|
CA2442596A1
(fr)
*
|
2001-04-24 |
2002-10-31 |
Exxonmobil Upstream Research Company |
Procede pour ameliorer l'allocation de la production dans un systeme integre a reservoirs et installations de surface
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
US7054750B2
(en)
*
|
2004-03-04 |
2006-05-30 |
Halliburton Energy Services, Inc. |
Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole
|
US7258175B2
(en)
*
|
2004-03-17 |
2007-08-21 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry
|
US7546884B2
(en)
*
|
2004-03-17 |
2009-06-16 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
|
US7627461B2
(en)
*
|
2004-05-25 |
2009-12-01 |
Chevron U.S.A. Inc. |
Method for field scale production optimization by enhancing the allocation of well flow rates
|
GB0419588D0
(en)
*
|
2004-09-03 |
2004-10-06 |
Virtual Well Engineer Ltd |
"Design and control of oil well formation"
|
GB2419707B
(en)
*
|
2004-10-28 |
2006-12-27 |
Schlumberger Holdings |
System and method for placement of packers in open hole wellbores
|
US7277796B2
(en)
*
|
2005-04-26 |
2007-10-02 |
Schlumberger Technology Corporation |
System and methods of characterizing a hydrocarbon reservoir
|
US20070016389A1
(en)
*
|
2005-06-24 |
2007-01-18 |
Cetin Ozgen |
Method and system for accelerating and improving the history matching of a reservoir simulation model
|
CA2616835C
(fr)
|
2005-07-27 |
2015-09-29 |
Exxonmobil Upstream Research Company |
Modelisation de puits associee a l'extraction d'hydrocarbures dans des formations souterraines
|
US8249844B2
(en)
|
2005-07-27 |
2012-08-21 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
US20070032994A1
(en)
*
|
2005-08-02 |
2007-02-08 |
Kimminau Stephen J |
System and method of flow assurance in a well
|
WO2007089832A1
(fr)
*
|
2006-01-31 |
2007-08-09 |
Landmark Graphics Corporation |
Procédés, systèmes, et supports lisibles par ordinateur pour optimisation de production de champs de pétrole et de gaz en temps réel à l'aide d'un simulateur mandataire
|
US8504341B2
(en)
*
|
2006-01-31 |
2013-08-06 |
Landmark Graphics Corporation |
Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
|
EP1989396A4
(fr)
*
|
2006-02-10 |
2014-08-27 |
Exxonmobil Upstream Res Co |
Procede de completion de puits polyvalent
|
US7857050B2
(en)
|
2006-05-26 |
2010-12-28 |
Schlumberger Technology Corporation |
Flow control using a tortuous path
|
US8025072B2
(en)
*
|
2006-12-21 |
2011-09-27 |
Schlumberger Technology Corporation |
Developing a flow control system for a well
|
US7789145B2
(en)
|
2007-06-20 |
2010-09-07 |
Schlumberger Technology Corporation |
Inflow control device
|
BRPI0817402A2
(pt)
*
|
2007-11-10 |
2019-09-24 |
Landmark Graphics Corp A Halliburton Company |
dispositivos e métodos para automação de fluxos de trabalho, adaptação e integração
|
WO2009075946A1
(fr)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Surveillance itérative de réservoir
|
US9074454B2
(en)
*
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
AU2009238481B2
(en)
|
2008-04-22 |
2014-01-30 |
Exxonmobil Upstream Research Company |
Functional-based knowledge analysis in a 2D and 3D visual environment
|
US8960292B2
(en)
|
2008-08-22 |
2015-02-24 |
Halliburton Energy Services, Inc. |
High rate stimulation method for deep, large bore completions
|
US8439116B2
(en)
*
|
2009-07-24 |
2013-05-14 |
Halliburton Energy Services, Inc. |
Method for inducing fracture complexity in hydraulically fractured horizontal well completions
|
US8892407B2
(en)
*
|
2008-10-01 |
2014-11-18 |
Exxonmobil Upstream Research Company |
Robust well trajectory planning
|
CA2737415C
(fr)
|
2008-11-06 |
2017-03-28 |
Exxonmobil Upstream Research Company |
Systeme et procede de planification d'une operation de forage
|
US9016376B2
(en)
|
2012-08-06 |
2015-04-28 |
Halliburton Energy Services, Inc. |
Method and wellbore servicing apparatus for production completion of an oil and gas well
|
US9796918B2
(en)
|
2013-01-30 |
2017-10-24 |
Halliburton Energy Services, Inc. |
Wellbore servicing fluids and methods of making and using same
|
US8887803B2
(en)
|
2012-04-09 |
2014-11-18 |
Halliburton Energy Services, Inc. |
Multi-interval wellbore treatment method
|
US8631872B2
(en)
|
2009-09-24 |
2014-01-21 |
Halliburton Energy Services, Inc. |
Complex fracturing using a straddle packer in a horizontal wellbore
|
US8403061B2
(en)
*
|
2009-10-02 |
2013-03-26 |
Baker Hughes Incorporated |
Method of making a flow control device that reduces flow of the fluid when a selected property of the fluid is in selected range
|
US8931580B2
(en)
|
2010-02-03 |
2015-01-13 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
EP2545461A4
(fr)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Groupage dynamique d'objets de domaine au moyen de groupes intelligents
|
AU2011293804B2
(en)
|
2010-08-24 |
2016-08-11 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
WO2012102784A1
(fr)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Procédé d'analyse des compartiments d'un réservoir en utilisant la structure topologique d'un modèle de terre 3d
|
WO2012106348A2
(fr)
*
|
2011-01-31 |
2012-08-09 |
M-I Llc |
Procédé permettant réduire l'instabilité d'un puits de forage
|
CA2822890A1
(fr)
|
2011-02-21 |
2012-08-30 |
Exxonmobil Upstream Research Company |
Analyse de la connectivite d'un reservoir dans un modele terrestre 3d
|
NO20110435A1
(no)
*
|
2011-03-22 |
2012-08-13 |
Wellbarrier As |
Verktøy for konstruksjon og vedlikehold av brønner
|
US20120278053A1
(en)
*
|
2011-04-28 |
2012-11-01 |
Baker Hughes Incorporated |
Method of Providing Flow Control Devices for a Production Wellbore
|
US9223594B2
(en)
|
2011-07-01 |
2015-12-29 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
WO2013169429A1
(fr)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Commande de toile pour traitement de données volumétriques 3d
|
US20140129296A1
(en)
*
|
2012-11-07 |
2014-05-08 |
Schlumberger Technology Corporation |
Method and system for offering and procuring well services
|
US10584570B2
(en)
|
2013-06-10 |
2020-03-10 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
CA2914366C
(fr)
|
2013-08-01 |
2017-12-12 |
Landmark Graphics Corporation |
Algorithme pour une configuration icd optimale a l'aide d'un modele puits de forage-reservoir couple
|
WO2015023266A1
(fr)
*
|
2013-08-13 |
2015-02-19 |
Landmark Graphics Corporation |
Méthodologie probabiliste pour forage en temps réel
|
MX357810B
(es)
*
|
2013-08-30 |
2018-07-25 |
Halliburton Energy Services Inc |
Perforacion de fondo de pozo de forma automatizada con perfil de energia y forma del pozo.
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
DE112013007643T5
(de)
*
|
2013-11-27 |
2016-09-08 |
Landmark Graphics Corporation |
Wärmefluss-, Belastungs- und Bohrbeanspruchungsanalyse für Bohrlöcher mit Strahlpumpe
|
WO2015147652A1
(fr)
*
|
2014-03-25 |
2015-10-01 |
Wellbarrier As |
Outil et procédé pour la planification, la construction, le développement, la maintenance et l'abandon de puits de pétrole
|
US10192182B2
(en)
*
|
2014-06-10 |
2019-01-29 |
Wellaware Holdings, Inc. |
Aerial drone for well-site and signal survey
|
US11823517B2
(en)
|
2014-06-12 |
2023-11-21 |
Drilling Tools International, Inc. |
Access monitoring system for compliance
|
US10198883B2
(en)
|
2014-06-12 |
2019-02-05 |
Wellfence Llc |
Access monitoring system for compliance
|
US10713398B2
(en)
|
2016-05-23 |
2020-07-14 |
Saudi Arabian Oil Company |
Iterative and repeatable workflow for comprehensive data and processes integration for petroleum exploration and production assessments
|
US10605054B2
(en)
|
2017-02-15 |
2020-03-31 |
General Electric Co. |
System and method for generating a schedule to extract a resource from a reservoir
|
US10891407B2
(en)
|
2017-03-28 |
2021-01-12 |
Saudi Arabian Oil Company |
System and method for automated-inflow control device design
|
US11180976B2
(en)
|
2018-12-21 |
2021-11-23 |
Exxonmobil Upstream Research Company |
Method and system for unconventional gas lift optimization
|
EP3973143A4
(fr)
|
2019-05-21 |
2023-01-25 |
Services Pétroliers Schlumberger |
Commande de forage
|
US11668847B2
(en)
|
2021-01-04 |
2023-06-06 |
Saudi Arabian Oil Company |
Generating synthetic geological formation images based on rock fragment images
|