NO20023024D0 - Forbedret fremgangsmåte og apparat for å forutse fluidkarakteristikker i et brönnhull - Google Patents
Forbedret fremgangsmåte og apparat for å forutse fluidkarakteristikker i et brönnhullInfo
- Publication number
- NO20023024D0 NO20023024D0 NO20023024A NO20023024A NO20023024D0 NO 20023024 D0 NO20023024 D0 NO 20023024D0 NO 20023024 A NO20023024 A NO 20023024A NO 20023024 A NO20023024 A NO 20023024A NO 20023024 D0 NO20023024 D0 NO 20023024D0
- Authority
- NO
- Norway
- Prior art keywords
- well hole
- state properties
- fluid
- along
- improved method
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 2
- 239000000470 constituent Substances 0.000 abstract 1
- 230000005484 gravity Effects 0.000 abstract 1
- 238000013178 mathematical model Methods 0.000 abstract 1
- 238000005259 measurement Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/26—Oils; Viscous liquids; Paints; Inks
- G01N33/28—Oils, i.e. hydrocarbon liquids
- G01N33/2823—Raw oil, drilling fluid or polyphasic mixtures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Fluid Mechanics (AREA)
- Food Science & Technology (AREA)
- General Chemical & Material Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Biochemistry (AREA)
- Analytical Chemistry (AREA)
- Medicinal Chemistry (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- General Health & Medical Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Geophysics (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Sampling And Sample Adjustment (AREA)
- Measuring Arrangements Characterized By The Use Of Fluids (AREA)
- Measuring Volume Flow (AREA)
- Indicating Or Recording The Presence, Absence, Or Direction Of Movement (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
- Geophysics And Detection Of Objects (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/469,437 US6305216B1 (en) | 1999-12-21 | 1999-12-21 | Method and apparatus for predicting the fluid characteristics in a well hole |
PCT/US2000/033278 WO2001046673A1 (en) | 1999-12-21 | 2000-12-20 | Improved method and apparatus for predicting the fluid characteristics in a well hole |
Publications (3)
Publication Number | Publication Date |
---|---|
NO20023024D0 true NO20023024D0 (no) | 2002-06-21 |
NO20023024L NO20023024L (no) | 2002-06-21 |
NO322629B1 NO322629B1 (no) | 2006-11-06 |
Family
ID=23863806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20023024A NO322629B1 (no) | 1999-12-21 | 2002-06-21 | Forbedret fremgangsmate og apparat for a forutse fluidkarakteristikker i et bronnhull |
Country Status (9)
Country | Link |
---|---|
US (1) | US6305216B1 (no) |
EP (1) | EP1240495B1 (no) |
AT (1) | ATE300041T1 (no) |
AU (1) | AU2072401A (no) |
CA (1) | CA2392618C (no) |
DE (1) | DE60021420T2 (no) |
ES (1) | ES2243334T3 (no) |
NO (1) | NO322629B1 (no) |
WO (1) | WO2001046673A1 (no) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2801996B1 (fr) * | 1999-12-07 | 2002-01-11 | Inst Francais Du Petrole | Methode et systeme pour le calcul de pertes de charge prenant en compte les effets thermiques |
GB2363809B (en) * | 2000-06-21 | 2003-04-02 | Schlumberger Holdings | Chemical sensor for wellbore applications |
FR2816350B1 (fr) * | 2000-11-08 | 2002-12-20 | Inst Francais Du Petrole | Methode de determination d'un profil thermique d'un fluide de forage dans un puits |
FR2842321B1 (fr) * | 2002-07-11 | 2008-12-05 | Inst Francais Du Petrole | Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques |
GB2392731B (en) * | 2002-09-03 | 2005-03-30 | Schlumberger Holdings | Method for interpreting data measured in a hydrocarbon well in production |
US6947870B2 (en) * | 2003-08-18 | 2005-09-20 | Baker Hughes Incorporated | Neural network model for electric submersible pump system |
US7536905B2 (en) * | 2003-10-10 | 2009-05-26 | Schlumberger Technology Corporation | System and method for determining a flow profile in a deviated injection well |
US7672818B2 (en) | 2004-06-07 | 2010-03-02 | Exxonmobil Upstream Research Company | Method for solving implicit reservoir simulation matrix equation |
US7389684B2 (en) * | 2005-11-03 | 2008-06-24 | Roy Jude B | Gas lift flow surveillance device |
GB2443675B (en) * | 2006-10-23 | 2011-07-27 | Flosoft Ltd | Oil Well Management |
US8113041B2 (en) * | 2007-08-17 | 2012-02-14 | Baker Hughes Incorporated | Gravitational method and apparatus for measuring true vertical depth in a borehole |
CA2702965C (en) | 2007-12-13 | 2014-04-01 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
CN102165413A (zh) * | 2008-09-30 | 2011-08-24 | 埃克森美孚上游研究公司 | 自适应迭代求解器 |
US9388686B2 (en) | 2010-01-13 | 2016-07-12 | Halliburton Energy Services, Inc. | Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids |
CN102135484B (zh) * | 2010-12-16 | 2012-02-08 | 西南石油大学 | 带水气藏、水溶性气藏井下样品气水比的测定装置及方法 |
BR112016006452A2 (pt) * | 2013-11-27 | 2017-08-01 | Landmark Graphics Corp | método implementado por computador e meio legível por computador |
CN104915529A (zh) * | 2014-03-10 | 2015-09-16 | 中国石油化工股份有限公司 | 一种基于自信度转换的不确定性评价方法 |
CN105386751B (zh) * | 2015-12-04 | 2018-10-16 | 中国石油天然气集团公司 | 一种基于油藏渗流模型的水平井测井产能预测方法 |
CN105840187B (zh) * | 2016-06-03 | 2018-12-25 | 陕西延长石油(集团)有限责任公司研究院 | 致密性油藏水平井分段压裂产能计算方法 |
CN110163442A (zh) * | 2019-05-27 | 2019-08-23 | 华北理工大学 | 一种基于集成学习的气井积液预测方法 |
CN111696000B (zh) * | 2020-06-12 | 2022-04-29 | 中国石油大学(北京) | 气井配产方法、装置及设备 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3584880D1 (de) * | 1984-06-29 | 1992-01-23 | Baxter Int | Verfahren und vorrichtung zum steuern der entnahme und anschliessenden infusion von blut. |
US4787421A (en) * | 1986-04-14 | 1988-11-29 | General Motors Corporation | Flow path defining means and method of making |
US5635631A (en) * | 1992-06-19 | 1997-06-03 | Western Atlas International, Inc. | Determining fluid properties from pressure, volume and temperature measurements made by electric wireline formation testing tools |
US5327984A (en) * | 1993-03-17 | 1994-07-12 | Exxon Production Research Company | Method of controlling cuttings accumulation in high-angle wells |
CA2197535A1 (en) * | 1997-02-13 | 1998-08-13 | John Nenniger | Method and apparatus for measurement and prediction of waxy crude characteristics |
US5924048A (en) * | 1997-03-14 | 1999-07-13 | Mccormack; Michael D. | Automated material balance system for hydrocarbon reservoirs using a genetic procedure |
US6021664A (en) * | 1998-01-29 | 2000-02-08 | The United States Of America As Represented By The Secretary Of The Interior | Automated groundwater monitoring system and method |
US5937362A (en) * | 1998-02-04 | 1999-08-10 | Diamond Geoscience Research Corporation | Method for predicting pore pressure in a 3-D volume |
-
1999
- 1999-12-21 US US09/469,437 patent/US6305216B1/en not_active Expired - Lifetime
-
2000
- 2000-12-20 EP EP00984045A patent/EP1240495B1/en not_active Expired - Lifetime
- 2000-12-20 ES ES00984045T patent/ES2243334T3/es not_active Expired - Lifetime
- 2000-12-20 CA CA002392618A patent/CA2392618C/en not_active Expired - Fee Related
- 2000-12-20 AU AU20724/01A patent/AU2072401A/en not_active Abandoned
- 2000-12-20 WO PCT/US2000/033278 patent/WO2001046673A1/en active IP Right Grant
- 2000-12-20 AT AT00984045T patent/ATE300041T1/de not_active IP Right Cessation
- 2000-12-20 DE DE60021420T patent/DE60021420T2/de not_active Expired - Lifetime
-
2002
- 2002-06-21 NO NO20023024A patent/NO322629B1/no not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
EP1240495A1 (en) | 2002-09-18 |
DE60021420D1 (de) | 2005-08-25 |
AU2072401A (en) | 2001-07-03 |
EP1240495A4 (en) | 2004-07-21 |
DE60021420T2 (de) | 2006-04-27 |
CA2392618C (en) | 2007-07-17 |
ATE300041T1 (de) | 2005-08-15 |
EP1240495B1 (en) | 2005-07-20 |
NO322629B1 (no) | 2006-11-06 |
US6305216B1 (en) | 2001-10-23 |
ES2243334T3 (es) | 2005-12-01 |
CA2392618A1 (en) | 2001-06-28 |
NO20023024L (no) | 2002-06-21 |
WO2001046673A1 (en) | 2001-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20023024D0 (no) | Forbedret fremgangsmåte og apparat for å forutse fluidkarakteristikker i et brönnhull | |
CA2236944A1 (en) | Flow control apparatus and methods | |
US7536905B2 (en) | System and method for determining a flow profile in a deviated injection well | |
US20160123117A1 (en) | Method of treatment design and optimization of sequenced fracturing technique | |
SA522432270B1 (ar) | توصيف تدفق مائع للداخل باستخدام قياسات مستشعر صوتي موزع/ استشعار درجة حرارة موزع مختلطة | |
CA2898876C (en) | Modeling acid distribution for acid stimulation of a formation | |
NO20061389L (no) | System og fremgangsmate for a bestemme stromningsmengder i en bronn | |
NO20054938L (no) | Fremgangsmate og apparat for a komplettere ukonsoliderte, laterale, bronner | |
NO20034802D0 (no) | System og fremgangsmåte for estimering av flerfase-fluidrater i en undergrunnsbrönn | |
NO20053786D0 (no) | Elektromagnetisk malesystem og fremgangsmate som kombinerer malinger fra overflate og borebronner til bestemmelse av fluidegenskaper for undergrunnsformasjoner | |
BR112012016256A2 (pt) | métiodo para determinação de um perfil de influxo e parâmetros de uma área em torno do poço em um poço de múltipla zonas | |
SA119410067B1 (ar) | التنبؤ بتوزيع مادة في مرحلة معالجة بالتصديع الهيدروليكي | |
WO2004101946A3 (en) | Formation characterization using wellbore logging data | |
SA522440376B1 (ar) | طريقة ونظام لمحاكاة أداء بئر باستخدام قياسات فوهة البئر | |
EA005105B1 (ru) | Способ контроля направления распространения трещин от нагнетания в проницаемых породах | |
GB2392731B (en) | Method for interpreting data measured in a hydrocarbon well in production | |
Massaras et al. | Enhanced fracture entry friction analysis of the rate step-down test | |
RU2004127945A (ru) | Коррекция глубины | |
WO2001027432A3 (en) | Methods and apparatus for making measurements on fluids produced from underground formations | |
EP2088281A1 (en) | Method for determining the viscosity of a waxy fluid in a shut-in pipeline | |
Brazil et al. | Successful production allocation through esp performance in peregrino field | |
CN109424355A (zh) | 油井垮塌状态的获取方法及装置 | |
WO2009098447A2 (en) | Method for determining the viscosity of a waxy fluid in a shut-in pipeline | |
Jokhio et al. | Forecasting liquid condensate and water production in two-phase and three-phase gas condensate systems | |
Zakharov | A New Approach to Obtain Producer FBHP and FBHT from SCADA Data in the Schoonebeek Steamflood |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM1K | Lapsed by not paying the annual fees |