NO20021495D0 - Fremgangsmåte for oppdatering av en jordmodell ved å benytte målinger innsamlet under borehullskonstruksjon - Google Patents

Fremgangsmåte for oppdatering av en jordmodell ved å benytte målinger innsamlet under borehullskonstruksjon

Info

Publication number
NO20021495D0
NO20021495D0 NO20021495A NO20021495A NO20021495D0 NO 20021495 D0 NO20021495 D0 NO 20021495D0 NO 20021495 A NO20021495 A NO 20021495A NO 20021495 A NO20021495 A NO 20021495A NO 20021495 D0 NO20021495 D0 NO 20021495D0
Authority
NO
Norway
Prior art keywords
updating
procedure
collected during
measurements collected
soil model
Prior art date
Application number
NO20021495A
Other languages
English (en)
Other versions
NO20021495L (no
NO334505B1 (no
Inventor
Ian Bradford
John Mervyn Cook
John Fuller
Walter David Aldred
Vidhyadhar Ggolkar
Original Assignee
Schlumberger Holdings
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Holdings filed Critical Schlumberger Holdings
Publication of NO20021495D0 publication Critical patent/NO20021495D0/no
Publication of NO20021495L publication Critical patent/NO20021495L/no
Publication of NO334505B1 publication Critical patent/NO334505B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/003Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/40Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Analytical Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
NO20021495A 1999-10-01 2002-03-26 Fremgangsmåte og datamaskin-lesbart medium for oppdatering av en jordmodell ved å benytte målinger innsamlet under borehulls-konstruksjon NO334505B1 (no)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB9923290A GB2354852B (en) 1999-10-01 1999-10-01 Method for updating an earth model using measurements gathered during borehole construction
PCT/GB2000/003704 WO2001025823A1 (en) 1999-10-01 2000-09-27 Method for updating an earth model using measurements gathered during borehole construction

Publications (3)

Publication Number Publication Date
NO20021495D0 true NO20021495D0 (no) 2002-03-26
NO20021495L NO20021495L (no) 2002-05-27
NO334505B1 NO334505B1 (no) 2014-03-24

Family

ID=10861982

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20021495A NO334505B1 (no) 1999-10-01 2002-03-26 Fremgangsmåte og datamaskin-lesbart medium for oppdatering av en jordmodell ved å benytte målinger innsamlet under borehulls-konstruksjon

Country Status (6)

Country Link
US (1) US6766254B1 (no)
AU (1) AU7535000A (no)
EA (1) EA004218B1 (no)
GB (1) GB2354852B (no)
NO (1) NO334505B1 (no)
WO (1) WO2001025823A1 (no)

Families Citing this family (83)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5794720A (en) 1996-03-25 1998-08-18 Dresser Industries, Inc. Method of assaying downhole occurrences and conditions
US6612382B2 (en) 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US6826486B1 (en) 2000-02-11 2004-11-30 Schlumberger Technology Corporation Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
CA2412337A1 (en) 2000-06-06 2001-12-13 Halliburton Energy Services, Inc. Real-time formation stability and drilling fluid formation interaction monitoring capability
GB2396428B8 (en) * 2000-08-28 2005-03-19 Halliburton Energy Serv Inc Method and system for predicting performance of a drilling system for a given formation
US20040047234A1 (en) * 2001-10-19 2004-03-11 Philip Armstrong Method of monitoring a drilling path
US6968909B2 (en) 2002-03-06 2005-11-29 Schlumberger Technology Corporation Realtime control of a drilling system using the output from combination of an earth model and a drilling process model
US7331469B2 (en) * 2004-04-29 2008-02-19 Varco I/P, Inc. Vibratory separator with automatically adjustable beach
US7278540B2 (en) * 2004-04-29 2007-10-09 Varco I/P, Inc. Adjustable basket vibratory separator
US20050242003A1 (en) 2004-04-29 2005-11-03 Eric Scott Automatic vibratory separator
US7571817B2 (en) * 2002-11-06 2009-08-11 Varco I/P, Inc. Automatic separator or shaker with electromagnetic vibrator apparatus
US8312995B2 (en) * 2002-11-06 2012-11-20 National Oilwell Varco, L.P. Magnetic vibratory screen clamping
US20060113220A1 (en) * 2002-11-06 2006-06-01 Eric Scott Upflow or downflow separator or shaker with piezoelectric or electromagnetic vibrator
US7128167B2 (en) 2002-12-27 2006-10-31 Schlumberger Technology Corporation System and method for rig state detection
US6868920B2 (en) 2002-12-31 2005-03-22 Schlumberger Technology Corporation Methods and systems for averting or mitigating undesirable drilling events
US6662110B1 (en) * 2003-01-14 2003-12-09 Schlumberger Technology Corporation Drilling rig closed loop controls
MXPA04003024A (es) * 2003-04-03 2004-10-06 Schlumberger Technology Bv Metodos y aparato para predecir presiones de poro y fractura de una formacion subsuperficial.
US7422076B2 (en) * 2003-12-23 2008-09-09 Varco I/P, Inc. Autoreaming systems and methods
US7100708B2 (en) * 2003-12-23 2006-09-05 Varco I/P, Inc. Autodriller bit protection system and method
WO2005071222A1 (en) * 2004-01-20 2005-08-04 Saudi Arabian Oil Company Real time earth model for collaborative geosteering
GB2413403B (en) 2004-04-19 2008-01-09 Halliburton Energy Serv Inc Field synthesis system and method for optimizing drilling operations
GB0419588D0 (en) * 2004-09-03 2004-10-06 Virtual Well Engineer Ltd "Design and control of oil well formation"
GB2439571B (en) 2006-06-28 2008-11-12 Schlumberger Holdings Method for updating a model of the earth using microseismic measurements
US7657407B2 (en) * 2006-08-15 2010-02-02 Landmark Graphics Corporation Method and system of planning hydrocarbon extraction from a hydrocarbon formation
US20080083566A1 (en) 2006-10-04 2008-04-10 George Alexander Burnett Reclamation of components of wellbore cuttings material
US7529624B2 (en) * 2007-02-21 2009-05-05 Geomechanics International, Inc. Method and apparatus for remote characterization of faults in the vicinity of boreholes
US7526385B2 (en) * 2007-06-22 2009-04-28 Schlumberger Technology Corporation Method, system and apparatus for determining rock strength using sonic logging
US20090045973A1 (en) * 2007-08-16 2009-02-19 Rodney Paul F Communications of downhole tools from different service providers
US8622220B2 (en) 2007-08-31 2014-01-07 Varco I/P Vibratory separators and screens
WO2009075667A2 (en) 2007-11-30 2009-06-18 Halliburton Energy Services Method and system for predicting performance of a drilling system having multiple cutting structures
CA2703072C (en) 2007-12-13 2016-01-26 Exxonmobil Upstream Research Company Iterative reservoir surveillance
US9638830B2 (en) * 2007-12-14 2017-05-02 Westerngeco L.L.C. Optimizing drilling operations using petrotechnical data
EP2238477A4 (en) 2007-12-19 2016-08-24 Exxonmobil Upstream Res Co GAMMA RAY TOOL RESPONSE MODELING
US8884964B2 (en) * 2008-04-22 2014-11-11 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2D and 3D visual environment
US9073104B2 (en) 2008-08-14 2015-07-07 National Oilwell Varco, L.P. Drill cuttings treatment systems
US20100078216A1 (en) * 2008-09-25 2010-04-01 Baker Hughes Incorporated Downhole vibration monitoring for reaming tools
US8892407B2 (en) * 2008-10-01 2014-11-18 Exxonmobil Upstream Research Company Robust well trajectory planning
US9249654B2 (en) 2008-10-03 2016-02-02 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system
US9079222B2 (en) 2008-10-10 2015-07-14 National Oilwell Varco, L.P. Shale shaker
US8556083B2 (en) 2008-10-10 2013-10-15 National Oilwell Varco L.P. Shale shakers with selective series/parallel flow path conversion
WO2010043951A2 (en) 2008-10-14 2010-04-22 Schlumberger Technology B.V. System and method for online automation
US8908473B2 (en) 2008-12-23 2014-12-09 Schlumberger Technology Corporation Method of subsurface imaging using microseismic data
NO338750B1 (no) 2009-03-02 2016-10-17 Drilltronics Rig Systems As Fremgangsmåte og system for automatisert styring av boreprosess
EP2425280A2 (en) * 2009-04-27 2012-03-07 Services Pétroliers Schlumberger Method for uncertainty quantification in the performance and risk assessment of a carbon dioxide storage site
US8341984B2 (en) * 2009-05-27 2013-01-01 Westerngeco L.L.C. Estimating velocities with uncertainty
CA2781868C (en) 2010-02-03 2016-02-09 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
EP2947263B1 (en) 2010-04-12 2016-12-14 Services Pétroliers Schlumberger Automatic stage design of hydraulic fracture treatments using fracture height and in-situ stress
US9593558B2 (en) 2010-08-24 2017-03-14 Exxonmobil Upstream Research Company System and method for planning a well path
US9366776B2 (en) * 2010-11-30 2016-06-14 Schlumberger Technology Corporation Integrated formation modeling systems and methods
CA2823017A1 (en) 2011-01-26 2012-08-02 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
NO345482B1 (no) * 2011-02-08 2021-03-01 Logined Bv Tredimensjonal modellering av boreparametere ved brønnboring på oljefelt
EP2678802A4 (en) 2011-02-21 2017-12-13 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3d earth model
GB2505095B (en) 2011-06-21 2018-07-04 Baker Hughes Inc Computer-Based method for real-time three-dimensional geological model calculation and reservoir navigation
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
US20130049983A1 (en) 2011-08-26 2013-02-28 John Rasmus Method for calibrating a hydraulic model
US9394783B2 (en) 2011-08-26 2016-07-19 Schlumberger Technology Corporation Methods for evaluating inflow and outflow in a subterranean wellbore
US9228430B2 (en) 2011-08-26 2016-01-05 Schlumberger Technology Corporation Methods for evaluating cuttings density while drilling
MX341248B (es) * 2011-10-03 2016-08-09 Landmark Graphics Corp Metodo 1-d mejorado para prediccion de ventana de densidad de lodo para secciones de pozo subsal.
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
US20130341093A1 (en) * 2012-06-21 2013-12-26 Stuart Inglis Jardine Drilling risk avoidance
GB2503903B (en) 2012-07-11 2015-08-26 Schlumberger Holdings Fracture monitoring and characterisation
US20140076632A1 (en) * 2012-09-20 2014-03-20 Baker Hughes Incoroporated Method to predict overpressure uncertainty from normal compaction trendline uncertainty
CA3006150A1 (en) * 2012-09-28 2014-04-03 Landmark Graphics Corporation Self-guided geosteering assembly and method for optimizing well placement and quality
US20140241111A1 (en) * 2013-02-28 2014-08-28 Weatherford/Lamb, Inc. Acoustic borehole imaging tool
US9643111B2 (en) 2013-03-08 2017-05-09 National Oilwell Varco, L.P. Vector maximizing screen
EP3008281A2 (en) 2013-06-10 2016-04-20 Exxonmobil Upstream Research Company Interactively planning a well site
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
CA2922647A1 (en) 2013-10-01 2015-04-09 Landmark Graphics Corporation In-situ wellbore, core and cuttings information system
EP3055716B1 (en) 2013-10-08 2018-06-06 Exxonmobil Upstream Research Company Automatic dip picking from wellbore azimuthal image logs
WO2015065651A1 (en) 2013-10-29 2015-05-07 Exxonmobil Upstream Research Company Method for estimating subsurface properties from geophysical survey data using physics-based inversion
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
US20170306726A1 (en) * 2014-09-02 2017-10-26 King Abdullah University Of Science And Technology Stuck pipe prediction
CN104727815A (zh) * 2015-03-15 2015-06-24 河北百冠钻井设备有限公司 一种实时钻井地层修正预测方法及装置
AU2015417392B2 (en) 2015-12-15 2021-01-21 Halliburton Energy Services, Inc. Orientation and actuation of pressure-activated tools
US20170176228A1 (en) * 2015-12-22 2017-06-22 Schlumberger Technology Corporation Drilling fluid loss rate prediction
GB2569481A (en) * 2016-09-07 2019-06-19 Geoquest Systems Bv Drilling geomechanics salt creep monitoring
GB2556621B (en) * 2016-09-30 2020-03-25 Equinor Energy As Improved structural modelling
KR101841844B1 (ko) * 2016-10-13 2018-03-26 서울대학교산학협력단 유체압력에 의한 전단 예측 시스템 및 프로그램
US20190024485A1 (en) * 2017-07-19 2019-01-24 Baker Hughes, A Ge Company, Llc Methods and systems for automated cementing and liner hanging
US11947069B2 (en) 2018-05-15 2024-04-02 Schlumberger Technology Corporation Adaptive downhole acquisition system
US10557345B2 (en) 2018-05-21 2020-02-11 Saudi Arabian Oil Company Systems and methods to predict and inhibit broken-out drilling-induced fractures in hydrocarbon wells
US10753203B2 (en) 2018-07-10 2020-08-25 Saudi Arabian Oil Company Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells
WO2020069378A1 (en) * 2018-09-28 2020-04-02 Schlumberger Technology Corporation Elastic adaptive downhole acquisition system

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4340934A (en) * 1971-09-07 1982-07-20 Schlumberger Technology Corporation Method of generating subsurface characteristic models
GB8416708D0 (en) * 1984-06-30 1984-08-01 Prad Res & Dev Nv Drilling motor
US4794534A (en) * 1985-08-08 1988-12-27 Amoco Corporation Method of drilling a well utilizing predictive simulation with real time data
US5329448A (en) * 1991-08-07 1994-07-12 Schlumberger Technology Corporation Method and apparatus for determining horizontal conductivity and vertical conductivity of earth formations
IT1277377B1 (it) * 1995-07-28 1997-11-10 Agip Spa Metodo per l'aggiornamento continuo dell'immagine sismica bidimensionale e tridimensionale in profondita' mediante
WO1997027502A1 (en) * 1996-01-26 1997-07-31 Baker Hughes Incorporated A drilling system with an acoustic measurement-while-drilling system for determining parameters of interest and controlling the drilling direction
US6408953B1 (en) * 1996-03-25 2002-06-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system for a given formation
US5838634A (en) * 1996-04-04 1998-11-17 Exxon Production Research Company Method of generating 3-D geologic models incorporating geologic and geophysical constraints
US5905657A (en) * 1996-12-19 1999-05-18 Schlumberger Technology Corporation Performing geoscience interpretation with simulated data
US5995446A (en) * 1998-04-21 1999-11-30 Schlumberger Technology Corporation Method of conducting drilling operations using vertical seismic profiles
AU3229900A (en) * 1999-02-12 2000-08-29 Prange, Michael Uncertainty constrained subsurface modeling

Also Published As

Publication number Publication date
AU7535000A (en) 2001-05-10
GB9923290D0 (en) 1999-12-08
WO2001025823A1 (en) 2001-04-12
NO20021495L (no) 2002-05-27
EA200200426A1 (ru) 2002-10-31
US6766254B1 (en) 2004-07-20
GB2354852B (en) 2001-11-28
EA004218B1 (ru) 2004-02-26
NO334505B1 (no) 2014-03-24
GB2354852A (en) 2001-04-04

Similar Documents

Publication Publication Date Title
NO20021495L (no) Fremgangsmåte for oppdatering av en jordmodell ved å benytte målinger innsamlet under borehullskonstruksjon
NO20015862D0 (no) Fremgangsmåte for å lage et borehull
NO20012162D0 (no) Fremgangsmåte til klargjöring av en brönnboring
NO20002585L (no) Fremgangsmåte for komplettering av en brönn
NO20013127L (no) Fremgangsmåte for evaluering av fysiske parametere til et undergrunnsreservoar fra borekaks tatt derfra
NO20013814D0 (no) Nede i hullet traktor
NO20014901D0 (no) Fremgangsmåte for å danne et borehull i en undergrunnsformasjon
NO20020028L (no) Nedihulls spyleverktöy
NO20011179L (no) Fremgangsmåte for å bestemme en borestrengs stivhet
NO20005940L (no) Generering av kommandoer for et nedihullsverktöy
NO20013800L (no) Fremgangsmåte for å estimere petrofysiske parametere for berg ved å bruke temperaturmodifiserte NMR-data
NO20001073D0 (no) Fremgangsmõte for bestemmelse av ekvivalent statisk slamdensitet under en forbindelse ved bruk av nedihulls trykkmõlinger
NO20022506D0 (no) Elektrogenerator for bruk i borehull
NO20001632L (no) BorehullstverrmÕl utledet fra porøsitetsmÕlinger ved hjelp av nøytroner
NO20002348L (no) Behandling av perforeringer ved komplettering av et borehull
NO20022516L (no) Fremgangsmåte for å forbedre en jordformasjons permeabilitet
GB2337546B (en) Drillpipe structures to accomodate downhole testing
NO330930B1 (no) Fremgangsmate for utforming av en sidegren fra et borehull
NO20021738L (no) Fremgangsmåte for å frembringe et bilde av en undergrunnsformasjon
NO20022519D0 (no) Fremgangsmåte for å frembringe multifrakturer i en jordformasjon
NO20010481L (no) FremgangsmÕter for anvendelse av en somatostatinanalog
NO20000418D0 (no) Nedihulls trekkeverktoey
GB2344127B (en) Drillpipe structures to accomodate downhole testing
DK1088150T3 (da) Borestrengskobling
FR2795120B1 (fr) Serrure a pene demi-tour reversible

Legal Events

Date Code Title Description
MM1K Lapsed by not paying the annual fees