NL7908771A - Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension - Google Patents

Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension Download PDF

Info

Publication number
NL7908771A
NL7908771A NL7908771A NL7908771A NL7908771A NL 7908771 A NL7908771 A NL 7908771A NL 7908771 A NL7908771 A NL 7908771A NL 7908771 A NL7908771 A NL 7908771A NL 7908771 A NL7908771 A NL 7908771A
Authority
NL
Netherlands
Prior art keywords
pile
tube piece
pile tube
soil
tube
Prior art date
Application number
NL7908771A
Other languages
Dutch (nl)
Original Assignee
Gerard Simon Lankelma Zuiderwe
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gerard Simon Lankelma Zuiderwe filed Critical Gerard Simon Lankelma Zuiderwe
Priority to NL7908771A priority Critical patent/NL7908771A/en
Publication of NL7908771A publication Critical patent/NL7908771A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The unit is used for driving a foundation pile (3,22) into the soil (1). The pile is formed by a tube, the first portion (3) of which is placed in a prepared shallow starting hole. Water is injected (via 20,21) into the tube (3) whilst this is rocked laterally to and fro (via actuator clamped 5 to the tube 3) to loosen the soil. A suction (15) line (9,6,7) lowered into the tube (3) removes the soil therefrom as a water suspension so that the tube gradually moves deeper into the ground. The tube (3,22) may be gradually built up out of shorter lengths welded together, whilst the suction line is equally lengthened via flange connections (10), a concrete foot being formed when the desired depth is reached followed by placing reinforcement in the tube and filling it with concrete.

Description

* —* a* -* a

HdB/dM/34.197 - 1 -HdB / dM / 34,197 - 1 -

Gerard Simon LANKELMA te Beemster.Gerard Simon LANKELMA in Beemster.

PaalfunderingPile foundation

De uitvinding heeft betrekking op een werkwijze voor het aanbrengen van een paalfundering opgebouwd uit betrekkelijk korte segmenten, alsmede op een daarbij te gebruiken inrichting.The invention relates to a method for arranging a pile foundation built up from relatively short segments, and to a device to be used therewith.

5 Voor het aanbrengen van palen bijv. onder bestaande gebouwen is meestal slechts een geringe werkhoogte beschikbaar, zodat geen volledige heistelling kan worden opgesteld.5 For the installation of piles, eg under existing buildings, usually only a small working height is available, so that a complete pile driver cannot be set up.

In dergelijke omstandigheden worden veelal korte paalstukken van bijv. 2 meter lengte na elkaar in de bodem· geheid en 10 eventueel op verschillende wijze met elkaar verbonden.In such circumstances, usually short pile pieces of, for example, 2 meters in length are driven into the ground one after the other and, if necessary, connected together in different ways.

Om daarbij ongewenste en schadelijke trillingen te voorkomen is reeds voorgesteld paalstukken hydraulisch de grond in te drukken. Daarbij is het noodzakelijk voorzieningen te treffen om de reactiekrachten bij het in de grond drukken van een paal 15 op te nemen. Daartoe wordt veelal een zware betonvloer gestort, welke geschikt is om deze krachten op te nemen.In order to prevent unwanted and harmful vibrations, it has already been proposed to press pile pieces hydraulically into the ground. It is then necessary to make provisions for absorbing the reaction forces when a pile 15 is pressed into the ground. For this purpose, a heavy concrete floor is usually poured, which is suitable for absorbing these forces.

De uitvinding beoogt een eenvoudige werkwijze voor het in de grond brengen van een paalfundering, waarbij de werkwijze ook in ruimten met een beperkte hoogte kan worden uitgevoerd en 20 waarbij geen schadelijke trillingen optrden.The object of the invention is a simple method for placing a pile foundation in the ground, wherein the method can also be carried out in spaces with a limited height and in which no harmful vibrations occur.

Daartoe wordt volgens de uitvinding voorgesteld gebruik te maken van betrekkelijk korte paalbuisstukken, waarvan het eerst in de grond te drijven paalbuisstuk aan het uiteinde van een vertanding kan zijn voorzien en waarbij steeds aan 25 het bovenste gedeelte van een dergelijk paalbuisstuk een zwenkbeweging om de verticale as wordt gegeven, terwijl in het paalbuisstuk water wordt aangevoerd voor het handhaven van een voldoende waterdruk in de pijp en voor het vormen van een suspensie met de losgemaakte grond waarna de2e 30 suspensie wordt opgezogen en afgevoerd, waarbij het paalbuisstuk geleidelijk dieper wordt gebracht.For this purpose it is proposed according to the invention to make use of relatively short pile tube pieces, the first pile tube piece for which can be driven into the ground can be provided with a toothing at the end and wherein a pivotal movement is always made at the top part of such a pile tube piece about the vertical axis. is given, while water is introduced into the pile tubing to maintain sufficient water pressure in the pipe and to form a slurry with the loosened soil after which the 2nd slurry is aspirated and discharged, gradually bringing the pile tubing deeper.

7908771 ♦.-· * -2-.7908771 ♦ .- · * -2-.

Doelmatig wordt daarbij ook een zuigbuis in stukken van betrekkelijk korte lengte uitgevoerd, overeenkomstig de lengte van de paalbuisstukken, terwijl de paalbuisstukken steeds aan elkaar worden gelast nadat een voorgaand buisstuk 5 in de grond is gedreven. Na het' op deze wijze in de grond drijven van een paalbuis kan eerst een betonpaalvoet in de grond worden gevormd, bijv. door middel van het inbrengen van in een bus opgesloten betonspecie, welke bus door een stamporgaan wordt verbrijzeld, terwijl na het uitharden van 10 de paalvoet de buizen met een wapening en betonspecie kunnen worden gevuld voor het vormen van de definitieve paal.A suction tube is expediently also constructed in pieces of relatively short length, corresponding to the length of the pile tube pieces, while the pile tube pieces are always welded together after a previous piece of tube 5 has been driven into the ground. After driving a pile tube into the ground in this manner, a concrete pile base can first be formed in the ground, eg by inserting concrete mortar enclosed in a can, which sleeve is crushed by a ramming device, while after curing 10 the pile base the tubes can be filled with a reinforcement and concrete mortar to form the final pile.

' De uitvinding betreft eveneens een inrichting voor het uitvoeren van deze werkwijze waarbij de inrichting een. reservoir omvat, zoals een container, voorzien van een toevoer voor 15 water, een filter met een aansluiting voor een pomp en een toevoerbuis van water in een paalbuisstuk, een zuigleiding opgebouwd uit korte buisstukken, welke zuigleiding verbonden is met het reservoir door middel van een pomp geschikt voor het verwerken van met zand, klei, modder en andere delen 20 vermengd water, terwijl eveneens voorzien is in een klemblok voor een paalbuisstuk, welk klemblok voorzien is van een aandrijving voor het doen uitvoeren van een zwenkbeweging door een paalbuisstuk om zijn verticale hartlijn.The invention also relates to a device for carrying out this method, wherein the device comprises a. reservoir comprises, such as a container, provided with a supply for water, a filter with a connection for a pump and a supply pipe of water in a pile pipe piece, a suction pipe built up of short pipe pieces, which suction pipe is connected to the tank by means of a pump suitable for processing water mixed with sand, clay, mud and other parts, while also a clamping block for a pile tube piece is provided, which clamp block is provided with a drive for performing a pivoting movement through a pile tube piece around its vertical centerline.

Nadere bijzonderheden van de pitvinding zullen blijken uit 25 de hieronder volgende beschrijving van een uitvoeringsvoor-beeld.Further details of the pit finding will become apparent from the following description of an exemplary embodiment.

Fig. 1 toont schematisch een toepassing van de werkwijze volgens de uitvinding, alsmede een daarbij gebruikte inrichting ; 30 fig. 2 toont in bovenaanzicht schematisch de zwenkaandrij-ving voor een buisstuk; fig. 3 toont de onderzijde van een zuigbuis; fig. 4 toont een variant voor het ondereinde van een paalbuisstuk; en 79 0 8 7 7 f * —> - 3 - fig. 5 toont de vorming van een paalvoet.Fig. 1 schematically shows an application of the method according to the invention, as well as a device used therewith; Fig. 2 schematically shows a top view of the pivot drive for a pipe section; Fig. 3 shows the bottom of a suction tube; Fig. 4 shows a variant for the bottom end of a pile tube piece; and 79 0 8 7 7 f * -> - 3 - fig. 5 shows the formation of a pile base.

In fig. 1 is schematisch een uitvoeringsvoorbeeld van de uitvinding weergegeven. Het oppervlak van de grond, bijv. een vloer van een gebouw, een keldervloer of dergelijke is 5 aangegeven met 1. Op deze vloer is een hijsblok 2 geplaatst, dat dient voor het ophalen en neerlaten van verschillende delen. Het zal duidelijk zijn dat, voorzover de constructie van het gebouw het toelaat, ook een andere hijsinstallatie kan worden toegepast. In de grond is reeds een eerste paal-10 buisstuk 3 over enige afstand neergelaten.Fig. 1 schematically shows an exemplary embodiment of the invention. The surface of the ground, eg a floor of a building, a basement floor or the like, is indicated by 1. A hoisting block 2 is placed on this floor, which serves for raising and lowering various parts. It will be clear that, insofar as the construction of the building allows, another hoisting installation can also be used. A first pile-10 pipe piece 3 has already been lowered into the ground over some distance.

Dit paalbuisstuk is aan de onderzijde voorzien van snijtanden 4. Desgewenst kunnen deze snijtanden van een gelaste slijtvaste laag zijn voorzien. Aan het boveneinde van het eerste paalstuk is bij 5 een klemconstructie weergegeven, 15 waarvan nadere bijzonderheden in fig. 2 zijn aangegeven.This pile tube piece is provided with cutting teeth 4 at the bottom side. If desired, these cutting teeth can be provided with a welded wear-resistant layer. At the top end of the first pile section, a clamping construction is shown at 5, details of which are given in Fig. 2.

Met behulp van deze klemconstructie kan het paalbuisstuk 3 een zwenkbeweging uitvoeren om zijn verticale as.With the aid of this clamping construction, the pile tube piece 3 can perform a pivoting movement about its vertical axis.

Bij een dergelijke zwenkbeweging zullen de tanden 4 de grond onder het paalbuisstuk losmaken. Voorzover hier harde delen 20 aanwezig zijn, zoals resten van fundamenten e.d. zullen deze worden vermalen tot met water in een suspensie op te zuigen delen. Binnen paalbuisstuk 3 bevindt zich een deel van een zuig-leiding 6, waarvan het ondereinde verbreed is uitgevoerd en eveneens van een vertanding of andere scherpe delen bij 8 25 voorzien. Op het eerste zuigleidingdeel is reeds een tweede deel 9 door middel van een flensverbinding 10 bevestigd.With such a pivoting movement, the tines 4 will loosen the ground under the pile tube piece. Insofar as hard parts 20 are present here, such as remains of foundations and the like, these will be ground to parts to be sucked up with water in a suspension. Within pile tube piece 3 there is a part of a suction pipe 6, the bottom end of which is made widened and also provided with a toothing or other sharp parts at 8. A second part 9 is already fastened to the first suction line part by means of a flange connection 10.

Op het tweede zuigbuisdeel 9 is een zuigbuisbocht 11 aangebracht. Deze zuigbuisbocht is voorzien van een hijsoog 12.A suction pipe bend 11 is arranged on the second suction pipe section 9. This suction pipe bend is equipped with a lifting eye 12.

Met een takel aan de hijsbok 2 kan een op-en neergaande 30 beweging aan de zuigbuis worden gegeven, zodat eventuele grote delen onder bij de zuigmond 8 kunnen worden vermorzeld en fijn geslagen.· Om te voorkomen dat grote stukken de zuigbuis kunnen verstoppen of deze binnen kunnen treden, is het ondereinde van de zuigbuismond voorzien van dwarsschotten 13, 35 zoals het beste uit figuur 3 blijkt. Het zuigbuisbochtstuk 11 is via een, water met betrekkelijk grove delen verwerkende,With a hoist on the lifting stand 2, an up and down movement can be given to the suction tube, so that any large parts at the bottom of the suction mouth 8 can be crushed and beaten finely. · To prevent large pieces from clogging the suction tube or the bottom end of the suction pipe mouth is provided with transverse partitions 13, 35, as best shown in figure 3. The suction pipe elbow 11 is processed via a water which processes relatively coarse parts.

79 0 87 7 T79 0 87 7 T

- 4 - zuigpomp 15 aangesloten. Het is gebleken, dat voor een dergelijke pomp een zgn. Sykes-pomp goede resultaten geeft, ofschoon ook een vuilwatermembraampomp, zoals bijv. een kattekop goede resultaten geeft. Het opgezogen water met 5 gruis, zand, modder e.d. wordt gestort in een reservoir of container 16, welke bij het heiwerk is opgesteld.- 4 - suction pump 15 connected. It has been found that a so-called Sykes pump gives good results for such a pump, although a dirty water membrane pump, such as, for example, a cat's head, also gives good results. The sucked up water with grit, sand, mud and the like is poured into a reservoir or container 16, which is arranged at the piling work.

Deze container is aangesloten op een watersuppletieleiding 17 met flotterniveauregelaar 18, zodat een bepaald constant niveau in de container 16 wordt gehandhaafd. Het vuil, zand 10 e.d. krijgt gelegenheid tot bezinken, waarbij de container periodiek kan worden weggehaald, zodra deze voor het grootste deel is gevuld. In de container is een van geperforeerde plastic pijp en grof grint opgebouwde aanzuigfilter 19 aangebracht. Dit filter is aangesloten op een zuigperspomp 15 20, welke via een persleiding 21 bovenin het buisstuk 3, resp. een verlengstuk 22 daarvan uitmondt. In de persleiding is een regelventiel 23 aangebracht. Het doel hiervan is het niveau van het water bij 24 nagenoeg constant te houden, zodanig dat onder in de paalbuis voldoende druk wordt ge-20 handhaafd.Hierdoor wordt voorkomen dat zand, modder e.d. van buiten de paal wordt aangevoerd.This container is connected to a water make-up line 17 with float level regulator 18, so that a certain constant level in the container 16 is maintained. The dirt, sand, etc., is allowed to settle, whereby the container can be periodically removed as soon as it has been filled for the most part. A suction filter 19 constructed of perforated plastic pipe and coarse gravel is arranged in the container. This filter is connected to a suction press pump 15, which, via a pressure pipe 21 at the top of the pipe section 3, resp. an extension 22 thereof opens out there. A control valve 23 is arranged in the pressure pipe. The purpose of this is to keep the level of the water at 24 substantially constant, such that sufficient pressure is maintained at the bottom of the pile tube, thereby preventing sand, mud and the like from being supplied from outside the pile.

De inrichting werkt als volgt. Aanvankelijk wordt een klein gat, bijv. met de hand gegraven, waarin eerst het paalbuis-stuk 3 wordt ingelaten, waarna het klemblok 5 wordt bevestigd. 25 Vervolgens wordt de zuigbuis 6 met de zuigmond 7 aangebracht en aangesloten op de zuigleiding 11. Vervolgens wordt paalbuis 3 heen en weer gezwenkt, waarbij het losgewoelde materiaal met het aangevoerde water wordt opgezogen via leiding 6. Dit materiaal bezinkt in container 16 en het 30 schone water wordt via de zuigbuisleiding 21 weer boven in het paalbuisstuk aangëvoerd. Door een op-en neergaande beweging van de zuigleiding 6 met zuigmond 7 worden eventuele grote delen verkleind. Nadat het eerste zuigbuisdeel 3 vrijwel geheel in de grond is verdwenen, wordt de flens-35 koppeling tussen zuigbochtstuk 11 en het eerste zuigleiding-deel 6 losgenomen en opgehaald, terwijl het klemblok 5 7 9 0 8 7 7 f - 5 - wordt gelost. Vervolgens wordt een tweede zuigleidingdeel 9 met flenzen 10 vastgezet op het eerste zuigleidingdeel 6. Daarna wordt een tweede paalbuisstuk 22 geplaatst op het eerste paalbuisstuk 3 en bij 30 daaraan vastgelast.The device works as follows. Initially, a small hole, for example by hand, is dug, in which the pile tube piece 3 is first let in, after which the clamping block 5 is attached. The suction pipe 6 is then fitted with the suction mouth 7 and connected to the suction pipe 11. Subsequently, the pipe tube 3 is swung back and forth, whereby the loosened material with the supplied water is sucked up via pipe 6. This material settles in container 16 and the clean water is fed back into the pile tube piece via the suction pipe 21. Any large parts are reduced by an up and down movement of the suction line 6 with suction mouth 7. After the first suction pipe part 3 has disappeared almost entirely into the ground, the flange coupling between suction elbow 11 and the first suction pipe part 6 is loosened and picked up, while the clamping block 5 7 9 0 8 7 7 f-5 is released. Subsequently, a second suction pipe section 9 with flanges 10 is fixed on the first suction pipe section 6. A second pile pipe piece 22 is then placed on the first pile pipe piece 3 and welded to it at 30.

5 Vervolgens wordt het klemblok 5 aan het boveneinde van het paalbuisstuk 22 vastgeklemd en wordt het zuigbuisbochtstuk 11 door middel van flenzen 10 bevestigd aan het boveneinde van het zuigleidingdeel 9. De watertoevoerleiding 21 wordt weer geplaatst en de watercirculatie door middel van de 10 beide pompen 15 en 20 wordt weer in werking gesteld.5 Then the clamping block 5 is clamped to the top end of the post pipe piece 22 and the suction pipe bend piece 11 is attached to the top end of the suction pipe part 9 by means of flanges 10. The water supply pipe 21 is reinserted and the water circulation by means of both pumps 15 and 20 is reactivated.

Nadat ook dit paalbuisstuk 22 op diepte is gekomen, worden de bovenaangeduide handelingen herhaald totdat de gewenste diepte is bereikt.After this pile tube piece 22 has also reached depth, the above-mentioned operations are repeated until the desired depth is reached.

Zodra de gewenste diepte is bereikt, wordt de volledige 15 zuigbuis 6, 9 en volgende delen opgehaald en wordt een cementvoet gemaakt, zoals uit fig. 5 blijkt. Daartoe wordt cementspecie in blikken dozen in de paal neergelaten tot bij het ondereinde. Vervolgens wordt met een stamper, een klein heiblok of dergelijke door middel van de takeIconstructie 20 de blikken doos stuk geslagen waardoor de specie zich verdeelt. Afhankelijk van de aard van de bodemlaag waarin de voet wordt gevormd, wordt een kleinere of grotere voet onder aan de paal gevormd, zoals met 31 in fig. 5 is aangegeven. Nadat de voet is uitgehard wordt in de buis een 25 wapening aangebracht en de buis wordt verder gevuld met cement, zodat na uitharding een gewapende massieve betonnen paal voorzien van eenstalenmantelbuis 3, 22 e.d. wordt gevormd.Once the desired depth is reached, the full suction tube 6, 9 and subsequent parts are retrieved and a cement base is made, as shown in Fig. 5. To this end, cement mortar is lowered into the pile in tin boxes up to the bottom end. Then the tin box is broken with a pestle, a small pile driver or the like by means of the takeI construction 20, whereby the mortar is distributed. Depending on the nature of the bottom layer in which the base is formed, a smaller or larger base is formed at the bottom of the post, as indicated by 31 in Figure 5. After the base has hardened, a reinforcement is placed in the tube and the tube is further filled with cement, so that after hardening a reinforced solid concrete pile provided with a steel jacket tube 3, 22 and the like is formed.

Vooral wanneer de paal betrekkelijk lang moet worden biedt 30 het voordeel het onderste paalbuisstuk 3 uit te voeren zoals in fig. 4 is aangegeven. Behalve de daarin weergegeven tanden 8 zijn aan de buitenzijde van het paalbuisstuk een aantal nokken 32 aangebracht. Door de zwenkbeweging van het paalbuisstuk zal daardoor een iets groter gat in de bodem worden 35 gevormd dan overeenkomt met de diameter van de paalbuis.Especially when the pile has to be relatively long, it offers the advantage to design the bottom pile tube piece 3 as shown in fig. In addition to the teeth 8 shown therein, a number of projections 32 are arranged on the outside of the pile tube piece. As a result of the pivoting movement of the pile tube piece, a slightly larger hole will be formed in the bottom than corresponds to the diameter of the pile tube.

79 0 87 7 f - 6 -79 0 87 7 f - 6 -

Hierdoor zal de paalbuis minder wrijving ondervinden bij het dieper in de grond doordringen. Het is gebleken dat het eigen gewicht van de paalbuis normaal voldoende is om geleidelijk dieper in de grond door te dringen bij het losmaken van de 5 grond en het wegpompen van de gevormde suspensie.As a result, the pile tube will experience less friction as it penetrates deeper into the ground. It has been found that the self-weight of the pile tube is normally sufficient to gradually penetrate deeper into the soil when loosening the soil and pumping out the suspension formed.

In fig. 2 is een uitvoering voor de zwenkaandrijving van de paalbuisstukken weergegeven. Het kLemblok 5 bestaat uit twee helften 40 resp. 41 die bij 42 scharnierend zijn verbonden.Fig. 2 shows an embodiment for the pivot drive of the pile tube pieces. The clamping block 5 consists of two halves 40 resp. 41 hingedly connected at 42.

De beide klemblokhelften worden geopend en gesloten door 10 middel van een hydraulische cylinder 43 die op een op zichzelf bekende wijze op een hydraulisch 'circuit is aangesloten. Op de ene klemblokhelft 41 zijn door middel van bolscharnier-koppelingen 44 steeds de zuigerstangen van twee hydraulische cylinders 45 resp. 46 gekoppeld.The two clamping block halves are opened and closed by means of a hydraulic cylinder 43 which is connected to a hydraulic circuit in a manner known per se. On one clamping block half 41, the piston rods of two hydraulic cylinders 45 and 45 respectively are always secured by means of ball joint couplings 44. 46 linked.

15 De andere einden van deze hydraulische cylinders zijn bij 47 resp. 48 opgenomen in een freem 49 eveneens door middel van bolscharnieren.The other ends of these hydraulic cylinders are at 47 resp. 48 received in a frame 49 also by means of ball hinges.

De beide cylinders 45 resp. 46 zijn aangebracht in een T-vormig juk 50, waarvan de dwarsas 51 de beide cylinders draagt. 20 Een lange arm 52 is bij 53 vast verbonden met het· freem 49.The two cylinders 45 resp. 46 are mounted in a T-shaped yoke 50, the transverse axis 51 of which carries both cylinders. A long arm 52 is fixedly connected to the frame 49 at 53.

Het uiteinde van de arm 52 is bij 54 voorzien van een gat waardoorheen een grondpen 55 in de grond kan worden gedreven.The end of the arm 52 is provided at 54 with a hole through which a ground spike 55 can be driven into the ground.

De lengte van de arm 52 is een veelvoud van de lengte van het freem 49. Daardoor kunnen de betrekkelijk grote krachten 25 uitgeoefend door de hydraulische cylinders 45 en 46 worden opgenomen door betrekkelijk kleine krachten via de grondpen55. De hydraulische cylinder 45 is voorzien van een hydraulische toe-en afvoerleiding 56 en hydraulische cylinder 46 van een overeenkomstige leiding 57. Bovendien zijn de andere einden 30 van deze beide cylinders 45 en 46 verbonden door een ver-bindingsleiding 58. Bij toevoer van olie via leiding 56 zal · de zuiger met zuigerstang in cylinder 45 naar buiten worden gedreven. De hydraulische vloeistof onder de zuiger in cylinder 45 gaat via leiding 58 naar de ruimte onder de zuiger in 35 cylinder 46 waardoor de zuiger met zuigerstang in deze 790877f - 7 - cylinder naar binnen zal worden getrokken.The length of the arm 52 is a multiple of the length of the frame 49. Therefore, the relatively large forces exerted by the hydraulic cylinders 45 and 46 can be absorbed by relatively small forces via the ground pin 55. The hydraulic cylinder 45 is provided with a hydraulic supply and discharge pipe 56 and hydraulic cylinder 46 with a corresponding pipe 57. In addition, the other ends 30 of these two cylinders 45 and 46 are connected by a connecting pipe 58. When oil is supplied via line 56 the piston with piston rod in cylinder 45 will be driven out. The hydraulic fluid under the piston in cylinder 45 passes via line 58 to the space below the piston in cylinder 46, whereby the piston with piston rod will be drawn into this 790877f - 7 cylinder.

Door het afwisselend toevoeren resp. afvoeren van een hydraulisch medium onderdruk in leiding 56 resp. leiding 57 zal aan het klemblok 41 een zwenkbeweging worden opgelegd, 5 waardoor de paalstukken een zwenkbeweging om hun verticale as zullen uitvoeren. Klemblok 5 zal steeds aan het boveneinde van een paalbuisstuk worden bevestigd en geleidelijk met dit buisstuk naar beneden zakken tot een onderste stand is bereikt. Vervolgens wordt het klemblok gelost, een nieuw 10 paalbuisstuk gemonteerd en het klemblok weer bevestigd aan het boveneinde van het volgende buisstuk.By alternating feeding or. discharge of a hydraulic medium underpressure in line 56 resp. conduit 57 will be imposed a pivotal movement on the clamping block 41, whereby the pile pieces will perform a pivotal movement about their vertical axis. Clamping block 5 will always be attached to the top end of a pile tube piece and gradually lower with this tube piece until a bottom position is reached. Then the clamping block is unloaded, a new pole post piece is mounted and the clamping block is reattached to the top end of the next pipe piece.

Door de lengte van de arm 52 en een zekere bewegingsmogelijkheid ook in het verticale vlak van de grondpen 55 kunnen de verticale verplaatsingen van de paalbuisstukken gemakkelijk 15 worden gevolgd.Due to the length of the arm 52 and a certain possibility of movement also in the vertical plane of the ground pin 55, the vertical displacements of the pile tube pieces can be easily followed.

79087717908771

Claims (7)

1. Werkwijze voor het aanbrengen van een paalfundering met het kenmerk, dat een eerste holpaalbuisstuk in de grond wordt gelaten, waarna in het paalbuisstuk water wordt aangevoerd en aan het paalbuisstuk een zwenkbeweging 5 wordt gegeven voor het geleidelijk losmaken van de grond waarna door middel van een in het paalbuisstuk geplaatste zuigleiding grond, zand en klei als een suspensie in water wordt opgezogen en afgevoerd en waarbij het paalbuisstuk geleidelijk dieper wordt gebracht.Method for applying a pile foundation, characterized in that a first hollow pile tube piece is left in the ground, after which water is supplied in the pile tube piece and a pivot movement is given to the pile tube piece for gradually loosening the soil, after which a suction pipe of soil, sand and clay placed in the pile tube piece is sucked up and discharged as a suspension in water and wherein the pile tube piece is gradually brought deeper. 2. Werkwijze volgens conclusie 1, met het kenmerk, dat een paalbuis wordt opgebouwd uit delen van beperkte lengte waarbij de zuigleiding van overeenkomstige korte delen wordt opgebouwd en waarbij opeenvolgende paalbuisstukken aan elkaar worden verbonden, terwijl de delen van de 15 zuigleiding door middel van flensverbindingen met elkaar worden verbonden en waarbij na het aanbrengen van een voldoend lengte aan paalbuisstukken in de grond een beton-voet onder aan de paal wordt gevormd, waarna in de paal een wapening wordt aangebracht en verder wordt gevuld met 20 betonspecie.2. A method according to claim 1, characterized in that a pile tube is built up of parts of limited length, wherein the suction pipe is built up of corresponding short parts and in which successive pile tube pieces are connected to each other, while the parts of the suction pipe are flanged connections. are connected to each other and in which after a sufficient length of pile pipe pieces have been placed in the ground a concrete base is formed at the bottom of the pile, after which a reinforcement is applied in the pile and further filled with concrete mortar. 3. Inrichting voor het uitvoeren van de werkwijze volgens één der voorgaande conclusies, met het kenmerk dat voorzien is in een klemblok, welke aan het boveneinde van een paalbuisstuk kan worden bevestigd, welke klemblok voorzien 25 is van een aandrijving voor het doen uitvoeren van een zwenkbeweging door het paalbuisstuk om zijn verticale hartlijn, terwijl een spoelcircuit is ingericht voor aansluiting op een coritainer, met een zuigperspomp voor het opzuigen van water uit de container en de toevoer in het 30 paalbuisstuk, en met een zuigmond met zuigleiding, die in het paalbuisstuk kan worden neergelaten en kan worden aangesloten op een vuilwaterzuigpomp, waarvan de afvoer is ingericht om uit te monden .in de container. 79 0 877 1 - 9 -3. Device for carrying out the method according to any one of the preceding claims, characterized in that a clamping block is provided, which can be attached to the top end of a pile tube piece, which clamping block is provided with a drive for carrying out a pivotal movement through the pole tube about its vertical axis, while a flushing circuit is arranged for connection to a coritainer, with a suction press pump for drawing water from the container and the supply in the pole tube piece, and with a suction nozzle with suction pipe, which is in the pole tube piece can be lowered and can be connected to a waste water suction pump, the drain of which is arranged to discharge into the container. 79 0 877 1 - 9 - 4. Inrichting volgens conclusie 3,met het kenmerk, dat de aandrijving voor de zwenkbeweging van het paalbuisstuk met behulp van een klemblok een T-vormig juk omvat . voorzien van twee horizontaal op stand van elkaar 5 gebrachte hydraulische cylinders, die verbonden zijn met het klemblok en waarbij de ruimten in de hydraulische cylinders aan de ene zijde van de zuigers in beide cylinders met elkaar zijn verbonden, terwijl de ruimten in de cylinders aan de andere zijde van de zuigers elk 10 zijn aangesloten op een hydraulische leiding, welke hydraulische leidingen zijn ingericht voor aansluiting op een hydraulische druk-en retourleiding voor het afwisselend toevoeren en afvoeren van een hydraulisch medium onderdruk terwijl het uiteinde van het T-vormige 15 juk is ingericht voor het opnemen van de reactiekrachten bij het doen zwenken van het paalbuisstuk.Device according to claim 3, characterized in that the drive for the pivoting movement of the pile tube piece comprises a T-shaped yoke by means of a clamping block. provided with two horizontally aligned hydraulic cylinders, which are connected to the clamping block and wherein the spaces in the hydraulic cylinders on one side of the pistons in both cylinders are connected to each other, while the spaces in the cylinders on the the other side of the pistons are each connected to a hydraulic line, which hydraulic lines are arranged for connection to a hydraulic pressure and return line for alternately supplying and discharging a hydraulic medium underpressure, while the end of the T-shaped yoke is adapted to absorb the reaction forces when the pile tube piece is pivoted. 5. Paalbuisstuk kennelijk bestemd voor het toepassen van de werkwijze volgens conclusie 1 of 2, met het kenmerk dat het paalbuisstuk aan de onderzijde van een vertanding is 20 voorzien.Pile tube piece evidently intended for applying the method according to claim 1 or 2, characterized in that the pile tube piece is provided with a toothing on the underside. 6. Paalbuisstuk volgens conclusie 5, met het kenmerk, dat nabij de vertanding aan de buitenzijde van het paalbuisstuk enkele nokken zijn aangebracht.Pile tube piece according to claim 5, characterized in that a few projections are arranged near the toothing on the outside of the pile tube piece. 7. Funderingspaal aangebracht onder het toepassen van de 25 werkwijze volgens conclusies 1 of 2 en/of onder gebruik making van een inrichting volgens één der conclusies 3 tot 6. 79087717. Foundation pile applied using the method according to claims 1 or 2 and / or using an apparatus according to any one of claims 3 to 6. 7908771
NL7908771A 1979-12-05 1979-12-05 Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension NL7908771A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NL7908771A NL7908771A (en) 1979-12-05 1979-12-05 Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL7908771 1979-12-05
NL7908771A NL7908771A (en) 1979-12-05 1979-12-05 Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension

Publications (1)

Publication Number Publication Date
NL7908771A true NL7908771A (en) 1981-07-01

Family

ID=19834282

Family Applications (1)

Application Number Title Priority Date Filing Date
NL7908771A NL7908771A (en) 1979-12-05 1979-12-05 Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension

Country Status (1)

Country Link
NL (1) NL7908771A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5002434A (en) * 1988-09-02 1991-03-26 Darya Paye Jetty Co., Ltd. Method and apparatus for placing a hollow column in the hard bottom of a body of water in particular in a rock bottom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5002434A (en) * 1988-09-02 1991-03-26 Darya Paye Jetty Co., Ltd. Method and apparatus for placing a hollow column in the hard bottom of a body of water in particular in a rock bottom

Similar Documents

Publication Publication Date Title
US8079780B2 (en) Slotted mandrel for lateral displacement pier and method of use
CN101644053B (en) Method for enhancing pulling-resistant and tensile-resistant capability of soft and weak soil layer anchor rod/anchor rope
JP2007126846A (en) Reinforcing cage, construction method for cast-in-place concrete pile, and cast-in-place concrete pile
AU614927B2 (en) Improvements in or relating to pile driving
CN107338781A (en) A kind of compacting pile construction device and its construction method
CN101761081A (en) Construction method and equipment of holding and pressing type static-pressure driven cast-in-place pile
NL1012243C2 (en) Method and device for manufacturing a pile in the ground.
CN103161155A (en) Pile machine special for immersed tube pressure filling pile, using method thereof and application thereof
US20160177528A1 (en) Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns
NL7908771A (en) Tubular foundation building pile - is driven into soil by rocking tube laterally, injecting water and pumping out loosened soil in suspension
US5026214A (en) Apparatus for placing cementitious materials in earth excavations
CN112343045A (en) Static pressure pipe pile sinking device with recyclable pile tip and construction method
CN207277312U (en) A kind of compacting pile construction device
CN1367296A (en) Soft foundation composite ground base construction method for field pouring pipe pile with large diameter
US5256005A (en) Method and apparatus for placing cementitious materials in earth excavations
CN113073631B (en) Construction method for deep and soft soil layer of highway
NL8900541A (en) METHOD FOR MANUFACTURING A CLOSING VERTICAL WALL IN THE BOTTOM, AND APPARATUS FOR USING THIS METHOD
CN210459189U (en) Novel BNT carrier pile and construction equipment thereof
US10690468B2 (en) Apparatus and method for filling boreholes in blasting operations
BE1023940B1 (en) DEVICE AND METHOD FOR IMPROVING THE WATERPROOFABILITY OF A SOIL
CN2661770Y (en) Behind inserting reinforcing cage for long screw pore-forming guncreting piling and conveying device therefor
KR102239806B1 (en) Soft ground improvement method using mechanical replacement
GB2189533A (en) Improvements in or relating to pile driving
CN213952217U (en) Static pressure pipe pile sinking device with recyclable pile tip
CN217053369U (en) Filling equipment with clear hole device

Legal Events

Date Code Title Description
A1A A request for search or an international-type search has been filed
BB A search report has been drawn up
A85 Still pending on 85-01-01
BC A request for examination has been filed
BV The patent application has lapsed