|
FR2128120B1
(cs)
*
|
1971-03-05 |
1974-02-15 |
Erap Elf Entr Rech Activ Petro |
|
|
BE790646A
(fr)
*
|
1971-10-29 |
1973-02-15 |
Erap |
Installation pour la separation de fond des effluents des puitsproducteurs d'un champ petrolier marin
|
|
GB1421162A
(en)
*
|
1972-01-18 |
1976-01-14 |
Balaena Group Ltd |
Structures for use at sea
|
|
GB1469749A
(en)
*
|
1973-03-13 |
1977-04-06 |
Davies R |
Liquid handling
|
|
US3961488A
(en)
*
|
1974-11-19 |
1976-06-08 |
A/S Akers Mek. Verksted |
Method for filling and emptying of cassions
|
|
DE2549859C3
(de)
*
|
1975-11-06 |
1979-03-22 |
Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim |
Verbindung zwischen einer Überwasserplattform o.dgl. und einem Fundament
|
|
FR2384902A2
(fr)
*
|
1976-07-23 |
1978-10-20 |
Doris Dev Richesse Sous Marine |
Ouvrage oscillant a installer dans une nappe d'eau et procede pour sa construction
|
|
FR2404096A1
(fr)
|
1977-09-23 |
1979-04-20 |
Emh |
Structure d'exploitation du fond marin permettant d'assurer les differentes fonctions a une telle exploitation
|
|
USRE32119E
(en)
*
|
1980-04-30 |
1986-04-22 |
Brown & Root, Inc. |
Mooring and supporting apparatus and methods for a guyed marine structure
|
|
GB2075096B
(en)
*
|
1980-04-30 |
1984-08-08 |
Brown & Root |
Mooring and supporting apparatus and methods for a guyed marine structure
|
|
US4512409A
(en)
*
|
1983-10-13 |
1985-04-23 |
Exxon Production Research Co. |
Moonpool guidance system for floating structures
|
|
US4685833A
(en)
*
|
1984-03-28 |
1987-08-11 |
Iwamoto William T |
Offshore structure for deepsea production
|
|
US4610569A
(en)
*
|
1984-07-30 |
1986-09-09 |
Exxon Production Research Co. |
Hybrid offshore structure
|
|
JPH0285016U
(cs)
*
|
1988-12-20 |
1990-07-03 |
|
|
|
US6578637B1
(en)
|
1999-09-17 |
2003-06-17 |
Exxonmobil Upstream Research Company |
Method and system for storing gas for use in offshore drilling and production operations
|
|
US7006959B1
(en)
|
1999-10-12 |
2006-02-28 |
Exxonmobil Upstream Research Company |
Method and system for simulating a hydrocarbon-bearing formation
|
|
WO2005121840A1
(en)
*
|
2004-06-07 |
2005-12-22 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
|
MX2010005485A
(es)
*
|
2007-11-19 |
2011-06-16 |
Keith K Millheim |
Sistema de tubo de subida autonomo que tiene camaras de flotacion multiples.
|
|
US8437996B2
(en)
*
|
2007-12-13 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
|
BRPI0919456A2
(pt)
*
|
2008-09-30 |
2015-12-22 |
Exxonmobil Upstream Res Co |
método para modelar escoamento de fluido em um reservatório de hidrocarboneto
|
|
US9327805B2
(en)
*
|
2012-08-07 |
2016-05-03 |
China National Offshore Oil Corporation |
Vertical oil storage system and its method for deepwater drilling and production
|
|
WO2017091146A1
(en)
*
|
2015-11-27 |
2017-06-01 |
Blue Capital Pte. Ltd. |
An offshore storage facility
|
|
SG10201806224VA
(en)
*
|
2018-07-20 |
2020-02-27 |
Blue Capital Pte Ltd |
An offshore storage facility
|
|
GB2602115B
(en)
|
2020-12-18 |
2023-07-12 |
Subsea 7 Norway As |
Storage of fluids underwater
|