E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
E02D27/00—Foundations as substructures
E02D27/10—Deep foundations
E02D27/12—Pile foundations
E02D27/14—Pile framings, i.e. piles assembled to form the substructure
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
Assembly for producing foundation in ground comprises elongated pins which form a first row and further pins form a second row, the two rows being approximately 80 cm apart, an elongated U-profile being fitted over two rows