NL2032809B1 - Installing a heavy lift crane system at a hoisting site - Google Patents

Installing a heavy lift crane system at a hoisting site Download PDF

Info

Publication number
NL2032809B1
NL2032809B1 NL2032809A NL2032809A NL2032809B1 NL 2032809 B1 NL2032809 B1 NL 2032809B1 NL 2032809 A NL2032809 A NL 2032809A NL 2032809 A NL2032809 A NL 2032809A NL 2032809 B1 NL2032809 B1 NL 2032809B1
Authority
NL
Netherlands
Prior art keywords
rear mast
crane
connector support
main boom
slew
Prior art date
Application number
NL2032809A
Other languages
Dutch (nl)
Inventor
Van Der Linde Adrianus
Original Assignee
Itrec Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Itrec Bv filed Critical Itrec Bv
Priority to NL2032809A priority Critical patent/NL2032809B1/en
Priority to PCT/EP2023/072512 priority patent/WO2024038072A1/en
Application granted granted Critical
Publication of NL2032809B1 publication Critical patent/NL2032809B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/74Counterweights or supports for balancing lifting couples separate from jib
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/365Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes dismantable into smaller units for transport purposes

Abstract

Method for installing a heavy lift crane system at a hoisting site. The crane system comprises a circular slew track assembly extending over at least a slew arc about a slew center and a crane with a crane carriage configured to travel over the track arrangement, a main boom, a back mast, an adjustable length arrangement between the back mast and the main boom. The method comprises arranging a connector strut underneath the horizontal back mast, pivotally connecting an upper end of the connector strut, pivoting the back mast into an inclined raised position, arranging a countenNeight at the slew center, bringing the connector strut into a substantially vertical orientation above the countenNeight, connecting a lower end of the connector strut to the counterweight, and raising the main boom.

Description

P35757NL00
INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE
The present invention relates to the field of heavy lift crane systems.
In the field of heavy lifting crane systems are known, e.g. as disclosed in WO2010/121134,
WO2019/050405. An example of a heavy lifting mobile crane system is the SK10,000 crane system that has been developed by the company ALE.
In WO2021/140011 a heavy lift crane system is disclosed. This crane system has a track arrangement configured to be installed on the ground. The arrangement includes a circular slew track assembly that extends over at least a slew arc about a slew center. The crane has a crane carriage with a base, a first chassis, and second chassis. The first and second chassis are configured to travel over the track arrangement and to support the base thereon.
A main boom of the crane is pivotal relative to the base of the crane carriage about a main boom pivot axis and has a main boom tip. A back mast is pivotal relative to the base of the crane carriage about a back mast pivot axis and has a back mast tip. An adjustable length arrangement is provided between the back mast and the main boom. The crane has a counterweight that is arranged at the slew center. A connector strut of the crane serves to suspend the counterweight from the back mast. As is known in the art, the counterweight may then still rest on the ground or another support. A swivel is provided between the counterweight and the back mast to allow for slew motion of the crane about the slew center, e.g. the swivel being integrated with the connector strut.
These cranes are in practice so large that the crane is commonly assembled at the location of the hoisting job, e.g. at a refinery, a power plant, a production/assembly location of (offshore) wind turbines, etc. Commonly the main boom and the back mast are each assembled from modules, e.g. latticed modules. For example, the main boom and/or back mast are embodied as an A-frame. Other designs are also known, e.g. a main boom with parallel boom legs connected by brace members.
The track arrangement, in embodiments, may comprise load spreading boards on which the tracks are mounted, so that loads are distributed in view of the allowable ground pressure. In another design, the track arrangement is mounted on a foundation, e.g. for a more permanent (longer duration) use of the crane at one site.
In practice, the main boom, possibly extended by a jib, may be over 100 meters long. A tall main boom, e.g. including a jib, is for example envisaged for wind turbine assembly.
The present invention aims to enhance the installation process of a heavy lift crane system.
The present invention provides a method according to claim 1.
The circular slew track assembly is installed at the hoisting site. This can be a full circle slew track, a semi-circular slew track, or a track extending over another arc segment, e.g. just more or less than half a circle. The center of the slew track forms the slew center of the crane.
The slew track can be configured to be deployed at various locations, as the crane system is used at these locations for hoisting jobs. The slew track can also be permanent, e.g. when the crane system is to be used at one location over a prolonged period. For example, the slew track can be mounted on a foundation, e.g. of concrete.
The assembly of the crane comprises installing the crane carriage on the track arrangement.
If only the circular slew track assembly is present, the carriage is installed thereon. In case of amore complex track arrangement, e.g. as in WO2021/140011, the carriage could also be installed on the rectilinear track assembly, as discussed therein. Yet, in many situations, the track arrangement will only consist of the circular slew track assembly.
The main boom is assembled in a horizontal orientation thereof to the crane carriage. As discussed, the main boom will in practical embodiments be modular, and assembled from (many) main boom segments, e.g. as in WO2021/140011. For example, the main boom is an
A-frame. In practical embodiments the horizontal main boom will rest on ground supports that hold the main boom horizontal and at a distance above the ground, e.g. the assembly of the main boom takes place on the ground supports. A jib may be fitted to the tip end of the main boom.
The back mast is assembled in horizontal orientation thereof to the crane carriage. As discussed, the back mast will in practical embodiments be modular, and assembled from (many) back mast segments, e.g. as in WO2021/140011. For example, the back mast is an
A-frame. In practical embodiments the horizontal back mast will rest on ground supports that hold the back mast horizontal and at a distance above the ground, e.g. the assembly of the back mast takes place on the ground supports.
The adjustable length arrangement is provided between the back mast and the main boom.
As, for example, described in WO2021/140011, this arrangement may comprise one or more winch driven cables, e.g. in multiple-fall arrangements between associated sheaves, between the back mast and the boom, e.g. between the back mast tip and the main boom tip. Possibly, the arrangement comprises a dedicated mechanism of winch{es) and cable(s) between the back mast that is solely used for raising of the main boom (e.g. with jib), this mechanism nat being of use during normal operation of the crane.
Due to the inventive approach, the connector strut can be effectively handled. This connector strut is a crucial component of significant dimensions (in particular length) and mass, and may be assembly from strut components that are secured end-to-end. The strut may have multiple parallel strut components.
In a practical embodiment, it is envisaged that the connector strut is moved underneath the still horizontal back mast, e.g. using one or more vehicles, e.g. self-propelled modular transporters. In another approach, the assembly of the connector strut is done underneath the still horizontal back mast.
In a practical embodiment, before moving or assembling the connector strut underneath the back mast, ground supports upon which the back mast rests are first removed or displaced to clear the area for the connector strut. In a practical embodiment, the adjustable length arrangement is operated, e.g. tensioned, so that the back mast no longer rests on the ground supports and is effectively suspended, albeit in horizontal position, by this adjustable length arrangement.
The upper end of the connector strut is then pivotally connected to the back mast, e.g. to the tip end of the back mast.
In an embodiment, a temporarily fastening is then arranged and/or operated to secure the connector strut along the back mast. This allows to raise the connector strut by the process step of pivoting the back mast into a raised position thereof. For example, the temporarily fastening involves the use of an auxiliary winch of the crane system and a corresponding winch driven cable that extends from the back mast and that is attached to the connector strut remote from its upper end, e.g. at or near its lower end. The cable can be used to pull the connector strut towards the back mast. Other approaches to provide a temporary fastening, e.g. involving the use of slings, locking devices, etc. are also envisaged.
Pivoting the back mast into the raised position can be done, in embodiments, using the adjustable length arrangement. Other approaches, e.g. including a dedicated upending mechanism for the back mast, are also envisaged.
In another embodiment, the connector strut is — after pivotally connecting the upper end of the connector strut to the horizontal back mast — supported at a lower end thereof by a vehicle, wherein the method then comprises: - pivoting the back mast into an inclined raised position, wherein the lower end of the connector strut initially remains supported by the vehicle that moves away from the slew track assembly until the lower end of the connector strut is lifted off the vehicle, - arranging the counterweight at the slew center, - bringing the connector strut in a substantially vertical orientation above the counterweight, - connecting the lower end of the connector strut to the counterweight, - raising the main boom, e.g. by operating the adjustable length arrangement between the back mast and the main boom.
Herein, the vehicle can be one that has been employed in moving the connector strut in position underneath the horizontal back mast.
In a further development of this approach — before pivoting the back mast into the inclined raised position — the lower end of the connector strut is connected via a sling or cable to the back mast, thereby limiting the pivot angle of the connector strut relative to the back mast, and wherein the method then comprises: - pivoting the back mast into an inclined raised position, preferably by operating the adjustable length arrangement between the back mast and the main boom, wherein the lower end of the connector strut initially remains supported by the vehicle that moves away from the slew track assembly until the lower end of the connector strut is lifted off the vehicle as the sling or cable limits the pivot angle of the connector strut, - arranging the counterweight at the slew center, - bringing the connector strut in a substantially vertical orientation above the counterweight, e.g. by pivoting the back mast, - connecting the lower end of the connector strut to the counterweight, - raising the main boom, e.g. by operating the adjustable length arrangement between the back mast and the main boom.
As the back mast in its horizontal orientation effectively extends over the slew center, the phase of arranging the counterweight at the slew center can readily be performed once the back mast is in this raised position, so that the connector strut is clear from the location where the counterweight is to be arranged.
The phase of arranging the counterweight may involve the assembly of the counterweight from components, e.g. steel plates, containers filled with ballast material, etc.
Once the counterweight has been completed, the connector strut is brought into position that allows for connection of the lower end thereof to the counterweight. For example, the connector strut is released from the back mast so that the strut can swing about its pivotal connection to a more or less vertical orientation, e.g. completely vertical orientation. In view of the dimension and mass of the connector strut an auxiliary winch and corresponding cable may be employed to cause a controlled swing of the back mast.
The lower end of the connector strut is then connected to the counterweight. Once this situation has been reached, the main boom — possibly with jib arrangement at the tip end thereof — can be raised by operating the adjustable length arrangement between the back mast and the main boom.
The inventive installation process is effective and dependable.
In an embodiment, horizontal main boom rests on ground supports that hold the main boom horizontal and at a distance above the ground, e.g. the assembly of the main boom takes place on the ground supports and/or the horizontal back mast rests on ground supports that hold the back mast horizontal and at a distance above the ground, e.g. the assembly of the back mast takes place on the ground supports.
In an embodiment, before moving or assembling the connector strut underneath the back mast, ground supports upon which the back mast rests are first removed or displaced to clear an area for the connector strut. For example, the adjustable length arrangement is operated so that the back mast no longer rests on the ground supports and is effectively suspended, in horizontal position, by the adjustable length arrangement, the ground supports then be displaced or removed to clear an area under the horizontal back mast for the connector strut.
In an embodiment, the temporarily fastening involves the use of an auxiliary winch of the crane system and a corresponding winch driven cable that extends from the back mast and that is attached to the connector strut remote from its upper end, e.g. at or near its lower end, wherein the cable is used to retain the connector strut along the back mast, e.g. to pull the connector strut towards, e.g. against, the back mast.
-B-
In an embodiment, an auxiliary winch and corresponding cable is employed to cause a controlled swing of the back mast away from the back mast, e.g. the winch of used for temporarily fastening the connector strut.
The present invention also relates to a heavy lift crane system to be installed at a hoisting site according to claim 10.
The invention will now be discussed with reference to the drawings. In the drawings: - fig. 1 shows an example of the installation of a heavy lift crane system according to the invention, wherein the crane is arranged on the circular slew track assembly, - fig. 2 shows the crane of figure 1 in side view, - fig. 3 illustrates the installing of the crane carriage on the circular slew track assembly, and the assembly of the main boom in horizontal orientation to the crane carriage, - fig. 4 illustrates the assembly of the back mast in horizontal orientation to the crane carriage, and providing the adjustable length arrangement between the back mast and the main boom, - fig. 5 illustrates tensioning the adjustable length arrangement and removal of the supports from underneath the still horizontal back mast, - fig. 6 illustrates the arranging of the connector strut underneath the horizontal back mast, the pivotally connecting of an upper end of the connector strut to the horizontal back mast, and the temporarily fastening the connector strut along the back mast, - fig. 7 illustrates the pivoting the back mast into an inclined raised position by operating the adjustable length arrangement between the back mast and the main boom, - fig. 8 illustrates the arranging of the counterweight at the slew center, the undoing of the temporarily fastening the connector strut and causing the connector strut to swing to a substantially vertical orientation, followed by connecting a lower end of the connector strut to the counterweight, - fig. 9 illustrates another embodiment for the arranging of the connector strut underneath the horizontal back mast, and the pivotally connecting of an upper end of the connector strut to the horizontal back mast, - fig. 10 illustrates, following the figure 9, the pivoting the back mast into an inclined raised position by operating the adjustable length arrangement between the back mast and the main boom, - fig. 11 illustrates, following the figure 10, the arranging of the counterweight at the slew center, bringing the connector strut above the counterweight, followed by connecting a lower end of the connector strut to the counterweight.
The figures 1 and 2 show a heavy lift crane system that is installed at a hoisting site.
The crane system comprises a track arrangement installed on the ground. Here the track arrangement consists of a circular slew track assembly 1 that extends over a slew arc about a slew center 2. The slew track, for example, comprises a pair of track members, e.g. skid rails.
The crane system further comprises a crane 20. The crane comprises: - a crane carriage, comprising a base 30, a first chassis 31 and second chassis 31, the first and second chassis being configured to travel over the track arrangement and to support the base 30 thereon, - a main boom 40, that is pivotal relative to the base of the crane carriage about a main boom pivot axis 41, and has a main boom tip 42, - a back mast 50, that is pivotal relative to the base 30 of the crane carriage about a back mast pivot axis 51, and has a back mast tip 52, - an adjustable length arrangement 60 between the back mast 50 and the main boom 40, - a counterweight 70, that is arranged at the slew center 2, -a connector strut 80 that suspends the counterweight 70 from the back mast 50. As is shown and is known in the art, the counterweight 70 may then still rest on the ground or another support.
A swivel 82 is provided between the counterweight 70 and the back mast 50 to allow for slew motion of the crane about the slew center 2, e.g. the swivel being integrated with the connector strut or with the connector 71 of the counterweight 70. In another embodiment, the counterweight 70 itself can revolve along with slew motion of the crane, e.g. mounted on a circular counterweight track.
The crane 20 is, for example, of use to production of wind turbines, e.g. that are to be installed by means of the crane 20 onto a floating foundation and then towed out to an offshore wind farm.
The depicted crane 20 is also provided with a jib 55, that is pivotally mounted to the tip of the main boom 50 as is known in the art. The jib 55 is kept in its desired orientation by a stay mechanism, here comprising a lower jib strut 56, a lower stay 57, and an upper jib strut 58, and an upper stay 59. As known in the art, the jib struts 56, 58 are each connected at an inner end to the tip of the main boom. A variable length mechanism 65 is present between the struts 58, 58.
It is illustrated that a hoist system of the crane 20 includes a winch driven hoist cable 90 that depends from a sheave assembly on the tip of the jib 55 in a multiple-fall arrangement to a hoisting block 91, e.g. with hook. For example, a further hoist system of the crane includes a winch driven hoist cable that depends from a sheave assembly on the tip of the main boom in a multiple-fall arrangement to a hoisting block, e.g. with hook.
In an embodiment, the crane is provided with a taglines system, e.g. including one or more tagline rails along the main boom on which one or more tagline trolleys travel, as is known in the art, e.g. in view of handling wind turbine blades.
As is known in the art, and as preferred, the tracks of the tracks of the circular slew track assembly may be embodied for skidding. For example, each track comprises a skid surface arranged between two skid rails, wherein skid actuators are engageable with one or both of said skid rails and with the carriage to advance the crane over the respective track. In another embodiment, the track engaging members are embodied as wheels that are configured to roll over a roll surface of the tracks, e.g. similar to railroad tracks.
The main boom 40 is, as is preferred, modular, more preferably with two latticed legs, e.g. as an A-frame as shown here.
The back mast 50 is, as is preferred, modular, more preferably with one or two latticed legs, e.g. as an A-frame as shown here.
The counterweight 70 may be composed of steel elements, e.g. that are arranged on a platform, in a cradle, etc. At the top of the counterweight 70 there is a connector 71 for the connector strut 80.
With reference to figures 3 — 8 the relevant phases of the installation of the crane 20 will be discussed.
Figure 3 illustrates the installing of the crane carriage 30 on the circular slew track assembly 1, and the assembly of the main boom 40 in horizontal orientation to the crane carriage 30.
As shown the main boom 40 rests on ground supports 45 that keep the main boom at a distance (here of several meters) above the ground and in horizontal orientation.
For purpose of illustration of the scale, a person is shown on the track assembly 1 under the carriage.
Figure 4 illustrates the assembly of the back mast 50 in horizontal orientation to the crane carriage 30, and providing the adjustable length arrangement 60 between the back mast 50 and the main boom 40. This arrangement 60 includes one or more winches 61 on the back mast 50 and one or more winch driven cables 62 that extend from the tip of the back mast 50 and are to be connected in this phase to the main boom 40. The back mast is resting on ground supports 54.
Figure 5 illustrates tensioning the adjustable length arrangement 60 and removal of the supports 54 from underneath the still horizontal back mast 50 to clear an area for the connector strut 80.
Figure 6 illustrates the arranging of the connector strut 80 underneath the horizontal back mast 50. Here, two self-propelled modular transporters 100 are used to transport the strut 80 that rests thereon. Once positioned underneath the back mast 50, the upper end of the strut 80 is pivotally connected to the horizontal back mast.
The temporarily fastening of the strut 80 to the back mast, here involves the use of an auxiliary winch 95 of the crane system and a corresponding winch driven cable 96 that extends from the back mast 50 and that is attached to the connector strut 80 remote from its upper end, here at its lower end. The cable 96 is used to retain the connector strut 80 along the back mast, here to pull the connector strut towards, e.g. against, the back mast 50.
Figure 7 illustrates the pivoting the back mast 50 as well as the temporarily fastened connector strut 80 into an inclined raised position by operating the adjustable length arrangement 60 between the back mast and the main boom 40. This clears the back mast from the slew center, so that now the counterweight 70 can be arranged at the slew center 2 as is shown in figure 8. The raised position of the back mast 50 the allows for the undoing of the temporarily fastening of the connector strut 80, and causing the connector strut 80 to swing to a substantially vertical orientation, followed by connecting a lower end of the connector strut to the counterweight. The swing of the strut 80 is here controlled by operation of the winch 95.
Once the connector strut 80 is secured to the counter weight, the main boom (here with jib) is raised by operating the adjustable length arrangement 60 between the back mast and the main boom 40. The crane system is now ready for use.
With reference to figures 9 - 11 a second embodiment of the invention will now be discussed.
Herein components have been indicated with the same reference numerals as in the first embodiment.
The figure 9 illustrates that the connector strut 80 is transported on two transporters 100 to a location underneath the horizontally oriented back mast 50, which rests on ground supports 54. The transporters 100 move in between the supports 54 so that the back mast 50 can remain supported thereon in this phase.
The figure 9 illustrates that the upper end of the connector strut 80 is lifted by means of a mobile crane 200 with hoist cable 201, so that the upper end of the strut 80 can be connected to the tip end 52 of the back mast. The lower end of the strut 80 remains on the transporter 100.
Figure 9 illustrates that an auxiliary bracket 130 is employed to provide a lever for the arrangement 60 in the course of the following step of raising the back mast 50.
The raising of the back mast 50, whilst the strut 80 is connected thereto pivotally at its upper end, is illustrated in figure 10. It is shown that the connector strut 80 is supported at a lower end thereof by transporter 100. The raising step then comprises pivoting the back mast 50 into an inclined raised position, e.g. by operating the adjustable length arrangement 60 between the back mast and the main boom. Herein the lower end of the connector strut 80 initially remains supported by the transporter 100 that moves away from the slew track assembly 1 until the lower end of the connector strut is lifted off the transporter 100.
The figure 10 illustrates that — before pivoting the back mast 50 into the inclined raised position — the lower end of the connector strut 80 is connected via a sling 85 or cable to the back mast, thereby limiting the pivot angle of the connector strut 80 relative to the back mast.
Initially the sling 85 is slack as shown in figure 10, but as the back mast is pivoted upwards and the transporter 100 moves away from the slew track assembly 1, the sling becomes taut as also shown in figure 10. When continuing the process step of raising the back mast 50, the lower end of the connector strut 80 is lifted off the transporter 100 as the sling 85 limits the pivot angle of the connector strut relative to the back mast 50.
Figure 11 illustrates the back mast 50 is raised to an inclination such that the depending connector strut 80 is well clear of the slew center 2 which allows for arranging the counterweight 70 at the slew center 2. Once the counterweight 70 is completed, the back mast 50 is lowered somewhat, as shown in figure 11, so that the connector strut is brought in a substantially vertical orientation above the counterweight. Then the lower end of the connector strut 80 is connected to connector 71 of the counterweight 70. In the further installation process, the main boom 40 can be raised by operating the adjustable length arrangement 60, e.g. a dedicated mechanism thereof, between the back mast and the main boom.

Claims (12)

CONCLUSIESCONCLUSIONS 1. Werkwijze voor het installeren van een heavy lift kraansysteem op een hijslocatie, waarbij het kraansysteem omvat: - een baansamenstel ingericht om te worden geïnstalleerd op de grond en omvattende: - een cirkelvormig slewbaansamenstel (1) dat zich uitstrekt over ten minste een slewboog om een slewcentrum (2), - een kraan (20) omvattende: - een kraanonderstel, omvattende een basis (30), een eerste chassis (31) en een tweede chassis (32), waarbij het eerste en tweede chassis zijn ingericht om te rijden over het baansamenstel en om de basis (30) daarop te ondersteunen, - een hoofdgiek (40), die scharnierbaar is ten opzichte van de basis van het kraanonderstel om een hoofdgiekscharnieras (41), en die een hoofdgiekpunt (42) heeft, - een achtermast (50), die scharnierbaar is ten opzichte van de basis (30) van het kraanonderstel om een achtermastscharnieras (51), en een achtermastpunt (52) heeft, - een verstelbare-lengte-samenstel (60) tussen de achtermast (50) en de hoofdgiek (40), - een contragewicht (70), dat is ingericht om bij het slewcentrum te worden opgesteld, waarbij de kraan een connectorsteun (80) omvat om het contragewicht van de achtermast af te hangen, en waarbij, bij voorkeur, een zwenkkoppeling (82) is voorzien tussen het contragewicht en de achtermast (50) om een slewbeweging van de kraan om het slewcentrum (2) mogelijk te maken, waarbij de werkwijze omvat: - het installeren van het cirkelvormige slewbaansamenstel (1) op de hijslocatie,1. Method for installing a heavy lift crane system at a lifting location, wherein the crane system comprises: - a track assembly designed to be installed on the ground and comprising: - a circular slew track assembly (1) extending over at least one slew arc to a slew center (2), - a crane (20) comprising: - a crane chassis, comprising a base (30), a first chassis (31) and a second chassis (32), wherein the first and second chassis are adapted to drive over the track assembly and to support the base (30) thereon, - a main boom (40), which is pivotable relative to the base of the crane undercarriage about a main boom pivot axis (41), and which has a main boom point (42), - a rear mast (50), which is pivotable relative to the base (30) of the crane undercarriage about a rear mast pivot axis (51), and has a rear mast point (52), - an adjustable-length assembly (60) between the rear mast (50) and the main boom (40), - a counterweight (70) adapted to be positioned at the slew centre, the crane comprising a connector support (80) for suspending the counterweight from the aft mast, and wherein, preferably a slew coupling (82) is provided between the counterweight and the rear mast (50) to allow a slewing movement of the crane about the slew center (2), the method comprising: - installing the circular slewing track assembly (1) at the lifting location , - het assembleren van de kraan (20) omvattende: - het installeren van het kraanonderstel (30,31,32) op het baansamenstel, bijvoorbeeld op het cirkelvormige slewbaansamenstel (1), - het assembleren van de hoofdgiek (40) in horizontale oriëntatie aan het kraanonderstel, - het assembleren van de achtermast (50) in horizontale oriëntatie aan het kraanonderstel, - het verschaffen van het verstelbare-lengte-samenstel (60) tussen de achtermast en de hoofdgiek, - het opstellen van de connectorsteun (80) onder de horizontale achtermast (50), - het scharnierbaar verbinden van een bovenste einde van de connectorsteun (80) met de horizontale achtermast (50), - het scharnieren van de achtermast (50) naar een schuin omhooggerichte positie waarbij de connectorsteun (80) aan zijn bovenste einde is verbonden met de achtermast, - het opstellen van het contragewicht (70) op het slewcentrum (2), - het boven het contragewicht brengen van de connectorsteun (80), - het verbinden van een onderste einde van de connectorsteun (80) met het contragewicht (70), - het omhoog bewegen van de hoofdgiek (40).- assembling the crane (20) comprising: - installing the crane undercarriage (30,31,32) on the track assembly, for example on the circular sled track assembly (1), - assembling the main boom (40) in horizontal orientation the crane undercarriage, - assembling the aft mast (50) in horizontal orientation to the crane undercarriage, - providing the adjustable length assembly (60) between the aft mast and the main boom, - arranging the connector support (80) under the horizontal rear mast (50), - hingedly connecting an upper end of the connector support (80) to the horizontal rear mast (50), - hinging the rear mast (50) to an angled upward position with the connector support (80) at its upper end is connected to the rear mast, - setting up the counterweight (70) on the slew center (2), - raising the connector support (80) above the counterweight, - connecting a lower end of the connector support (80) with the counterweight (70), - raising the main boom (40). 2. Werkwijze volgens conclusie 1, waarbij — na het scharnierbaar verbinden van het bovenste einde van de connectorsteun (80) met de horizontale achtermast (50) — de connectorsteun (80) tijdelijk langs de achtermast (50) wordt vastgezet, en waarbij de werkwijze dan omvat: - het scharnieren van de achtermast (50) met de connectorsteun (80) die tijdelijk daaraan is vastgezet naar een schuin omhooggerichte positie, - het opstellen van het contragewicht (70) op het slewcentrum {2}, - het losnemen van de tijdelijke vastzetting van de connectorsteun (80) en het bewerkstelligen dat de connectorsteun (80) zwenkt naar een in hoofdzaak verticale oriëntatie boven het contragewicht, - het verbinden van een onderste einde van de connectorsteun (80) met het contragewicht (70), - het omhoog bewegen van de hoofdgiek (40).A method according to claim 1, wherein - after pivotally connecting the upper end of the connector support (80) to the horizontal rear mast (50) - the connector support (80) is temporarily secured along the rear mast (50), and wherein the method then includes: - pivoting the rear mast (50) with the connector bracket (80) temporarily secured to it to an obliquely upwards position, - setting up the counterweight (70) on the slew center {2}, - loosening the temporarily securing the connector support (80) and causing the connector support (80) to pivot to a substantially vertical orientation above the counterweight, - connecting a lower end of the connector support (80) to the counterweight (70), - raising the main boom (40). 3. Werkwijze volgens conclusie 1, waarbij — na het scharnierbaar verbinden van het bovenste einde van de connectorsteun (80) met de horizontale achtermast (50) — de connectorsteun (80) wordt ondersteund aan een onderste einde daarvan door een voertuig (100), en waarbij de werkwijze dan omvat: - het scharnieren van de achtermast (50) naar een schuin omhooggerichte positie, waarbij het onderste einde van de connectorsteun (80) in eerste instantie gesteund blijft door het voertuig dat van het slewbaansamenstel vandaan beweegt totdat het onderste einde van de connectorsteun van het voertuig wordt getild, - het opstellen het contragewicht (70) op het slewcentrum (2), - het in een in hoofdzaak verticale oriëntatie boven het contragewicht brengen van de connectorsteun (80), - het verbinden van het onderste einde van de connectorsteun (80) met het contragewicht (70), - het omhoog bewegen van de hoofdgiek (40).Method according to claim 1, wherein - after pivotally connecting the upper end of the connector support (80) to the horizontal rear mast (50) - the connector support (80) is supported at a lower end thereof by a vehicle (100), and wherein the method then comprises: - pivoting the rear mast (50) to an upwardly inclined position, the lower end of the connector bracket (80) initially remaining supported by the vehicle moving away from the sled track assembly until the lower end is lifted from the vehicle's connector bracket, - positioning the counterweight (70) on the slew center (2), - raising the connector bracket (80) in a substantially vertical orientation, - connecting the lower end of the connector support (80) with the counterweight (70), - raising the main boom (40). 4. Werkwijze volgens conclusie 3, waarbij — vóór het scharnieren van de achtermast (50) naar de schuin omhooggerichte positie — het onderste einde van de connectorsteun {80) wordt verbonden met de achtermast via een lus of kabel, daardoor de scharnierhoek van de connectorsteun (80) ten opzichte van de achtermast begrenzend, en waarbij de werkwijze dan omvat: - het scharnieren van de achtermast (50) naar een schuin omhooggerichte positie, waarbij het onderste einde van de connectorsteun (80) in eerste instantie gesteund blijft door het voertuig (100) dat van het slewbaansamenstel vandaan beweegt totdat het onderste einde van de connectorsteun van het voertuig wordt getild doordat de lus of kabel de scharnierhoek van de connectorsteun begrenst, - het opstellen van het contragewicht (70) op het slewcentrum (2), -het in een in hoofdzaak verticale oriëntatie boven het contragewicht brengen van de connectorsteun (80), bijvoorbeeld door het scharnieren van de achtermast, - het verbinden van het onderste einde van de connectorsteun (80) met het contragewicht (70), - het omhoog bewegen van de hoofdgiek (40).Method according to claim 3, wherein - before pivoting the rear mast (50) to the angled upward position - the lower end of the connector support {80) is connected to the rear mast via a loop or cable, thereby increasing the hinge angle of the connector support (80) relative to the rear mast, and the method then comprises: - pivoting the rear mast (50) to an obliquely upwards position, with the lower end of the connector support (80) initially remaining supported by the vehicle (100) moving away from the slew track assembly until the lower end of the connector bracket is lifted off the vehicle by the loop or cable limiting the pivot angle of the connector bracket, - setting up the counterweight (70) on the slew center (2), - bringing the connector support (80) into a substantially vertical orientation above the counterweight, for example by pivoting the rear mast, - connecting the lower end of the connector support (80) to the counterweight (70), - moving upward of the main boom (40). 5. Werkwijze volgens een of meer van de conclusies 1 - 4, waarbij de horizontale hoofdgiek (40) op grondsteunen rust die de hoofdgiek horizontaal houden en op een afstand boven de grond, bijvoorbeeld waarbij het assembleren van de hoofdgiek plaatsvindt op de grondsteunen (45), en/of waarbij de horizontale achtermast (50) op grondsteunen (54) rust die de achtermast horizontaal en op een afstand boven de grond houden, bijvoorbeeld waarbij het assembleren van de achtermast plaatsvindt op de grondsteunen.Method according to one or more of claims 1 to 4, wherein the horizontal main boom (40) rests on ground supports that keep the main boom horizontal and at a distance above the ground, for example where the assembly of the main boom takes place on the ground supports (45 ), and/or where the horizontal rear mast (50) rests on ground supports (54) which keep the rear mast horizontal and at a distance above the ground, for example where the assembly of the rear mast takes place on the ground supports. 6. Werkwijze volgens een of meer van de conclusies 1 - 5, waarbij, voor het bewegen of assembleren van de connectorsteun (80) onder de achtermast, grondsteunen (54) waarop de achtermast (50) rust eerst worden verwijderd of verplaatst om een gebied vrij te maken voor de connectorsteun (80), die bijvoorbeeld wordt getransporteerd op een of meer voertuigen (100).A method according to any one of claims 1 to 5, wherein, before moving or assembling the connector support (80) under the rear mast, ground supports (54) on which the rear mast (50) rests are first removed or moved to an area to clear the connector support (80), which is, for example, transported on one or more vehicles (100). 7. Werkwijze volgens conclusie 6, waarbij het verstelbare-lengte-samenstel (60) zo wordt bediend dat de achtermast niet langer rust op de grondsteunen (54) en effectief hangt in een horizontale positie door het verstelbare-lengte-samenstel, waarbij de grondsteunen dan worden verplaatst of verwijderd om een gebied vrij te maken onder de horizontale achtermast voor de connectorsteun.A method according to claim 6, wherein the adjustable length assembly (60) is operated so that the rear mast no longer rests on the ground supports (54) and is effectively suspended in a horizontal position by the adjustable length assembly, the ground supports then moved or removed to clear an area under the horizontal rear mast for the connector support. 8. Werkwijze volgens conclusie 2, waarbij het tijdelijk vastzetten omvat het gebruik van een hulplier (95) van het kraansysteem en een bijbehorende door de lier aangedreven kabel (96) die zich uitstrekt van de achtermast en die aan de connectorsteun wordt bevestigd op een afstand van het bovenste einde daarvan, bijvoorbeeld bij of nabij het onderste einde daarvan, waarbij de kabel wordt gebruikt om de connectorsteun langs de achtermast te houden, bijvoorbeeld om de connectorsteun naar, bijvoorbeeld tegen, de achtermast te trekken.A method according to claim 2, wherein the temporary securing comprises the use of an auxiliary winch (95) of the crane system and an associated winch-driven cable (96) extending from the aft mast and attached to the connector support at a distance from the upper end thereof, for example at or near the lower end thereof, wherein the cable is used to hold the connector support along the rear mast, for example to pull the connector support towards, for example against, the rear mast. 9. Werkwijze volgens een of meer van de conclusies 1 - 8, waarbij een hulplier (95) en een bijbehorende kabel (96) worden gebruikt om een gecontroleerde scharnierbeweging van de connectorsteun (80) ten opzichte van de achtermast te bewerkstelligen, bijvoorbeeld de lier van conclusie 8.Method according to one or more of claims 1 to 8, wherein an auxiliary winch (95) and an associated cable (96) are used to achieve a controlled pivoting movement of the connector support (80) relative to the rear mast, e.g. the winch of claim 8. 10. Een heavy lift kraansysteem om te worden geïnstalleerd op een hijslocatie, het kraansysteem omvattende: - een baansamenstel ingericht om te worden geïnstalleerd op de grond en omvattende: - een cirkelvormige slewbaansamenstel (1) dat zich uitstrekt over ten minste een slewboog om een slewcentrum (2), - een kraan (20) omvattende:10. A heavy lift crane system to be installed at a lifting location, the crane system comprising: - a track assembly adapted to be installed on the ground and comprising: - a circular slew track assembly (1) extending over at least one slew arc about a slew center (2), - a tap (20) comprising: - een kraanonderstel, omvattende een basis (30), een eerste chassis (31) en tweede chassis (32), waarbij het eerste en tweede chassis zijn ingericht om te rijden over het baansamenstel en om de basis (30) daarop te ondersteunen, - een hoofdgiek (40), die scharnierbaar is ten opzichte van het basis of het kraanonderstel om een hoofdgiekscharnieras (41), en een hoofdgiekpunt (42) heeft, - een achtermast (50), die scharnierbaar is ten opzichte van de basis (30) van het kraanonderstel om een achtermastscharnieras (51), en een achtermastpunt (52) heeft, - een verstelbare-lengte-samenstel (60) tussen de achtermast (50) en de hoofdgiek (40), - een contragewicht (70), dat is ingericht om te worden opgesteld op het slewcentrum (2) waarbij de kraan een connectorsteun (80) omvat om het contragewicht van de achtermast te hangen, waarbij de connectorsteun (80) is ingericht om, tijdens de installatie van de kraan, onder de achtermast in horizontale oriëntatie daarvan te worden opgesteld, en om dan scharnierbaar te worden verbonden aan een bovenste einde van de connectorsteun met de horizontale achtermast.- a crane chassis, comprising a base (30), a first chassis (31) and second chassis (32), wherein the first and second chassis are adapted to drive over the track assembly and to support the base (30) thereon, - a main boom (40), which is pivotable relative to the base or the crane undercarriage about a main boom pivot axis (41), and has a main boom point (42), - a rear mast (50), which is pivotable relative to the base (30) of the crane undercarriage about a rear mast pivot axis (51), and a rear mast point (52), - an adjustable-length assembly (60) between the rear mast (50) and the main boom (40), - a counterweight (70), which is arranged to be set up on the slew center (2), the crane comprising a connector support (80) for hanging the counterweight from the rear mast, the connector support (80) being adapted to be fitted under the rear mast during installation of the crane to be arranged in a horizontal orientation thereof, and then to be hingedly connected to an upper end of the connector support with the horizontal rear mast. 11. Heavy lift kraansysteem volgens conclusie 10, waarbij tijdelijke vastzetmiddelen (95,98) zijn voorzien voor het tijdelijk vastzetten van de connectorsteun langs de horizontale achtermast, waardoor het mogelijk is de achtermast en de connectorsteun (80) die daar tijdelijk aan is vastgezet te scharnieren naar een schuin omhooggerichte positie, bijvoorbeeld door het bedienen van het verstelbare-lengte-samenstel (60) tussen de achtermast en de hoofdgiek.11. Heavy lift crane system according to claim 10, wherein temporary securing means (95, 98) are provided for temporarily securing the connector support along the horizontal rear mast, making it possible to move the rear mast and the connector support (80) temporarily secured thereto. pivot to an upward angled position, for example by operating the adjustable length assembly (60) between the rear mast and the main boom. 12. Heavy lift kraansysteem volgens conclusie11, waarbij de tijdelijke vastzetmiddelen omvatten een hulplier (95) van het kraansysteem en een bijbehorende door de lier aangedreven kabel (96) die zich uitstrekt vanaf de achtermast en die kan worden bevestigd aan de connectorsteun (80) op een afstand van het bovenste einde daarvan.A heavy lift crane system according to claim 11, wherein the temporary securing means comprises an auxiliary winch (95) of the crane system and an associated winch-driven cable (96) extending from the aft mast and attachable to the connector support (80) on a distance from the upper end thereof.
NL2032809A 2022-08-19 2022-08-19 Installing a heavy lift crane system at a hoisting site NL2032809B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NL2032809A NL2032809B1 (en) 2022-08-19 2022-08-19 Installing a heavy lift crane system at a hoisting site
PCT/EP2023/072512 WO2024038072A1 (en) 2022-08-19 2023-08-16 Installing a heavy lift crane system at a hoisting site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2032809A NL2032809B1 (en) 2022-08-19 2022-08-19 Installing a heavy lift crane system at a hoisting site

Publications (1)

Publication Number Publication Date
NL2032809B1 true NL2032809B1 (en) 2024-02-27

Family

ID=84462915

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2032809A NL2032809B1 (en) 2022-08-19 2022-08-19 Installing a heavy lift crane system at a hoisting site

Country Status (2)

Country Link
NL (1) NL2032809B1 (en)
WO (1) WO2024038072A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4081081A (en) * 1975-10-23 1978-03-28 The Manitowoc Company, Inc. Demountable gantry, boom hoist and counterweight
US4579234A (en) * 1984-03-16 1986-04-01 American Hoist & Derrick Company Self-erecting mobile crane
WO2010121134A1 (en) 2009-04-17 2010-10-21 Bigge Crane & Rigging Co. Ring derrick with stationary counterweight
WO2019050405A1 (en) 2017-09-08 2019-03-14 Mammoet Engineering B.V. Reconfigurable crane system and methods for use thereof
WO2021140011A1 (en) 2020-01-06 2021-07-15 Itrec B.V. A mobile heavy lift crane system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4081081A (en) * 1975-10-23 1978-03-28 The Manitowoc Company, Inc. Demountable gantry, boom hoist and counterweight
US4579234A (en) * 1984-03-16 1986-04-01 American Hoist & Derrick Company Self-erecting mobile crane
WO2010121134A1 (en) 2009-04-17 2010-10-21 Bigge Crane & Rigging Co. Ring derrick with stationary counterweight
WO2019050405A1 (en) 2017-09-08 2019-03-14 Mammoet Engineering B.V. Reconfigurable crane system and methods for use thereof
WO2021140011A1 (en) 2020-01-06 2021-07-15 Itrec B.V. A mobile heavy lift crane system

Also Published As

Publication number Publication date
WO2024038072A1 (en) 2024-02-22

Similar Documents

Publication Publication Date Title
RU2476371C2 (en) Self-propelled hoisting crane and method of its assembly (versions)
RU2514561C2 (en) Self-propelled hoisting crane and method of its disassembly, transportation and adjustment
NL2004987C2 (en) LIFT DEVICE AND METHOD FOR POSITIONING A LOG OBJECT.
US6213319B1 (en) Powered lifting apparatus using multiple booms
US20140026335A1 (en) System and method for bridge replacement
DK3132137T3 (en) MOBILE CRANE DEVICE AND METHOD FOR THE TEMPORARY ASSEMBLY OF SUCH A CRANE DEVICE
US20190219035A1 (en) Method and equipment for replacing wind turbine components
CN201485194U (en) 60T walking type full-swing erecting crane
CN101519178A (en) Crane and method thereof
US7066343B1 (en) Powered lifting apparatus using multiple booms
RU2307783C1 (en) Tower crane
NL2032809B1 (en) Installing a heavy lift crane system at a hoisting site
RU2556777C2 (en) Hoisting gear for flyover erection
US2674378A (en) Removable counter weight for truck cranes
US7370767B2 (en) Mobile crane
CN105883645B (en) The method for dismounting of tower crane attachment device
CN205998901U (en) Tower crane and its gin-pole truck being used
EP1673304B1 (en) A mobile crane
JP2021528335A (en) Large crane with boom
JP4489872B2 (en) Bridge erection method and apparatus
RU2362868C1 (en) Installation for drilling, testing and repair of oil and gas wells upa-80
JP2004115174A (en) Movable carriage for member erection, and bridging member erection method using it
EP2362021A1 (en) A turning arrangement for turning an elongated element, method and uses of the turning arrangement
CN111749141A (en) Bridge deck rotating system and mounting method
CN106081913B (en) Gin-pole truck control method